20
USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The New Encana: the clear energy choice

USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

  • Upload
    lythu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Page 1: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

USA Division | HAYNESVILLE SHALE & EAST TEXASDanny Dickerson, Team Lead, East Texas & North Texas

The New Encana:the clear energy choice

Page 2: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Haynesville Shale, East Texas, Fort Worth

Page 3: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Haynesville ShaleAdvancing the 2010 Development Program

2010 Objectives• Drill bit land retention• Mid Bossier testing • Gas Factory pilot• San Augustine extension

71

325

10

2008 2009 2010F

ProductionMMcfe/d

21

18

13

15

8

8

6

5

10

9

18

50 miles

12

8

17

18

11

19

3121

9

20

2022

109

13

4 10

22

16

2323

20

20

D

20

19

25

37

2017

DCD

D

C

AMI area

4

11

20

20

Industry HSVL ECA JV HSVLIndustry MBSR ECA JV MBSREncana Acreage: 429,000 net; including 63,000 net mineral interest

24 hour IPs

NGIP

Page 4: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Haynesville Land Retention Strategy

• Top performing asset in Encana portfolio• Superb shale quality• Massive NGIP (175-225 Bcf/Sec)• Up to 8 Tcf recoverable*• High deliverability• Close proximity to infrastructure

• 2010 budget is focused on retaining land• 109 net wells (225 gross)• Gas Factory pilot• 20-25 operated rigs• 7-10 non-operated rigs (Shell)

• Will lead Encana’s production and reserve growth

NGIP = Natural Gas in Place*Based on 2P Proved + Probable Reserves & 2C Economic Contingent Resources

Page 5: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

0

5

10

15

20

25

30

35

40

0 500 1,000 1,500 2,000 2,500 3,000

Cumulative Gas (MMcf)

Haynesville Well PerformanceConfidence in Productivity

7.5 Bcf Type Curve12 Fracs

Well rates limited by infrastructure flowing pressures: 7,000 to 10,000 psi

Productivity increases driven by:

• Additional frac stages

• Refining perforation clusters

• Increased proppant concentrations20 stages

12 stages

Gas Rate (MMcf/d)

Page 6: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.comNote: Diagram not to scale

1’ - 2’ Clusters@ 6 Shots/ft250-300' Stages 50’ - 70’

Spacing

Forward Testing• 5 ½” production casing• 12 -16 stages• Increased proppant concentrations• Sand and other proppants• More perf clusters per stage• Increased lateral length (>4,200 ft)

Horizontal Haynesville Completion DesignLonger laterals, more frac stages = better wells

Current Frac Design

• 5” production casing

• 10 - 14 stages

• 300-350K lb proppant per stage

• 12,000 bbl of slick water & linear gel per stage

• Pump rate of 70-75 bpm

10K Composite Bridge Plugs BHT: 370-400 degreesBHP: 11,000 psi

XXXXXXXXXXX

Stage 10 Stage 9 Stage 8 Stage 7 Stage 6 Stage 5Stage 4 Stage 3 Stage 2 Stage 1

Stage 11

Page 7: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

9.08.89.39.710.7

15.6

Q4-08 Q1-09 Q2-09 Q3-09 Q4-09 Q1-10F

Haynesville – Focus on Cost ReductionsImproving Operational Performance

DC&T Costs reduced 40%• Best 3 well average $7.4 million• Drilling longer laterals• Spud to release decreased by

16 days

DC&T Costs IP (30 Day)

6

12

$MM MMcf/d

IP (30 day) increasing• Increasing number of frac stages• Increasing clusters per frac stage• More proppant & fluid pumped• Gathering system growth

16.9

13.312.4

7.0

9.88.2

Q4-08 Q1-09 Q2-09 Q3-09 Q4-09 Q1-10F

Page 8: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Surface Hole133/8” @

1,850’Fresh Water

Inter’ Hole95/8” @ 10,500’Water Based Mud 11.5 ppg

Lateral Section61/2” Hole @ 12,500 TVD,

16,500 MD’ Oil Based Mud 16 ppg

Current Drill Design• 55 day spud to release

• Faster rig moves

• Built for purpose bits and use of faster motors

• More geological control

• Well section accountability

• Improved formation pressure control

Drill Design Progression• <35 day spud to release

• Consistency

• Pre-set surface casing

• Drill lateral with water based mud

• Optimization – casing, bit selection, motors, etc.

• Utilizing 3D Seismic

Haynesville Horizontal Drilling DesignBit and Motor Optimization

Page 9: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

HaynesvilleManufacturing Process

Step Change in Development• Gas Factory

• Multi-well pads; simultaneous operations

• Manufacturing process • Skidding FFP rigs • Single pipeline connection• Reduced overall foot print

• Downhole spacing ~660 feet• Well orientation N-S• 4,000’+ laterals (12+ stages)• Improved overall gas recovery

= pressure monitoring well

330 ’

380’

430’

390’ 550’

510’

1 Mile

Page 10: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

ECA JV Operated MBSR Well

Current ECA Acreage

9

5

Industry Operated MBSR Well

ECA JV Operated - Completing

ECA JV Operated - Drilling

C

D

50 miles

Jagger

12

D

17

98

E

5

20

8

C

22

Jimmy Brown

Walker

Mid Bossier Shale• 100 to 200 Bcf/section• Encouraging results• High quality shale as good as

Haynesville• 10-15 wells for 2010F• 150,000 to 200,000 acres• 6 Tcfe potential*

North LouisianaMid Bossier

24 hour IPs

*Based on 2P Proved + Probable Reserves & 2C Economic Contingent Resources

NGIP

NGIP = Natural Gas in Place

Page 11: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com*3 stages producing

0

5

10

15

20

25

0 60 120 180 240 300 360

Days

Colbert 16-1Blackstone 12H-1Douciere 13H-1CHK Blackstone 26H-1Brown SW 10H-1Walker 2H

EUR = 7.8 BCF HSVLECA Douciere 13-1

Rate limited

EUR = *2.5 BCF MBSSR

ECA Jimmy Brown 9-1

ECA Walker 2H

North LouisianaMid Bossier - Haynesville Comparison

Gas Rate (MMcf/d)

Page 12: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Haynesville and Mid Bossier NGIPOverlap of 100 Bcf/section in each zone

• Stacked pay

• 14 Tcfe total resource*

• Potential longer laterals

• Double well count

• Double production volumes

• Existing infrastructure

Imagine…

NGIP = Natural Gas in Place*Based on 2P Proved + Probable Reserves & 2C Economic Contingent Resources

Overlap Haynesville/Mid Bossier100 Bcf NGIP in each interval

Page 13: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Encana HaynesvilleTotal Resource

Total net well inventory • 1P + 1C = 1,600

Average F&D cost: • $1.70/Mcfe

Average supply cost• $3.75/MMBtu

Reserves (Tcfe)1P 2P 3P

0.7 2.0 2.9

Economic Contingent Resources (Tcfe)

1C 2C 3C

5.3 13.5 21.3

F&D & supply cost based on 1P Reserves & 1C Economic Contingent Resources

World Class Shale Gas Opportunity

Page 14: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

• Environmental Management System• Use of surface water for operations• Potential water recycling project• Natural gas powered rigs• CNG fleet trucks & filling station• Multi-well drilling pad development (Gas Factory)• Local workforce training• Energy Summer Camps

Responsible DevelopmentHaynesville & Mid Bossier Shales

Page 15: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Haynesville Shale Production Growth

Production

2010F

• 110 net wells

• Land retention drilling

• Gas Factory pilot

• Play extension drilling

Activity

325

7110

0

100

200

300

400

2008 2009 2010F

MMcfe/d

Page 16: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

East Texas Growth Opportunities

Page 17: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Amoruso Development Expanding

0

100

200

300

400

Oct-05

Apr-06

Oct-06

Apr-07

Oct-07

Apr-08

Oct-08

Apr-09

Oct-09

MMcfe/d

Deep Bossier Development

2 miles

E. Amoruso66

Bcf/Sec

Amoruso29

Bcf/Sec

Planned curtailment

Growth• Successful step-out to East• Testing 2-4 analogous

prospects• Working to unlock tight sand

potential in northern area

Deep Bossier Net Production

Page 18: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

East Texas – Deep BossierStrong Well Results

62

54 53

40 39 383941434551

55

0

20

40

60

80

Laxs

on 2

Mad

den

9-4

Judg

e D

igby

7

Sch

arff

3X

McL

ean

E-1

*

Cha

rlene

1*

Live

ly 7

Bon

nie

Ann

1

Lac

Bla

nc 1

S. M

cLea

n B

-1

Fitz

henr

y 1

Sch

arff

5

McL

ean

A-2

Nav

asot

2*

Rus

sell

3

Hen

ley

GU

1

Bay

ou C

arlin

1

AD

Car

r A-1

*

McL

ean

E-2

*

Car

r-Nav

asot

1*

Con

stitu

tion

Sou

th 1

Sch

arff

4

Lily

Hop

pes

2*

Highest North American Average 3 Month Gross Gas Production (‘05 – ‘09)

ECA Deep Bossier WellsECA Deep Bossier 2009

MMcf/d

• Strongest well results in onshore North America• Deep Bossier generates some of the strongest returns in Encana’s portfolio• Encana is the leader in identifying and developing these plays• We’re growing what we have and are on the hunt for more!

* Indicates modeled production due to 2009 curtailmentSource: HPDI

Page 19: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Aggressively Pursuing GrowthGulf Coast Jurassic Trend

Significant Growth Opportunities• Targeting follow-up to Amoruso step-out success• Expect to drill 2-4 wells in 2010

Page 20: USA Division HAYNESVILLE SHALE & EAST TEXAS Danny ... · USA Division | HAYNESVILLE SHALE & EAST TEXAS Danny Dickerson, Team Lead, East Texas & North Texas The NewEncana: ... ndusry

www.encana.com

Haynesville Simultaneous Operations

Summary

• Haynesville exceeding predictions

• 2010F land retention strategy• Mid Bossier results encouraging• Gas Factory pilot for 2010F• East Texas assets performing

very well• Growth opportunities abound!• Total net well inventory:

• 1P + 1C = 1,600