U.S. ATLAS Physics and ComputingBudget and Schedule Review
John Huth
Harvard University
DOE/NSF Review of U.S. ATLAS and CMS Computing Projects
Brookhaven National LaboratoryNOVEMBER 14-17, 2000
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 2
Overall Budget Breakout
0
2000
4000
6000
8000
10000
12000
14000
FY 01 FY 02 FY 03 FY 04 FY05 FY06
Fiscal Year
FY
01
$K
Management Reserve
Physics
Facilities
Software
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 3
Budget and Guidance
0
5,000
10,000
15,000
20,000
AY k$
US Atlas Computing 3,972 4,880 6,245 7,808 10,471 14,510
Budget Guidance 3,000 4,000 5,500 8,500 13,500 17,500
FY 01 FY 02 FY 03 FY 04 FY05 FY06
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 4
DOE Profile and Guidance
US ATLAS Computing Project DOE Guidance vs. Project Profile
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
FY 01 FY 02 FY 03 FY 04 FY05 FY06
AY k $'s
Fisc
al Y
ear
Doe Profile and Reserve Doe Guidance
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 5
Cumulative Profile
US ATLAS Computing ProjectCumulative Funding
10
20
30
40
50
60
FY 01 FY 02 FY 03 FY 04 FY05 FY06
Fiscal Year
AY
M$'
s
US Atlas ComputingBudget Guidance
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 6
Profile Comments
• Details of profile still in progress
– Understand thoroughly all components
• Years 01, 02 and 03 short relative to guidance
– Impact on software particularly severe
– DOE funded portion short in all years but 04 (Labs) Consequence of Regional Center ramp in 05 and 06
– NB – this assumes that NSF funds for Tier 2’s come from other
sources than guidance In years 04, 05 and 06, could be directed to Tier 2’s
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 7
FY 01 and 02 Requests
Funding Categories FY 01 FY 02
Estimate of DOE Funding Requirements 3,493 4,323Estimate of NSF Funding Requirements 460 617US ATLAS Core Computing Project Subtotal 3,953 4,940Distributed IT Infrastructure (Tier II) 412 1,255Summary Total 4,365 6,195
AY k$'s
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 8
FTE Count
Proposed Project Funded FTE's FY 01 FY 02Physics 1 1Software 12.9 15.5Facilities Tier I 4.4 5.8 Tier II 1.1 1.7
Proposed Infrastructure Funded FTE'sDistributed IT Infrastructure (Tier II) 1 5
Summary FTE Total 20.4 29
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 9
Build to Cost: Identified Areas
• Overall: scale back on requirements– Software:
Degree of grid automation Overall requirements
» (e.g. carrying two vs. one DB product) Shifting personnel
» (e.g. CERN location of SW pros)
– Hardware Reduction of scope of RC… Delay of purchases – Moore’s law Alternative data-analysis strategies
Comment: user part of facilities is conservative
N.B. – the quantitative implications are still under study
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 10
Summary
• Functional Organization
– Software effort backbone of Intl. ATLAS
– Regional Center operational, in use by users
• International ATLAS planning on track
– Software agreements, facilities planning
• Grid tasks beginning
– U.S. ATLAS Testbed
• Funding profile must be addressed
November 14-17, 2000
Schedule Milestones
November 14-17, 2000
Summary Information FY 01 & FY 02
Funding Categories FY 01 FY 02
Estimate of DOE Funding Requirements 3,493 4,323
Estimate of NSF Funding Requirements 460 617
US ATLAS Core Computing Project Subtotal 3,953 4,940
Distributed IT Infrastructure (Tier II) 412 1,255
Summary Total 4,365 6,195
Proposed Project Funded FTE's FY 01 FY 02
Physics 1 1
Software 12.9 15.5
Facilities
Tier I 4.4 5.8
Tier II 1.1 1.7
Proposed Infrastructure Funded FTE's
Distributed IT Infrastructure (Tier II) 1 5
Summary FTE Total 20.4 29
FY 01 FY 02
Core Funded Facilities Purchases 639 579
Distributed IT Facilities Purchases 324 565
AY k$'s
FTE
AY k$'s
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 13
NSF and DOE Split
US ATLAS Computing Project DOE and NSF Funding Split
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Fiscal Years
AY
k$'
s
NSF Management Reserve
NSF Estimated Profile
DoE Management Reserve
DoE Estimated Profile
NSF Management Reserve 42 55 55 55 55 55
NSF Estimated Profile 418 562 578 593 609 625
DoE Management Reserve 318 393 516 644 853 1,249
DoE Estimated Profile 3,175 3,930 5,161 6,438 8,535 12,490
FY 01 FY 02 FY 03 FY 04 FY05 FY06
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 14
Cost Categories
• Advanced Information Technology
Professional
• Information Technology Professional
I
• Information Technology Professional
II
• Information Technology Technician
• Student
• Travel
• Stores
• Space
• Power
• Low value materials
• High value materials
• Licenses
• Maintenance
• Consulting
• Technical services
• Administrative service
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 15
Functional OverviewCost/Schedule Control System
Institutions
Terminal
Escalation Procedure
MS Project 98Baseline
(Resource LoadedSchedules)
Cost Reporting(WBS Level 5)
Report Generator
Update Procedure
ACCESS Database
CSSR Procedure
• WBS• WBS Dictionary• Estimate - Labor - Material - Travel• Rates• Contingency• Cost Books• MOUs• Project/NSF/Base/ Infrastructure• Funding Source
CSSR atWBS Level 3WBS Level 5
BCWS/BCWP
Cumulative CostMonthly Cost
Reports
Escalation RatesDOE
Reports
Schedules
S/S Mgr. Status Data
Baseline
MS Project 98Statused
(Resource LoadedSchedules)
ProjectionsProcedure
FY Fundingby Institution
Status Sheets
1 2 3
4 5
6 7
8 9
10
11
12 13 14
15 16 17
18
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 16
Change Control
SubsystemManager
Defines Need forBaseline Change
Proposal(BCP)
Associate ProjectManager Review
Change ControlBoard Review
ATLASCERN
DOE/NSF
Change ControlOffice
Prepares BCP
Updates ControlDocuments
BCP LogContingency Log
Milestone LogCost Baseline Log
U.S. ATLAS Change Control Process
Distribution
Approved
Rejected
Approved/Rejected
10/9/97
Revisions
CCProcess.vsd
ATLAS CERN
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 17
Grid vs. Athena Services
Craig TullNERSC/LBL
Athena and Grids: http://documents.cern.ch/age?a00380
November 14-17, 2000J. Huth U.S. ATLAS Physics and Computing Project Status 18
Calren Esnet, Abilene, Nton
Abilene
Esnet, Mren
UC BerkeleyLBNL-NERSC
Esnet
NPACI, Abilene
BrookhavenNationalLaboratory
Indiana University
Boston University
ArgonneNationalLaboratory
Initial Participants
HPSS sites
U Michigan
University ofTexas atArlington
SUNYAlbany