Roundabout Construction SP 373-01-0020 LA 8 / US 171 Roundabout Leesville, LA Vernon Parish

US 171 at LA 8 Roundabout - Before and After Safety and Operations

Embed Size (px)

Citation preview

Page 1: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Roundabout Construction

SP 373-01-0020

LA 8 / US 171 Roundabout

Leesville, LA

Vernon Parish

Page 2: US 171 at LA 8 Roundabout - Before and After Safety and Operations

What this presentation covers

Recognition for District 08 Design and Traffic Sections

Difference between a circle and a roundabout

Why did DOTD elect to construct the Roundabout?

Public Meeting and Public Perceptions

Barrier Curb and Gutter Modifications

Challenges for Sequences of Construction

Time Constraints

General Public Comments and End Results

Page 3: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Recognition for District 08 – Design and Traffic Sections

Dale Craig – District 08 Traffic Section

• Recommended roundabout design and spearheaded

the project to the design phase

Jason Rachal – District 08 Design Section

• The overall success for this project is greatly

attributed to the project plans developed by Jason

Rachal

David Backstedt - District 08 Traffic Engineer

• David meet with me on the project site on numerous occasions

in order to monitor the traffic flow after each construction

sequence change.

Page 4: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Circle or Roundabout ?

Circle

Area = π × r2 Roundabout

Page 5: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Why did DOTD elect to construct the Roundabout?

• Permit request for

access to a proposed

Market Basket grocery

store

• Traffic Study and

Evaluation

• Buy-in from DOTD,

Market Basket and City

of Leesville

Proposed

Market

Basket

location

Page 6: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Public Meeting and Public Perceptions

Page 7: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Public Meeting and Public Perceptions

Page 8: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Public Meeting Public Perceptions

Page 9: US 171 at LA 8 Roundabout - Before and After Safety and Operations

• Class M Concrete Mix Design

Modifications Recommend not using Grade A (Size 57) coarse aggregate (100%

passing the 1 ½” US Sieve)

Recommend changing mix design to max size Grade P (Size 67)

coarse aggregate (100% passing the ¾” US Sieve)

Barrier Curb and Gutter Modifications

• Installed continuous

steel reinforcement in

the barrier curb section

Page 10: US 171 at LA 8 Roundabout - Before and After Safety and Operations

• Installed Bolster Blocks behind sharp angled corners of

curb section

Barrier Curb and Gutter Modifications

Page 11: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Time Constraints

• Project Letting Date: July 21, 2010

• Work Order Date: September 24, 2010

• Roundabout Opening Date: August 1, 2011

• Market Basket Grand Opening Date: August 4, 2011

• Governor’s Ribbon Cutting Date: August 5, 2011

Page 12: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Page 13: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Temporary Traffic Signals

installed at intersection of LA

8 and US 171

Traffic congestion along US 171 South Bound Lane

Temporary Traffic

Signals

Page 14: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Page 15: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Page 16: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Page 17: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Page 18: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Page 19: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Page 20: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Page 21: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Page 22: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase I

Temporary Traffic Signals installed at

intersection of LA 8 and US 171

Page 23: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase II

Page 24: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase II

Page 25: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase II

Page 26: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase II

Page 27: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase III

Page 28: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase III

Page 29: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase III

• Removed temporary traffic signals

• Staged flagmen at each access point into the

roundabout

• Utilized dynamic message signs cautioning

traveling public that roundabout is open and there

is a yield condition ahead

• Installed do not enter signs on temporary stands at

each connection point to the roundabout

Page 30: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Sequence of Construction - Phase III

Page 31: US 171 at LA 8 Roundabout - Before and After Safety and Operations

General Public Comments and End Results

• All of the Politicians and most of the general public

have very favorable comments in regards to the

functionality of the Roundabout

• From 2007 to 2010 there was an average of 10

injuries per year with only 1 fatality during that time

period.

• Since 2010 there has only been one injury, which

occurred in January 2013.

Page 32: US 171 at LA 8 Roundabout - Before and After Safety and Operations

End Results

Page 33: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Size Comparison between the Alexandria South Traffic Circle and the Leesville Roundabout

Page 34: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Photo of the intersection of LA 8 and US 171, prior to construction

Proposed

Market Basket

location

Page 35: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Completed Roundabout Aerial Photo of the intersection of LA 8 and US 171

Photo taken by SURDEX Corporation

Page 36: US 171 at LA 8 Roundabout - Before and After Safety and Operations
Page 37: US 171 at LA 8 Roundabout - Before and After Safety and Operations

Questions ?