Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings, Executive Director Southwest Concrete Pavement Association Aug 29 2012

Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Slab Replacement in

Urban Areas

High-Early-Strength Concrete

Craig Hennings, Executive Director

Southwest Concrete Pavement Association

Aug 29 2012

Page 2: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

50,000 Lane Miles

16,000 L.M. Concrete

3,400 L.M. Distressed

Exceeded Design Life

California – Many

Urban Areas

Page 3: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Emergency rehabilitation of truck bypass tunnel (after vehicle fire)

I-5 and CA-14, November 2007.

Rapid strength concrete (RSC) has been efficiently used for

emergency repair and planned rehabilitation of concrete

infrastructure and for new construction, where acceleration is

a concern. This concrete is produced with hydraulic cements.

Accelerators of hardening, if used, are non-chloride in nature.

3

Page 4: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

First used in 1998-1999

Total volume of various types of RSC in 2008 >190,000 CY.

RSC for pavement rehabilitation was 130,000 CY.

Rapid strength lean concrete base was approx 37,000 CY.

Pavement

replacement at I-10,

Pomona, CA, 1999

(4-hrs RSC)

Replacement HOV

lane at I-10, Los

Angeles, CA, 2009

(12-hrs RSC)

Pavement replacement

at I-710, Los Angeles,

CA, 2005 (1.5-hrs RSC)

4

Page 5: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Proportioning for ultra-rapid strength gain in

early age is one difference in the design of RSC and

regular concrete.

Options:

• Use of faster hardening hydraulic cements

(rapid hardening cements, ASTM C1600;

Type III portland cement, ASTM C150)

• Use of accelerating admixtures (non-chloride)

• Limiting W/C

• Optimizing (increasing) initial and curing

temperatures of concrete

5

Page 6: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Proper design of RSC should account for other

properties influencing acceleration of construction,

such as:

• Ability to be placed, spread and consolidated

conveniently and quickly without segregation

• Time within which fresh RSC retains workable

consistency

• Ability to be finished promptly upon completion

of consolidation

• Ambient Temp, Environment

6

Page 7: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Two types of rapid strength concrete (RSC) mostly used in California for pavement rehabilitation within short-time lane closures are: • RSC with rapid hardening cements (examples of

such cements are CTS Rapid Set® Cement and Ultimax Cement-DOT®)

• RSC with Type III Portland cement and non-chloride accelerator of hardening (this type of RSC is often called “4 x 4” concrete, because it was first developed to achieve flexural strength of 400 psi in 4 hours by Master Builders)

7

Page 8: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Rate of strength gain of RSC is mainly controlled by:

Type of hydraulic cement

Chemical admixtures

Water to cement ratio

Concrete temperature

RATE OF STRENGTH GAIN IN EARLY AGE

50

60

70

80

90

100

110

120

130

140

150

0.0 0.5 1.0 1.5 2.0 2.5 3.0

Te

mp

era

ture

F)

Time after finishing (hours)

Ambient Temperature

Temperature of bottom of slab

Temperature of beams

Temperature of top of slab

Testing Notes:

Estimation of strength gain

requires matching

temperature of concrete in

specimens and in pavement

during curing.

8

Page 9: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Min Curing Time

to Achieve MOR (*)

Proportioning

for Early Age Flexural Strength

400 psi 550 psi Type of Cement Accelerator fl. oz./100 #

cmt.

Max W/C

1 to 2

hours

2 to 4

hours

Rapid hardening

cement, ASTM C1600

----- ~0.41 -

0.43

2.5 to 4

hours

4 to 7

hours

Portland cement

Type III, ASTM C150

70 to 100 ~0.32 -

0.34

8 to 12

hours

12 to 16

hours

Portland cement

Type III, ASTM C150

20 to 40 ~034 -

0.36

≥16 hours ≥22 hours Portland cement

Type II, ASTM C150

None ~0.37 -

0.39

PROPORTIONING FOR EARLY AGE MOR

NOTE: (*) Since the time RSC has been formed and finished.

9

Page 10: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

0

2000

4000

6000

8000

10000

12000

1 hour 2 hour 3 hour 4 hour 6 hour 8 hour 7 day 28 day 1 year

PS

I S

tren

gth

Time

CTS Rapid Set Compressive Strengths

4.5 Sack

5.0 Sack

5.5 Sack

6.0 Sack

6.5 Sack

7.0 Sack

7.5 Sack

Urban Slab Replacement

Page 11: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

0

200

400

600

800

1000

1200

1400

1 hour 2 hour 3 hour 4 hour 6 hour 8 hour 7 day 28 day 1 year

PS

I S

tren

gth

Time

CTS Rapid Set Flexural Strength

4.5 Sack

5.0 Sack

5.5 Sack

6.0 Sack

6.5 Sack

7.0 Sack

7.5 Sack

Urban Slab Replacement

Page 12: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

RSC is typically proportioned with superplasticizers for

achieving desired (often near-flowable) consistency while

maintaining low water to cement ratio (W/C). Hydration

controlling admixtures extend time within which RSC

retains workable consistency. Optimized consistency and

cohesiveness accelerate construction of pavements.

WORKABILITY

12

Page 13: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

RSC with Type III portland

cement typically has been

produced using transit mixers.

Superplasticizer and set

controlling admixture are

added at the batch plant.

Accelerator of hardening is

added on site.

RSC with rapid hardening

cements is most often

produced by mobile

(volumetric) mixers to

allow for immediate

placement. The demand in

hydration stabilizers is

reduced and uniformity of

workability and strength is

improved.

13

Page 14: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 15: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Std Specs - Timeline

Urban Slab Replacement

• 45 Days Prior Pour: Cement Sample

• 10 Days Prior Trial Slab: Mix Design

• 7 Days Prior Pour: “JITT” Submittal

• 5 Days Prior Pour: Completion “JITT”

• 5 Days Prior Pour: Pre-Const Conference

Page 16: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Trial Slab

C109 Calibrate Volumetric Mixer

Trial Slab Simulate Job Conditions

Evaluation of All Parties / Materials:

a) Concrete Producer

b) Contractor

c) Testing Laboratory

Urban Slab Replacement

Page 17: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Construction Procedures

2 Days Prior: Perimeter Saw Cuts

Remove Panels: Non-Impact Method

Inspect / Analyze Existing Base

¼” Foam Joint Filler Installed

Bond Breaker Installed

Urban Slab Replacement

Page 18: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 19: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 20: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 21: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 22: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 23: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 24: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 25: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 26: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Replacing Base

Page 27: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Construction Procedures – cont.

Nightly Material Samples Taken

Load Materials Volumetric Mixers

Begin Concrete Production Process

a) Place Concrete

b) Consolidation

c) Finishing

d) Curing

Urban Slab Replacement

Page 28: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

9.5 CY per truck

Page 29: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 30: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 31: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 32: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 33: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 34: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 35: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 36: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 37: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Production rates: 300 CY per 7 hr shift (~60 slabs)

Max: 450 CY in 7 hours

Page 38: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 39: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 40: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 41: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 42: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 43: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 44: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 45: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Continuous panels need to be saw cut < 1 hr. Depth =T/3

Dowels on baskets can be used.

Page 46: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Quality Control Program

21 Days Prior Trial Slab Submit QCP

QCM Current ACI Field Tech I

& ACI Lab Test Tech Grade II

Technicians Caltrans Certified

Contractor / QCM / Eng. Meeting

Urban Slab Replacement

Page 47: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Quality Control Program – cont.

First 25cy Testing/then every 100cy

List Testing Equipment

Testing Shall Included:

a) Yield b) Penetration c) Air d) Unit Weight e) Slump f) Flex Beams g) Temperature

Urban Slab Replacement

Page 48: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 49: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 50: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 51: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 52: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Calibrated Portable

Testing equipment

Page 53: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,
Page 54: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Caltrans Project

Interstate 5

2167 Cubic Yards

Page 55: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

SR 22 Garden Grove

3790 Cubic Yards Poured

Page 56: Urban slab replacement - Amazon Web Servicespavementvideo.s3.amazonaws.com/2012_Pavement_National/PDF/… · Slab Replacement in Urban Areas High-Early-Strength Concrete Craig Hennings,

Craig Hennings

[email protected]