18
URBAN SETTLEMENTS DEVELOPMENT GRANT CITY OF JOHANNESBURG REPORT ON PROGRESS PORTFOLIO COMMITTEE ON HUMAN SETTLEMENTS – 12 SEPTEMBER 2012

URBAN SETTLEMENTS DEVELOPMENT GRANT CITY OF JOHANNESBURG REPORT ON PROGRESS

Embed Size (px)

DESCRIPTION

URBAN SETTLEMENTS DEVELOPMENT GRANT CITY OF JOHANNESBURG REPORT ON PROGRESS PORTFOLIO COMMITTEE ON HUMAN SETTLEMENTS – 12 SEPTEMBER 2012. Presentation Content. Strategic Spatial Overview 2011/2012 Delivery 2012/2013 Planned projects. - PowerPoint PPT Presentation

Citation preview

Page 1: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

URBAN SETTLEMENTS DEVELOPMENT GRANT

CITY OF JOHANNESBURG REPORT ON PROGRESSPORTFOLIO COMMITTEE ON HUMAN SETTLEMENTS –

12 SEPTEMBER 2012

Page 2: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

Presentation Content

• Strategic Spatial Overview

• 2011/2012 Delivery

• 2012/2013 Planned projects

Page 3: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

SPATIAL DEVELOPMENT FRAMEWORK (SDF)*

SPATIAL DEVELOPMENT FRAMEWORK (SDF)*

GROWTH DEVELOPMENT STRATEGY (GDS) / INTEGRATED DEVELOPMENT PLAN (IDP) *

GROWTH DEVELOPMENT STRATEGY (GDS) / INTEGRATED DEVELOPMENT PLAN (IDP) *

REGIONAL SDFs (RSDFs)REGIONAL SDFs (RSDFs)

PRECINCT PLANS / URBAN DF’sPRECINCT PLANS / URBAN DF’s

< D

etail / G

uid

elines

><

Deta

il / Gu

idelin

es >

PO

LIC

Y S

IGN

IFIC

AN

CE

<

RE

GIO

N /

NE

IGH

BO

UR

HO

OD

P

RO

VIN

CIA

L /

CIT

Y >

PO

LIC

Y S

IGN

IFIC

AN

CE

<

RE

GIO

N /

NE

IGH

BO

UR

HO

OD

P

RO

VIN

CIA

L /

CIT

Y >

BU

ILT

EN

VIR

ON

ME

NT

P

ER

FO

RM

AN

CE

PL

AN

BU

ILT

EN

VIR

ON

ME

NT

P

ER

FO

RM

AN

CE

PL

AN

Desired Urban Form / Objectives: Efficient, Sustainable, Accessible CityDesired Urban Form / Objectives: Efficient, Sustainable, Accessible City

Status Quo / Development TrendsStatus Quo / Development Trends

Growth Management StrategyGrowth Management Strategy

SHS Urbanisation PlanSHS Urbanisation Plan

Capital Investment FrameworkCapital Investment Framework

Sub-Area D’ment Objectives Tables Sub-Area D’ment Objectives Tables

Detail Design / Dev. ControlsDetail Design / Dev. Controls

Components to achieve Desired Urban Form

Components to achieve Desired Urban Form

Page 4: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

Population Deprivation Index

BROAD REGIONAL CONTEXT

Page 5: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

Informal Settlements – Citywide Assessment

04/20/235

• +/-156 000 Informal Settlement

• 43 000 in Ivory Park• 27 000 in Soweto• 21 000 in Diepsloot• 17 000 in Greater

Orange Farm• 12 000 in Alexandra• 1 000 in CBD

Page 6: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

Backyard Shacks – Citywide Assessment

04/20/236

• +/- 320 800 Backyard Shacks Citywide

• 164 000 in Soweto• 72 000 in Ivory Park• 41 600 in Dieplsoot• 27 000 in Greater Orange

Farm• 7 000 in Alexandra• 3 000 in CBD

Page 7: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

Motorway

GMS Priority AreasPublic Transport Management Area (Marg)

Public Transport Management Area (Cons)

Marginalised Areas

Consolidation Areas

Expansion Areas

Beyond Urban Development Boundary

CoJ_boundaryIvory Park+Soweto +Alexandra +Orange Farm + Dieplsoot +

1km distance from• Existing / Upgraded Rail +• Developing Gautrain +• Developing Phase1 BRT=

• Densification priority • Infrastructure priority• Capex priority• Development priority

Priority Growth Areas

Page 8: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

Sustainable human settlements

City / State:

• Opportunities for major transit orientated development linked to economic and job creation opportunities

– BRT

– Rail stations

• Infill

• Expansion

• Redevelopment

Market/private sector:

• Introduction of Inclusionary housing along public transport corridors

• Additional incentives to facilitate “gap” market housing within the prime development areas

• Role of Backyard Shacks / Rooms (a market is providing this currently…)

Page 9: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

Land Acquisition Priorities

• Provisional R250m p/a for strategic land acquisition

• Immediate need in Princess, Diepsloot and Zandspruit areas

• Medium term land acquisition

– Diepsloot corridor

– Doornfontein corridor

– Rail and BRT network in support of TOD

• SHSHUP strategic areas (work in progress)

• City’s Joint Land Steering Committee

Page 10: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

04/20/23 10

Page 11: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

Current and medium-term housing projects

04/20/2311

Housing projects 2012/13

Housing projects medium-term

Page 12: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

Current and medium-term Joshco projects

04/20/2312

Page 13: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

USDG COMMUNITY FACILITIES

04/20/2313

Page 14: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

OUTPUTS AND PERFORMANCE 2011/2012

04/20/2314

Page 15: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

04/20/23 15

USDG OUTPUTS AND PERFORMANCE – FY 2011/12

DELIVERY AREA PROGRESS TO DATE

OUTPUTS

COST

R'000

Upgraded Households      

Informal Settlements 100% 2542 h/holdsR 84,055

Bulk Infrastructure (Access to Basic Water, Sanitation & Electricity)

    

90% 132,530 h/holdsR 490,122

Kilometers of Roads Constructed 95% 32,5 km R 169,840

No. of Streetlights Erected 100% 2939 R 45,000

No. of Clinics Upgraded / Constructed 100% 8 R 15,000

No. of Parks and     

Recreation Centre Upgraded / Constructed 100% 14 R 67,000

No of Cemeteries Upgraded 100% 4 R 24,000

No. of Landfill Sites Upgraded 100% 5 R 34,000

Land Acquisition     R 40,620

TOTAL USDG SPENT: R 969,637

Page 16: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

04/20/23

16

FINANCIAL PERFORMANCE PER QUARTER (PRELIMINARY FIGURES)

R’000 %

•1ST QUARTER - R 56,942 6%

•2ND QUARTER - R 149,858 16%

•3RD QUARTER - R 254,400 26%

•4TH QUARTER - R 508,437 52%

•TOTAL - R 969 637 92. 6%

Page 17: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

17

PROJECTS TO BE ROLLED-OVER TO FY 2012/13R’000’s

PROJECTS PORTION % COMPLETE UNSPENT

Sol Plaatjie Roads and Storm-water 60% R 2,088

Lakeside X 1 & 3 Roads and Storm-water 80% R 1,553

Kliptown Roads and Storm-water 60% R 10,573

Braamfischerville X 13 Roads and Storm-water 90% R 2,233

Land Purchases (in neg) R 23,048

Lufhereng Bulk Infrastructure 60% R 22,826

Vlakfontein West Various Bulk Services 95% R 7,292

Emma Flats Bulk Storm-water 95% R 498

Formalisation of Informal Settlements 95% R 734

Page 18: URBAN SETTLEMENTS DEVELOPMENT  GRANT  CITY OF JOHANNESBURG REPORT ON PROGRESS

18

PROJECTS TO BE ROLLED-OVER TO FY 2012/13R’000’s

PROJECTS PORTION % COMPLETE UNSPENT

Storm-water Master planning 78% R 3,613

Conversion of Open Drains to

Underground/Covered Drains 80% R 703

Emergency Storm-water Projects 75% R 302

Gravel Roads- Diepsloot, Ivory Park,

Orange Farm 95% R 976

TOTAL R 76,439

NOTES

1) Projects are contractually committed.

2) NT request for roll-over submitted 28 August 2012.