16
PRESENTED BY DARYATI ASRINING RINI HEAD OF TRANSJAKARTA MANAGEMENT BODY JAKARTA – INDONESIA UNITED NATIONS FORUM ON CLIMATE CHANGE MITIGATION, FUEL ECONOMY AND SUSTAINABLE DEVELOPMENT OF URBAN TRANSPORT MARCH 2010

Urban Public Transport System in Jakarta

Embed Size (px)

Citation preview

Page 1: Urban Public Transport System in Jakarta

PRESENTED BY

DARYATI ASRINING RINIHEAD OF TRANSJAKARTA MANAGEMENT BODY

JAKARTA – INDONESIA

UNITED NATIONS FORUM ON CLIMATE CHANGE MITIGATION, FUEL ECONOMY AND SUSTAINABLE

DEVELOPMENT OF URBAN TRANSPORT

MARCH 2010

Page 2: Urban Public Transport System in Jakarta

EXISTING TRANSPORTATION CONDITION

IN THE CITY OF JAKARTA - INDONESIA

Page 3: Urban Public Transport System in Jakarta

PORTRAITS OF TRANSPORTATION PROBLEMS IN JAKARTA

traffic jam!

Congestion is not a problem, but the result of a

larger problem:

Dependence of the private vehicle

Page 4: Urban Public Transport System in Jakarta

Paradigm must be changed1. Road construction (0.01%/year) cannot keep up with vehicle

growth (9.5%/year)

Vehicle growth illustrates the increasing number of people who

leave public transport

2. Solutions to solve bottlenecks with road construction

Cannot solve bottlenecks with road construction

Congestion can't be solved by the construction of roads =>It

is people who need to move, not cars

SOLUTION: Mass Public Transportation

The focus of the next Transport: how to move large

quantities of PEOPLE??

Page 5: Urban Public Transport System in Jakarta

3.300

3.000

2.700

2.400

2.100

1.800

1.500

1.200

4-wheel vech.(x 1000)

Uncontrolled use of private vehicles will caused saturated traffic congestion in Jakarta at 2014

Page 6: Urban Public Transport System in Jakarta

PUBLIC

TRANSPORT

DEVELOPMENT

TRAFFIC RESTRAINT

NETWORK

CAPACITY

IMPROVEMENT

MRT / Subway

LRT / Monorail

BRT / Busway

Waterways

Road Pricing

Parking Restraint

Park and Ride

Road Network

Pedestrianisasi/NMV

ATCS / ITS

JAKARTA

TRANSPORTATIO

N MASTERPLAN

(PTM)

3 STRATEGY IN JAKARTA TRANSPORTATION MASTERPLAN

3 in 1

Page 7: Urban Public Transport System in Jakarta

CONCEPT OF BUSWAY SYSTEM“THINK RAIL, USE BUSES”

Page 8: Urban Public Transport System in Jakarta

BENEFIT OF BUSWAY

Page 9: Urban Public Transport System in Jakarta

10 CORRIDORS

1. Blok M – Kota

2. Pulogadung – Harmoni

3. Kalideres – Harmoni

4. Pulogadung – Dukuh atas

5. Kp. Melayu - Ancol

6. Ragunan - Kuningan

7. Kp.Rambutan – Kp.Melayu

8. Lebak Bulus – Harmoni

9. Pinang Ranti – Pluit

10. Cililitan – Tanjung Priok

10 CORRIDORS

1. Blok M – Kota

2. Pulogadung – Harmoni

3. Kalideres – Harmoni

4. Pulogadung – Dukuh atas

5. Kp. Melayu - Ancol

6. Ragunan - Kuningan

7. Kp.Rambutan – Kp.Melayu

8. Lebak Bulus – Harmoni

9. Pinang Ranti – Pluit

10. Cililitan – Tanjung Priok

BUSWAY CORRIDORS IN BUSWAY CORRIDORS IN 20102010

2

3

6

7

5

4

ANCOL

TJ. PRIOK

KP. RAMBUTAN

KP. MELAYU

RAGUNAN

BLOK M

KALIDERES

PULOGADUNG

PULOGEBANG

HI

KOTA

8

10

9

KB. JERUK

CILILITAN

GROGOL

1

Page 10: Urban Public Transport System in Jakarta

Planning, Programming, Controlling

BLU – TRANSJAKARTA BUSWAY

Ticketing Revenue Collector

Security Service Agency

Busway Operator

Feeder Operator

Trustee (Bank DKI)

Page 11: Urban Public Transport System in Jakarta

CITY COMMITMENT TO DEVELOP BUSWAY

0% 25% 50% 75% 100%

Guadalajara

Mexico City

Perreira

Bogota

Jakarta

Local Central

FUNDING SOURCE OF BRT

Rp 3,4 Trillions 1)

for investment &

subsidize

Transjakarta

1) = APBD DKI Total for busway 2004-2010

100%

30%

50%

50%

50%

11

Page 12: Urban Public Transport System in Jakarta

CITY COMMITMENT TO GIVE BEST SERVICE IN AFFORDABLE FARE

0% 20% 40% 60% 80% 100%

2004

2005

2006

2007

2008

2009 Rp 4,505*

Rp 4,997

Rp 5,245

Rp 4,495

Rp 3,177

* only operational expenses

Rp 3,500

Rp 3,500

Rp 3,500

Rp 3,500

Rp 2,500

Rp 2,500

Cost/Pax

DKI keeps affordable fare

for passengers

Fuel price

decrease

FareSubsidy

Rp 2,916

12

Page 13: Urban Public Transport System in Jakarta

2

3

6

7

5

4

ANCOL

TJ. PRIOK

KP. RAMBUTAN

KP. MELAYU

RAGUNAN

BLOK M

KALIDERES

PULOGADUNG

PULOGEBANG

HI

KOTA

8

10

9

KB. JERUK

CILILITAN

GROGOL

1

13

• Length Corridor : 143,35 Km (8 Corridor)

• Number of Shelter : 142 shelter

(distance each shelter ~ 1000 m)

• Number of Buses : 426 bus

• Number of Operator : 6 operator bus

• Number of Depot Bus : 7 Depot

• CNG Station : 6 CNG Station

• Ticket Cost : IDR 3.500 & 2.000 (5-7am)

Page 14: Urban Public Transport System in Jakarta

MAJOR OPERATIONAL ISSUES FOR BUS OPERATION

Mixed with other traffic

Long queue at the Gas Station

Page 15: Urban Public Transport System in Jakarta

MAJOR OPERATIONAL ISSUES FOR BUS

OPERATION

Page 16: Urban Public Transport System in Jakarta

CONCLUSION