11
14/05/2014 1 Urban Flood Model Alejandro de Juanes Manila, May 15 th 2014 INCLAM Prevent, control and mitigate negative impacts of a flood Reduce flood risk Improve the citizens' well-being Flood Modeling

Urban Flood Model

Embed Size (px)

Citation preview

Page 1: Urban Flood Model

14/05/2014

1

Urban Flood Model

Alejandro de JuanesManila, May 15th 2014

INCLAM

Prevent, control and mitigate negative impacts of a flood

Reduce flood risk

Improve the citizens' well-being

Flood Modeling

Page 2: Urban Flood Model

14/05/2014

2

Flood Risk

water depth Velocity

Hazard

Duerna River

Page 3: Urban Flood Model

14/05/2014

3

Duerna River

Vulnerability

Affected People, impact on exposed economical activity, cultural heritage and

environmental damages

Page 4: Urban Flood Model

14/05/2014

4

To analyze risk

To propose measures. Cost/Benefit analysis.

Measures, Plan

HAZARD * VULNERABILITY =

RISK

18 M USD

32 M USD

Flood Risk

Measures Cost-benefit analysis

Indicators (trace)

Comparative analysis of the Comparative analysis of the costcost--benefitbenefit helps to helps to make make decisionsdecisions, to choose the , to choose the best solutionbest solution

BENEFITS: Damage before and after the measures were implemented

Average year Cost (USD)

USD:USD:

Cost-benefit analysis

Page 5: Urban Flood Model

14/05/2014

5

COSTS: Measure Implementation and maintenance and repairs works cost during the

lifetime are considered.

Average Anual Improvement (blue bar) - Total measures cost (orange bar)

Economic profitability analysis

PROGRAM 1: River restoration Measures

PROGRAM 2: Infrastructures drainage improvement Measures

PROGRAM 3: Flood prediction Measures

PROGRAM 4: Civil Protection Measures

PROGRAM 5: Measures of Urban and Territorial Planning and

Development

PROGRAM 6: Knowledge Improvement

PROGRAM 7: Erosion and sedimentation Control

PROGRAM 8: Resilience Improvement

PROGRAM 9: Training and communication

PROGRAM 10: Plan Management and Coordination with other authorities

PROGRAM 11: Structural Measures

Measures priority (by program)

Priority level. Multicriteria

Page 6: Urban Flood Model

14/05/2014

6

ESTERO DE PACO. PHILLIPINESESTERO DE PACO. PHILLIPINES MELAKA. MALAYSIAMELAKA. MALAYSIA MANDALAY. MYANMARMANDALAY. MYANMAR

Historical Protection infrastructures

VINH YEN. VIET NAMVINH YEN. VIET NAM

High vulnerability

HUÉ .VIET NAMHUÉ .VIET NAM

Traditional buildings linked to water

Problems (examples)

Ebro; Meandro de Ranillas

Example: Flood Hazard

Page 7: Urban Flood Model

14/05/2014

7

Feasibility studies of structural and non-structural measures

the effect of protection measures

measuresFlood Hazard

Cinca River. Fraga (Huesca)

Page 8: Urban Flood Model

14/05/2014

8

Burlada

BURLADA

White Oak Bayou

White Oak Bayou

Page 9: Urban Flood Model

14/05/2014

9

White Oak Bayou (II)

White Oak Bayou (II)

White Oak Bayou (III)

White Oak Bayou (III)

Page 10: Urban Flood Model

14/05/2014

10

White Oak Bayou (IV)

White Oak Bayou (IV)

White Oak Bayou (V)

White Oak Bayou (V)

Page 11: Urban Flood Model

14/05/2014

11

THANK YOUAlejandro de Juanes

INCLAM

[email protected]