31
URBAN AGE CITY TRANSFORMATIONS CONFERENCE

URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

URBAN AGE

CITY TRANSFORMATIONS CONFERENCE

Page 2: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Urban Age City

Transformations Conference Maria Silvia Bastos Marques - CEO

October/2013

1/29

Page 3: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

09/2007: Bid presentation

Aside from Rio, the other bidding cities were

Chicago, Tokyo, Madrid, Doha, Baku and Prague.

06/2008: End of phase one

Rio remains in the bidding dispute along with

Chicago, Tokyo and Madrid.

02/2009: Bid Book is delivered

10/2009: Rio de Janeiro is elected the host city

for the 2016 Olympic and Paralympic Games

Rio’s Bid

2/29

Page 4: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Along this decade, Rio de Janeiro will be

recognized as the best city of the Southern

Hemisphere to live, work, and visit.

BY ENGAGING THE BRAZILIAN SOCIETY

LONG-LASTING TRANSFORMATIONS

OPPORTUNITY = STRATEGIC VISION

URBAN INFRASTRUCTURE

URBAN MOBILITY ENVIRONMENT

SOCIAL DEVELOPMENT

LEGACY AND

SUSTAINABILITY

Along this decade, Rio de Janeiro will be recognized as the best city of the

Southern Hemisphere to live, work, and visit.

3/29

Page 5: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Rio 2016 in Numbers

First Olympic Games in South

America

+ 200 nations

+10,500 Olympic athletes

+4,500 Paralympic athletes

28 Olympic sports & 22

Paralympic sports

+100K people directly involved

in organizing the Games

+30K press and media

professionals

+70K volunteers

4/29

Page 6: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

URBAN

INFRASTRUCTURE

URBAN MOBILITY

ENVIRONMENT

SOCIAL DEVELOPMENT, SPORTS

AND EDUCATION

LEGACY AND

SUSTAINABILITY

Rio City Hall´s first commandment: the Games must serve the city.

5/27

Page 7: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Region Barra

Region Copacabana

Region Maracanã

Region Deodoro

Region /Venues

OLYMPIC REGIONS

6/29

Page 8: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

BRT SYSTEM

4 expressways

152 Km

2 million people/day

Less than 20% to more than 60% of the

population using the high capacity

transportation system.

Estimated Investment: ~US$ 2,7 billion 7/29

Page 9: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

LRT DOWNTOWN

6 lines

42 stations

Connection between the Port region and the

Santos Dumont airport

Estimated Investment: R$ 1,1 Billion

8/29

Page 10: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Deodoro

Maracanã

Copacabana Barra da Tijuca

Train

Subway

Olympic Region

THE HIGH CAPACITY TRANSPORTATION SYSTEM - 2010

9/29

Page 11: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

LRT Deodoro

Maracanã

Copacabana Barra da Tijuca

THE HIGH CAPACITY TRANSPORTATION SYSTEM - 2016

BRT

Train

Subway

Olympic Region

10/29

Page 12: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Maravilha Port

Greater Tijuca and Praça

da Bandeira Flood

Control

Joá’s Viaduct

Accommodations

MAIN PROJECTS

11/29

Page 13: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Re-urbanization of the Port Region

5 million m²

70 km urbanized streets and lanes

4 tunnels, including the largest one of the city –

Via Expressa Tunnel (5,7 km)

Construction of the Via Binário (Binário

Highway), with 6 traffic lanes

2 new museums: MAR (inaugurated) and Museu do

Amanhã (Museum of Tomorrow, 2014)

To be delivered by: 1st semester 2016

Expected investment: R$ 8 billion (PPP)

MARAVILHA PORT

12/29

Page 14: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

GREATER TIJUCA AND PRAÇA DA BANDEIRA FLOOD CONTROL

Construction of five flood control and

outflow reservoirs for rainwaters in the

Greater Tijuca region, the Maracanã Stadium

surroundings and the Praça da Bandeira.

Waterflows interventions: Rio Joana;

Trapicheiros River; Rio Maracanã

Expected Investment: R$ 292 millions

(Federal Government and Municipal)

To be delivered by: 2nd semester of 2014

13/35

Page 15: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

JOÁ’S VIADUCT

Lagoa-Barra highway duplication

2 new tunnels

Two new traffic lanes, with 5Km of

extension each

Around 35% increase in the traffic capacity

between São Conrado - Barra da Tijuca

Bike Lane: tourist attraction and completion

of the bike lane belt (Recreio – Parque do

Flamengo)

To be delivered by: 2nd semester 2015

Expected Investment: R$ 489 millions

14/35

14/29

Page 16: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

ACCOMMODATIONS

Municipal Incentive Law

Tax Incentives

Urban Incentives

Olympic Package Valid until DEC/2015

+24% increase 2014:

2012: 20K hotel rooms

+78% increase 2016:

2016 Total Potencial:

36,4K hotel rooms

Deodoro

Current: 244 quartos

Working Projects: 675

Total: 919 rooms or +277%

Barra

Current: 2.633

Working Projects: 7.894

Total: 10.527 rooms or +300%

Maracanã

Current: 5.025

Working Projects: 3.547

Total: 8.572 rooms or +71%

Copacabana

Current: 12.512

Working Projects: 4.247

Total: 16.759 rooms or +34%

Last update: September/2013

Over 12k direct jobs

15/29

Page 17: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

GEO

Rio Global Child

MAIN PROJECTS

Rio’s City Hall is taking the

opportunity presented by the

2016 GAMES to develop and

offer SOCIAL DEVELOPMENT

initiatives, that meets society’s

overdue demands.

16/29

Page 18: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

RIO GLOBAL CHILD

Universalizes the English language in all municipal public schools;

By 2014: 515K students from 1st to 9th grades

2K English teachers trained and convened

1.076 public schools

Expected investment: R$ 200 million

To be concluded by: 1st semester 2014

OLYMPIC EXPERIMENTAL GYMNASIUM

Public school students with sporting aspirations will have the opportunity to develop their potential together with high quality education.

Offers 6 types of sport activities: athletics, volleyball, handball, table tennis, wrestling and swimming

Full time students: 6th to 9th grade

2013: 3 schools/ 965 students; 2016: 5 schools/ 2,5K students

Inaugurated Schools: - Santa Teresa – Feb/2012 - 455 students - Caju - Feb/2013 - 200 students - Pedra de Guaratiba - Feb/2013 - 310 students

To be inaugurated by 2016: Ilha do Governador and Honório Gurgel

Expected investment: R$ 142 million 17/29

Page 19: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Environmental Recovery of

the Jacarepaguá Basin

Waste Treatment Center

(CTR) – Seropédica

MAIN PROJECTS

Rio de Janeiro’s INTEGRATION with

nature is what makes it one of the most

beautiful cities in the world. Therefore,

the MAINTANAINCE and

ENVIRONMENT IMPROVEMENTS are

the City Hall’s long lasting permanent

commitments.

18/29

Page 20: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

ENVIRONMENTAL RECOVERY OF

THE JACAREPAGUÁ BASIN

Macro drainage works concluded in seven rivers;

Rainwaters flow capacity increase, decreasing

flood risks

9 km of recuperated water course with the revitalization of

the dredging and shores

350 thousand people directly benefitted

Status: Phase 1 in execution

To be concluded by: 2nd semester/2014

Expected investment: R$ 340 million

(Municipal and Federal Governments)

Waste treatment center with cutting edge technologies;

Launched in April 2011: treats around 9.000 tons of residues

per day;

Following international laws regarding the possessing of

solid residues in relation to the environment;

The opening of the CTR enabled the City Hall to close the

Gramacho and the Gericinó landfills;

Total investment: R$ 224 million (98% private)

WASTE TREATMENT CENTER

(CTR) – SEROPÉDICA

19/29

Page 21: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Olympic Park

Athletes’ Village

Athletes’ Park

Deodoro Sports Complex

Last Mile

MAIN PROJECTS

Amongst the dozens of projects

that are transforming Rio, many of

the initiatives are related to the

preparation of the city to host the

2016 Games, directly contributing

to the event’s sports legacy.

20/29

Page 22: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

OLYMPIC PARK

1,18 million m²

9 arenas

16 Olympic sports

10 Paralympic sports

Begin of construction works: July 2012

After the Games: a new neighborhood –

approximately the size of 165 soccer fields,

reference in energy efficiency, sustainability and

accessibility.

Olympic Training Centre (COT): 2016 Games

main sports legacy, for high performance

athletes 21/29

Heart of the 2016 Olympic and Paralympic Games

Page 23: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

MASTER PLAN – GAME MODE

1. Maria Lenk Aquatic Center

2. Rio Olympic Arena

3. Velodrome

4. Hall 3

5. Hall 2

6. Hall 1

7. Handball Arena

8. Aquatic Center

9. Tennis Center

10. IBC

11. MPC

12. Media Hotel

13. Live Site

14. Environmentally Protected Area

1

2 3

4

5

6

8

9 10

11 12

7

13

14 14

22/29

Page 24: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

OLYMPIC PARK (LEGACY MODE)

Environmentally

Protected Area

Environmentally

Protected Area

Residential and commercial developments

1. Maria Lenk Aquatic Center

2. Rio Olympic Arena

3. Velodrome

4. Olympic Training Center (COT)

5. Tennis Center

1

2 3 5

4

23/29

Page 25: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

AQUATIC CENTER

TEMPORARY

Seating capacity: 18.000

TENNIS CENTER

PERMANENT

Main Arena - seating capacity: 10.000

TEMPORARY – TWO ARENAS

Seating capacity: 5.000

Seating capacity: 3.000 (after the Games,

the bleachers will be removed, while the

court will remain as permanent)

13 outdoor courts:

7 for the games (six being permanent)

6 for training and warm up (temporaries)

Works Start: November/2013

VELODROME

PERMANENT

Seating capacity: 5.000

24/29

Page 26: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

HANDBALL

Nomadic Architecture

After the Games, the Handball arena will be used to build four public schools, including sports gymnasiums, in four

different areas of the city.

Reuse of the Handball arena as 4 public schools.

25/29

Page 27: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

OTC (Olympic Training Center) IBC (International Broadcast Center)

PERMANENT

Capacity during Games:

Olympic Hall 1 - 16.000

(7,500 – Legacy mode)

Olympic Hall 2 – 10.000

( 0 – Legacy Mode)

Olympic Hall 3 – 10.000

( 0 – Legacy Mode)

85.000 m² (Total area);

Destined to TV and radio stations with broadcasting rights of the Rio 2016 Olympic and

Paralympic Games

An independent office building, connected to the

main building through two footbridges, will house

the OBS (Olympic Broadcasting Services), responsible for the Olympic Broadcast and

generation of images;

Capacity: 10,000 people simultaneously;

24 hours a day, 7 days a week, during the Games.

Private investment (PPP), with assured legacy.

Games center for the accredited press

professionals

27.000 m²

Capacity: 5K people

24 hours per day (during the event)

Private Investment (PPP), with secured

legacy.

Begin works: 2nd semester 2013

MPC (Main Press Center)

26/29

Page 28: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Athletes’ Village Athletes’ Park

Total area: 800 thousand m2

Built area: 206 thousand m2

31 buildings with 17 floors each

The construction of the Athletes’ Village began in 2010 and

is being executed without public resources.

The buildings are a private investment. Internal infrastructure

(paving of streets, sewage and power), originally to be carried

out by the City Government, has been transferred to the

winners of the Olympic Park Public-Private Partnership.

Total area of 250 thousand square meters

A leisure area for Rio’s population and visitors with playgrounds,

senior gyms, soccer fields, volley and tennis courts.

The park will be used during the Rio 2016 Games as an

official training and leisure center for athletes

In September 2013, the Rock in Rio festival brought around

590K people in a span of seven days to the area, hosting

national and international performers

After the Games, the Athlete’s Park will remain an important

legacy for the city as a cultural hub and a leisure area

Investment: R$ 40 millions

Delivered in AUG/2011

Page 29: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

10k hectares (terrain)

11 Olympic sports

3 Paralympic sports

Access to the Transolímpica BRT: connection

between Deodoro and the Barra da Tijuca region,

benefitting100K passengers per day.

Investment: Federal Government

Works execution: City Hall

Deodoro Sports Complex

VENUES TO BE BUILT Deodoro Olympic Arena, Hockey Arena, Olympic BMX Center, Olympic Water Stadium

VENUES TO BE REMODELED National Shooting Center, Modern Pentathlon Aquatic Center, National Equestrian Center

TEMPORARY Rugby Stadium, Olympic Mountain Bike Park

28/29

National

Equestrian

Center

Olympic

BMX

Center

Olympic

Mountain

Bike Park

Olympic

Water

Stadium

Deodoro

Olympic

Arena

National

Shooting

Center

National

Hockey

Center

Pentathlon

and Rugby

Arena

Modern

Pentathlon

Aquatic Center

Page 30: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

Last Mile Barra To be concluded in the second semester of 2015

Last Miles

Urban interventions to improve and requalify

public spaces around Olympic equipment.

These improvements include:

Sidewalks and crossings improvements

Accessibility

Shelter and landscaping

Efficient lighting

Urban infrastructure betterments:

Underground galleries for all technical and

network cables from Concessionaires in

the immediate surrounding areas.

Last Mile Engenhão To be concluded in the second semester of 2016

Last Mile Maracanã

Concluded: July / 2013 (Overpass over the train tracks to be

instalated to the 2016 Games)

29/29

Page 31: URBAN AGE CITY TRANSFORMATIONS CONFERENCE · Olympic Hall 2 – 10.000 ( 0 – Legacy Mode) Olympic Hall 3 – 10.000 ( 0 – Legacy Mode) 85.000 m² (Total area); Destined to TV

www.cidadeolimpica.com/empresaolimpica

/empresaolimpica @empresaolimpica /empresaolimpica

THE MUNICIPAL OLYMPIC COMPANY

30/29