WORK PHASING AND POWER OUTAGE NOTES: 1. THE CONTRACTOR SHALL PERFORM PRIMARY CONNECTIONS UNDER A POWER OUTAGE. THE CONTRACTOR SHALL
COORDINATE ALL PRIMARY POWER OUTAGES WITH THE CONTRACTING OFFICER AND HURLBURT FIELD EXTERIOR
ELECTRIC DEPARTMENT 2 WEEKS IN ADVANCE. POWER OUTAGES OUTSIDE OF THE 30 DAY WINDOW DESCRIBED IN
NOTE 3 SHALL BE LIMITED TO NO MORE THAN 4 HOURS. PRIMARY CONNECTIONS ARE
ANTICIPATED TO BE MADE DURING THE 30 DAY WINDOW, PRELIMINARILY SCHEDULED TO OCCUR IN JUNE 2019.
2. THE CONTRACTOR SHALL PERFORM NEW SECONDARY CONNECTIONS TO EXISTING EQUIPMENT AND FEEDERS
UNDER A POWER OUTAGE. THE CONTRACTOR SHALL COORDINATE ALL POWER OUTAGES WITH THE CONTRACTING
OFFICER AND HURLBURT FIELD INTERIOR ELECTRIC DEPARTMENT 2 WEEKS IN ADVANCE.
POWER OUTAGES OUTSIDE OF THE 30 DAY WINDOW DESCRIBED IN NOTE 3 SHALL BE LIMITED TO NO MORE
THAN 4 HOURS.
3. THE CONTRACTOR WILL BE ALLOWED TO CUT POWER TO THE BUILDING DURING A 30 DAY PERIOD FROM
MID-JUNE 2019 TO MID-JULY 2019. THIS IS TO ALLOW THE CONTRACTOR TO REMOVE THE EXISTING SUBSTATIONS
AND INSTALL THE NEW SWITCHBOARDS ON THE PYLONS. THE CONTRACTOR SHALL SCHEDULE ANY MAJOR POWER
OUTAGES TO OCCUR DURING THE 30 DAYS. THE CONTRACTOR MAY WORK IN SHIFTS, ON NIGHTS AND WEEKENDS
TO ACCOMPLISH THE WORK IN THESE 30 DAYS. THE CONTRACTOR SHALL PROVIDE ELECTRIC POWER,
TEMPORARY COOLING AND LIGHTING AS DETAILED IN THE CONTRACT DOCUMENTS. THE BUILDING WILL BE
VACATED IN THE BAYS AND AREAS WITHOUT THIS POWER. THE CONTRACTOR MAY USE GENERATORS OR
TEMPORARY TRANSFORMERS AS REQUIRED. THE CONTRACTORS TEMPORARY POWER PLAN MUST BE
SUBMITTED WITHIN 30 DAYS AFTER NTP FOR GOVERNMENT APPROVAL.
4. FOLLOWING IS A GENERAL DESCRIPTION OF THE Tl MELINE FOR THIS CONTRACT, AND IS NOT INTENDED TO
BIND THE CONTRACTOR TO ANY SPECIFIC ORDER OF WORK:
A. BID IS AWARDED.
B. CONTRACTOR SUBMITS SHOP DRAWINGS.
C. SHOP DRAWINGS ARE APPROVED.
D. CONTRACTOR ORDERS MATERIALS AND DELIVERS SHORT LEAD ITEMS TO THE SITE. CONTRACTOR NOTIFIES
THE CONTRACTING OFFICER AS TO WHEN THE LONG LEAD ITEMS ARE ANTICIPATED TO ARRIVE ON THE JOB
SITE.
E. CONTRACTOR BEGINS INSTALLATION OF NEW EQUIPMENT, CONDUIT SYSTEMS, AND OTHER WORK THAT DOES
NOT INTERFERE WITH THE USER'S NORMAL MISSIONS OR REQUIRE POWER OUTAGES EXCEEDING 4 HOURS.
F. DURING THE 30 DAY WINDOW THE CONTRACTOR WILL MAKE PRIMARY CONNECTIONS, DEMOLISH THE EXISTING
SUBSTATIONS, ETC., AND INSTALL THE NEW SWITCHBOARDS, TRANSFORMERS, ETC.
G. THE 30 DAY WINDOW ENDS AND THE CONTRACTOR COMPLETES THE REMAINING CONSTRUCTION ITEMS THAT
DO NOT INTERFERE WITH THE USER'S NORMAL MISSIONS OR REQUIRE MAJOR POWER OUTAGES EXCEEDING 4
HOURS.
5. WHEN THE 30 DAY WINDOW IS OVER THE BUILDING OCCUPANTS RESUME THEIR WORK IN THIS FACILITY,
THE NEW ELECTRICAL SERVICES MUST BE ENERGIZED AND THE BUILDING MUST BE FUNCTIONAL FOR THE
NORMAL OPERATIONS THAT OCCUR IN THE FACILITY.
6. THE CONTRACTOR WILL BE PROVIDED A STAGING AREA IN THE GRASS ON THE FLIGHTLINE
SIDE OF THE HANGAR.
7. CONTRACTOR PERSONNEL WILL BE REQUIRED TO OBTAIN FLIGHTLINE DRIVING LICENSES
FROM THE GOVERNMENT. TRAINING WILL BE PROVIDED BY THE GOVERNMENT.
=
SECURITY POLICE
CONTRACTING
UPGRADE ELECTRICAL SERVICE
HANGAR 90700
HURLBURT FIELD, FLORIDA
FTEV 14-1057
D
D
D
B ILDI
=
COMMERCIAL VEHICL
INSPECTION GATE
BACK GATE
SHEET#
T-1
E-1
E-2
E-3
E-4
E-5
E-6
E-7
E-8
E-9
E-10
E-11
E-12
E-13
E-14
E-15
E-16
E-17
S-1
INDEX OF DRAWINGS TITLE
LOCATION MAP & INDEX OF DRAWINGS
ELECTRICAL SITE PLAN
ELECTRICAL PLAN - HANGAR 90700 - DEMOLITION
ELECTRICAL PLANS - PYLONS - DEMOLITION
ELECTRICAL PLAN - HANGAR 90700 - NEW WORK
ELECTRICAL PLANS - PYLONS - NEW WORK
SINGLE LINE DIAGRAMS
PANELBOARD ELEVATIONS - NORTH PYLON
PANELBOARD ELEVATIONS - NORTH PYLON
SWITCHBOARD "T1" ELEVATION
SWITCHBOARD "LC3" ELEVATION
PANELBOARD ELEVATIONS - SOUTH PYLON
SWITCHBOARD "T3" ELEVATION
SWITCHBOARD "T4" ELEVATION
MAIN SWITCHBOARD "MSB-N" ELEVATION
MAIN SWITCHBOARD "MSB-S" ELEVATION
PRIMARY RISER DIAGRAMS
PRIMARY EQUIPMENT DETAILS
TOPOGRAPHIC SURVEY
LOCATION MAP
1 SOCES/CECC OFFICE FORM 001 (JAN 96) STANDARD D LAYOUT (24" X 36")
N N.T.S.
C
b..
�
C
�0..
�
w w z ci z w
iw
:i: '0
w
0::: w
V>o ...JO <( I"--oo - (J)0:::I- 0:::O <(W e.,.....Jz w
<( WI 0 <( 0::: c., n...
::::,
C ...J z<( <( -:E o:E �o
15 "' z ci z "' ...I�0
(/)
z
! 0
LL 0
0 z
<(
z 0I-<(
0 _J
z 0a:
U) a: c(We W-z a: -oCl _J
(1)0 Z LL w -' C
wen - _J :? w
oz (.) ii:U) I-
C: 0 z a: Q::::,
o- - Ill
LL� !:;;: _J
a: a:w:::>
C: C: D. ::c:0
-w _J
<( a. c(
0 w D.U)�
DATE:
1 APRIL 2015
DESIGNED BY:
EWW/JRH
DRAWN BY:
JRH
BUILDING NO.:
90700
DRAWING NO.:
FTEV 14-1057
SHEET REF.:
T-1SHEET NO.:
1 OF 19
1
07/2
5/20
18
Upd
ated
Not
es
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
UG
EU
GE
UG
E
UG
E
UG
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
UG
E
UG
E
U
G
E
UG
E
UG
E
UG
E
U
G
E
U
G
E
U
G
E
UGE
UGE
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
U
G
E
PJC
PJC
PJC
PJC
PJC
PS
PJC
PS
PMT
ELECTRICAL SITE PLAN
SCALE: 1" = 60'-0"
PJC
PJC
PJC
PJC
PJC
PJC
PMT
PMT
PMT
PMT
PMT
PMT
90225
TU
LLY
S
TR
EE
T
90700
90708
90705
90707
90720
90228
90714
90713
90716
90717
90718
90702
90701
90703
90711
90710
B
E
N
N
E
T
T
A
V
E
N
U
E
90712
E
U
P
E
U
P
PJC
PMT
DB
PMT
PJC
PS
U
P
U
S
E
U
P
1
WORK NOTES:
BREAK INTO EXISTING CONCRETE ENCASED DUCTBANK & INTERCEPT ONE (1) 5" SPARE DUCT. TURN 5" DUCT UP INTO NEW
PRIMARY JUNCTION CABINET & PULL IN NEW PRIMARY CONDUCTORS FROM EXISTING PAD MOUNTED PRIMARY SWITCH TO NEW
JUNCTION CABINET.
1
2INSTALL TWO (2) 4" HIGH DENSITY POLYETHYLENE DUCTS BELOW EXISTING CONCRETE AIRCRAFT APRON BY DIRECTIONAL BORE METHOD.
2
3INSTALL NEW PAD MOUNTED PRIMARY SWITCH.
4INSTALL TWO-WAY 4" CONCRETE ENCASED PRIMARY DUCTBANK FROM PRIMARY SWITCH TO PAD MOUNTED TRANSFORMER.
5INSTALL NEW PAD MOUNTED TRANSFORMER.
5
6EXTEND NEW UNDERGROUND SECONDARY FROM TRANSFORMER TO NEW MAIN SWITCHBOARD "MSB-S" IN SOUTH LEAN-TO. CUT
& PATCH EXISTING ASPHALT PAVING FOR INSTALLATION OF SECONDARY.
6
7REMOVE EXISTING UNDERGROUND PRIMARY CONDUCTORS AFTER NEW SERVICE IS ENERGIZED.
8REMOVE EXISTING PRIMARY JUNCTION CABINET AFTER NEW SERVICE IS ENERGIZED & TURN OVER TO GOVERNMENT.
7
8
7
9REMOVE EXISTING PRIMARY JUNCTION CABINET & TURN OVER TO GOVERNMENT. INSTALL NEW JUNCTION CABINET ON EXISTING
CONCRETE PAD.
9
10INSTALL TWO (2) 5" HIGH DENSITY POLYETHYLENE DUCTS BELOW EXISTING STREET BY DIRECTIONAL BORE METHOD.
10
11
4
3
5
12
EXTEND NEW UNDERGROUND SECONDARY FROM TRANSFORMER TO NEW MAIN SWITCHBOARD "MSB-N" IN NORTH LEAN-TO. CUT
& PATCH EXISTING ASPHALT PAVING FOR INSTALLATION OF SECONDARY.
11
REMOVE EXISTING MANHOLE. TURN MANHOLE COVER OVER TO GOVERNMENT. FILL HOLE WITH APPROVED FILL DIRT.
12
PJC
PMT
PS
DB
UP
US
EUP
PJC
PS
EXISTING PRIMARY JUNCTION CABINET - TO REMAIN, UNLESS NOTED OTHERWISE.
NEW PRIMARY JUNCTION CABINET - SEE DETAILS, SHEET E-17.
NEW PAD MOUNTED TRANSFORMER - SEE DETAILS, SHEET E-17.
EXISTING PRIMARY SWITCH - TO REMAIN.
EXTERIOR ELECTRICAL LEGEND:
NEW PRIMARY SWITCH - SEE DETAILS, SHEET E-17.
EXISTING UNDERGROUND PRIMARY - TO REMAIN.
EXISTING UNDERGROUND PRIMARY - REMOVE.
NEW UNDERGROUND PRIMARY - DIRECTIONAL BORE.
NEW UNDERGROUND PRIMARY - CONCRETE ENCASED DUCTBANK.
NEW UNDERGROUND SECONDARY.
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
SS
SS
SS
SS
S
S
S
S
S
S
S
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
U
G
E
U
G
E
U
G
E
D
B
U
S
NOTE:
EXISTING UTILITIES ARE SHOWN FOR COORDINATION PURPOSES ONLY. OTHER BURIED
UTILITIES MAY EXIST IN THIS AREA. THE CONTRACTOR SHALL OBTAIN A DIG PERMIT AND
HAVE UTILITY LOCATION SERVICES PERFORMED PRIOR TO ANY EXCAVATION IN THIS AREA.
NOTE:
EXISTING UTILITIES ARE SHOWN ON SHEET S-1 FOR THIS AREA. THE CONTRACTOR SHALL
OBTAIN A DIG PERMIT AND HAVE UTILITY LOCATION SERVICES PERFORMED PRIOR TO ANY
EXCAVATION IN THIS AREA.
UGE
W W
G G
SD SD
SS SS
T T
EXISTING STREET LIGHT - TO REMAIN.
EXISTING UNDERGROUND ELECTRICAL LINE - TO REMAIN.
EXISTING WATER VALVE - TO REMAIN.
EXISTING FIRE HYDRANT - TO REMAIN.
EXISTING UNDERGROUND WATER LINE - TO REMAIN.
EXISTING GAS VALVE - TO REMAIN.
EXISTING UNDERGROUND GAS LINE - TO REMAIN.
EXISTING STORM DRAIN MANHOLE - TO REMAIN.
EXISTING STORM DRAIN INLET - TO REMAIN.
EXISTING UNDERGROUND STORM DRAIN LINE - TO REMAIN.
EXISTING UNDERGROUND SANITARY SEWER LINE - TO REMAIN.
EXISTING UNDERGROUND TELEPHONE LINE - TO REMAIN.
E-1
2
EL
EC
TR
IC
AL
S
IT
E P
LA
N
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
SCALE: 1/16" = 1'-0"
ELECTRICAL PLAN - HANGAR 90700 - DEMOLITION
SEE "ELECTRICAL PLANS - SOUTH PYLON - DEMOLITION,"
SHEET E-3 FOR DEMOLITION WORK IN THIS AREA.
SEE "ELECTRICAL PLANS - NORTH PYLON - DEMOLITION,"
SHEET E-3 FOR DEMOLITION WORK IN THIS AREA.
REMOVE (3) EXISTING 1200 A., 15 KV PRIMARY VACUUM CIRCUIT
BREAKERS & OUTDOOR METALCLAD SWITCHGEAR ENCLOSURE
AFTER NEW SERVICE HAS BEEN ENERGIZED. REMOVE EXISTING
METER & TURN OVER TO GOVERNMENT.
EXISTING MOTOR CONTROL CENTER - TO REMAIN.
P
P
REMOVE EXISTING EXPOSED PRIMARY CONDUIT & WIRING
REMOVE EXISTING PULL BOX
P
REMOVE EXISTING PRIMARY WIRING FROM
CONCEALED CONDUIT BACK TO EXISTING PRIMARY
VACUUM BREAKER. ABANDON EXISTING
CONCEALED CONDUIT.
GENERAL NOTES:
1. CONTRACTOR SHALL TURN OVER THE FOLLOWING ITEMS TO THE HURLBURT INTERIOR ELECTRIC SHOP
AFTER DEMOLITION IS COMPLETE:
CIRCUIT BREAKERS, FUSES, SWITCHBOARD AND PANELBOARD LUGS, CONDUIT BUSHINGS, LB FITTINGS
AND CONDUIT NIPPLES.
2. ALL EQUIPMENT NOT LISTED IN GENERAL NOTE 1 SHALL BE DISPOSED OF BY THE CONTRACTOR. THE
CONTRACTOR SHALL COMPLY WITH WASTE GENERATION, COLLECTION AND DISPOSAL AS SPECIFIED IN
THE HURLBURT FIELD HAZARDOUS WASTE MANAGEMENT PLAN.
P
EXISTING PANEL TO REMAIN
TIRE SHOP
REMOVE EXISTING FEEDER BACK TO DISCONNECT
SWITCH ON SIDE OF SUBSTATION "T3." SEE
"ELECTRICAL PLAN - MEZZANINE - SOUTH PYLON -
DEMOLITION," SHEET E-3, FOR CONTINUATION.
REMOVE EXISTING EXPOSED PRIMARY CONDUIT & WIRING
REMOVE EXISTING EXPOSED CONDUIT & WIRING.
REMOVE EXISTING "LB" FITTING.
REMOVE EXISTING CONDUIT & WIRING CONCEALED
ABOVE LAY-IN CEILING.
ELECTRICAL LEGEND - DEMOLITION:
P
S
S
S
EXISTING PANELBOARD - TO REMAIN.
EXISTING PANELBOARD - REMOVE.
EXISTING SECONDARY CONDUIT & WIRING - REMOVE.
EXISTING PRIMARY CONDUIT & WIRING - REMOVE, AS NOTED.
SEE "LARGE SCALE PLAN - DEMOLITION," THIS
SHEET, FOR DEMOLITION WORK IN THIS AREA.
SCALE: 1/8" = 1'-0"
LARGE SCALE PLAN - DEMOLITION
EXSTING PANEL "MP" TO REMAIN
REMOVE EXISTING 30 A. RECEPTACLE.
REMOVE EXISTING DUPLEX RECEPTACLE.
REMOVE EXISTING 200 A. RECEPTACLE.
REMOVE EXISTING CONDUIT & WIRING BACK TO
EXISTING PANEL "MP." TURN BREAKERS OFF &
LABEL AS SPARE.
REMOVE EXISTING COMPRESSED AIR DROP AND
PIPING TO A POINT BEYOND THE FOOTPRINT OF THE
NEW SWITCHBOARD. CAP EXISTING PIPE.
E-2
3
EL
EC
TR
IC
AL
P
LA
N - H
AN
GA
R 9
07
00
- D
EM
OL
IT
IO
N
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
SCALE: 1/8" = 1'-0"
ELECTRICAL PLAN - MEZZANINE - SOUTH PYLON - DEMOLITION
SCALE: 1/8" = 1'-0"
ELECTRICAL PLAN - MEZZANINE - NORTH PYLON - DEMOLITION
P
P
P
S
EXISTING UNIT SUBSTATION "T3"
REMOVE EXISTING PRIMARY SWITCH
REMOVE EXISTING SECONDARY DISTRIBUTION SECTION
EXISTING UNIT SUBSTATION "T4"
REMOVE EXISTING PRIMARY SWITCH
REMOVE EXISTING SECONDARY DISTRIBUTION SECTION
REMOVE EXISTING PULL BOX.
REMOVE EXISTING PRIMARY WIRING & ABANDON CONCEALED CONDUIT.
REMOVE EXISTING DISCONNECT SWITCH
EXISTING SECONDARY FEEDER EXITS BOTTOM OF DISTRIBUTION SECTION.
S
S
S
S
P
REMOVE EXISTING PRIMARY WIRING FROM
CONCEALED CONDUIT BACK TO EXISTING PRIMARY
VACUUM BREAKER. ABANDON EXISTING PRIMARY
CONDUIT WHERE CONCEALED.
EXISTING UNIT SUBSTATION "T1"
REMOVE EXISTING PRIMARY SWITCH
REMOVE EXISTING SECONDARY DISTRIBUTION SECTION
REMOVE EXISTING DISCONNECT SWITCH
S
S
S
P
P
S
REMOVE EXISTING 500 KVA, 12.47 KV PRIMARY TO
480Y/277 V. SECONDARY DRY-TYPE TRANSFORMER
REMOVE EXISTING 225 KVA, 12.47 KV PRIMARY TO
480Y/277 V. SECONDARY DRY-TYPE TRANSFORMER
REMOVE EXISTING SECONDARY CONDUIT & WIRING FROM
DISCONNECT SWITCH TO EXISTING PANEL IN TIRE SHOP
ON FIRST FLOOR.
REMOVE EXISTING 225 KVA, 12.47 KV PRIMARY TO
208Y/120 V. SECONDARY DRY-TYPE TRANSFORMER
REMOVE EXISTING PRIMARY EXPOSED CONDUIT &
WIRING BACK TO EXISTING PRIMARY VACUUM BREAKER.
EXISTING UNIT SUBSTATION "LC1"
REMOVE EXISTING PRIMARY SWITCH
REMOVE EXISTING SECONDARY DISTRIBUTION SECTION
REMOVE EXISTING 500 KVA, 12.47 KV PRIMARY TO
480Y/277 V. SECONDARY DRY-TYPE TRANSFORMER
EXISTING UNIT SUBSTATION "LC3"
REMOVE EXISTING PRIMARY SWITCH
REMOVE EXISTING SECONDARY MAIN SWITCH SECTION
REMOVE EXISTING 500 KVA, 12.47 KV PRIMARY TO
208Y/120 V. SECONDARY DRY-TYPE TRANSFORMER
REMOVE EXISTING SECONDARY DISTRIBUTION SECTION
REMOVE EXISTING PRIMARY CONDUIT & WIRING
REMOVE EXISTING PRIMARY CONDUIT & WIRING
SCALE: 1/8" = 1'-0"
ELECTRICAL PLAN - 2ND FLOOR - SOUTH PYLON - DEMOLITION
SCALE: 1/8" = 1'-0"
ELECTRICAL PLAN - 2ND FLOOR - NORTH PYLON - DEMOLITION
EXISTING PANEL "P1B" TO REMAIN
EXISTING PANEL "L6" TO REMAIN
EXISTING PANEL PP1 TO REMAIN
EXISTING PANELS TO REMAIN
REMOVE EXISTING FUSIBLE PANEL "S3"
REMOVE EXISTING FUSIBLE PANEL "S2"
REMOVE EXISTING FUSIBLE PANEL "P1A"
REMOVE EXISTING FUSIBLE PANEL "S1"
REMOVE EXISTING FUSIBLE LIGHTING PANEL # 1
REMOVE EXISTING FUSIBLE POWER PANEL # 1, SECTION 1
REMOVE EXISTING FUSIBLE POWER PANEL # 1, SECTION 2
EXISTING POWER PANEL P1 TO REMAIN
EXISTING SECONDARY FEEDER EXITS BOTTOM OF DISTRIBUTION SECTION
AND SERVES THE EXISTING MOTOR CONTROL CENTER ON THE FIRST FLOOR.
REMOVE EXISTING WIRING AND ABANDON EXISTING CONDUITS IN PLACE.
REMOVE EXISTING HANDRAIL SYSTEM AT EXISTING COUPLINGS AND
LOWER EXISTING SUBSTATION SECTIONS TO THE HANGAR FLOOR
THROUGH OPENING IN HANDRAIL. REINSTALL HANDRAIL AND COUPLINGS
AFTER WORK IS COMPLETE.
REMOVE EXISTING HANDRAIL SYSTEM AND LOWER EXISTING SUBSTATION SECTIONS
TO THE HANGAR FLOOR THROUGH OPENING IN HANDRAIL. CUT EXISTING STEEL
PIPES TO CREATE OPENING IN HANDRAIL SYSTEM. INSTALL COUPLINGS TO
RECONNECT THE EXISTING HANDRAIL PIPES AFTER WORK IS COMPLETE.
S
REMOVE EXISTING PULL BOX.
P
REMOVE EXISTING PRIMARY CONDUIT & WIRING.
REMOVE EXISTING PRIMARY WIRING & ABANDON CONCEALED CONDUIT.
S
S
S
S
EXISTING SECONDARY CONDUIT &
WIRING TO REMAIN (TYP.)
S
S
S
E-3
4
EL
EC
TR
IC
AL
P
LA
NS
- P
YL
ON
S - D
EM
OL
IT
IO
N
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
SCALE: 1/16" = 1'-0"
ELECTRICAL PLAN - HANGAR 90700 - NEW WORK
SEE "ELECTRICAL PLANS - SOUTH PYLON - NEW WORK,"
SHEET E-5 FOR NEW WORK IN THIS AREA.
SEE "ELECTRICAL PLANS - NORTH PYLON - NEW
WORK," SHEET E-5 FOR NEW WORK IN THIS AREA.
US
NEW MAIN SWITCHBOARD "MSB-N"
"MSB-N" MAIN BREAKER SECTION
"MSB-N" DISTRIBUTION SECTION
NEW MAIN SWITCHBOARD "MSB-S"
U
S
"MSB-S" MAIN BREAKER SECTION
"MSB-S" DISTRIBUTION SECTION
EXISTING MOTOR CONTROL
CENTER - TO REMAIN.
EXTEND UNDERGROUND
SECONDARY TO NEW PAD
MOUNTED TRANSFORMER.
EXTEND UNDERGROUND
SECONDARY TO NEW PAD
MOUNTED TRANSFORMER.
NEW PANEL "TS"
EXISTING PANEL
EXTEND NEW FEEDER TO SWITCHBOARD
"T3." SEE "ELECTRICAL PLAN - MEZZANINE -
SOUTH PYLON - NEW WORK," SHEET E-5,
FOR CONTINUATION.
EXTEND NEW FEEDER TO SWITCHBOARD
"T1." SEE "ELECTRICAL PLAN - MEZZANINE -
NORTH PYLON - NEW WORK," SHEET E-5,
FOR CONTINUATION.
EXTEND NEW FEEDER TO SWITCHBOARD
"T3." SEE "ELECTRICAL PLAN - MEZZANINE -
SOUTH PYLON - NEW WORK," SHEET E-5,
FOR CONTINUATION.
RUN CONDUITS CONCEALED
ABOVE LAY-IN CEILING
RUN CONDUITS EXPOSED
ON STRUCTURE
RUN CONDUITS EXPOSED
ON STRUCTURE
RUN CONDUITS EXPOSED
HIGH ON HANGAR WALL
PULL BOX - 48" HIGH X 36"
WIDE X 16" DEEP, NEMA 1
W/ SCREW COVER.
EXISTING HANGAR DOOR PANEL "HD-NW"
EXISTING HANGAR DOOR PANEL "HD-NE"EXISTING HANGAR DOOR PANEL "HD-SE"
EXISTING HANGAR DOOR PANEL "HD-SW"
"LB" FITTING
PULL BOX - 12" HIGH X 18"
WIDE X 6" DEEP, NEMA 1 W/
SCREW COVER.
PULL BOX - 12" HIGH X 18"
WIDE X 6" DEEP, NEMA 1
W/ SCREW COVER.
PULL BOX - 12" HIGH X 18"
WIDE X 6" DEEP, NEMA 1
W/ SCREW COVER.
PULL BOX - 12" HIGH X 18" WIDE X 6"
DEEP, NEMA 1 W/ SCREW COVER.
RUN CONDUIT EXPOSED
HIGH ON HANGAR WALL
RUN CONDUIT EXPOSED
HIGH ON HANGAR WALL
RUN CONDUIT SERVING PANEL "TS" EXPOSED
ON HANGAR WALL JUST ABOVE FIRST FLOOR
CEILING LEVEL
RUN CONDUIT EXPOSED
HIGH ON HANGAR WALL
SEE "LARGE SCALE PLAN -
SWITCHBOARD 'MSB-N',"
SHEET E-8, FOR ADDITIONAL
WORK IN THIS AREA.
SEE "LARGE SCALE PLAN - SWITCHBOARD 'MSB-S',"
SHEET E-13, FOR ADDITIONAL WORK IN THIS AREA.
PULL BOX - 48" HIGH X 36" WIDE X 16" DEEP,
NEMA 1 W/ SCREW COVER - LOCATE ABOVE
OFFICE ROOF.
ELECTRICAL LEGEND - NEW WORK:
EXISTING PANELBOARD - TO REMAIN.
NEW PANELBOARD.
EXISTING SECONDARY CONDUIT & WIRING - TO REMAIN & BE RECONNECTED.
NEW SECONDARY CONDUIT & WIRING.
S
T
NEW DRY-TYPE TRANSFORMER.
FLEXIBLE CONDUIT & WIRING CONNECTION - LIQUIDTIGHT FLEXIBLE METAL CONDUIT.
RUN CONDUIT EXPOSED
HIGH ON HANGAR WALL
E-4
5
EL
EC
TR
IC
AL
P
LA
N - H
AN
GA
R 9
07
00
- N
EW
W
OR
K
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
SCALE: 1/8" = 1'-0"
ELECTRICAL PLAN - MEZZANINE - SOUTH PYLON - NEW WORK
SCALE: 1/8" = 1'-0"
ELECTRICAL PLAN - MEZZANINE - NORTH PYLON - NEW WORK
NEW SWITCHBOARD "T3"
NEW SWITCHBOARD "T4"
S
S
S
S
NEW SWITCHBOARD "T1"
NEW SWITCHBOARD "LC3"
T
NEW DISTRIBUTION SECTION
NEW MAIN BREAKER SECTION
T
NEW DISTRIBUTION SECTION
NEW MAIN BREAKER SECTION
INSTALL NEW FEEDER TO NEW PANEL "TS." SEE
"ELECTRICAL PLAN - HANGAR 90700 - NEW WORK,"
SHEET E-4, FOR CONTINUATION.
NEW 300 KVA, 3Ø DRY-TYPE TRANSFORMER -
480 V. PRIMARY TO 208Y/120 V. SECONDARY.
NEW 500 KVA, 3Ø DRY-TYPE TRANSFORMER -
480 V. PRIMARY TO 208Y/120 V. SECONDARY.
SCALE: 1/8" = 1'-0"
ELECTRICAL PLAN - 2ND FLOOR - SOUTH PYLON - NEW WORK
SCALE: 1/8" = 1'-0"
ELECTRICAL PLAN - 2ND FLOOR - NORTH PYLON - NEW WORK
INSTALL NEW PANEL "LDP1"
INSTALL NEW PANEL "PDP1"
EXISTING POWER PANEL P1 TO REMAIN
EXISTING PANEL "P1B" TO REMAIN
EXISTING PANEL "L6" TO REMAIN
INSTALL NEW PANEL "P1A"
EXISTING PANEL PP1 TO REMAIN
INSTALL NEW PANEL "S3"
EXISTING SECONDARY CONDUIT &
WIRING TO REMAIN (TYP.)
EXISTING PANELS TO REMAIN
INSTALL NEW PANEL "S1"
EXISTING SECONDARY FEEDER EXITS BOTTOM OF DISTRIBUTION SECTION.
RECONNECT TO NEW CIRCUIT BREAKER IN SWITCHBOARD.
INSTALL NEW FEEDER TO NEW MAIN SWITCHBOARD
"MSB-S." SEE "ELECTRICAL PLAN - HANGAR 90700 -
NEW WORK," SHEET E-4, FOR CONTINUATION.
INSTALL NEW FEEDER TO NEW MAIN SWITCHBOARD
"MSB-N." SEE "ELECTRICAL PLAN - HANGAR 90700 -
NEW WORK," SHEET E-4, FOR CONTINUATION.
S
S
SS
S
S
S
S
S
S
S
USE OPENING IN HANDRAIL TO GET NEW SWITCHBOARD
SECTIONS TO THE MEZZANINE. INSTALL COUPLINGS TO
RECONNECT THE EXISTING HANDRAIL PIPES AFTER
WORK IS COMPLETE.
USE OPENING IN HANDRAIL TO GET NEW SWITCHBOARD
SECTIONS TO THE MEZZANINE. INSTALL COUPLINGS TO
RECONNECT THE EXISTING HANDRAIL PIPES AFTER
WORK IS COMPLETE.
THE CONTRACTOR SHALL ATTACH NEW CONDUITS TO EXISTING
STRUCTURE IN ACCORDANCE WITH THE NATIONAL ELECTRICAL
CODE. CONDUITS ABOVE PYLONS MAY BE ATTACHED TO EXISTING
BAR JOISTS, OR THE CONTRACTOR MAY SUSPEND A GALVANIZED
STEEL CHANNEL SYSTEM BELOW THE EXISTING ROOF STRUCTURE
TO SUPPORT THE NEW RUNS OF CONDUIT.
NOTE:
E-5
6
EL
EC
TR
IC
AL
P
LA
NS
- P
YL
ON
S - N
EW
W
OR
K
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
SINGLE LINE DIAGRAM - NORTH SERVICE
US
KWH METER
M
SEE PAD MOUNT TRANSFORMER
DETAILS, SHEET E-17.
UP
T
SINGLE LINE DIAGRAM - SOUTH SERVICE
US
M
A
SEE PAD MOUNT TRANSFORMER
DETAILS, SHEET E-17.
T
PAD MOUNT TRANSFORMER -
1000 KVA, 3Ø, 12.47 KV PRIMARY
TO 480Y/277 V. SECONDARY.
PAD MOUNT TRANSFORMER -
1500 KVA, 3Ø, 12.47 KV PRIMARY
TO 480Y/277 V. SECONDARY.
16
00
A
., 3
P
. G
FP
MA
IN
B
RE
AK
ER
A
V
25
00
A
., 3
P
. G
FP
MA
IN
B
RE
AK
ER
SWITCHBOARD "T1" SWITCHBOARD "LC3"
SWITCHBOARD "MSB-N" EXISTING MOTOR CONTROL CENTER
80
0 A
., 3
P
.
16
00 A
., 3
P
.
500 KVA, 3Ø DRY-TYPE TRANSFORMER - 480 V.
PRIMARY TO 208Y/120 V. SECONDARY.
80
0 A
., 3
P
.
300 KVA, 3Ø DRY-TYPE TRANSFORMER - 480 V.
PRIMARY TO 208Y/120 V. SECONDARY.
12
00
A
., 3
P
.
SWITCHBOARD "MSB-S"
SWITCHBOARD "T3" SWITCHBOARD "T4"
KWH METER
MEZZANINE
EXISTING 800 A., 3 P.
ENCLOSED MAIN BREAKER
MOUNTED ON MOTOR
CONTROL CENTER.
A
12
00
A
., 3
P
.
MA
IN
B
RE
AK
ER
A
20
00 A
., 3
P
.
MA
IN
B
RE
AK
ER
NO SCALE
SINGLE LINE DIAGRAM
WEATHERPROOF
"LB" FITTINGS
CORE DRILL EXISTING
WALL & GROUT
AROUND CONDUITS
8 CKTS. IN PARALLEL OF 4 - 600 MCM IN
4" PVC, SCH. 40 CONDUIT, EACH.
CONVERT PVC
CONDUITS TO RIGID
GALV. STEEL
BELOW GRADE.
EXTERIOR WALL
EXTERIOR WALL
WEATHERPROOF
"LB" FITTINGS
CORE DRILL EXISTING
WALL & GROUT
AROUND CONDUITS
VOLTMETER
AMMETER
V
VOLTMETER
AMMETER
V
VOLTMETER
AMMETER
V
VOLTMETER
AMMETER
2 CKTS. IN PARALLEL OF 4 - 500 MCM & 1 # 1/0
GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.
EXISTING
PANEL
"HD-NW"
EXISTING
PANEL
"HD-NE"
FIRST FLOOR
4" CONCRETE PAD
4" CONCRETE PAD
100 A., 3 P., 35 KAIC ENCLOSED CIRCUIT
BREAKER. PROVIDE PHENOLIC NAMEPLATE
INDICATING HANGAR DOOR PANEL SERVED.
100 A., 3 P., 35 KAIC, NEMA 3R ENCLOSED
CIRCUIT BREAKER. PROVIDE PHENOLIC
NAMEPLATE INDICATING HANGAR DOOR
PANEL SERVED.
4 # 2/0 & 1 # 6 GND. -
2" RIGID GALV.
STEEL CONDUIT
6 CKTS. IN PARALLEL OF 4 - 500 MCM IN
3 1/2" PVC, SCH. 40 CONDUIT, EACH.
CONVERT PVC
CONDUITS TO RIGID
GALV. STEEL
BELOW GRADE.
PANEL
"TS"
EXISTING
PANEL
EXISTING
PANEL
"HD-SW"
EXISTING
PANEL
"HD-SE"
PANEL
"PDP-1"
50
0 A
., 3
P
.
40
0 A
., 3
P
.
40
0 A
., 3
P
.
4 CKTS. IN PARALLEL OF 4 - 600 MCM & 1 - 250 MCM
GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.
2 CKTS. IN PARALLEL OF 4 - 250 MCM & 1 # 3 GND.
IN 3" RIGID GALV. STEEL CONDUIT, EACH.
4 # 4/0 & 1 # 4 GND. - 3" EMT TO
225 A., 3 P. BKR. IN PANEL "TS."
2 CKTS. IN PARALLEL OF 3 - 250 MCM & 1 # 2 GND.
IN 2 1/2" RIGID GALV. STEEL CONDUIT, EACH.
4 - 600 MCM & 1 # 3 GND. - EXISTING 4" C.
4 CKTS. IN PARALLEL OF 4 - 350 MCM & 1 # 3/0
GND. IN 3" RIGID GALV. STEEL CONDUIT, EACH.
30
0 A
., 3
P
.
PANEL
"LDP-1"
4 - 500 MCM & 1 # 3 GND. - EXISTING 4" C.
SECOND FLOOR
6 CKTS. IN PARALLEL OF 4 - 600 MCM & 1 - 350 MCM
GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.
2 CKTS. IN PARALLEL OF 3 - 500 MCM & 1 # 1/0
GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.
6 CKTS. IN PARALLEL OF 4 - 500 MCM & 1 # 250 MCM
GND. IN 4" RIGID GALV. STEEL CONDUIT, EACH.
60
0 A
., 3
P
.
PANEL
"P1A"
4 - 500 MCM & 1 # 3 GND. - EXISTING 4" C.
SECOND FLOOR
MEZZANINE
FIRST FLOOR
PANEL
"S3"
40
0 A
., 3
P
.
2 CKTS. IN PARALLEL OF 4 - 350 MCM &
1 # 1 GND. IN EXISTING 4" CONDUITS
40
0 A
., 3
P
.
PANEL
"S1"
4 - 600 MCM & 1 # 3 GND. - EXISTING 4" C.
# 3/0 COPPER - 1" PVC, SCH. 40 TO 3/4" X 20'-0" COPPERCLAD
GROUND ROD. # 3/0 COPPER - 1" PVC, SCH. 40 TO BUILDING STEEL. #
3/0 COPPER - 1" PVC, SCH. 40 TO METALLIC COLD WATER PIPE. # 3/0
COPPER - 1" PVC, SCH. 40 TO EXISTING COUNTERPOISE.
# 2/0 COPPER - 3/4" C. TO BUILDING STEEL
# 1/0 COPPER - 3/4" C. TO BUILDING STEEL
3 # 2 COPPER (15 KV) TYPE "EPR" W/ 1/3
CONCENTRIC NEUTRAL IN TWO-WAY 4" CONC.
ENCASED DUCT BANK - SEE DETAIL, SHEET E-17.
UP
PULL BOX - SEE "ELECTRICAL PLAN -
HANGAR 90700 - NEW WORK," SHEET
E-4, FOR SIZE AND LOCATION.
PULL BOX - SEE "ELECTRICAL PLAN -
HANGAR 90700 - NEW WORK," SHEET
E-4, FOR SIZE AND LOCATION.
3 # 2 COPPER (15 KV) TYPE "EPR" W/ 1/3
CONCENTRIC NEUTRAL IN TWO-WAY 4" CONC.
ENCASED DUCT BANK - SEE DETAIL, SHEET E-17.
10 KV LIGHTNING ARRESTER - BOND TO
TRANSFORMER GROUND CONNECTION.
SEE PAD MOUNT TRANSFORMER
DETAILS, SHEET E-17.
10 KV LIGHTNING ARRESTER - BOND TO
TRANSFORMER GROUND CONNECTION.
# 3/0 COPPER - 1" PVC, SCH. 40 TO 3/4" X 20'-0" COPPERCLAD
GROUND ROD. # 3/0 COPPER - 1" PVC, SCH. 40 TO BUILDING STEEL. #
3/0 COPPER - 1" PVC, SCH. 40 TO METALLIC COLD WATER PIPE. # 3/0
COPPER - 1" PVC, SCH. 40 TO EXISTING COUNTERPOISE.
4 # 2/0 & 1 # 6 GND. - 2" RIGID
GALV. STEEL CONDUIT.
4 # 2/0 & 1 # 6 GND. - 2" RIGID
GALV. STEEL CONDUIT
4 # 2/0 & 1 # 6
GND. - 2" EMT
4 # 2/0 & 1 # 4 GND. - 2" RIGID
GALV. STEEL CONDUIT.
4 # 2/0 & 1 # 4 GND. - 2" RIGID
GALV. STEEL CONDUIT.
E-6
7
SIN
GL
E L
IN
E D
IA
GR
AM
S
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
PANEL "S1"
AMP
BREAKER
PANELBOARD SCHEDULE
SPARE
SPACE ONLY
SPACE ONLY
13
11
9
7
3125
300 3
3
3
14
12 300
100
10
8
AMP
SPACE ONLY
SPACE ONLY
EXISTING PANEL PP1
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3
3
125 3 1
POLE
BREAKER
4
6
2 100
CKT. #
3
3
3
3
EXISTING LOAD
EXISTING MD-4
SPACE ONLY
SPACE ONLY
3
3
3
SURFACE MOUNTED PANEL W/ GROUND BUS
POLE A
ISOLATED FROM NEUTRAL BUS.
LOAD (AMPS)
B C
SPACE ONLY
SPACE ONLY
SPARE
LOAD SERVED
25 KAIC INTERRUPTING RATING480Y/277 V., 3Ø, 4 W.
400 A. M.L.O. (TOP MTD.)
EXISTING LOAD
ELEVATION - PANEL "S3"
2'-4 1/2"
7'-4
1
/4
"
1
KEY NOTES - PANEL "S3"
N.T.S.
EXISTING PANEL TO BE REMOVED AND REPLACED.
2 NEW PANELBOARD "S3" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 26" W. X 6.5" D. X 83" H.
1
2
3
RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR BID
PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.
5
INSTALL COUPLINGS AND EXTEND NEW CONDUITS ON EXISTING FEEDER FROM SWITCHBOARD "LC3." PULL IN NEW WIRING AS
SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUITS ARE 4" RIGID GALV. STEEL.
AMP
BREAKER
PANELBOARD SCHEDULE
SPACE ONLY
SPACE ONLY
13
11
9
7
3100
100 3
3
3
14
12
100
100
10
8
AMP
PANEL "S3"
SPACE ONLY
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3150
3
125 3 1
POLE
BREAKER
4
6
2
125
100
125
CKT. #
3
3
3
3
SPACE ONLY
SPACE ONLY
3
3
3
POLE A
LOAD (AMPS)
B C
SPARE
SPARE
LOAD SERVED
208Y/120 V., 3Ø, 4 W.
600 A. M.L.O. (TOP MTD.)
22 KAIC INTERRUPTING RATING SURFACE MOUNTED PANEL W/ GROUND BUS
ISOLATED FROM NEUTRAL BUS.
EXISTING FLOOR
RECEPTACLE
EXISTING FLOOR
RECEPTACLE
EXISTING WALL
RECEPTACLE
EXISTING WALL
RECEPTACLE
EXISTING PANEL L3
EXISTING PANEL L6
EXISTING PANEL L4
55
3
4 INSTALL COUPLING AND EXTEND NEW CONDUIT TO NEW PANEL. RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER.
FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.
4
2'-2"
6'-1
1"
5'-1 1/2"
7'-4 1
/4
"
3'-6"
7'-2
"
ELEVATION - PANEL "S1"
N.T.S.
1
KEY NOTES - PANEL "S1"
EXISTING PANEL TO BE REMOVED AND REPLACED. EXISTING PANEL HAS TWO INTERIORS INSTALLED IN ONE ENCLOSURE.
2 NEW PANELBOARD "S1" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 42" W. X 9.5" D. X 86" H.
3
RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR
BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.
INSTALL COUPLING AND EXTEND NEW CONDUIT ON EXISTING FEEDER FROM SWITCHBOARD "T1." PULL IN NEW WIRING AS
SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.
4
1
2
3
4
RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR
BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.
4 5 4
PANELBOARD NOTE:
PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT. OTHER
SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH NEW CIRCUIT
BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE PANELBOARD TO ENSURE THAT
THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW PANELBOARD WILL BE PROVIDED WITH
GROUNDING BUSHINGS.
PANELBOARD NOTE:
PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT.
OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH
NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE
PANELBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW
PANELBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.
EXISTING
FLOOR SLAB
EXISTING
FLOOR SLAB
5
CIRCUIT BREAKER NOTE:
EXISTING FUSE SIZES HAVE BEEN VERIFIED IN THE EXISTING FUSIBLE PANELBOARDS ONLY WHERE EXISTING FUSIBLE
SWITCH DOORS COULD BE OPENED WHILE THE SWITCH WAS ENERGIZED. FUSE SIZES HAVE NOT BEEN VERIFIED WHERE
THE SWITCH DOORS COULD NOT BE OPENED. THE CONTRACTOR SHALL SCHEDULE A POWER OUTAGE PRIOR TO
ORDERING THE NEW REPLACEMENT CIRCUIT BREAKER PANELBOARDS SO THAT ALL FUSIBLE SWITCH DOORS CAN BE
OPENED AND ALL FUSES SIZES CAN BE VERIFIED. THE CONTRACTOR SHALL PROVIDE NEW CIRCUIT BREAKERS IN THE
NEW PANELBOARDS WHICH ARE SIZED TO MATCH THE EXISTING FUSE SIZES. THE AS BUILT DRAWINGS PROVIDED AT
THE END OF CONSTRUCTION SHALL REFLECT THE EXACT CIRCUIT BREAKER SIZES.
E-7
8
PA
NE
LB
OA
RD
E
LE
VA
TIO
NS
- N
OR
TH
P
YL
ON
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
PANEL "P1A"
AMP
BREAKER
PANELBOARD SCHEDULE
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
13
11
9
7
3
3
3
3
14
12
10
8
AMP
SPARE
SPACE ONLY
EXISTING PANEL P1B
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3125
3
125 3 1
POLE
BREAKER
4
6
2
100
200
CKT. #
3
3
3
3
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
3
3
3
SURFACE MOUNTED PANEL W/ GROUND BUS
POLE A
ISOLATED FROM NEUTRAL BUS.
LOAD (AMPS)
B C
SPARE
SPACE ONLY
SPARE
LOAD SERVED
22 KAIC INTERRUPTING RATING208Y/120 V., 3Ø, 4 W.
400 A. M.L.O. (TOP MTD.)
EXISTING
FLOOR SLAB
2'-4 1/2"
7'-4
1
/4"
2'-2"
6'-1
1"
1
KEY NOTES - PANEL "P1A"
EXISTING PANEL TO BE REMOVED AND REPLACED.
2
3
RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR
BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.
REUSE EXISTING COUPLING AND EXTEND NEW CONDUIT ON EXISTING FEEDER FROM SWITCHBOARD "LC3." PULL IN NEW
WIRING AS SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.
4
PANELBOARD NOTE:
PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT.
OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH
NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE
PANELBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW
PANELBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.
ELEVATION - PANEL "P1A"
N.T.S.
NEW PANELBOARD "P1A" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 26" W. X 6.5" D. X 83" H.
1
2
3
44
4
LARGE SCALE PLAN - SWITCHBOARD "MSB-N"
SCALE: 1/4" = 1'-0"
NEW 4" HIGH CONCRETE PAD -
EXTEND 6" MINIMUM BEYOND
EDGES OF NEW SWITCHBOARD.
NEW SWITCHBOARD "MSB-N"
IN OUTDOOR ENCLOSURE.
FA
BR
IC
W
ID
TH
7
2"
6'-0" MAXIMUM
6"
3'-4" M
IN
.
10" MIN. DIA.
CONCRETE BASE
TOP RAIL
LINE POST
HOG RINGS (TYP.)
FABRIC
TENSION BAR
CARRIAGE BOLT
FABRIC
NO SCALE
DETAIL - CHAIN-LINK FENCE
LINE POST ATTACHMENTS
TOP RAIL ATTACHMENT
9-GAGE STEEL TIE WIRES
(2'-0" O.C. MAX.)
TENSION BAND (15" O.C. MAX. AND
WITHIN 4" FROM TOP AND BOTTOM
OF FABRIC)
TENSION BAR TO ENGAGE
EACH FABRIC LINK
CHAIN-LINK FABRIC (9 GAGE,
2" MESH)
END OR GATE POST DETAIL
CORNER, END, OR
PULL POST
TIE WIRES OR
CLIPS (TYP.)
TENSION WIRE
9-GAGE STEEL TIE
WIRE (15" O.C. MAX.
AND WITHIN 4" FROM
TOP AND BOTTOM
OF FABRIC)
FENCE NOTES:
1. WIRE TIES, RAILS AND POSTS SHALL BE CONSTRUCTED ON THE SWITCHBOARD SIDE OF THE FENCE
ALIGNMENT. CHAIN-LINK FABRIC SHALL BE PLACED ON THE SIDE OPPOSITE THE SWITCHBOARD AREA.
2. CORNER, END & PULL POSTS SHALL BE 2.875" O.D. MINIMUM.
3. LINE POSTS SHALL BE 2.375" O.D. MINIMUM.
4. TOP RAILS SHALL BE 1.66" O.D. MINIMUM.
1" ±
EXISTING CONCRETE FLOOR
CORE DRILL EXISTING CONCRETE
SLAB FOR POST INSTALLATIONS
CONSTRUCT NEW CHAIN LINK FENCE -
SEE DETAILS, THIS SHEET.
TWO 3'-0" WIDE CHAIN LINKE FENCE
GATES W/ PAD LOCKING PROVISIONS
12'-0"
15
'-6
"
ENCLOSED CIRCUIT BREAKERS FOR
HANGAR DOOR PANELS. SEE
"SINGLE LINE DIAGRAM," SHEET E-6.
CIRCUIT BREAKER NOTE:
EXISTING FUSE SIZES HAVE BEEN VERIFIED IN THE EXISTING FUSIBLE PANELBOARDS ONLY WHERE EXISTING FUSIBLE
SWITCH DOORS COULD BE OPENED WHILE THE SWITCH WAS ENERGIZED. FUSE SIZES HAVE NOT BEEN VERIFIED WHERE
THE SWITCH DOORS COULD NOT BE OPENED. THE CONTRACTOR SHALL SCHEDULE A POWER OUTAGE PRIOR TO
ORDERING THE NEW REPLACEMENT CIRCUIT BREAKER PANELBOARDS SO THAT ALL FUSIBLE SWITCH DOORS CAN BE
OPENED AND ALL FUSES SIZES CAN BE VERIFIED. THE CONTRACTOR SHALL PROVIDE NEW CIRCUIT BREAKERS IN THE
NEW PANELBOARDS WHICH ARE SIZED TO MATCH THE EXISTING FUSE SIZES. THE AS BUILT DRAWINGS PROVIDED AT
THE END OF CONSTRUCTION SHALL REFLECT THE EXACT CIRCUIT BREAKER SIZES.
E-8
9
PA
NE
LB
OA
RD
E
LE
VA
TIO
NS
- N
OR
TH
P
YL
ON
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
AMP
BREAKER
SWITCHBOARD SCHEDULE
SPACE ONLY
EXISTING HOIST
13
11
9
7
3
3
3
3
14
12
10
8
AMP
SWITCHBOARD "T1"
EXISTING PANEL HN
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3225
3
400 3 1
POLE
BREAKER
4
6
2
225
200
CKT. #
3
3
3
3
SPACE ONLY
EXISTING PANEL
3
3
3
POLE A
LOAD (AMPS)
B C
EXISTING PANEL P-7
EXISTING PANEL P-2
LOAD SERVED
35 KAIC INTERRUPTING RATING
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
EXISTING DISTRIBUTION
PANEL S1
EXISTING PANEL P-9
SPACE ONLY
225
30 200
480Y/277 V., 3Ø, 4 W.
2000 A. MAIN LUGS ONLY
FREE STANDING FRONT AND REAR
ACCESSIBLE SWITCHBOARD W/ GROUND
BUS ISOLATED FROM NEUTRAL BUS.
1
KEY NOTES - SWITCHBOARD "T1"
2
3
4
7'-6
"
3'-0"
ELEVATION - SWITCHBOARD "T1"
N.T.S.
5
6
7
400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 1
SPACE ONLY
225 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 3
8
9
10
225 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 4
225 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 5
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 6
11
12
30 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 7
800 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 22
SWITCHBOARD DEPTH SHALL BE 48"
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 8
1
2
3
5
4
6
8
7
2
2
2
2
9
15 16
17 18
19 20
21
22
3 3SPACE ONLY SPACE ONLY
3 3SPACE ONLY SPACE ONLY
3 3SPACE ONLY SPACE ONLY
3
SPACE ONLY
SWITCHBOARD "LC3"
2
EXISTING
FLOOR SLAB
SWITCHBOARD NOTE:
PHYSICAL SIZE OF NEW SWITCHBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE SWITCHBOARD
REPLACEMENT. OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING
CONDUCTORS WILL REACH NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE
ADJUSTED WITHIN THE SWITCHBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT
TERMINATIONS ON NEW SWITCHBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.
RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR
BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.
10
INSTALL 12" X 12" X 8" DEEP PULL BOX W/ SCREW COVER ON EXISTING CONDUIT AND EXTEND NEW CONDUIT NIPPLE FROM PULL
BOX TO NEW SWITCHBOARD. SPLICE EXISTING WIRING TO NEW WIRING W/ BUTT-TYPE COMPRESSION SPLICES& HEAT SHRINK
INSULATION AND EXTEND TO NEW CIRCUIT BREAKER. EXISTING CIRCUIT IS 4 # 3/0 & 1 # 2 GND. - 2" RIGID GALV. STEEL CONDUIT.
NEW PARALLEL FEEDER TO SWITCHBOARD "T1" FROM SWITCHBOARD "MSB-N" ON FIRST FLOOR.
12
11
10
10
800
2
E-9
10
SW
IT
CH
BO
AR
D "T
1" E
LE
VA
TIO
N
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
AMP
BREAKER
SWITCHBOARD SCHEDULE
EXISTING PANEL L-1
13
11
9
7
350
200 3
200 3
3
14
12
200
200
10
8
AMP
SWITCHBOARD "LC3"
SPARE
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3
3
200 3 1
POLE
BREAKER
4
6
2
200
600
200
CKT. #
3
3
3
3
EXISTING PANEL P-6
EXISTING PANEL P1A
3
3
3
POLE A
LOAD (AMPS)
B C
EXISTING PANEL P-8
EXISTING PANEL S3
LOAD SERVED
208Y/120 V., 3Ø, 4 W.
2000 A., 3 P. MAIN BREAKER
65 KAIC INTERRUPTING RATING FREE STANDING FRONT AND REAR ALIGNED,
FRONT AND REAR ACCESSIBLE SWITCHBOARD
W/ GROUND BUS BONDED TO NEUTRAL BUS.
EXISTING PANEL P-10
EXISTING LOAD
SPARE
EXISTING LOAD
EXISTING PANEL P-3
SPACE ONLY
EXISTING PANEL P-5
EXISTING DISTRIBUTION
PANEL # 2
153100 16 3EXISTING PANEL ME2 SPACE ONLY
300
400 400
200
1
KEY NOTES - SWITCHBOARD "LC3"
SWITCHBOARD "LC3" MAIN BREAKER SECTION
2
3
4
7'-6
"
2'-6" 3'-0"
ELEVATION - SWITCHBOARD "LC3"
N.T.S.
2000 A., 3 P. MAIN BREAKER
SWITCHBOARD "LC3" DISTRIBUTION SECTION
SURGE PROTECTIVE DEVICE
5
6
7
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 1
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 2
SPACE ONLY, CIRCUIT # 3
8
9
10
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 4
300 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 5
600 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 6
11
12
13
400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 7
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 9
14
15
16
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 10
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 11
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 12
17
18
19
50 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 13
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 14
100 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 15
20 SPACE ONLY
SWITCHBOARD DEPTH SHALL BE 48" FOR MAIN
BREAKER SECTION AND DISTRIBUTION SECTION.
5 6
87
9
10
400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 8
11
12
13 14
1615
17 18
19
20
20
17 18
19 20
3 SPACE ONLY
2 SPACE ONLY
3SPACE ONLY
2SPACE ONLY
EXISTING
FLOOR SLAB
21 RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT
BREAKER. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.
21
21
21
21 21
SWITCHBOARD NOTE:
PHYSICAL SIZE OF NEW SWITCHBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE SWITCHBOARD
REPLACEMENT. OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING
CONDUCTORS WILL REACH NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE
ADJUSTED WITHIN THE SWITCHBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT
TERMINATIONS ON NEW SWITCHBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.
1
2
3
4
METERING COMPARTMENT
SURGE PROTECTIVE DEVICE NOTE:
SURGE PROTECTIVE DEVICES (SPD) SHALL BE LISTED IN ACCORDANCE W/ UL 1449, 3RD EDITION AND SHALL BE A
TYPE 1 DEVICE. SPD SHALL PROVIDE PROTECTION OF LINE-NEUTRAL, LINE-GROUND, NEUTRAL-GROUND AND
LINE-LINE. EACH MODE OF PROTECTION SHALL BE FUSED W/ 200 KAIC SURGE RATED FUSES. SPD SHALL BE
FURNISHED W/ AN AUDIBLE ALARM, AN ALARM ON/OFF SWITCH AND AN ALARM PUSH TO TEST SWITCH. MINIMUM
SHORT CIRCUIT CURRENT RATING SHALL BE 200kA. MINIMUM SURGE CURRENT RATING PER PHASE SHALL BE
300kA. VOLTAGE PROTECTION RATINGS SHALL BE 700 VOLTS FOR LINE-NEUTRAL, LINE-GROUND AND
NEUTRAL-GROUND. VOLTAGE PROTECTION RATING SHALL BE 1200 VOLTS FOR LINE-LINE. SPD SHALL HAVE A
MINIMUM EMI/RFI FILTERING OF -50dB AT 100kHz WITH AN INSERTION RATIO OF 50:1 USING MIL-STD-220A
METHODOLOGY. SPD SHALL BE PROVIDED WITH ONE SET OF NO/NC CONTACTS, AND SHALL HAVE A FULL 10 YEAR
WARRANTY. SPD SHALL HAVE A NEMA 1 ENCLOSURE FOR INDOOR APPLICATIONS.
22 NEW PARALLEL FEEDER FROM DRY-TYPE TRANSFORMER.
22
E-10
11
SW
IT
CH
BO
AR
D "L
C3
" E
LE
VA
TIO
N
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
PANEL "LDP-1"
AMP
BREAKER
PANELBOARD SCHEDULE
EXISTING PANEL L13
SPACE ONLY
SPACE ONLY
13
11
9
7
3100
100 3
3
3
14
12 100
100
10
8
AMP
SPARE
EXISTING PANEL L1
LOAD SERVED
LOAD (AMPS)
A B C
5
CKT. #
3200
1 1
POLE
BREAKER
4
6
2 200
CKT. #
3
3
3
3
SPARE
SPARE
SPACE ONLY
SPACE ONLY
3
3
3
SURFACE MOUNTED PANEL W/ GROUND BUS
POLE A
ISOLATED FROM NEUTRAL BUS.
LOAD (AMPS)
B C
SPACE ONLY
SPACE ONLY
LOAD SERVED
22 KAIC INTERRUPTING RATING208Y/120 V., 3Ø, 4 W.
400 A. M.L.O. (TOP MTD.)
EXISTING PANEL L2
EXISTING OUTLET - C130
TECH OFFICE
200
3
15
2SPACE ONLY
EXISTING LOAD 20
ELEVATION - PANEL "LDP-1"
N.T.S.
1
KEY NOTES - PANEL "LDP-1"
EXISTING PANEL TO BE REMOVED AND REPLACED.
2
3
RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR
BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.
INSTALL COUPLING AND EXTEND NEW CONDUIT ON EXISTING PARALLEL FEEDER FROM SWITCHBOARD "T4." PULL IN NEW
WIRING AS SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.
4
RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR
BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 3/4" RIGID GALV. STEEL.
PANELBOARD NOTE:
PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT.
OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH
NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE
PANELBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW
PANELBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.
5
NEW PANELBOARD "LDP-1" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 26" W. X 6.5" D. X 83" H.
2'-4 1/2"
2'-2"
7'-3
"
6'-1
1"
3
4
4
5
6
44
RECONNECT EXISTING EMPTY CONDUIT TO NEW PANELBOARD. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS
3/4" RIGID GALV. STEEL.
6
RECONNECT EXISTING EMPTY CONDUIT TO NEW PANELBOARD. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2"
RIGID GALV. STEEL.
7
7
1
2
ELEVATION - PANEL "PDP-1"
N.T.S.
PANEL "PDP-1"
AMP
BREAKER
PANELBOARD SCHEDULE
EXISTING AIR COMPR.
SPARE
SPACE ONLY
13
11
9
7
3200
200 3
3
3
14
12 200
200
10
8
AMP
LOAD SERVED
LOAD (AMPS)
A B C
5
CKT. #
3
1
POLE
BREAKER
4
6
2 200
CKT. #
3
3
3
3
EXISTING AIR COMPR.
EXISTING PANEL P5
SPARE
SPACE ONLY
3
3
3
SURFACE MOUNTED PANEL W/ GROUND BUS
POLE A
ISOLATED FROM NEUTRAL BUS.
LOAD (AMPS)
B C
SPACE ONLY
SPACE ONLY
LOAD SERVED
25 KAIC INTERRUPTING RATING480Y/277 V., 3Ø, 4 W.
400 A. M.L.O. (TOP MTD.)
EXISTING PANEL P1
EXISTING MD4 WASH
RACK
3
1
KEY NOTES - PANEL "PDP-1"
EXISTING PANEL TO BE REMOVED AND REPLACED.
2
3
RECONNECT EXISTING CONDUIT TO NEW PANELBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR
BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.
INSTALL COUPLING AND EXTEND NEW CONDUIT ON EXISTING FEEDER FROM SWITCHBOARD "T3." PULL IN NEW WIRING AS
SHOWN ON "SINGLE LINE DIAGRAM." FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.
4
PANELBOARD NOTE:
PHYSICAL SIZE OF NEW PANELBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE PANELBOARD REPLACEMENT.
OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING CONDUCTORS WILL REACH
NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE ADJUSTED WITHIN THE
PANELBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT TERMINATIONS ON NEW
PANELBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.
5
NEW PANELBOARD "PDP-1" - APPROXIMATE DIMENSIONS OF NEW BOX SHALL BE 26" W. X 6.5" D. X 83" H.
RECONNECT EXISTING EMPTY CONDUIT TO NEW PANELBOARD. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2"
RIGID GALV. STEEL.
SPACE ONLY
SPACE ONLY
SPACE ONLY 3
3
100 200
1
2
4'-11 1/4"
2'-2"
7'-3
"
6'-1
1"
3
4
4
5
4
CIRCUIT BREAKER NOTE:
EXISTING FUSE SIZES HAVE BEEN VERIFIED IN THE EXISTING FUSIBLE PANELBOARDS ONLY WHERE EXISTING FUSIBLE
SWITCH DOORS COULD BE OPENED WHILE THE SWITCH WAS ENERGIZED. FUSE SIZES HAVE NOT BEEN VERIFIED WHERE
THE SWITCH DOORS COULD NOT BE OPENED. THE CONTRACTOR SHALL SCHEDULE A POWER OUTAGE PRIOR TO
ORDERING THE NEW REPLACEMENT CIRCUIT BREAKER PANELBOARDS SO THAT ALL FUSIBLE SWITCH DOORS CAN BE
OPENED AND ALL FUSES SIZES CAN BE VERIFIED. THE CONTRACTOR SHALL PROVIDE NEW CIRCUIT BREAKERS IN THE
NEW PANELBOARDS WHICH ARE SIZED TO MATCH THE EXISTING FUSE SIZES. THE AS BUILT DRAWINGS PROVIDED AT
THE END OF CONSTRUCTION SHALL REFLECT THE EXACT CIRCUIT BREAKER SIZES.
E-11
12
PA
NE
LB
OA
RD
E
LE
VA
TIO
NS
- S
OU
TH
P
YL
ON
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
AMP
BREAKER
SWITCHBOARD SCHEDULE
SPACE ONLY
13
11
9
7
3
3
3
3
14
12
10
8
AMP
SWITCHBOARD "T3"
EXISTING PANEL PDP-1
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3
3
400 3 1
POLE
BREAKER
4
6
2
CKT. #
3
3
3
3
SPACE ONLY
3
3
3
POLE A
LOAD (AMPS)
B C
LOAD SERVED
35 KAIC INTERRUPTING RATING
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
NEW PANEL "TS" SPACE ONLY
400
480Y/277 V., 3Ø, 4 W.
800 A. MAIN LUGS ONLY
FREE STANDING FRONT AND REAR
ACCESSIBLE SWITCHBOARD W/ GROUND
BUS ISOLATED FROM NEUTRAL BUS.
1
KEY NOTES - SWITCHBOARD "T3"
2
3
4
7'-6
"
3'-0"
ELEVATION - SWITCHBOARD "T3"
N.T.S.
5
6
400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 1
400 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 5
SPACE ONLY
SWITCHBOARD DEPTH SHALL BE 48"
1
3
3
2
3
3
3
3
3
15 16
17 18
19 20
21 22
3 3SPACE ONLY SPACE ONLY
3 3SPACE ONLY SPACE ONLY
3 3SPACE ONLY SPACE ONLY
3SPACE ONLY
2
EXISTING
FLOOR SLAB
SWITCHBOARD NOTE:
PHYSICAL SIZE OF NEW SWITCHBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE SWITCHBOARD
REPLACEMENT. OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING
CONDUCTORS WILL REACH NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE
ADJUSTED WITHIN THE SWITCHBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT
TERMINATIONS ON NEW SWITCHBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.
RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT BREAKER. FOR
BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.
NEW PARALLEL FEEDER TO SWITCHBOARD "T3" FROM SWITCHBOARD "MSB-S" ON FIRST FLOOR.
33
33
4
SPACE ONLY
SPACE ONLY
SPACE ONLYSPACE ONLY
SPACE ONLY
SPACE ONLY
2 SPACE ONLY
3
SPACE ONLY
5
NEW FEEDER TO PANELBOARD "TS" ON FIRST FLOOR.
6
23 24
AMP
BREAKER
PANELBOARD SCHEDULE
SPACE ONLY 9
7
3
3
10
8
AMP
PANEL "TS"
SPACE ONLY
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3
3
225 3 1
POLE
BREAKER
4
6
2
CKT. #
3
3
SPACE ONLY
3
3
3
POLE A
LOAD (AMPS)
B C
LOAD SERVED
14 KAIC INTERRUPTING RATING
EXISTING PANELBOARD SPACE ONLY
480Y/277 V., 3Ø, 4 W.
400 A., 3 P. MAIN BREAKER
SURFACE MOUNTED PANEL W/ GROUND BUS
ISOLATED FROM NEUTRAL BUS.
SPACE ONLY
SPACE ONLY
SPACE ONLYSPACE ONLY
SPACE ONLY
E-12
13
SW
IT
CH
BO
AR
D "T
3" E
LE
VA
TIO
N
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
AMP
BREAKER
SWITCHBOARD SCHEDULE
13
11
9
7
3
3
3
3
14
12
10
8
AMP
SWITCHBOARD "T4"
EXISTING LOAD
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3
3
100 3 1
POLE
BREAKER
4
6
2 200
CKT. #
3
3
3
3
3
3
3
POLE A
LOAD (AMPS)
B C
LOAD SERVED
208Y/120 V., 3Ø, 4 W.
1200 A., 3 P. MAIN BREAKER
65 KAIC INTERRUPTING RATING FREE STANDING FRONT AND REAR ALIGNED,
FRONT AND REAR ACCESSIBLE SWITCHBOARD
W/ GROUND BUS BONDED TO NEUTRAL BUS.
EXISTING LOAD
SPACE ONLY
EXISTING LOAD
153 16 3 SPACE ONLY
1
KEY NOTES - SWITCHBOARD "T4"
SWITCHBOARD "T4" MAIN BREAKER SECTION
2
3
4
7'-6
"
2'-6" 3'-0"
ELEVATION - SWITCHBOARD "T4"
N.T.S.
1200 A., 3 P. MAIN BREAKER
SWITCHBOARD "T4" DISTRIBUTION SECTION
SURGE PROTECTIVE DEVICE
5
6
7
100 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 1
200 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 2
8
9
10
11
12
SPACE ONLY
SWITCHBOARD DEPTH SHALL BE 48" FOR MAIN
BREAKER SECTION AND DISTRIBUTION SECTION.
5 6
710
8
10
10
9
10
17 18
19 20
3 SPACE ONLY
2 SPACE ONLY
3SPACE ONLY
2SPACE ONLY
EXISTING
FLOOR SLAB
RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT
BREAKER. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 4" RIGID GALV. STEEL.
SWITCHBOARD NOTE:
PHYSICAL SIZE OF NEW SWITCHBOARD SHOWN IS MEANT TO DEFINE THE INTENTION OF THE SWITCHBOARD
REPLACEMENT. OTHER SIZES MAY BE ACCEPTABLE, BUT CARE MUST BE TAKEN TO ENSURE THAT EXISTING
CONDUCTORS WILL REACH NEW CIRCUIT BREAKER TERMINALS. CIRCUIT BREAKERS LOCATIONS MAY HAVE TO BE
ADJUSTED WITHIN THE SWITCHBOARD TO ENSURE THAT THE EXISTING CONDUCTORS WILL REACH. ALL CONDUIT
TERMINATIONS ON NEW SWITCHBOARD WILL BE PROVIDED WITH GROUNDING BUSHINGS.
1
2
3
4
125 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 4
300 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 5
300 A., 3 P. CIRCUIT BREAKER, CIRCUIT # 8
125
300
300
EXISTING LOAD
EXISTING PANEL LDP-1
1010
10
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
11
11
RECONNECT EXISTING CONDUIT TO NEW SWITCHBOARD & RECONNECT EXISTING WIRING TO NEW CIRCUIT
BREAKER. FOR BID PURPOSES, ASSUME THAT EXISTING CONDUIT IS 2" RIGID GALV. STEEL.
1212
NEW SWITCHBOARD "MSB-S"
LARGE SCALE PLAN - SWITCHBOARD "MSB-S"
SCALE: 1/4" = 1'-0"
ENCLOSED CIRCUIT BREAKERS FOR
HANGAR DOOR PANELS. SEE
"SINGLE LINE DIAGRAM," SHEET E-6.
NEW 4" HIGH CONCRETE PAD -
EXTEND 6" MINIMUM BEYOND
EDGES OF NEW SWITCHBOARD.
METERING COMPARTMENT
SURGE PROTECTIVE DEVICE NOTE:
SURGE PROTECTIVE DEVICES (SPD) SHALL BE LISTED IN ACCORDANCE W/ UL 1449, 3RD EDITION AND SHALL BE A
TYPE 1 DEVICE. SPD SHALL PROVIDE PROTECTION OF LINE-NEUTRAL, LINE-GROUND, NEUTRAL-GROUND AND
LINE-LINE. EACH MODE OF PROTECTION SHALL BE FUSED W/ 200 KAIC SURGE RATED FUSES. SPD SHALL BE
FURNISHED W/ AN AUDIBLE ALARM, AN ALARM ON/OFF SWITCH AND AN ALARM PUSH TO TEST SWITCH. MINIMUM
SHORT CIRCUIT CURRENT RATING SHALL BE 200kA. MINIMUM SURGE CURRENT RATING PER PHASE SHALL BE
300kA. VOLTAGE PROTECTION RATINGS SHALL BE 700 VOLTS FOR LINE-NEUTRAL, LINE-GROUND AND
NEUTRAL-GROUND. VOLTAGE PROTECTION RATING SHALL BE 1200 VOLTS FOR LINE-LINE. SPD SHALL HAVE A
MINIMUM EMI/RFI FILTERING OF -50dB AT 100kHz WITH AN INSERTION RATIO OF 50:1 USING MIL-STD-220A
METHODOLOGY. SPD SHALL BE PROVIDED WITH ONE SET OF NO/NC CONTACTS, AND SHALL HAVE A FULL 10 YEAR
WARRANTY. SPD SHALL HAVE A NEMA 1 ENCLOSURE FOR INDOOR APPLICATIONS.
13
13 NEW PARALLEL FEEDER FROM DRY-TYPE TRANSFORMER.
E-13
14
SW
IT
CH
BO
AR
D "T
4" E
LE
VA
TIO
N
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
AMP
BREAKER
SWITCHBOARD SCHEDULE
13
11
9
7
3
3
3
3
14
12
10
8
AMP
SWITCHBOARD "MSB-N"
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3
3
1600
3 1
POLE
BREAKER
4
6
2
800
CKT. #
3
3
3
3
3
3
3
POLE A
LOAD (AMPS)
B C
LOAD SERVED
480Y/277 V., 3Ø, 4 W.
2500 A., 3 P. GFP MAIN BREAKER
50 KAIC INTERRUPTING RATING FREE STANDING FRONT AND REAR ALIGNED,
FRONT ACCESSIBLE SWITCHBOARD W/
OUTDOOR WEATHERPROOF ENCLOSURE &
GROUND BUS BONDED TO NEUTRAL BUS.
SPACE ONLY
153 16 3 SPACE ONLY
1
KEY NOTES - SWITCHBOARD "MSB-N"
SWITCHBOARD "MSB-N" MAIN BREAKER SECTION
2
3
4
7'-6
"
2'-6" 3'-0"
ELEVATION - SWITCHBOARD "MSB-N"
N.T.S.
2500 A., 3 P. MAIN BREAKER
SWITCHBOARD "MSB-N" DISTRIBUTION SECTION
SURGE PROTECTIVE DEVICE
5
6
7
1600 A., 3 P. CIRCUIT BREAKER
SPACE ONLY
SWITCHBOARD DEPTH SHALL BE 48" FOR MAIN
BREAKER SECTION AND DISTRIBUTION SECTION.
7 7
77
7
7
7
7
17 18 2 SPACE ONLY2SPACE ONLY
EXISTING
FLOOR SLAB
1
2
3
4
SWITCHBOARD "T1"
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
EXISTING MOTOR CONTROL
CENTER "MCC"
SPACE ONLY
SPACE ONLY
SPACE ONLY
5
800 A., 3 P. CIRCUIT BREAKER
6
7
77
SPACE ONLY SPACE ONLY
SWITCHBOARD "MSB-N"
BUILDING 90700 SERVICE ENTRANCE 1 OF 2
SERVICE NUMBER 2 IS LOCATED IN THE EQUIPMENT ROOM ON
THE SOUTH END OF THIS BUILDING. SEE THE MAP BELOW FOR THE LOCATION.
SERVICE ENTRANCE 1 OF 2
SERVICE ENTRANCE 2 OF 2
8 SERVICE ENTRANCE ENGRAVED PHENOLIC NAMEPLATE. SEE DETAIL, THIS SHEET.
8
DETAIL - SERVICE ENTRANCE NAMEPLATE
N.T.S.
METERING COMPARTMENT
GFP COMPARTMENT
NOTE:
THIS ELEVATION DOES NOT INCLUDE THE OUTDOOR ENCLOSURE. SEE
"OUTDOOR ENCLOSURE ELEVATION - SWITCHBOARD 'MSB-N'," THIS SHEET.
OUTDOOR ENCLOSURE ELEVATION - SWITCHBOARD "MSB-N"
N.T.S.
FRONT VIEW SIDE VIEW
7'-8
1
5/1
6"
5'-1"SWITCHBOARD WIDTH 1/8"1/8"
4 1/2" 2 1/2"
SLOPED ROOF
KEY LOCK & HANDLE
VENTILATION OPENINGS
SURGE PROTECTIVE DEVICE NOTE:
SURGE PROTECTIVE DEVICES (SPD) SHALL BE LISTED IN ACCORDANCE W/ UL 1449, 3RD EDITION AND
SHALL BE A TYPE 1 DEVICE. SPD SHALL PROVIDE PROTECTION OF LINE-NEUTRAL, LINE-GROUND,
NEUTRAL-GROUND AND LINE-LINE. EACH MODE OF PROTECTION SHALL BE FUSED W/ 200 KAIC SURGE
RATED FUSES. SPD SHALL BE FURNISHED W/ AN AUDIBLE ALARM, AN ALARM ON/OFF SWITCH AND AN
ALARM PUSH TO TEST SWITCH. MINIMUM SHORT CIRCUIT CURRENT RATING SHALL BE 200kA. MINIMUM
SURGE CURRENT RATING PER PHASE SHALL BE 300kA. VOLTAGE PROTECTION RATINGS SHALL BE 1200
VOLTS FOR LINE-NEUTRAL, LINE-GROUND AND NEUTRAL-GROUND. VOLTAGE PROTECTION RATING
SHALL BE 2000 VOLTS FOR LINE-LINE. SPD SHALL HAVE A MINIMUM EMI/RFI FILTERING OF -50dB AT
100kHz WITH AN INSERTION RATIO OF 50:1 USING MIL-STD-220A METHODOLOGY. SPD SHALL BE
PROVIDED WITH ONE SET OF NO/NC CONTACTS, AND SHALL HAVE A FULL 10 YEAR WARRANTY. SPD
SHALL HAVE A NEMA 1 ENCLOSURE FOR INDOOR APPLICATIONS.
PHENOLIC ENGRAVED NAMEPLATE -
8" X 10" MINIMUM WITH 1/8" HIGH
LETTERING - WHITE NAMEPLATE W/
BLACK CORE.
E-14
15
MA
IN
S
WIT
CH
BO
AR
D "M
SB
-N
" E
LE
VA
TIO
N
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
AMP
BREAKER
SWITCHBOARD SCHEDULE
13
11
9
7
3
3
3
3
14
12
10
8
AMP
SWITCHBOARD "MSB-S"
LOAD SERVED
LOAD (AMPS)
A B C
5
3
CKT. #
3
3
3 1
POLE
BREAKER
4
6
2
CKT. #
3
3
3
3
3
3
3
POLE A
LOAD (AMPS)
B C
LOAD SERVED
480Y/277 V., 3Ø, 4 W.
1600 A., 3 P. GFP MAIN BREAKER
50 KAIC INTERRUPTING RATING FREE STANDING FRONT AND REAR ALIGNED,
FRONT ACCESSIBLE SWITCHBOARD W/
GROUND BUS BONDED TO NEUTRAL BUS.
SPACE ONLY
153 16 3 SPACE ONLY
1
KEY NOTES - SWITCHBOARD "MSB-S"
SWITCHBOARD "MSB-S" MAIN BREAKER SECTION
2
3
4
7'-6
"
2'-6" 3'-0"
ELEVATION - SWITCHBOARD "MSB-S"
N.T.S.
1600 A., 3 P. MAIN BREAKER
SWITCHBOARD "MSB-S" DISTRIBUTION SECTION
SURGE PROTECTIVE DEVICE
5
6
1200 A., 3 P. CIRCUIT BREAKER
SPACE ONLY
SWITCHBOARD DEPTH SHALL BE 48" FOR MAIN
BREAKER SECTION AND DISTRIBUTION SECTION.
5
6
6
6
17 18
SWITCHBOARD "T3"
2 SPACE ONLY2SPACE ONLY
EXISTING
FLOOR SLAB
1
2
3
4
1200
66
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLYSPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
SPACE ONLY
66
6
SPACE ONLY
7
7 SERVICE ENTRANCE ENGRAVED PHENOLIC NAMEPLATE. SEE DETAIL, THIS SHEET.
SWITCHBOARD "MSB-S"
BUILDING 90700 SERVICE ENTRANCE 2 OF 2
SERVICE NUMBER 1 IS LOCATED IN THE STORAGE AREA ON
THE NORTH END OF THIS BUILDING. SEE THE MAP BELOW FOR THE LOCATION.
SERVICE ENTRANCE 1 OF 2
SERVICE ENTRANCE 2 OF 2
DETAIL - SERVICE ENTRANCE NAMEPLATE
N.T.S.
METERING COMPARTMENT
GFP COMPARTMENT
SPACE ONLY
SPACE ONLY
SURGE PROTECTIVE DEVICE NOTE:
SURGE PROTECTIVE DEVICES (SPD) SHALL BE LISTED IN ACCORDANCE W/ UL 1449, 3RD EDITION AND SHALL BE A
TYPE 1 DEVICE. SPD SHALL PROVIDE PROTECTION OF LINE-NEUTRAL, LINE-GROUND, NEUTRAL-GROUND AND
LINE-LINE. EACH MODE OF PROTECTION SHALL BE FUSED W/ 200 KAIC SURGE RATED FUSES. SPD SHALL BE
FURNISHED W/ AN AUDIBLE ALARM, AN ALARM ON/OFF SWITCH AND AN ALARM PUSH TO TEST SWITCH. MINIMUM
SHORT CIRCUIT CURRENT RATING SHALL BE 200kA. MINIMUM SURGE CURRENT RATING PER PHASE SHALL BE
300kA. VOLTAGE PROTECTION RATINGS SHALL BE 1200 VOLTS FOR LINE-NEUTRAL, LINE-GROUND AND
NEUTRAL-GROUND. VOLTAGE PROTECTION RATING SHALL BE 2000 VOLTS FOR LINE-LINE. SPD SHALL HAVE A
MINIMUM EMI/RFI FILTERING OF -50dB AT 100kHz WITH AN INSERTION RATIO OF 50:1 USING MIL-STD-220A
METHODOLOGY. SPD SHALL BE PROVIDED WITH ONE SET OF NO/NC CONTACTS, AND SHALL HAVE A FULL 10
YEAR WARRANTY. SPD SHALL HAVE A NEMA 1 ENCLOSURE FOR INDOOR APPLICATIONS.
PHENOLIC ENGRAVED NAMEPLATE -
8" X 10" MINIMUM WITH 1/8" HIGH
LETTERING - WHITE NAMEPLATE W/
BLACK CORE.
E-15
16
MA
IN
S
WIT
CH
BO
AR
D "M
SB
-S
" E
LE
VA
TIO
N
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
PRIMARY RISER DIAGRAM - NORTH SERVICE
NO SCALE
REMOVE EXISTING PRIMARY JUNCTION
CABINET & INSTALL NEW JUNCTION
CABINET ON EXISTING CONCRETE PAD.
RECONNECT EXISTING PRIMARY
CONDUCTORS TO NEW JUNCTION CABINET.
NEW 4-WAY, 600 A., 15 KV PAD MOUNTED
PRIMARY SWITCH - S & C VISTA 413.
NEW PAD MOUNTED
TRANSFORMER
3 # 2 COPPER (15 KV) TYPE "EPR" W/ 1/3
CONCENTRIC NEUTRAL IN TWO-WAY 4" CONC.
ENCASED DUCT BANK - SEE DETAIL, SHEET E-17.
3 # 4/0 COPPER (15 KV) TYPE "EPR" W/ 1/3
CONCENTRIC NEUTRAL IN 5" HDPE
DIRECTIONAL BORE DUCT
EXISTING PRIMARY CIRCUITS TO
REMAIN & BE RECONNECTED
PRIMARY RISER DIAGRAM - SOUTH SERVICE
NO SCALE
NEW PRIMARY JUNCTION CABINET
W/ 4 POINT, 600 A. JUNCTIONS
PULL 3 # 2 COPPER (15 KV) TYPE "EPR" W/
1/3 CONCENTRIC NEUTRAL IN EXISTING 5"
DUCT TO EXISTING PRIMARY SWITCH.
NEW PAD MOUNTED
TRANSFORMER
3 # 2 COPPER (15 KV) TYPE "EPR" W/ 1/3
CONCENTRIC NEUTRAL IN 4" HDPE
DIRECTIONAL BORE DUCT
NEW UNDERGROUND SECONDARY
TO MAIN SWITCHBOARD "MSB-N"
NEW UNDERGROUND SECONDARY
TO MAIN SWITCHBOARD "MSB-S"
600 A. DEADBREAK
ELBOWS
600 A. DEADBREAK
ELBOWS W/ TAP
REDUCING PLUGS &
200 A. LOADBREAK
ELBOWS
200 A. LOADBREAK ELBOWS
10 KV LIGHTNING ARRESTERS
200 A. LOADBREAK ELBOWS
10 KV LIGHTNING ARRESTERS
600 A. DEADBREAK
ELBOWS W/ TAP
REDUCING PLUGS &
200 A. LOADBREAK
ELBOWS
EXISTING 4-WAY, 600 A., 15 KV
PAD MOUNTED PRIMARY SWITCH
600 A. DEADBREAK
ELBOWS W/ TAP
REDUCING PLUGS &
200 A. LOADBREAK
ELBOWS
E-16
17
PR
IM
AR
Y R
IS
ER
D
IA
GR
AM
S
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
DETAIL - TWO-WAY 4" CONCRETE ENCASED DUCT BANK
3"
3500 P.S.I. CONCRETE
NO SCALE
3" 3"
3"
4" PVC CONDUIT (TYP.)
3"
RIGID STEEL 90 DEGREE ELBOW (TYP.)
PAD MOUNT TRANSFORMER DETAILS
TWO-WAY 4" CONCRETE ENCASED
DUCT BANK - SEE DETAIL, THIS SHEET
NOTES:
NOT TO SCALE
SECTION A
E17E17
TYPICAL "T-TAP"
#4 BARS AT 12" O.C. EACH WAY (TYP.)
TYPICAL SECONDARY CONDUIT
W/ SHOP DRAWINGS.
VERIFY CONDUIT STUB-UP LOCATION
#3/0 IN SECONDARY SECTION
2#4 CONT. (TYP.)
CAP ALL SPARE CONDUITS.
TYPICAL PRIMARY CONDUIT
4"
12"
8"
12"
7"
5"
PLAN VIEW
TERMINATE W/ GROUNDING
NOT TO SCALE
BUSHINGS & BOND TO GROUND.
8" MINIMUM
6" TYPICAL
G
G
#3/0 IN PRIMARY SECTION
G
CONCRETE PAD
G
G
A
RIGID STEEL TO PVC, SCH. 80
CONDUIT ADAPTER (TYP.)
#3/0 GROUND GRID
#3/0 BARE COPPER GROUND
BOLTS PER MANUFACTURER'S
CONCRETE PAD W/ ANCHOR
SECURE TRANSFORMER TO
GRID (TYPICAL)
SPECIFICATIONS
GROUND ROD (TYP. - 4.)
3/4" X 20'-0" COPPERCLAD
OUTLINE OF TRANSFORMER
G
PROVIDE OPENING IN CONC. SLAB
FOR PRIMARY AND SECONDARY
CONDUITS. FILL OPENING W/ GRAVEL.
E17E17
NOT TO SCALE
PRIMARY JUNCTION CABINET DETAIL
DETAILS," THIS SHEET.
JUNCTION CABINET INSTALLATION
600 A. DEADBREAK CONNECTORS
CONCRETE PAD - SEE "PRIMARY
HINGED SWING LID (SHOWN IN OPEN POSITION)
SECTION B
PRIMARY JUNCTION CABINET
NOTES:
NOT TO SCALE
12" MINIMUM
6" TYPICAL
CONCRETE PAD
#2/0 TO CASE GROUND
#3/0 BARE COPPER GROUND
#3/0 GROUND GRID
GRID (TYPICAL)
SECURE JUNCTION CABINET TO
SPECIFICATIONS
CONCRETE PAD W/ ANCHOR
BOLTS PER MANUFACTURER'S
PLAN VIEW
NOT TO SCALE
G
OUTLINE OF JUNCTION CABINET
G
G
B
G
RIGID GALV. STEEL ELBOWS (TYP.)
BUSHINGS & BOND TO GROUND.
TERMINATE W/ GROUNDING
TYPICAL PRIMARY CONDUIT
CAP ALL SPARE CONDUITS.
6"
4"
VERIFY CONDUIT STUB-UP LOCATION
REBAR - 12" O.C. EACH WAY.
3500 PSI CONCRETE W/ # 4
10"
W/ SHOP DRAWINGS.
TOOLED EDGES
FOR PRIMARY CONDUITS
PROVIDE OPENING IN CONC. SLAB
G
G
TYPICAL "T-TAP"
18"
3/4" X 20'-0" COPPERCLAD GROUND
ROD - 18" BELOW GRADE (TYP. - 4.)
PVC TO RIGID GALV.
COUPLING IN CONCRETE.
STEEL COUPLING - ENCASE
INSTALLATION DETAILS
PRIMARY SWITCH INSTALLATION DETAILS
SECTION C
NOTES:
NOT TO SCALE
12" MINIMUM
6" TYPICAL
CONCRETE PAD
#2/0 TO CASE GROUND
#3/0 BARE COPPER GROUND
#3/0 GROUND GRID
GRID (TYPICAL)
SECURE JUNCTION CABINET TO
SPECIFICATIONS
CONCRETE PAD W/ ANCHOR
BOLTS PER MANUFACTURER'S
PLAN VIEW
NOT TO SCALE
G
OUTLINE OF JUNCTION CABINET
G
G
C
G
RIGID GALV. STEEL ELBOWS (TYP.)
BUSHINGS & BOND TO GROUND.
TERMINATE W/ GROUNDING
TYPICAL PRIMARY CONDUIT
CAP ALL SPARE CONDUITS.
6"
4"
VERIFY CONDUIT STUB-UP LOCATION
REBAR - 12" O.C. EACH WAY.
3500 PSI CONCRETE W/ # 4
10"
W/ SHOP DRAWINGS.
TOOLED EDGES
FOR PRIMARY CONDUITS
PROVIDE OPENINGS IN CONC. SLAB
G
G
TYPICAL "T-TAP"
18"
3/4" X 20'-0" COPPERCLAD GROUND
ROD - 18" BELOW GRADE (TYP. - 4.)
PVC TO RIGID GALV.
COUPLING IN CONCRETE.
STEEL COUPLING - ENCASE
E17E17
E17E17 E17E17
E17E17
FIBERGLASS PRIMARY JUNCTION CABINET
PROVIDE FAULTED CIRCUIT INDICATORS
FOR ALL ACTIVE JUNCTIONS.
FINISH GRADE
BURIED ELECTRICAL
DUCTBANK WARNING TAPE
12"
12"
ALL GROUND CONNECTIONS MAY BE EXOTHERMICALLY WELDED OR MAY
USE UL LISTED, NON-REVERSIBLE COMPRESSION CONNECTORS. PROVIDE
ENGRAVED RED BAKELITE SIGN W/ 2 1/2" HIGH LETTERS "DANGER - HIGH
VOLTAGE." SIGN SHALL BE 12" W. X 9" HIGH. SECURE TO DOOR OF HOUSING
W/ BRASS SCREWS.
ALL GROUND CONNECTIONS MAY BE EXOTHERMICALLY WELDED OR MAY
USE UL LISTED, NON-REVERSIBLE COMPRESSION CONNECTORS. PROVIDE
ENGRAVED RED BAKELITE SIGN W/ 2 1/2" HIGH LETTERS "DANGER - HIGH
VOLTAGE." SIGN SHALL BE 12" W. X 9" HIGH. SECURE TO DOOR OF HOUSING
W/ BRASS SCREWS.
ALL GROUND CONNECTIONS MAY BE EXOTHERMICALLY WELDED OR MAY USE UL
LISTED, NON-REVERSIBLE COMPRESSION CONNECTORS. PROVIDE ENGRAVED RED
BAKELITE SIGN W/ 2 1/2" HIGH LETTERS "DANGER - HIGH VOLTAGE." SIGN SHALL BE
12" W. X 9" HIGH. SECURE TO DOOR OF HOUSING W/ BRASS SCREWS.
PARKING STAND AND BUSHING - PROVIDE ONE
FOR EACH DEADBREAK CONNECTOR.
TWO-WAY 4" CONCRETE ENCASED
DUCT BANK - SEE DETAIL, THIS SHEET
TWO-WAY 4" CONCRETE ENCASED
DUCT BANK - SEE DETAIL, THIS SHEET
E-17
18
PR
IM
AR
Y E
QU
IP
ME
NT
D
ET
AIL
S
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
HA
NG
AR
90700
HU
RL
BU
RT
F
IE
LD
FT
EV
1
4-1
05
7
TO
PO
GR
AP
HIC
S
UR
VE
Y
1 of 1
23
01
N
. N
in
th
A
ve
nu
e, S
uite
3
00
Pe
nsa
co
la
, F
lo
rid
a 3
25
03
Te
le
ph
on
e 8
50
.4
38
.0
40
0 F
ax 8
50
.4
38
.0
44
8
RE
BO
L-B
AT
TL
E &
A
SS
OC
IA
TE
S
EB
0
00
09
65
7 L
B 7
91
6
PR
EP
AR
ED
F
OR
:
RE
QU
ES
TE
D B
Y:
PR
OJE
CT
N
O:
DR
AW
N B
Y:
CH
K'D
B
Y:
SC
ALE
:
F.B
.:
DA
TE
:
PG
.:
SE
CT
IO
N:
CO
UN
TY
:
TO
WN
SH
IP
:
ST
AT
E: F
LO
RID
A
NO
.D
AT
EA
PP
R.
RE
VIS
IO
N/A
CT
IO
N T
AK
EN
A P
OR
TIO
N O
F
RA
NG
E:
C C
90700
UP
GR
AD
E E
LE
CT
RIC
AL
S
ER
VIC
E
HA
NG
AR
9
07
00
OF
FTEV 14-1057
JRH
EWW/JRH
1 APRIL 2015
19
S-1
19
TO
PO
GR
AP
HIC
S
UR
VE
Y
2014.212
CB
D
MA
N
1" =
20'
14-09
3-5
11-6-2014
18
2 S
OU
TH
24
W
ES
T
OK
AL
OO
SA
PE
TE
RS
ON
E
NG
IN
EE
RIN
G
PE
TE
RS
ON
E
NG
IN
EE
RIN
G