10
TOLEDO: van 7.2. naar 9.0 in 2 dagen na 20 weken voorbereiding Blackboard BENE Usergroup Bijeenkomst 24 maart 2010 - Leuven

Upgrade Bb9 Ku Leuven 0 Introductie

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Upgrade Bb9 Ku Leuven 0 Introductie

TOLEDO: van 7.2. naar 9.0

in 2 dagen na 20 weken

voorbereiding

Blackboard BENE Usergroup Bijeenkomst 24 maart 2010 - Leuven

Page 2: Upgrade Bb9 Ku Leuven 0 Introductie

TOLEDO: Context

• Learning Portal for the KULeuven Association • Toledo (since 2001)

– ‘Toetsen en leren doeltreffend ondersteunen– Blackboard / Questionmark Perception /

Building blocks & integrations

• Bridge between– Staff & Student, Applications & Institutions:

1 University & 12 University colleges

Page 3: Upgrade Bb9 Ku Leuven 0 Introductie

Toledo - K.U.Leuven Associaton

Page 4: Upgrade Bb9 Ku Leuven 0 Introductie

Challenge 1: Scale & Use

• 1 University & 12 University colleges with a customized portal & specific branding

• More than 95.000 active users• About 32000 different users online per day• More than 17000 active courses• About 2300 active communities

2001-

2002

2002-

2003

2003-

2004

2004-

2005

2005-

2006

2006-

2007

2007-

2008

2008-

2009

0100002000030000400005000060000700008000090000

100000

Active users

2001-

2002

2002-

2003

2003-

2004

2004-

2005

2005-

2006

2006-

2007

2007-

2008

2008-

2009

0

5000

10000

15000

20000

25000

30000

35000

Active users per day

Page 5: Upgrade Bb9 Ku Leuven 0 Introductie

Challenge 2: Heavily Customized

Page 6: Upgrade Bb9 Ku Leuven 0 Introductie

Challenge 3: Integrations & Extensions

• Custom authentication & Shibboleth federation• Data management: Automatic provisioning with

students, courses & staff – Overnight synchronisation with administrative systems, – Webservice: real time synchronisation with ISP

• Links to learning tools trough Building Blocks– Group, Peer & Self assessment tool– Wiki & Blog service– Question Mark Perception (assessments)

• Links to other ICT-tools– Exchange webmail – ISP – Tolinto

• Links to repositories– Turnitin: plagiarism detection– Library (links to queries & articles)– Videolab (streaming video AVNet)

Page 7: Upgrade Bb9 Ku Leuven 0 Introductie

ADMINISTRATIVE DATA

Bb Idiomatic

AUTHENTICATION

Library

Community tool

Enrollment tool

Blogservice

LEARNING TOOLS

ICT TOOLS

REPOSITORIES

Parser

BB API’s Hib API’s

Wiki farm

QM Perception

Webmail

USolv-IT

Tolinto

Peer Assessm.

Mail Storage Intranet

VideoLAB

Shibboleth

IMS xml

Shibboleth

Building block Shibboleth

Shibboleth

Intermediate

DatabaseWebservices

Single sign-on building block

Course Status tool

External users

Building block

QMWise

Webservices

Information

RSS

Challenge 3: Integrations & Extensions

Turnitin

Building block

Building block

Page 9: Upgrade Bb9 Ku Leuven 0 Introductie

Macroplanning for the Upgrade

• Important Dates: – May 2009: Specification of the Functionality (Advisory Board)– October 1st 2009: Start of the final Preparations (Main Project)– December 21-22th 2009: Upgrade 1 eloV– February 13-14th 2010: Upgrade 2 TOLEDO

• Planning: categories week by week: (spreadsheet)– System engineers: Upgrade of the systems– Developers: - Upgrade of the building blocks

- Bugfixing for BB 9- (Stress)testing

– Consultants: - Specification of the functionality - Customization of the interface- Functional Testing- Manuals / Documentation- Promotion, communication & info

sessions- Training (support staff, users, helpdesk)

Page 10: Upgrade Bb9 Ku Leuven 0 Introductie

Presentations

• Upgrade your Blackboard 7.2 servers to 9.0 14h15–14h45 Jo Vanvoorden

• Upgrade your Blackboard building blocks to 9.0. 14h45-15h15 Wim Machiels

• Upgrade your Blackboard users(interface) to 9.0 15h15-16h Bert Coenen & Kenny Verbeke