4
RESUME UPENDRA SINGH To work in a dynamic environment, be flexible and help the organization to grow in every possible way & to accept jobs that provide challenging opportunities for carrier growth. Work profile: Work profile: 1. Working as a Project Engineer in Larsen & Toubro Limited, Sec-128, Noida jaypee greens (japee orchard & kube) Project. Duration Duration : From 10 Aug 2012 to till date. Job Responsibility: 1) Personally involved in the planning, procurement of equipments, construction & commissioning of Projects. 2) Daily planning of activities & co-ordination with construction site about bought out daily stock & shortages. 3) Collecting & filling approved requisition serially to take action on storage. 4) Visited site periodically for inspection of the project work. 5) Visited factories of suppliers for inspection of the equipments. 6) Sending enquiries to various suppliers to get quotations in time. 7) After getting quotation discussing with boss & preparing the order. 8) Made comparative statements for different suppliers which gave a clear idea of their scope of supply, prices, delivery periods, etc. This helped during Techno – commercial discussions with them. 9) Worked on EIP PATHARA software for procurement module. 10) Follow-up with supplier about timely delivery, rejection & excess of material. UPENDRA SINGH 138 Old Anarkali, Near: Krishna Nagar New Delhi-110051 Email- [email protected] Career Objective: Experience:

Upen Production Profile

Embed Size (px)

Citation preview

Page 1: Upen Production Profile

RESUME

UPENDRA SINGH

To work in a dynamic environment, be flexible and help the organization to grow in every possible way & to accept jobs that provide challenging opportunities for carrier growth.

Work profile:Work profile:1. Working as a Project Engineer in Larsen & Toubro Limited, Sec-128, Noida jaypee greens (japee orchard & kube) Project.

DurationDuration: From 10 Aug 2012 to till date.

Job Responsibility:

1) Personally involved in the planning, procurement of equipments, construction & commissioning of Projects.

2) Daily planning of activities & co-ordination with construction site about bought out daily stock & shortages.

3) Collecting & filling approved requisition serially to take action on storage.

4) Visited site periodically for inspection of the project work.5) Visited factories of suppliers for inspection of the equipments.6) Sending enquiries to various suppliers to get quotations in time.7) After getting quotation discussing with boss & preparing the order.8) Made comparative statements for different suppliers which gave a

clear idea of their scope of supply, prices, delivery periods, etc. This helped during Techno – commercial discussions with them.

9) Worked on EIP PATHARA software for procurement module.10)Follow-up with supplier about timely delivery, rejection & excess of

material.11)Cost reduction by finding & developing new supplier.12)Sending enquiries to various supplier to get quotation in

time & after proper negotiation finalization of order.13)Keeping work area clean and maintaining healthy environment with

safety work procedure.14)Coordinate with the entire department for necessary work.

UPENDRA SINGH138 Old Anarkali, Near: Krishna NagarNew Delhi-110051Email- [email protected] Phone- +91-9953596386

Career Objective:

Experience:

Page 2: Upen Production Profile

2. Pioneer Tooling Service LTD ,Noida

CompanyProfile:Pioneer Tooling service Noida, (An ISO 9001:2000 Certified for Design and Development of Plastics Dies and manufacturer & supply of Plastics Moulded components. Pioneer tooling service, Noida is an automotive parts Manufacturers company. PTS is the manufacturer of Plastic moulding component. DurationDuration: From 16 July 2011 to 6 Aug 2012.Responsibility:1. To achieve daily machining production targets set as per Planning and Control department.2. Cross check material availability against plan.3. Co-ordinate with planning and stores department for materials requirement to meet production targets and to maintain minimum inventory to avoid losses. 4. Cross check production target for each machine identify reasons for downtime losses and take preventive actions to avoid recurrence.5. Responsible for all production related activity like achieving daily targets, reducing rejection, increasing work efficiency, maintain record of daily production.6. To maintain the production sheet, Increase productivity, manpower handling.7. To make standard parameter for m/c under parameter.8. Responsible for Day to day production planning and achieve maximum Production. 9. Responsible for Assigning work load to operators & achieving daily production target.10. Responsible for Monitoring of hourly production Vs hourly production plan.11. Responsible for Shop floor administration, handling skilled manpower.12. Responsible for to organize daily work management at shop floor. 13. Responsible for continuously working towards Quality & Productivity improvement through Kaizen activities.14. Responsible for to Eliminate useless work.15. Responsible for maintaining discipline according to safety rules. 16. Responsible for Conducting Quality Circles in Department.

10th G. I. C. Inter College SC- CLASS Sultanpur (Uttar Pradesh). 12th G.I.C Inter College SC-CLASS Sultanpur (Uttar Pradesh). B.E. Mechanical Engineering 58%

Vijayanagar Engineering College (JULY 2011) (VTU, Belgaum), (Karnataka).

Date of Birth : 10/12/1989Father’s name : Mr. Hari Govind Singh

Academic qualification:

Personal Details:

Page 3: Upen Production Profile

Residential Address : K.N.I.T Hostel (Bajrangnagar) Distt- Sultanpur (Uttar Pradesh)Phone number : 9953596386 Languages known : English, Hindi

Listening music, playing cricket

I vouch for the authenticity of the aforementioned facts.

Date: UPENDRA SINGH Place:

Hobbies & interests:

Declaration: