24
AREVA PROJECTS UK Introduction

Updated Introduction AREVA UK March2017 MMc

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Updated Introduction AREVA UK March2017 MMc

AREVA PROJECTS U

K Introduction

Page 2: Updated Introduction AREVA UK March2017 MMc

Safety M

oment

Page 3: Updated Introduction AREVA UK March2017 MMc

New

AREVA Strategic refocus on the nuclear fuel cycle

Page 4: Updated Introduction AREVA UK March2017 MMc

Recent Restructuring

4

Timeline for N

ew AREVA

Novem

ber 2016: Contract signed betw

een AREVA and EdF regarding the sale of AREVA N

P’s activities: reactors and services.

2016 Transition for AREVA Group

February 2016: Announcem

ent of AREVA’s restructuring

July 2016: Launch of N

ew

AREVA

Novem

ber 2017: Launch of new

UK business

model

Greater focus on UK

Decomm

issioning and Engineering

Page 5: Updated Introduction AREVA UK March2017 MMc

Group Position AREVA Projects U

K

BU Logistic

BU AREVA

Projects BU

Propulsion &

Research Reactors*

BU M

ining BU

Chem

istry-Enrichm

ent

BU

Recycling BU

Dism

antling

AREVA GRO

UP

AREVA Projects UK

A UK com

pany providing local and technically experienced services Ability to draw

on the international resource pool of its parent

Page 6: Updated Introduction AREVA UK March2017 MMc

AREVA Projects Proven Engineering Expertise

LA H

AG

UE

/ ME

LOX

Three generations of used fuel recycling facilities

Georges B

esse II: latest generation enrichm

ent facility at the Tricastin site

A wide range of solutions,

including consulting, engineering studies, construction and testing, turnkey projects and m

ultiple services

40 years of experience in design and execution of com

plex projects, and supporting the operations of m

ajor sites (m

odification, adaptation, shutdown, dism

antling scenarios…

)

Proven expertise in international project m

anagement and execution

MFFF: M

OX fuel fabrication facility in

the United-S

tates

RO

KK

AS

HO

-MU

RA

: U

sed fuel recycling facility in Japan, based on la H

ague

> 90%

OTD over the past 2 years

> benchmark in the field

Operational Excellence

Page 7: Updated Introduction AREVA UK March2017 MMc

Delivering a full range of teams and services

from Basic Design to Project Handover

Design & construction

of nuclear facilities

Upgrade &

dismantling

of existing facilities

Technical support to R&D

of nuclear facilities Engineering and Construction

for worldw

ide clients

Page 8: Updated Introduction AREVA UK March2017 MMc

AREVA in the UK

The history behind AREVA Projects UK

2010: AREVA UK office established in

London.

2008: RM Consultants acquired by AREVA.

Consultancy operating since 1977 in civil nuclear and defence sectors.

2015: AREVA UK office opened

in West Cum

bria.

2015: AREVA Engineering and O

perations team established in

Warrington.

October 2016:

Launch of AREVA Projects UK, integrating both consultancy and engineering expertise,

while m

aintaining an active corporate interface based in West Cum

bria

Consulting teams

Corporate AREVA office

Engineering teams

Page 9: Updated Introduction AREVA UK March2017 MMc

Engineering design

Waste M

anagement and Decom

missioning

Project Managem

ent

Research and Development (R&

D)

Decomm

issioning engineering

Layout and simulation system

s

Mechanical studies

Instrumentation and controls

Safety engineering for the entire fuel cycle

Chemical process engineering

Electrical systems

Our Structure

Technical consulting and engineering

AREVA Projects UK

Nuclear safety cases

Human factors

Shielding & dose assessm

ent

Waste m

anagement &

decomm

issioning

Radioactive materials transport safety

Site licensing & de-licensing

Independent peer review

Environmental data collection and evaluation

Safety assurance for new build

Nuclear fire safety

Requirements m

anagement

Specialist technical training

TECHNICAL CO

NSU

LTING

ENGIN

EERING SERVICES

&

Page 10: Updated Introduction AREVA UK March2017 MMc

UK M

arket Proposition 4 key stages

A gateway to:

the expertise of AREVA Projects the full AREVA capabilities

EPC Engineering

Projects

Engineering Consultancy

Technical Services &

Consultancy

Safety Case &

Safety Assurance

Integrated engineering and consulting services that offer

high-quality, technically expert service to our clients

Page 11: Updated Introduction AREVA UK March2017 MMc

Our Skills M

ix AREVA Projects U

K

Page 12: Updated Introduction AREVA UK March2017 MMc

Technical Consulting AREVA Projects U

K

Page 13: Updated Introduction AREVA UK March2017 MMc

Specialist nuclear consultancy, providing recognised expertise and multi-

disciplinary teams to som

e of the UK’s m

ost complex nuclear projects

Expertise spanning the entire lifecycle of facilities, from conception,

strategy, build, operation to decomm

issioning

Technical leadership to deploy and manage know

ledge to support clients in their design/decom

missioning projects

70 + specialist technical staff, 7 technical experts accredited by the AREVA Group

Providing the infrastructure for the new AREVA Projects U

K business and grow

ing in the UK and internationally

Consulting AREVA Projects U

K

Page 14: Updated Introduction AREVA UK March2017 MMc

AREVA Projects UK

Technical Capabilities:

Consulting

Nuclear

Safety Cases

Decom and

Waste

Managem

ent

Human

Factors

Shielding and Dose

Assessment

Radioactive M

aterials Transport

Safety

Environmental

Data Collection and

Evaluation Independent Peer Review

(IN

SA)

Safety Assurance for

New

Build

Specialist Technical Training

DQO

, Site Licensing

and Delicensing

Technical Consulting Services AREVA Projects U

K

Page 15: Updated Introduction AREVA UK March2017 MMc

AREVA Projects UK: Consulting

In-depth understanding of regulatory requirem

ents and client procedures

Excellence in process managem

ent

Structured knowledge m

anagement

Customer and reputation focussed

Quality of output is our N

o. 1 Priority

Training and continual professional developm

ent is at the heart of the business - training is a business stream

Page 16: Updated Introduction AREVA UK March2017 MMc

How w

e complem

ent AREVA’s work in the U

K

UK Reputation

• Established in the U

K for 40 years •

Operated on m

ost UK sites for 20+ years

• Highly regarded staff

Access to Clients and SLCs •

Netw

ork of people and partner companies

• Access to alm

ost all SLCs via existing framew

orks

Backend knowledge

•In depth know

ledge of plant & equipm

ent (Sellafield, Dounreay, Magnox)

•Technical expertise in: •

Safety (cases, assurance, ALARP, industrial) •

Waste m

anagement

•Decom

missioning &

decontamination (optioneering, strategy, techniques)

•Hum

an factors, Radioactive Materials Transport

Page 17: Updated Introduction AREVA UK March2017 MMc

Existing customers

Page 18: Updated Introduction AREVA UK March2017 MMc

Engineering Services AREVA Projects U

K

Page 19: Updated Introduction AREVA UK March2017 MMc

Experienced engineering teams providing key skills for the U

K nuclear m

arket Recognised expertise that com

bines operational UK experience w

ith the w

ide-reaching capabilities of the international AREVA Group

Proven track record of delivering projects safely to the highest standards of quality, in line w

ith UK regulatory and AREVA Group standards

Capability to provide high-quality operational support

Engineering AREVA Projects U

K

Page 20: Updated Introduction AREVA UK March2017 MMc

Engineering Services and Capability AREVA Projects U

K

Working in conjunction w

ith the global AREVA Group, UK

engineering teams form

a bridge between local U

K capability and the broad, international experience of AREVA across the w

hole nuclear fuel cycle, providing the following services to

clients:

Engineering Consultancy Project M

anagement

Design Engineering Tests and Com

missioning

Operational Support

Research & Developm

ent (R&D)

Page 21: Updated Introduction AREVA UK March2017 MMc

In-house design team in W

arrington - each m

ember of the team

with

significant experience in the nuclear industry

Supported by technical consultancy - in areas such as Hum

an Factors and Ergom

onics, Shielding and Dose Assesm

ent and Safety Assessment

Our Engineering Team

AREVA Projects U

K

15% 25%

15%

10%

15% 20%

PDM

SEC&IProcessStructuralCA

DM

echanical

Page 22: Updated Introduction AREVA UK March2017 MMc

Discipline Structures x

Design: Monitoring and induction program

me

xProject m

anagement

xConstruction & com

missioning

Quaility M

anagement System

x

ISO 9001:2008

xKey processes, Project Focus and design guidelines

Qualified CAD and PDM

S tools

Engagement m

odes x

Full Project Execution x

Task Based Operations

xIntegrated Project Team

s x

Engineering Consultancy

What do you receive from

the wider AREVA Projects organisation?

Main inputs and support from

AREVA Projects

Page 23: Updated Introduction AREVA UK March2017 MMc

As a local U

K company, AREVA Projects U

K offers an on-the-ground and technically experienced resource to its clients, w

hile providing a gateway to the global

experience and expertise of the AREVA Group

Page 24: Updated Introduction AREVA UK March2017 MMc

AREVA UK

Kelton House, Westlakes Science &

Technology Park, Moor Row, Cum

bria, CA24 3HX Telephone: +44 (0)1946 67377, M

obile: +44 (0)7715 631819 Em

ail: michael.m

[email protected]

Website: w

ww

.areva.com

Michael M

cloughlin Business Developm

ent Manager