Upload
craig-johnstone
View
14
Download
1
Embed Size (px)
Citation preview
Craig Andrew Johnstone
India Cell: +919840630662
India Cell Alternate: +919840122550 Flat No E, Second Floor Home: (91)44 450-90552F-123, Sixth Street E-mail: [email protected] Nagar East, Chennai – 600 102 Skype ID: +91 9840630662 India
OBJECTIVE
To use and further develop my Skills and qualifications and to climb the ladder of hierarchy with hard work and dedication. My aim is to excel in any assignment I may undertake, by carrying out a work order in an efficient and successful manner. I can then explore my true potential and add value to the Organization.
Summary:
Have 7 years of experience in Drilling industries, experience in onshore, working in different positions Driller, Assistant Driller, Derrickman, Floorman and Roustabout. Overseas experience, working in pumping, for well intervention, testing, commissioning, well testing operations and exploration wells. Well experienced on Cyber and Semi Cyber rigs 3000 HP Double Stand and Triple Stand .
Knowledge about Saudi Aramco and Kuwait Oil Company drilling standards, working in different rigs in Saudi Arabia and Kuwait.
First hand knowledge to introduction to computer technology and Microsoft Office and basic features of Windows XP, Outlook, Word, Excel and PowerPoint. Writing clear, concise reports and business correspondence.Excellent oral communication and written skills and abilities to work with team members. Can grasp the use of any software that is used by the organization for preparing reporting and statements.
SKILLS AND ATTRIBUTES:
Operates and monitors all drilling systems and equipment under the supervision of the Tool Pusher or other competent person, supervises drill crew work activities with complete and appropriate drilling documentation to the satisfaction of the client, Company management and in compliance with applicable policies and regulations.
Assist to determine means of improving efficiency and reducing costs where possible, investigate and take corrective action when required.
Assist in planning and coordinating repairs of major budget items to minimize downtime and provide the most cost effective means of maintaining company’s equipment to the highest standards and contractual requirements.Has to make sure spares and consumables usage is kept under reasonable control without affecting the efficiency of the operations or the quality of the maintenance.Possess a friendly, professional demeanor with effective listening and reasoning ability with very good communication skills. Well versed in computers and use of Word, Excel and emailing. Can grasp the use of any software that is used by the organization for reporting to send in reports etc.
1 | P a g e
Craig Andrew Johnstone
QHSE Responsibilities :
To lead through effective safety leadership by being personally responsible for Implementation of the HSEMS.
To ensure a safe working environment without harm to persons or the environment. To address QHSE issues at the time of their identification Ensure compliance with company HSE policies by all personnel, support personal to
take time out for safety, when necessary and encourage employees to make safety suggestions
Ensure Waste Management Plan is adhered to. Ensure that the permit to work system and other HSE management tools are used
correctly. Actively assist and participate in safety discussions, safety drills (like BOP shut in) and
regular inspections.(esp. daily check on well control equipment and other safety equipment).
Operational Responsibility:
Operates drilling activities in accordance with safe well control practices and in accordance with local regulatory requirements under guidance from STP.
Ensure well programs and schedules are well known to the Drilling crew. Assist to inspect drilling unit and ensure compliance with all regulatory body
requirements. Ensure that all rig equipment within area of responsibility is maintained in accordance
with the Company’s Preventive Maintenance System. Well Control Lead BOP drills BOP system check Monitor for well control Perform trip sheet calculation Maintain hole condition Make up bottom hole assembly Operate auto driller Operate pumps Operate Rotary table Select Toolbars Boiler Maintenance Engine Maintenance Drill line cutter maintenance Operate the winch Maintain inventory
2 | P a g e
Well trained on rig move activities. Ensure well programs and schedules are well known to the Drilling crew
Craig Andrew Johnstone
Business Planning / Continuous Improvement / Organization Efficiency : Ensure all work is performed within the requirements and guidance of the company
BMS process. Ensure that equipment is returned to its proper storage location in a condition where
it is ready for use again.
Craig Andrew Johnstone
Conduct pre-tour meetings with rig crew to communicate daily objectives, special instructions, safety precautions and training activities as required.
Must ensure in liaison with the STP immediate and detailed reporting in writing of any incident/accident or other operational problems to base in accordance with the normal protocol.. esp., damage to equipment and safety related incidents
Tries to achieve standard drilling performance and propose solutions to improve performance if necessary.
To preplan operational needs, organize equipment and supplies, conduct testing of critical equipment/systems as required, pre-inspect safety related issues and direct crew for operations.
Supporting, promoting and actively participating in the Company’s CAP (Competency Assurance Program) process.
Customer / Public Relations : Good relation with the client representatives and ability to make sure misunderstanding or bad communication does not develop within the people working on the rig.Represent the Company in a professional manner both on and off the job to include
confidentiality of Company and client business.Be knowledgeable of all safety policies and procedures that pertain to my area of
responsibility including fire fighting, emergency equipment, life saving equipment and emergency response
Credibility with staff and managementUnderstanding of Well Control activities
Rigs worked on with specifications:3 | P a g e
1.Super single cannrig.(INDIA Weatherford drilling Int)709750 HP EDS Semi Cyber.750 HP Draw works 1 3/8 drill line.Cannrig top drive.Pyramid shale shakers.Rig sense operating system.F1000 1000hp mud pumps triplex.Shaffer BOPSFarr tong and manual tongs HT 35 65 Cameroon choke manifold (insert type NRV s on bop stack)
Craig Andrew Johnstone
2.Super single Nov rig. (INDIA Weatherford drilling Int)807750 HP Cyber.750 HP Draw works 1 3/8 drill line.NOV top drive.Pyramid shale shakers.Rig sense operating system.F1000 1000hp mud pumps triplex.Shaffer BOPSST80 and manual tongs HT 35 65 Cameroon choke manifold 5000 psi (insert type NRV s on bop stack)
3.Triple stand Cameroon (le Tourneau) rig (KUWAIT WDI)8703000 HP Semi Cyber.3 (1500) HP GE motors for draw works 2 in use and 1 spare hence 3000hp DW (2-inch drill line)(le Tourneau) Cimarron Direct drive tds.2000 HPDerrick Cooperation shale shakers.Omron operating system.Nation 12p 1600 HP triplex pumps (hydraulic operated caps for servicing) Wdi Germany (iron rough neck 2.0) and manual tongs HT 35 65 100 200 Cameron BOPS (choke manifold 10000psi)
4.Triple stand Cameron (le Tourneau) rig (KUWAIT WDI)8783000 HP Cyber.3 (1500) HP GE motors for draw works 2 in use and 1 spare hence 3000hp DW (2-inch drill line)(le Tourneau) Cimarron Direct drive tds.2000hpDerrick Cooperation shale shakers.Omron operating system.Nation 12p 1600 HP triplex pumps (hydraulic operated caps for servicing) Wdi Germany (power arm 2.1) and manual tongs HT 35 65 100 200
4 | P a g e
Cameron BOPS (choke manifold 10000psi)
5.Tripple stand Nov rig (Saudi Arabia Trinidad drilling Int)1261500 HP Semi Cyber.1500 HP draw works NOV top drive 1000 HPCobra shale shakers.Rig Minder operating system.Nov 12p 1000 HP triplex pumps ST80 and manual tongs HT 35 65 100 200 Cameron BOPS (choke manifold 10000psi)
Craig Andrew Johnstone
Types of pipes used and worked withG grade and E grade pipes,Range 2 and Range 3,SDML and SDL drill pipe slips and casing slips,Well experienced with ST80, Power Arm, Farr tong, Casing tong and all manual tongs,Worked with max 14-inch DRILL COLLAR,36-inch conductor casing max.Exploration wells with coring done in India and in KuwaitFishing jobs done in Kuwait and in Saudi Arabia. Completion jobs done upper and lower completion.
EDUCATION:
Degree/ Course / Training Program
Name and Address of University/ College/ Technical Institute/
Period of Course/ Program
Certificate Particulars
BACHELOR OF SCIENCE – HOTEL
AND TOURISM MANAGEMENT
MADRAS INSTITUTE OF HOTEL MANAGEMENT & CATERING TECHNOLOGY#60, POONAMALLE HIGH ROAD, KATTUPAKKAM, CHENNAI - 600056
Date Started Certificate No.
2005 - 2008 051110440
Date Completed Date of Issue 23/04/08
18/07/08
HIGHER SECONDARY COURSE
CERTIFICATE
ST. MARYS ANGLO INDIAN – HIGHER SECONDARY SCHOOL. # 110 ARMEANIAN STREET, CHENNAI- 600 001
Date Started Certificate No.
JUNE 2002 1022834
Date Completed Date of Issue MARCH 2004 12.05.2004
TENTH STANDARDST. MARYS ANGLO INDIAN – HIGHER
Date Started Certificate No.
JUNE 2001 1008898
5 | P a g e
SECONDARY SCHOOL. # 110 ARMEANIAN STREET, CHENNAI- 600 001
Date Completed Date of Issue
MARCH 2002 30.05.2002
Craig Andrew Johnstone
TECHNICAL:
COMPLETED A SAFETY COURSE.
INDIAN NATIONAL DATABASE OF
SEAFARERSINDoS No: 09ZL5485
Date Started 24th Aug 2009
ValidTill Date
COMPLETED IADC RIG PASS – SURFACE
ID NUMBERIADCA1049884
http://www.iadc.org/accreditation/iadc-certificates-
of-completion/
Date Completed 26/02/2009
Valid Till Date
COMPLETED IADC RIG PASS – OFFSHORE
ID NUMBERIADCA1049884
PETRO TALENT- PUNEhttp://www.iadc.org/
accreditation/iadc-certificates-of-completion/
Date Completed 04/12/2013
Valid Till Date
COMPLETED IADC WELL CAP CERTIFICATION
Supervisor level
Completed WELL CONTROL
CERTIFICATION LEVEL 3(DRILLER)
AL KEBAR Petroleum Services.Certificate NumberRef#: WSE617368
MERSKTRAINING
Certificate Number: T-699-00038759
Date Started 12/30/2015
Date Started
05/08/2016
Date of Expiry 12/30/2017
Date of Expiry
05/08/2018
6 | P a g e
COMPLETED H2S & SCBA TRAINING: Trinidad Drilling International
Date of Expiry 01/27/2017
Craig Andrew Johnstone
WORK EXPERIENCE:
Sl. Name of the Company Country Period Worked
From(dd-mm-yyyy)
To(dd-mm-yyyy)
1. TRINIDAD DRILLING
INTERNATIONAL- Driller
SAUDI
ARABIA
15/12/2014 29/04/2016
2. WEATHERFORD INTERNATIONAL –
KUWAIT – Driller
KUWAIT 09/12/2013 14/11/2014
3. WEATHERFORD INTERNATIONAL –
KUWAIT- Derrick Hand/Asst
Driller
KUWAIT 20/12/2011 08/12/2013
4. WEATHERFORD INTERNATIONAL
BARMER – Floor Man/Roustabout
RAJASTHAN 05/03/2009 30/06/2011
PERSONAL: Date of Birth: 30th November 1986Gender/Status: Male /Unmarried
Passport #: H4410579 OLD :M9662318 NEW
REFERENCES : Sheldon Kemp – Drilling Sup-NDSCO – [email protected]
7 | P a g e
Neil Johnstone – STP –Trinidad Drilling – [email protected] Rajagopalan-Operarions Manager-WDI IRAQ/OMAN-+614- 98825250
Sincerely,
CRAIG JOHNSTONE Date: 15th August 2016
8 | P a g e