Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Brian Patton
November 8, 2017
Update on Water Supply and ESPA Managed Recharge
Idaho Legislature Interim Committee on Natural Resources Boise, Idaho
2018 Water Supply = Reservoir Carryover + New Runoff
2018 Water Supply = Reservoir Carryover + New Runoff
Upper Snake Reservoirs = 76% of capacity
Current Contents
Average Contents
Boise Reservoirs = 55% of capacity
Current Contents
Average Contents
Payette Reservoirs = 69% of capacity
Current Contents
Contents Last Year
Oakley Reservoir= 37% of capacity
Mackay Reservoir= 83% of capacity
(highest historical carryover)
Magic Reservoir= 65% of capacity Bear Lake = 85% of
capacity
Salmon Falls Creek
Reservoir= 39% of capacity
2018 Water Supply = Reservoir Carryover + New Runoff
Basin
% of Average streamflow need to
meet adequate irrigation supply in 2018
Bear 17%
Salmon Falls 15%
Oakley 39%
Little Lost 40%
Big Wood 43%
Boise 51%
Upper Snake 71%
Big Lost 107%
Runoff Needed
Source: NRCS Snow Survey
ENSO Status: La Nina Watch
1912 – 1952 Change +17,000,000 AF
1952 – 2015 Change -13,000,000 AF
Average annual 1952-2015 loss of aquifer storage is about 215,000 AF
Aquifer storage and flows from the Thousand Springs are directly correlated
Aquifer Storage
Thousand Springs Discharge
Total Thousand Springs Flows
Volume Change of Water Stored Within the Eastern Snake Plain Aquifer and Thousand Springs Total Discharge
Combined System
Surface Water Coalition Delivery Call
Thousand Springs Area Delivery Calls
ESPA discharge to Snake River at Thousand Springs
ESPA discharge to Snake River at American Falls
Milner Dam – Milner Zero Flow
Thousand Springs-fed minimum flows pass through IPCO hydropower system
Swan Falls Dam –Minimum Flow of 3,900 cfs/5,600 cfs
American Falls-area springs partly supply river flows that feed Surface Water Coalition canals
Idaho Power Hells Canyon Complex
2016 Legislative Actions
•Senate Concurrent Resolution 136 – Supports Surface Water Coalition Delivery Call Settlement
•Senate Concurrent Resolution 137 – Directs Water Board and IDWR to address declining aquifers state-wide
•Senate Concurrent Resolution 138 – Directs Water Board to develop capability to accomplish average of 250,000 AF of managed recharge annually by 2024
•Senate Bill 1402 – firmed up funding for managed recharge
2016 Legislative Actions
•Senate Concurrent Resolution 136 – Supports Surface Water Coalition Delivery Call Settlement
•Senate Concurrent Resolution 137 – Directs Water Board and IDWR to address declining aquifers state-wide
•Senate Concurrent Resolution 138 – Directs Water Board to develop capability to accomplish average of 250,000 AF of managed recharge annually by 2024
•Senate Bill 1402 – firmed up funding for managed recharge
Recharge Program
Capacity Development Construction of conveyance and recharge sites Institutional agreements
Operations Operations agreements Monitoring
Administration of Program
Lower Valley Recharge Capacity –Complete / In Progress
Projected Winter Capacity980 cfs = 290,000 af
500 cfs
30 cfs
100 cfs
300 cfs
50 cfs
Minimum Water Availability500 cfs = 150,000 af
Dietrich Drop By-Pass
Water Available - 150 days
Median Water Availability1,000 cfs = 300,000 af
Upper Valley Off-Canal Recharge Capacity – Current
Water Available Every Other Year on Average
Off-Site Capacity430 cfs = 26,000 af
200 cfs
20 cfs
30 cfs
30 cfs
150 cfs
April – June ~ 30 days
Median Water Availability1980-2014 = 150,000 af
Upper Valley – Recharge Capacity in Development
2016-2017 Recharge Construction Milner-Gooding Canal: MP31 2nd Turn-Out
Construction on Nov 29, 2016 New facility in use – April 24, 2017
Completed pumps and piping to SWID injection well system
Pipeline under constriction to SWID injection well system --
June 20, 2017
November 1, 2016
2016-2017 Recharge Construction Southwest Irrigation District: Buckhorn Pipeline
0
400
800
1200
1600
2000
2400
2800
3200
3600
4000
4400
0
400
800
1200
1600
2000
2400
2800
3200
3600
4000
4400
Jensen Grove
FFIC
ECC
FMID
GFCC
BWCC
NSCC
AFRD2
SWID
TFCC
Available Flow
Total IWRB Managed Recharge Rates During 2016 - 2017 Season
Re
char
ge F
low
(cfs
)
Dates of Recharge
Recharge below Minidoka Dam Oct 25 - May 17
Jun 9 - July 2
Preliminary Data
Total IWRB Managed Recharge Rates During 2016 - 2017 SeasonTotal Volume of Recharge = af (October 25, 2016 to )317,714
Total Water Available for Recharge Snake River
July 7, 2017
Maximum Flow past Milner
4/14 = 21,300 cfs
Big Wood Recharge Feb 22 -
Jun 23
Recharge above Minidoka Dam Feb 28 - May 17
Jun 9 - July 2
Upper Valley
Lower Valley
Big/Little Wood
ESPA Managed Recharge Operations & GW level monitoring $2,950,000
ESPA Managed Recharge Infrastructure (MP31, NSCC, SWID, Egin Ph. 2) 4,200,000
Investigation/engineering for further ESPA recharge capacity improvements 460,000
Treasure Valley (Ground Water Model, Recharge Studies, Storage Studies) 1,700,000
Mountain Home Aquifer Recharge 50,000
Weiser River Valley 100,000
Bear/Malad Aquifers 50,000
Northern Idaho Aquifers 109,273
State-Wide Efforts 1,820,000
Amount reserved for projects in other priority aquifers or carry-forward 723,551
TOTAL FY2018 BUDGETED FUNDS $ 12,162,824
IWRB FY 2018 Budget for Aquifer Stabilization (Secondary Aquifer Fund)
ESPA Recharge share is $7.61M
IWRB ESPA Managed Recharge – 2016 / 2017
SWID - 802 af
Jensen Grove - 4,864 af
TFCC – 9,121 af
NSCC – 23,878 af
AFRD2 – 107,470 af
BWCC – 39,240 af
FMID - 61,103 af
ECC -7,623 af
GFCC - 53,060 af
FFIC - 10,553 af
Total IWRB Recharge 317,714 af
C Canal
By-passCanal
Planned 2017-2018 Construction - North Side Canal Company
Wilson Lake Recharge Area - 130 cfs
Wilson Canyon Recharge Site - 100 cfs
Hydro By-PassProjects
Estimated annual recharge volume – 60,000 AF/yearTotal cost: $4M
Water Resource Board
Planned 2017-2018 Construction: Richfield Site – Wood River
Potential Recharge Capacity 100 cfs - Big/Little Wood Rivers
(Fall 2017)
Oct 2017
50.8 acresDevelopment of Proposed Site
• Engineering Design• Turnout Structure w/ Headgates• Basin Work
• Trenching• Berms
• Monitoring Plan & Wells
TOTAL $150,000
Planned 2017-2018 Construction: Egin Lakes Phase II
Potential Recharge Capacity 60 cfs (additional) - (Fall 2017)
Oct 2017
• Phased Construction: 1. Egin Ditch $95,0002. Canal Drop Structure $61,0003. Berms
• Egin Lakes $170,000• Qualye Lake $155,000
• Contingency (25%) $85,000
• Oversight $14,000
TOTAL $580,000
Egin Ditch
Berms
Phase I
Phase II
Canal Drop Structure
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
0
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
IID
FFIC
ASCC
GFCC
ECC
NSID
SVRID
FMID
NSCC
AFRD2
TFCC
SWID
Available Flow
Re
char
ge F
low
(cfs
)
Dates of RechargePreliminary Data
Total IWRB Managed Recharge Rates During 2017 - 2018 SeasonTotal Volume of Recharge = af (August 30, 2017 to )85,897 November 5, 2017
Upper Valley
Lower Valley
Total Natural Flow Available below Minidoka Dam for
Recharge - Snake River
2017 SWC Storage WaterTotal Volume = 61,100 af
above Minidoka DamRecharge Started
Aug 30
above Minidoka DamNatural Flow Recharge
Oct 31
Recharge Right in Priority belowMinidoka Dam
Oct 16th
Water Resource Board
Questions ?