19
Update on the NIHR TMN, BRTC and the Hubs for TMR Athene Lane

Update on the NIHR TMN, BRTC and the Hubs for TMR

  • Upload
    zelia

  • View
    20

  • Download
    0

Embed Size (px)

DESCRIPTION

Update on the NIHR TMN, BRTC and the Hubs for TMR. Athene Lane. Overview. TMN history and past activities Planned activities BRTC Hubs for Trials Methodology Research. UK TMN history. Network for trial managers on MRC trials Commenced in 1988 2003 joint funding HTA & MRC - 2010 - PowerPoint PPT Presentation

Citation preview

Page 1: Update on the NIHR TMN, BRTC and the Hubs for TMR

Update on the NIHR TMN, BRTC and the Hubs for TMR

Athene Lane

Page 2: Update on the NIHR TMN, BRTC and the Hubs for TMR

Overview• TMN history and past activities

• Planned activities

• BRTC

• Hubs for Trials Methodology Research

Page 3: Update on the NIHR TMN, BRTC and the Hubs for TMR

UK TMN history• Network for trial managers on MRC trials

• Commenced in 1988

• 2003 joint funding HTA & MRC - 2010

• Annual meetings with workshops (1999)

• Linking with new trial managers

• Steering group of TM & funders (2006 AL)

Page 4: Update on the NIHR TMN, BRTC and the Hubs for TMR

UK TMN activities• One day workshops

• Project management,

• Practical GCP

• Writing study newsletters

• Website: http://www.tmn.ac.uk/

• Trial management guide

Page 5: Update on the NIHR TMN, BRTC and the Hubs for TMR

Current status• NIHR TMN reflecting funding changes

• NETSCC funding the network

• Base in Leeds CTU, CTRU: Vicky Napp

• Network coordinator tba

• Activities to resume in 2011

Page 6: Update on the NIHR TMN, BRTC and the Hubs for TMR

Planned activities?• Eligibility: NIHR portfolio studies and EME

• Reinstate the annual meeting

• Update trial management guide

• Website and discussion board facility

• Newsletter, inc new trial developments

• Signpost TM relevant training opportunities

Page 7: Update on the NIHR TMN, BRTC and the Hubs for TMR

Bristol Randomised Trials Collaboration

• NCRI accredited and UKCRC registered CTU

• School of Social and Community Medicine

• Director: Alan Montgomery, Associate: AL

• Management group: statisticians, health

economists and social sciences

Page 8: Update on the NIHR TMN, BRTC and the Hubs for TMR

Bristol Randomised Trials Collaboration

• Primary care especially mental health

• Cancer and other secondary care trials

• Qualitative research for trial design and conduct

• Complex trial designs

[email protected]

Page 9: Update on the NIHR TMN, BRTC and the Hubs for TMR

Bristol Randomised Trials Collaboration

• Primary care especially mental health

• Cancer and other secondary care trials

• Qualitative research for trial design and conduct

• Complex trial designs

[email protected]

Page 10: Update on the NIHR TMN, BRTC and the Hubs for TMR

Collaboration and innovation in Difficult or Complex randomised controlled Trials

• •••

••

•Rhiannon Macefield

TMH Director: Jane Blazeby

http://www.methodologyhubs.mrc.ac.uk/default.aspx

Page 11: Update on the NIHR TMN, BRTC and the Hubs for TMR

PRISMA flow diagramRecords identified through

database searching(Embase: 529, Medline: 536)Additional records identified

through other sourcesn= 33

(Hand search of CT/CCT/CCT, referenced in other papers , personal knowledge)

Records after duplicates removed(n =678)

Records screened(n = 678)

Records excluded (n = 526)

Full-text articles assessed for eligibility

(n =152)

Full-text articles excluded (n = 117)Reasons inc: Safety monitoring only, central monitoring only, monitoring of specific procedure only e.g. radiotherapy QA, no monitoring details/ does not discuss monitoring methods, site visits excluded monitoring conduct, not full paper.

(Waiting on 1 inter-lib loan)

Articles included in review(n = 68)

Page 12: Update on the NIHR TMN, BRTC and the Hubs for TMR

Benefits of on-site monitoring• Identified problems, e.g. procedural errors (weighing) and

data inconsistencies

• Issues resolved quicker, e.g. increased recruitment

• Improved protocol adherence and GCP compliance

• Greater central & site staff interaction and between sites

• Shared best practice between sites

• Opportunities for additional training

Page 13: Update on the NIHR TMN, BRTC and the Hubs for TMR

Site monitoring disadvantages• Costs ($800-1500/visit) or 0.1% annual budget NCI

• Staff time (1-2 days per visit)

• Environmental impact of travel to sites

• Visits created potential for staff friction or harassment

• Little evaluation of benefits or disadvantages

• “On-site monitoring is the only type intended to seek out

sloppiness and fraud” (Cohen 1994)

Page 14: Update on the NIHR TMN, BRTC and the Hubs for TMR

Written report to CIs & PI within 12 weeks

PRIMESite visits 1-2 days

PRIME structure

Problem solving meeting with senior

nurse at close

Review arranged 8 wks in advance

Monitoring SOP & report template

Utilise report at next review

Page 15: Update on the NIHR TMN, BRTC and the Hubs for TMR

PRIME site activities

• Observation of recruitment & follow-up appointments

• Major focus and most informative aspect

• Individual feedback – mentoring and training role

• CRF completion during/after appt

Page 16: Update on the NIHR TMN, BRTC and the Hubs for TMR

PRIME site activities• Group meetings/orientation meeting

• Site recruitment and attrition• Problem solving local issues• Protocol adherence

• Data storage• Site files• Safety reporting• Staff training

Page 17: Update on the NIHR TMN, BRTC and the Hubs for TMR

Monitoring report findings

Page 18: Update on the NIHR TMN, BRTC and the Hubs for TMR

Monitoring report findings

Page 19: Update on the NIHR TMN, BRTC and the Hubs for TMR

PRIME advantages for a trial

• Focuses on trial staff, including as reviewers

• Standardises conduct across staff (including data collection) & shares good practice

• Assists with overall staff training

• Potential for study performance gains

• Early notice of any issues

• Improves GCP compliance, e.g. site file