An update on the Irrawaddy Myitsone Dams Project
Kachin Development Networking Group
October 14, 2011
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
2/16
An update on the Irrawaddy Myitsone Dams Project
Following Thein Seins announcement on September 30 that construction of the Irrawaddy Myitsone dam
would be suspended, villagers living near the project are living in a state of uncertainty and fear as there is
no evidence on the ground that the dam project has indeed been suspended. KDNG has been monitoring the
Irrawaddy Myitsone Dams Project since 2005 and provides this brief update based on research conducted just
before and after the suspension announcement.
!"#$%&"'&("')**+,*-"."*&'/0+.'1,0.)2#'$0"#%3"*&4'&("0"'()#'5""*'*+'-+*60.)&%+*'/0+.'&("'$0+7"-&'.)*)8"04
China Power Investment Corporation (CPI). In a October 3rd interview with Chinese media, Lu Qizhou,
the President of CPI was very clear that CPI wants to go ahead with the construction: I strongly hope that
with unremitting efforts of relevant parties, this project can smoothly move forward on schedule, and mutual
5"*"6&')*3'9%*:9%*'0"#,;&'9%;;'5"-+."')'0");%&0@A,'B%C(+,@'
D*&%;'&("0"'%#')*'+/6-%);')**+,*-"."*&'/0+.'=EF'&()&'%&'9%;;'#&+$');;'&("'3).#'+*'F00)9)33
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
3/16
SH("0"'%#'*+'9)&"0')&'&("'/)0.;)*3'&()&'&(");%
Yang relocation camp in October 2011)
Houses at Mali Yang relocation camp, 4 miles downstream of Myitsone
Despite suspension announcement, workers are still active and waiting next
instructions
The majority of Chinese workers had left the Myitsone dam site before the suspension announcement onSeptember 30th. This was most likely due to the rainy season conditions, as Sinohydro explained in its
$0+.+&%+*);'J%3"+'I'(&&$YZZJ%."+@-+.ZQV[V\[]T'K'&()&'9+0M"0#'-)*'+*;
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
4/16
Chinese workers conduct land surveys between Lahpye and Tawngban villages on October 11, 2011. This
photo is taken looking upstream and the Irrawaddy Myitsone bridge and a containment wall are seen in the
3%#&)*-"@'=+*#&0,-&%+*'_%&"'`+@'\'%#'3%0"-&;
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
5/16
Myitsone Project Diagram Plan
Current status of Myitsone dam project
Construction of the main dam has not yet begun but several diversion tunnels and containment walls have
been completed. A supply road, bridge, and railway are nearly completed.
The Irrawaddy Myitsone bridge south of Myitsone dam site. The 600 meter long, 300 ton
capacity suspension bridge is planned to be completed in 2011. This bridge will link the
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
6/16
L'0)%;9)
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
7/16
L'-+*&)%*."*&'9);;'3+9*#&0").'+/'&("'>
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
8/16
>)-(%*"#')*3'"X,%$."*&'0".)%*')&'&("'>
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
9/16
Trucks and machines are parked and ready at Chinese workers compound
L /)-&+0< /+0 50")M%*8 #&+*"# )*3 .)M%*8 50%-M# )& =+*#&0,-&%+* _%&" `+ \
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
10/16
0
Tight security at the dam site
_%8*5+)03'%*'1,0."#"';)*8,)8"Y'SE0+7"-&'L0")4'`+'"*&0
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
11/16
L 8,)03 &+9"0 "X,%$$"3 9%&( #"-,0%&< -)."0)# %# #&)&%+*"3 )& );; -+*#&0,-&%+* #%&"#
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
12/16
2
a+;3' .%*%*8' 0)J)8%*8' &("' ;)*3#-)$"' )*3' 0%J"0#' )&' &("' -+*G,"*-"' )*3' ,$#&0").' +/
Myitsone
Mining and logging concessions were given after dam plans were announced in order to clear out the dam
and reservoir areas. Large scale gold mining began in 2010 and continues today. Mercury and cyanide used
in the processing of the gold is dumped without regulation into local rivers and directly into the Irrawaddy,
threatening downstream populations with exposure to toxins which leads to health problems and birth defects.
Hka Ka Bo Mining Co. Ltd. and the governments No (2) Mining Ministry have a joint venture to mine for
gold at the Myitsone
Gold mining on
the river banks
at the Myitsone
dam site
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
13/16
Gold mining on the river banks at the Myitsone dam site
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
14/16
Fearanduncertaintyremainforvillagers atMyitsonedam site
October14,2011
FORIMMEDIATERELEASE
Press re leasefromKachinDeve lopmentNetworkingGroup
Despite the announcement by Burmas m il itary government that the My itsone dam w il l be
suspended, loca l Kachin vil lagers have yet to see ev idence the pro ject will be stopped and
remainfearfulanduncertainaboutthe irfuture.
An update re leased today by the Kachin Development Networking Group (KDNG) shows
ev idence that equipment and supp lies for the pro ject remain in place, security restrict ions
continueforloca lresidents,anddestructive goldminingintheplannedMy itsone damreservoir
areais ongoing.
Therehadbeenalull inconstructionatthedam site be fore the suspensionannouncementdue
totherainy season.However,workonthedamprojectinfrastructurehas cont inued,evenafter
theannouncement.As ofOctober11,Chineseworkers were stil lcarry ingout land surveywork
southofthedam site,andwerecont inu ingconstructionofa supplyroad linking theMy itsone
dam site totheChinesebordertownofTengchong.
Staff from China Power InvestmentCorporation (CPI), themain project holder, recently to ld
loca l staff of theirpro jectpartner,AsiaWorld,not tomoveanyequipmentas thepro jectwil l
continueaftertherainy season,despite the suspensionannouncement.
We donottrustwhatthePresident saidabout suspendingtheMy itsone dam, saidavil lager
fromthedam site.We can see theworkers anddamconstructionmachines stil latthe site.
KDNGis ca llingforanoff icia lcancellationannouncementfromCPI,withdrawalofallequipment
andpersonnel,andforthe safereturnofa llthere loca tedvil lagers backtotheirorigina lhomes.
All seven dams of the Irrawaddy pro ject will have devastat ing effects on themillions living
alongtheriver.Wewil lcont inue toresistthedams unt iltheyarealloff icia llycancelled,not just
suspended, saidAhNanofKDNG.
Contact: AhNan(+66)848854154
Email:[email protected]
ToreadfullAnUpdateontheIrrawaddyMyitsonedamsproject,pleasevisitwww.kdng.org
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
15/16
(KDNG) Tengchong (CPI)
8/3/2019 Update on the Irrawaddy Myitsone Dams Project-KDNG-engl
16/16
" " " "KDNG CPI " "" "KDNG: (+66) 848854154Email: [email protected]