REI Nuclear, LLC 1230 Veterans Road Columbia, South Carolina, 29209 803.851.4700 reinuclear.com Update on Reactor Segmentation Developments Michael Anderson, PE 2016 EPRI Decommissioning Workshop June 20-21, 2016 Loews Royal Pacific Resort Orlando, FL

Update on Reactor Segmentation Developments...Update on Reactor Segmentation Developments Michael Anderson, PE 2016 EPRI Decommissioning Workshop June 20 -21, 2016 ... Major Component

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

REI Nuclear, LLC 1230 Veterans Road Columbia, South Carolina, 29209 803.851.4700 reinuclear.com

Update on Reactor Segmentat ion Developments

Michael Anderson, PE2016 EPRI Decommissioning WorkshopJune 20-21, 2016Loews Royal Pacific ResortOrlando, FL

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

2

Past Reactor Segmentat ion Experience

Rancho Seco Reactor Vessel Internals Segmentation

Fermi Unit 1 Segmentation of Reactor Vessel and Internals

Zion Stat ion Reactor Vessel Internals and Vessel

Segmentation

Humboldt Bay Reactor Vessel Internals and Vessel

Segmentation

Big Rock Point Major Component Removal Project at the Big Rock

Point Restoration Project

Millstone Unit 1 Segmentation of the Greater than Class C Upper

Grid Assembly for On-Site Storage

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

3

Reactor Project Philosophy and Approach

Minimize radiation exposure to workers.

Minimize generation of secondary waste.

Execute the project in the most cost effective manner.

Minimize the technical, schedule, and cost risks to the project.

Identify and delivery safe, proven, and reliable methods and processes to perform the segmentation activity.

Deliver a segmentation approach that minimizes the number of segments and Class B/ C waste while optimizing packaging efficiency.

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

4

Segmentat ion Tooling Timeline

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

5

Previous Segmentat ion Equipment Deployment

Big

Rock

Poi

nt

Mill

ston

e U

nit 1

Ranc

ho S

eco

Parr

CV

TR

Ferm

iH

umbo

ldt B

ay R

VI

Zion

Sta

tion

Hum

bold

t Bay

RV

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

6

Mult i-Purpose Segmentat ion Stat ion (Reciprocat ing Configurat ion)

Removes up to 0.007” of material per cut pass.

This configuration can be expected to execute approximately 2” of vertical cut per hour.

Each reciprocating blade includes several replaceable consumable cutter segments.

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

7

Mult i-Purpose Segmentat ion Stat ion (Vert ical Configurat ion)

This configuration can achieve single pass cutting rates of up to 1¾” per minute on 2” thick material.

Single configurations can cut material up to 11” thick.

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

8

Mult i-Purpose Segmentat ion Stat ion (Horizontal Crossbeam Config.)

The Horizontal Crossbeam saw, used similar to a radial arm saw, effectively removes control rod guide tubes and support columns associated with most upper internals assemblies.

Can also be used to volume reduce grid-shaped patterns up to11” deep.

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

9

Baffle Plate Removal

Removes bolts that fastened the baffle plates to the former plates. Removes 16 to 48 bolts per set-up position. 20 bolts can be milled per shift. GTCC material.

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

10

Baffle Former Plate Removal

Totally dependent on geometry, the existing flow holes found in the baffle former plates may allow removal using a tool similar to the BeaST as was deployed at Rancho Seco.

Most Westinghouse PWR are void of flow holes in the upper elevation of baffle former plates and the geometry is not sufficiently consistent. Milling solutions have been deployed in these cases.

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

11

Internal Barrel Cut ter

Used to sever the common right cylinders found within all PWRs.

Can be configured to perform sweeping multi-pass cutting or staggered complete plunge cutting.

Produce right cylindrical segments for further processing by the Multi-Purpose Segmentation Station.

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

12

Reactor Vessel Cut t ing

SONGS 1 – Type B Package

Rancho Seco – Abrasive Water Jet

Fermi Unit 1 – Mechanical

Humboldt Bay – Mechanical

Zion – Oxy-Propane

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

Remaining PWR Fleet

…complete, mature, executable

approach

13

51 Westinghouse (~like Zion)7 Babcock & Wilcox (~like Rancho Seco)14 Combustion Engineering (~like SONGS 2&3)

Shutdown AnnouncedKewaunee Fort CalhounCrystal RiverSONGS 2&3

CONFIDENTIAL INFORMATIONAll information contained within this presentation is property of REI Nuclear, LLC, and shall not be used or distributed without written consent of REI Nuclear, LLC.

No Full Scale Segmentat ion of a Mark Type BWR

Big Rock Point – completeHumboldt Bay – completeMillstone Unit 1 - partial

14

ShutdownVermont YankeeMillstone Unit 1

AnnouncedPilgramFitzpatrickOyster Creek