3 March 2006 E. Tsesmelis - TS/LEA 1
Update on Experimental Area Organisation StructureEmmanuel Tsesmelis
LEAF
3 March 2006
3 March 2006 E. Tsesmelis - TS/LEA 2
Introduction
In view of the appointment of four new Technicians (Work-
site Management), the the addition of two new Safety Coordinators, and the start of a new phase of activities at the
experimental areas,
the organisation structure supplied by the TS Department to ensure the coordination of the LHC experimental areas has been updated.
3 March 2006 E. Tsesmelis - TS/LEA 3
Technicians (Work-site Management) As work-site supervision technicians for the
LHC experimental areas, the four newly-appointed Technicians (Work-site Management) have the following functions: In the framework of the Experimental Area Teams
already in place, actively ensure that working procedures are respected in the experimental areas under the responsibility of TS-LEA, keeping technicians and engineers of the TS-LEA-EAM section well-informed of the application of procedures.
3 March 2006 E. Tsesmelis - TS/LEA 4
Updated Organisation StructurePOSITION ALICE ATLAS CMS LHCb
EAM S. Evrard F. Butin J. Osborne D. Lacarrère
EA SWIC B. Moris D. De Paoli N. Dos Santos J. Herranz-Alvarez
EA PLO M. Gastal C. Scalisi*
M. Kotamaki
M. Gastal D. Lacarrère
EA HTC J. Bernard A. Masson D. James J. Sakkinen
EA SC E. Paulat J. Etheridge
H. Buret
J. Weber
P. Thevenon
J. Etheridge
H. Buret
EA WSSA D. Derupt (50%) F. Baïs
B. Lebegue
A. Guiga**
S. Rew
R. Derupt (50%)
* Assistance for USA15 and US15
** Assistance to ATLAS until milestone of Ready for Lowering CMS Detector
3 March 2006 E. Tsesmelis - TS/LEA 5
Update to Point 1 (ATLAS) Experimental Area Organisation Update has been made to the organisation structure supplied by
the TS Department to ensure the coordination of the ATLAS Experimental Area at Point 1 to cover the installation and commissioning of the ATLAS experiment in the underground areas.
The UX15 organisation structure for the installation and commissioning phase of the ATLAS experiment remains unchanged.
The ATLAS Counting Room Management (CRM) organisation structure has been created under the responsibility of the ATLAS Collaboration to provide analysis and follow-up of WPs for USA15 and US15, where commissioning of the experiment electronics is carried-out.
3 March 2006 E. Tsesmelis - TS/LEA 6
Update to Point 1 (ATLAS) Experimental Area Organisation
EAM
PH HD
EAT
TC
TC Team
LEA GL TS HD
Global Coordination- Work Package definition (budget, scope & schedule) - All activities outside the Experimental Area- Detector Installation & commissioning- Overall schedule
In situ coordination -TS services & infrastructure - Detector installation & commissioning
PH
TS
3 March 2006 E. Tsesmelis - TS/LEA 7
Update to Point 1 (ATLAS) Experimental Area Organisation
Experimental Area Manager
Work Package 1
ATLAS Technical Coordinator
Work Package 2 Work Package n-1 Work Package n
Transport Coordination
Weekly Planning
Safety Coordination
Transport Contract
TS
PH
3 March 2006 E. Tsesmelis - TS/LEA 8
Update to Point 5 (CMS) Experimental Area Organisation In view of the start of CMS lowering in to the
UXC55 cavern in Summer 2006, the corresponding organisation structure for Point 5 (CMS) is presently under review.
3 March 2006 E. Tsesmelis - TS/LEA 9
SXL2 Surface Building at Point 2 In order to guarantee the safety coordination of the
ALICE activities in SXL2, the safety co-ordination of this building has been re-integrated under the responsibility of the TS Department.
The update has resulted in the following: E. Paulat has been re-appointed Safety Coordinator for
SXL2. P. Ijzermans remains TSO and will continue to lead the
organisation of Work Packages and the corresponding Work Package Analysis meetings for SXL2.
Effective as of 1 February 2006
3 March 2006 E. Tsesmelis - TS/LEA 10
Documentation
Updated versions of the relevant documents EDMS Doc. No. 483480 (Experimental Areas
Organisation) EDMS No. 490701 (List of Buildings and Civil
Engineering Infrastructures Included in the Different Experimental Areas)
EDMS Doc. No. 690581 (Update of Organisation Structure for ATLAS Experimental Area) has been released.