25
IAEA International Atomic Energy Agency Update on Denial and Delay Presentation 6.1 for TRANSSC 20

Update on Denial and Delay

Embed Size (px)

DESCRIPTION

Update on Denial and Delay. Presentation 6.1 for TRANSSC 20. Update issues since TRANSSC 18. What is new ? Schedule A new structure 1 st National Focal Points Meeting 5 th International Steering Committee Meeting Workshops Denial Network Handbook. Schedule. - PowerPoint PPT Presentation

Citation preview

Page 1: Update on Denial and Delay

IAEAInternational Atomic Energy Agency

Update on Denial and Delay

Presentation 6.1

for TRANSSC 20

Page 2: Update on Denial and Delay

IAEA 2

Update issues since TRANSSC 18

• What is new?

• Schedule

• A new structure

• 1st National Focal Points Meeting

• 5th International Steering Committee Meeting

• Workshops

• Denial Network Handbook

Page 3: Update on Denial and Delay

IAEA 3

Schedule

• 1st National Focal Points Meeting (Vienna, 23-24/02/2010)• 5th International Steering Committee Meeting

(Vienna, 25-26/02/2010)• PATRAM 2010 – 2 sessions on Denials of shipment

(London, 5-6/10/2010) • 2nd Workshops on denial of shipment

(October and November 2010)• CSs and TMs to prepare and consolidate results of NFP2

and ISC6 Meetings (2011)• 2nd National Focal Points Meeting (Vienna, 18-19/04/2011)• 6th International Steering Committee Meeting

(Vienna, 20-21/04/2011)• International Conference on the Safe and Secure Transport

of Radioactive Material (Vienna, October 2011)

Page 4: Update on Denial and Delay

IAEA 4

A new structure

ISC

Regional co-ordinators

National Focal points

National committee

Regional Network

Management Team

GROUPFACILITATION

Page 5: Update on Denial and Delay

IAEA 5

A new structure

Page 6: Update on Denial and Delay

IAEA 6

1st National Focal Points Meeting (1)

• 69 countries with NFP 75 NFPs including alternates151 IAEA Member States

• Dedicated Web folderhttp://ns-files.iaea.org/fileshare/rit/default.asp?fd=767

• Outputs of 1st NFP meeting• Agreed guidance on the roles and responsibilities of

NFPs (Strategic planning, Approaches/Solutions, Operational actions)

• Definition of Denial of shipment• An e-learning package made available to the

participants (developed on the initiative of IMO for all modes)http://www.class7elearning.com/

Page 7: Update on Denial and Delay

IAEA 7

1st National Focal Points Meeting (2)

• Outputs of 1st NFP meeting• Building knowledge

• Cost analysis model for Denials (Peru)• Review of Successes (Brazil Air Transport - Priority

given to Radioisotopes for medical Use)• Instructive reports of situation in Egypt (Suez Canal) /

Panama (Canal) / Malaysia (Straits) / Italy (Harbours) and Cuba

• Practice exercise• Perform practical training on a complex Denial

scenario • Clarify interactions of the global structures • Report Denials/Delays in the international database • Understand the issues of Denials/Delays

Page 8: Update on Denial and Delay

IAEA 8

1st National Focal Points Meeting (3)

• Outputs of 1st NFP meeting

• What is a denial of shipment?• Do I have a denial or a delay? • What should I do?• How to report?

Need for TOOLKIT and NETWORK

Denial Network Handbook

Page 9: Update on Denial and Delay

IAEA 9

5th ISC Meeting – Issues (1)

• The Agency has set the target of reducing delays and denials to an insignificant level by 2013.

• ISC endorsed many tools made available to empower RCs and NFPs.

• ISC Structure has been proposed to integrate NFPs, RCs and the ISC Management Team (New structure)

Page 10: Update on Denial and Delay

IAEA 10

5th ISC Meeting – Issues (2)

Discussions have identified:

• Urgent need to recruit additional suitable NFPs• Need to clarify the roles of the different elements within

the overall ISC structure.• Need to achieve better reporting of delays and denials.• Need to ensure there is a common understanding of

what constitutes a delay and/or denial.• That the Action Plan is too lengthy and unclear.

Page 11: Update on Denial and Delay

IAEA 11

The 5th ISC Meeting has progressed these needs in the following ways:

• Addressed roles and responsibilities within the overall ISC structure and the ISCs future direction.

• Definition of Delays and Denials• Special treatment for delays and denials related to

national or local regulation.• Identification of priorities for database development

and analysis.• Framework for the communications toolkit has been

developed.• Action Plan reviewed and a process to refocus this in

line with new ISC structure has begun.

5th ISC Meeting – Issues (3)

Page 12: Update on Denial and Delay

IAEA 12

Issues not addressed:• Definition of the regional groups (geographic)

• By the Secretariat (still in discussion with MT-ISC, for America as a whole)

• Training and education • TM in 01/2011 on Communication Strategy; • TM on simplified training and e-learning package in 03/2011)

• Translation of material• Identify for when national regulations are more restrictive than

international regulations for transport of Class 7• DenSec will take action with ISC-MT to contact NFP

• Funding and resourcing

5th ISC Meeting - Issues (4)

Page 13: Update on Denial and Delay

IAEA 13

Secretariat Specific • Actively pursue the recruitment of suitable NFPs in

collaboration with RCs• Identification of senior RC per region, to take contact with

Permanent Missions (69 MS with NFP, North America without NFP and RC,

• Establish a Denials Secretariat• Contacts taken with UN-ECE, ICAO and IMO, to be formalized

• Improve Database Control• Access restricted to DenSec, to be extended to RCs• Anonymize the reports provided by industry.

• Reconstitute ISC in line with proposal to integrate Regional and National Networks• RC to be integrated as ISC members.

5th ISC Meeting – Agreed actions (1)

Page 14: Update on Denial and Delay

IAEA 14

Secretariat Specific • Strengthen links between ISC and higher policy levels.

• Report to BoG (through Chairman ambassador (UK))• Develop specific web pages

• The PACT web page format is at IAEA clearance level to launch the project (http://cancer.iaea.org/index.asp : IAEA’s umbrella programme for combating denials of shipment)

• Development of further communication material subject to resources.• Communication toolkit to be incorporated on the basis of ISC5-WG3

recommendations)• Develop handbooks for all participants within the ISC structure.

• Denial Network Handbook draft has been circulated among RCs and ISC-MT, then to NFPs.

5th ISC Meeting – Agreed actions (2)

Page 15: Update on Denial and Delay

IAEA 15

Secretariat Specific • Coordinate in conjunction with RCs, regional

workshops November 2010 – subject to availability of resources.• 2nd Workshops on denials of shipment are planned

for 2010-Q4 for Africa, Asia-Pacific and Latin America

• To identify specificities of each region and presented to RCs and jointly propose TC funding for current and future projects.• TC projects are initiated for workshops (LA, AF) and for

training (LA: Panama, Columbia; AF)

5th ISC Meeting – Agreed actions (3)

Page 16: Update on Denial and Delay

IAEA 16

ISC Management Team Specific • Report to the higher policy level

• Report to BoG (through Chairman ambassador (UK))• Management Group meeting for Steering Committee

planned during General Conference in 09/2011 • Coordinate and manage ISC activities throughout the

year.• Monthly conference call (MT-DenSec), reports available

on http://ns-files.iaea.org/fileshare/rit/default.asp?fd=774 when validated.

• With authority provided by IAEA and based on validated data, subject to request, represent the ISC at senior levels with key stakeholders.

5th ISC Meeting – Agreed actions (4)

Page 17: Update on Denial and Delay

IAEA 17

Others • Action Plan Working Group

• Complete review of action plan by end of March 2010

• Included in ISC5 report (Annex 10)• Communication Working Group

• Continue to define the framework and populate toolkit with materials

• Discussions with WNA and outreach journalist taken.• CS to develop brochures aimed at carriers planned in

01/2011 and 09/2011.• TM for Communication Strategy for DoS planned in

01/2011.

5th ISC Meeting – Agreed actions (5)

Page 18: Update on Denial and Delay

IAEA 18

Others • NFPs

• Provide material for IAEA Web Folders of use in training and communication.

• Communicate with industry in their respective country regarding ISC existence and mandate and their own role as NFP.

• Inform industry of database confidentiality control.• Feedback on these items will be provided during

workshops, also on NFP contribution to establish their National Network

5th ISC Meeting – Agreed actions (6)

Page 19: Update on Denial and Delay

IAEA 19

Others • Regional Coordinators

• To the extent possible assist IAEA in identifying and encouraging additional suitable candidates as NFPs.

• RCLA reminds all LA Permanent Missions• Coordinate regional workshops in conjunction with

the Denials Secretariat.• 2nd workshops planned (programme defined, location to be

confirmed, attendees defined, training defined, …)

5th ISC Meeting – Agreed actions (7)

Page 20: Update on Denial and Delay

IAEA 20

Others • ICAO

• Integrate headquarters and 6 regional offices into the ISC process for managing the denial process

• List of regional officers• Hold modal discussions with the IAEA

• On the basis of conference call (to be pursued during ISC and TRANSSC meetings)

5th ISC Meeting – Agreed actions (8)

Page 21: Update on Denial and Delay

IAEA 21

Others • Industry

• WNTI will review the IAEA training modules for potential use (WNTI)

• TM to prepare a simplified training and e-learning package targeting denial planned in 03/2011.

• Incorporate industry associations in denial reporting process

• Denial Report submissions to Denials Secretariat (All)

• CS on analysis of denial reports planned in 04/2011 (to report on ISC6)

5th ISC Meeting – Agreed actions (9)

Page 22: Update on Denial and Delay

IAEA 22

5th ISC Meeting - Action Plan (WG4)

• 2009 Action Plan: 119 actions • covering 6 key areas

(Awareness / Training / Communication / Lobbying / Economic / Harmonisation)

• including actions for all actors AND on-going activities• WG4-ISC5

• Identification of on-going activities, complementary to Roles and Responsibilities

• Identification of completed actions• Complete set available on Annex 10 of ISC5 report

Page 23: Update on Denial and Delay

IAEA 23

Workshops on denials of shipment (1)

• 2nd Workshops on denial of shipment • Latin America and Caribbean Region (Panama,

1-5/11/2010)

• Africa (Seychelles or Mauritius, 15-19/11/2010)

• Asia-Pacific Region (Manila, 25-29/10/2010)

Page 24: Update on Denial and Delay

IAEA 24

Workshops on denials of shipment (2)

• 3-day Workshop • Strengthen the regional network (NFPs, RCs)• Analyze the work done since the 1st workshop• Provide an updated Regional Action Plan• Improve communication between the actors of the new structure

(NFPs, RCs, ISC, Denials Secretariat, Stakeholders)• Familiarize participants to the reporting format• Clarify the roles and responsibilities of NFPs and RCs

• 2-day Training Course• Special focus:

Customs with the participation of UNODC

Page 25: Update on Denial and Delay

IAEA 25

Conclusion

• No REPORT = No DENIAL• (Facilitate the) Solving of instances of

denial/delay of shipment = Harmonized application of Regulations

• Need for MS to get more involved (NFP nomination, National Network)

• Panel of instruments already availableTo be extended to webpage, Handbook and communication toolkits.