40
1 Update from ERCOT Retail Market Services to RMS August 14, 2003

Update from ERCOT Retail Market Services to RMS August 14, 2003

  • Upload
    carnig

  • View
    48

  • Download
    0

Embed Size (px)

DESCRIPTION

Update from ERCOT Retail Market Services to RMS August 14, 2003. Retail Market Update. Topics Data Archive Update FasTrak D2D / DEV Update 727 Checkpoint Meeting follow up Pre-TX SET 1.5 Clean up Customer Protection Period & 814.08 Issue - PowerPoint PPT Presentation

Citation preview

Page 1: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

1

Update from ERCOT Retail

Market Services

to RMS

August 14, 2003

Page 2: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

2

Retail Market Update

Topics• Data Archive Update • FasTrak D2D / DEV Update • 727 Checkpoint Meeting follow up • Pre-TX SET 1.5 Clean up• Customer Protection Period & 814.08 Issue• Data Extracts Working Group Meeting follow up • Stacking (V2.0) Coordination Team Update• Flight 0703 Progress Update • Flight 1003 Announcement • TEM IT Forum announcement

Page 3: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

3

Data Archive Update

• Data Archive Issue• Group Consensus Decision• Preliminary Timeline

Page 4: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

4

BackgroundERCOT has identified issues which have resulted in missing records in the archive and/or data extracts. ERCOT and MPs have focused on the impact on SCR727 extract data and the Data Extract Variance process.

Completed Items• Group meetings in Austin on 8/7 and 8/12• Consensus decision reached on 8/12

− Solution to provide new data to MPs− Data Extract Variance process treatment

Next Steps• RMS “blessing” on consensus decision (8/14)• Define timelines for:

− Providing data to the Market− Closure of “old” variances− Meeting to discuss Phase 2 MP requirements for SCR727

Data Archive Issue

Page 5: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

5

Variance TreatmentContinue to work all existing variances

– Close out all “old” variances once new data is implemented • Need to define timeline when “old” variances are

closed

Data Archive IssueGroup Consensus Decision

Extract Delivery Solution Full Extract Against Production Lodestar

– Provides clean starting point– Addresses issues MPs have had with data loading– Requires 5-6 weeks– ERCOT to provide supplemental data for deleted items

for MPs that want to maintain a historical perspective

Request RMS Approval for Consensus Decision on Variance Treatment

Page 6: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

6

Data Archive IssuePreliminary Timeline

Activity Start Stop

Clean up Archive 7/28/03 9/19/03

Historical Environment Prep 8/11/03 8/25/03

Creation of Historical Extracts 8/26/03 10/6/03

Weekly Data Archive Extracts 9/20/03 10/6/03

Daily Extracts Begin 10/7/03

Creation of Supplemental Deletion Files

10/7/03 10/20/03

8/4

8/11

8/18

8/25 9/1

10/2

0

10/1

3

10/6

9/29

9/22

9/159/8

Page 7: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

7

FasTrak Issue Status• Day-to-Day• Data Extract Variances (DEV)

Page 8: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

8

FasTrak 2003 “Day to Day”Issue Stats (as of 8-13-2003)

• Of the 338 In Progress with ERCOT, 179 are resolved and awaiting other party resolution check off.

STATUSIssueCount

Issues as a% of Total

New 18 0.22%

In Progress (ERCOT) 338 4.10%

In Progress (w/TDSP) 123 1.49%

In Progress (w/CR) 67 0.81%

Resolved 7,238 87.81%

Rejected 459 5.57%

Total 8,243

IssueCount

Issues as a% of Total

New 313 16.55%

In Progress 716 37.86%

Resolved 831 43.95%

Rejected 31 1.64%

Total 1,891

Non-ERCOT

ERCOT

Page 9: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

9

FasTrak 2003 Data Extract VarianceIssue Stats (as of 8-13-2003)

STATUSService History Usage

TotalIssues

Issues% of Total

New 29 0 29 2.47%

In Progress (ERCOT) 419 0 419 35.72%

In Progress (w/TDSP) 52 0 52 4.43%

In Progress (w/CR) 17 0 17 1.45%

Resolved 50 0 50 4.26%

Rejected/Withdrawn 580 26 606 51.66%

Total 1,147 26 1,173

Service History Usage

TotalIssues

Issues% of Total

New 15 18 33 1.47%

In Progress 482 712 1,194 53.07%

Resolved 297 451 748 33.24%

Rejected 93 182 275 12.22%

Total 887 1,363 2,250

Non-ERCOT (CR to TDSP)

• Of the 419 Service History Issues In Progress with ERCOT, 59 are resolved and awaiting other party resolution check off

• Of the 488 total In Progress Issues, 332 of these Issues were received by ERCOT after the resettlement date

• Of the 580 Rejected/Withdrawn, 250 of these are actually Withdrawn

Page 10: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

10

SCR727 Checkpoint Meeting

• Summary• Day-to-Day versus Extract Variances• Issues for Market Decision

Page 11: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

11

BackgroundERCOT had identified scenarios for which Market direction was needed. A meeting was set with an expanded agenda.

Completed Items• Group meetings in Austin on 8/7 • Defined FasTrak differences between Day-to-Day and Data

Extract Variance issues• Consensus decisions reached for ERCOT scenarios on 8/7 (See

additional slides) • Training scope defined and tentative timeline set

Next Steps• RMS “blessing” on consensus decisions (8/14)• Set meeting time and complete MP training

SCR727 Checkpoint Meeting

Page 12: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

12

FasTrak Day-to-Day versus DEV Issues

General Guidelines:

• Day to Day (D2D) issues should be filed for issues related to transaction or data processing with regards to current or subsequent transactions.

− Require the ESI ID with Original Tran ID

• Data Extract Variance (DEV) issues should be filed for data discrepancies identified by comparing the ERCOT 727 ESI ID extract to the MP source system.

− Require that transactions have been tried to correct the data discrepancy (i.e. back dated MVI, 814_20 Update for ESI ID Characteristics, etc.), if applicable

− Require the ERCOT 727 ESI ID extract record to complete spreadsheet for FasTrak

Page 13: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

13

FasTrak Day-to-Day versus DEV Issues

Examples:

a) A D2D should be submitted to correct an ESI ID start time because move-ins are failing to process.

b) A DEV should be submitted to correct an ESI ID start time by a TDSP to ERCOT because the 814_20 ADD was populated with the incorrect date.

c) If an MP submits a D2D just to change a date because they do not agree with ERCOT (without transactional reasoning), then ERCOT will reject and require a DEV be submitted.

Page 14: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

14

Issues for Market Decision

1. Multiple CR involvement  - Record change request that affects multiple CR records in ERCOT system (e.g. adjustment of the start time or the stop time where there is continuous energy service, but different CRs) a) Who owns responsibility for notification and reconciliation with

additional CR(s)? • ERCOT recommendation: ERCOT will open another DEV issue

and submit to the other CR(s) involved.

b) Acceptability of all CRs involved knowing who each other is? • ERCOT recommendation: Utilize a process similar to the

Inadvertent Switch Process for notifying multiple CR involvement.

c) What happens when one CR or more disagree with proposed fix?• ERCOT recommendation: MPs default to ERCOT decision.

ERCOT to provide MPs with basis for decision.

Consensus reached on 8-07-03

Page 15: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

15

Issues for Market Decision

2. Completion of some CR requests will create de-energized periods in ERCOT systems where usage data exists

a) Will Market Participants accept that usage will be UFE? YES(What if usage exists and is really large?)

b) Is anyone responsible for “finding the correct CR” if completing another CR request results in usage during a de-energized period?• ERCOT recommendation: ERCOT proposes that the TDSP will

notify ERCOT of the CR that owns the period that is being requested to be de-energized, and ERCOT will manually create a service instance for the ESI ID and notify the CR of such and ERCOT will provide CR with basis for decision. If agreed to, TDSP and CR will exchange appropriate transactions to facilitate corrections. – To date approximately 130 ESI IDs have been changed

causing de-energized period

Consensus reached on 8-07-03

Page 16: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

16

Issues for Market Decision

3. For LSE relationship issues where ERCOT and TDSP agree on record: (reflected in issue # 1)

• CR should modify their database (for 2002 issues)

• ERCOT recommendation: No transactions will be generated, manual corrections will be required. If agreed to, TDSP and CR will exchange appropriate transactions to facilitate corrections.

4. Non-ERCOT DEV issues where TDSP responds TDSP in agreement with ERCOT data extract:

• CR should modify their database (for 2002 issues)

• ERCOT recommendation: No transactions will be generated, manual corrections will be required. If agreed to, TDSP and CR will exchange appropriate transactions to facilitate corrections.

Consensus reached on 8-07-03

Page 17: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

17

Pre TX Set 1.5 Data Clean Up

• Directive from RMS 07-17-03 Meeting• Summary• In-Review Status Report• Scheduled Status Report• CWE with Meter Read Status Report

Page 18: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

18

A Reminder from RMS 07-17-03 Meeting Minutes

A motion was made by B. J. Flowers and seconded by Terri Eaton that

the RMS directs ERCOT to completely clean-up by August 13, 2003

the Pre-Texas SET 1.5 In Review, Scheduled, and Cancel With

Exception that have been identified and sent to the Market

Participants which should include cancels with CR approvals.

ERCOT will provide at the August RMS Meeting full statistics

involving Market Participants broken down per issue type. ERCOT is

directed that if the TDSP provides file names ERCOT will locate and

reprocess if it is a valid transaction. The RMS directs the TDSPs and

CRs to provide transactions or information necessary for ERCOT to

achieve the completion of the clean-up. The motion was approved by a

unanimous voice vote

Pre-TX SET 1.5 Data Clean-up

Page 19: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

19

BackgroundOn March 18, 2003, ERCOT identified approximately 40K Pre-TX SET 1.5 service orders in various pending statuses which were causing “Not-First-In” exceptions. ERCOT is to compile lists to send to TDSPs and CRs to request corrective actions. Response expected by:

− 8/1 for Cancel with Exception but meter read exists − 8/6 for Scheduled but not completing meter read

Completed Items• Lists were compiled and sent to MPs on 8/22/03 • Responses and current statuses are documented in following slides

Next Steps• TDSP to provide Meter Reads for scheduled• ERCOT to compile results for Cancel with Exception

− TDSPs to provide missing transaction − or provide confirmation to cancel from the CR

• Finalize and close-out clean-up initiative

Pre-TX SET 1.5 Data Clean-up

Page 20: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

20

Pre-TX SET 1.5 Data Clean-up Process

In Review Status Date Issue Count

03-18-03 16,188

06-12-03 207

07-17-03 12

08-13-03 0

Current Status

All have been completed, scheduled or changed to CWE.

(Changed to CWE indicates ERCOT did not receive a meter read, 814_04 or 814_25)

Page 21: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

21

Pre-TX SET 1.5 Data Clean-up Process

Scheduled Status

Current Status

AEP 229 All have been verified and are in process of being completed; AEP has sent 103 transactions thus far.

CNP 67 All have been verified and are in process of being completed

ONCOR 349 All have been verified and are in process of being completed

TNMP 942 Incomplete response received – TDSP to follow-up

Date Issue Count

03-18-03 23,030

06-12-03 11,038

07-17-03 6,153

08-13-03 1,587

Page 22: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

22

Pre-TX SET 1.5 Data Clean-up Process

CWE withMeter Read

Present

Current Status

AEP 0 31 changed to complete

CNP 0 697 changed to complete/in process of completing;

93 remain CWE after verification

ONCOR 0 624 changed to complete;

2 remain CWE/cancelled after verification

TNMP 162 Incomplete response received – TDSP to follow-up

NOTE: ERCOT has identified an additional 5,481 that are CWE with meter reads. ERCOT will send these out to the TDSPs by 8-19-03 for verification and ask that the results be returned to ERCOT by 8-29-03.

Date Issue Count

06-12-03 1,609

07-17-03 1,349

08-13-03 247 + New

Page 23: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

23

Customer Protection Periodand 814.08 Issue

• Background and Summary• Status Report

Page 24: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

24

BackgroundERCOT has determined that there was an issue with the 814_08 manual-processing tool related to the “cancel by customer objection” process. While ERCOT systems were updated appropriately, 972 ESI IDs (spanning the August 2002 through July 2003 time frame) were identified where ERCOT has been unable to confirm that the TDSP was sent the 814_08 cancel.

Completed Items• ERCOT compiled lists and forward them to the TDSPs on 8/6/03

Next Steps• TDSPs are to confirm they canceled or completed the service orders

and return the response to ERCOT by COB 08/15/03. • ERCOT will compile the results and work with TDSPs and CRs to

determine a course of action to synchronize records across MP systems. • ERCOT will compile final results and statistics for reporting to RMS

as required.

Customer Protection Period and 814.08

Page 25: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

25

Note: Current understanding is that process will require manual correction in the TDSP and CR systems along with probable cancel/re-bill activities.

Customer Protection Period and 814.08

Breakdown

AEP 111 Reported 3 canceled and 108 completed

CNP 499 Response pending

ONCOR 358 Reported 37 canceled and 321 completed

TNMP 4 Response pending

Page 26: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

26

Data Extracts Working Group

Page 27: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

27

DEWG Follow Up

• DEWG was originally established by the QSE Project Managers Working Group to understand & review extracts for accuracy and timeliness.

• As Retail Market has developed & matured, it now has the same needs. CRs & TDSPs are encouraged to participate to define extract requirements.

• Goal of the DEWG: To determine gaps within existing QSE/Retail extracts in order to conduct business within the ERCOT market.

Page 28: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

28

DEWG Follow Up

Accomplishments:• Review of Retail Extracts and the change request process

• Review of Betty Day’s presentation on ERCOT’s default profile analysis given at the June RMS meeting– CRs receive usage for an ESI ID only for the period where they

are the REP of Record in their SCR 727 extract– Difficult for a CR to always know with certainty what usage was

used to scale a profile in the aggregation process– CRs should not assume that historical usage they receive from a

TDSP has successfully loaded into Lodestar– Difficult for a CR to determine from the SCR 727 extract if a

default profile will be used in settlementsPossible solutions and Market Participant requirements were

developed

• Identified need for future meetings & Retail involvement

Page 29: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

29

Presented by: Glen Wingerd

Thursday, August 14th, 2003

Move-In/Move-Out Market Solution to Stacking

(Texas Set V2.0)

Page 30: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

30

• Continuing efforts for Project Success.– Working with PRS at next meeting to approve PRR444

– Working with Tx SET to finalize Version 2.0 baseline

• Modifications to Tx SET Visio Swim Lanes

– Continued improvements in communication

• Added Requirement Specification to V2.0 baseline

• FAQ E-mail address for questions [email protected]

• MP development design sessions

– Working design/functional issues as they are discovered

• Most have been identified and resolved

• Version control on Requirement Specification

Accomplishments/Goals

Page 31: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

31

Project Overview

Summary of Changes:Manage customer expectations by accepting and processing all valid requests.

Imp

act

Lev

el

Efficiency

Communication

Competition

Business Problem• Existing NFI logic forces an unreasonable amount

of dependency on labor intensive workarounds.• Execution of workarounds are causing

synchronization issues between market participants.

• Lack of synchronization leads to improper billing and mismanagement of customer expectations

Solution• All valid transactions will be accepted and

processed based on a set of market rules.• Drop notifications will be sent at a point in time

where the proper recipient can be positively identified.

• Rule based cancellations are sent on a pre-determined timeline with enough time for the recipient to react.

Page 32: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

32

Implementation Timeline

Production Implementation Timeline

1/12004

Oct. RMS

Production Implementation

Date:8/1/2004

7/72003

MIMO Task Force delivery of

PRR to PRS

7/312003

Texas SET Version 2.0

Final Baseline

10/12003

Market Coordination team

review of Production Processing Schedules

8/312003

TDSPs and ERCOT

Production Processing

Schedules due

11/142003

38 weeks

Details on ERCOT

exception processing

due

Draft Implementation

schedule and plan due

5/32004

7/232004

5/172004

10 weeks

Market Test

Testing checkpoints at

weeks 5 & 8

Final Implementation

schedule and plan due

Page 33: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

33

• Production Processing Schedules Due 8/31/03

– TDSPs and ERCOT

• Details on ERCOT Exception Processing Due 11/14/03

• Flight Test Plan Due 2/2/04

– Scripts

• Production Implementation Plan Due 5/3/04

Next Steps

Page 34: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

34

Thank-you

Page 35: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

35

Flight 0703 Progress Update

Page 36: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

36

Flight 0703 Progress Update

Frame 00 – GREEN

Frame 01 – GREEN

Frame 02 – GREEN

Frame 03 status – in progress

We are AHEAD OF SCHEDULE. Original deadline was 9/5, should complete by 8/22.

Transaction Progress

94.2% complete

Page 37: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

37

Flight 1003 Announcement

Page 38: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

38

Flight 1003 Announcement

This test will be for TX SET Version 1.6 and include Market Changes necessary to support Competitive Metering.  Testing is required for all Current Market Participants as well as New Market Participants entering the Texas Retail Market.

The deadline to register for participating in the Flight 1003, TX SET Version 1.6 Retail Market Testing is

September 4, 2003, 5 p.m. CPT.

ERCOT will host a MANDATORY orientation meeting in preparation for Flight 1003, TX SET Version 1.6 Retail Market Testing.  The meeting is required for both Current Market Participants operating in the Texas Retail Market as well as New Market Participants entering the Texas Retail Market.  This meeting will be held on Tuesday, August 26, 2003 10:00 am – 3:00 pm CPT at the Austin Airport Hilton. 

Page 39: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

39

ERCOT Texas Electric Market IT Forum Announcement

Page 40: Update from ERCOT Retail  Market Services  to RMS August 14, 2003

40

TEM IT Forum Announcement

ERCOT is sponsoring an Texas Electric Market IT Forum on September 15, 2003.

The mission is to provide an environment for Texas electric IT professionals to network with peers, share common issues and lessons learned, discuss new market initiatives, and provide feedback to ERCOT for the purpose of Advancing the Texas Electric Market.

There are still seats available. 

Call to register (512) 248-6338