16
1/9/2020 1 B/CS Association of Realtors – January Meeting January 9, 2020 UPCOMING TXDOT BRYAN DISTRICT PROJECTS Enhancing Quality of Life for All Texans January 9, 2020 B/CS Association of Realtors – January Meeting Allison K. Kurwitz, P.E. B/CS Association of Realtors – January Meeting January 9, 2020 #EndTheStreakTX Since November 7 th , 2000, Texas has had at least one death on its roadways every single day. 1 2

UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office [email protected] (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

1

B/CS Association of Realtors – January Meeting January 9, 2020

UPCOMING TXDOT BRYAN DISTRICT PROJECTS

Enhancing Quality of Life for All Texans

January 9, 2020

B/CS Association of Realtors –January MeetingAllison K. Kurwitz, P.E.

B/CS Association of Realtors – January Meeting January 9, 2020

#EndTheStreakTX

Since November 7th, 2000, Texas has had atleast one death on its roadways every single

day.

1

2

Page 2: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

2

B/CS Association of Realtors – January Meeting January 9, 2020

Growth & Congestion!

B/CS Association of Realtors – January Meeting January 9, 2020

Project Development Process

3

4

Page 3: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

3

B/CS Association of Realtors – January Meeting January 9, 2020

Upcoming Projects in 2020

B/CS Association of Realtors – January Meeting January 9, 2020

Upcoming Projects in 2020

Project: OSR Rehabilitate Existing Roadway,Bridge Replacements and Bridge Widenings

Location: FM 1687 to Navasota River, Brazos County

Timeline: Started Fall 2019

Status: Construction

Project: SH 21 Bridge Widening

Location: At IH 45 in Madisonville, Madison County

Timeline: Start Early 2020

Status: Construction

5

6

Page 4: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

4

B/CS Association of Realtors – January Meeting January 9, 2020

TxDOT Projects near Texas A&M

FM 2818 Superstreet Project

Status: Detailed Design, ROW, & Util.

Target Start: Fall 2020 (Pending ROW & Util.)

Target Finish: 2023

B/CS Association of Realtors – January Meeting January 9, 2020

FM 2818 (Harvey Mitchell) at FM 2347 (George Bush)

7

8

Page 5: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

5

B/CS Association of Realtors – January Meeting January 9, 2020

Upcoming Projects in 2020

Project: FM 1774 Rehabilitate Pavement, Shoulder Widening, and Flashing Beacon at CR 302

Location: SH 249 to Waller County Line, Grimes County

Target Start: Late 2020

Status: Detailed Design

Project: FM 2154 Intersection Improvements

Location: At Holleman Drive, College Station, Brazos County

Target Start: Late 2020

Status: Detailed Design

B/CS Association of Realtors – January Meeting January 9, 2020

Upcoming Projects in 2020

Project: Coulter Drive Sidewalks and Bike Lanes

Location: FM 158 to South College

Target Start: 2020

Status: Detailed Design

9

10

Page 6: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

6

B/CS Association of Realtors – January Meeting January 9, 2020

Upcoming Projects in 2021

B/CS Association of Realtors – January Meeting January 9, 2020

Raised Medians – Brazos County

Project: FM 2347 (George Bush) Raised MediansLocation: BS 6-R (Texas Ave.) to FM 2154 (Wellborn Rd.)Target Start: Summer 2021 (Lets for bids Summer 2020)Status: Develop Design, Public Meeting Jan. 21st

Project: FM 1179 Raised Medians Location: Kent Street to South College Ave. (Possibly FM 2154)Target Start: Fall 2021Status: Develop Design

Project: BS 6-R (Texas Avenue) Raised Medians, Bike-PedLocation: FM 60 (University Drive) to SH 21Target Start: Summer 2022Status: Preliminary

11

12

Page 7: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

7

B/CS Association of Realtors – January Meeting January 9, 2020

Upcoming Projects In 2021

Project: SH 6 Grade Separation

Location: At FM 2, Grimes County

Target Start: Fall 2021

Status: Detailed Design, ROW & Utility

B/CS Association of Realtors – January Meeting January 9, 2020

FM 158 (E. William Joel Bryan Pkwy)

Status: Detailed Design, ROW & Utility

Target Start: Fall 2021

Target Finish: 2023

13

14

Page 8: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

8

B/CS Association of Realtors – January Meeting January 9, 2020

FM 158 (E. William Joel Bryan Pkwy)

B/CS Association of Realtors – January Meeting January 9, 2020

Projects Beyond 2021

15

16

Page 9: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

9

B/CS Association of Realtors – January Meeting January 9, 2020

SH 6 Central BCS Widening

Current Status: Develop Design

Target Start: Early 2022 and Late 2024

Target Finish: 2024 and 2026

B/CS Association of Realtors – January Meeting January 9, 2020

Projects Beyond 2021

Project: FM 1179 Pavement Rehabilitation with TWLT (FM 158 to Riverstone Dr.),Replace Bridge (Wickson Creek)

Location: FM 158 to FM 2038, Brazos CountyTarget Start: Fall 2022Status: Develop Design

Project: US 190/SH 21 Widen from 2-lane to 4-lane DividedLocation: Navasota River to Madisonville, Madison CountyTarget Start: Late 2022 (Pending ROW & Utilities)Status: Develop Detailed Design

Project: IH 45 One-Way FR Conversion, New FR, Intersection Improvements, Ramp Reconfig, and Ped Infrastructure

Location: In Fairfield, Leon CountyTarget Start: Late 2022Status: Preliminary Design Schematic

17

18

Page 10: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

10

B/CS Association of Realtors – January Meeting January 9, 2020

Projects Beyond 2021

Project: SH 30 Bridge Replacement and WideningLocation: Navasota River & Reliefs, Brazos and Grimes CountiesTarget Start: Fall 2023Status: Develop Design

Project: FM 2154 WideningLocation: SH 40 to Greens Prairie, Brazos CountyTarget Start: 2024 (Pending ROW & Utilities)Status: Feasibility Study

Project: SH 21 Raised Medians, Curb & Gutter, & SidewalksLocation: BS 6-R (Texas Ave.) to SH 6, Brazos CountyTarget Start: 2025Status: Preliminary

B/CS Association of Realtors – January Meeting January 9, 2020

Projects Beyond 2021

Project: FM 60 Upgrade Railroad Grade Separation

Location: At UPRR in Deanville, Burleson County

Target Start: 2023

Status: Preliminary Design Schematic

Project: SH 7 Passing Lanes/Super 2

Location: SH 75 to Houston County Line, Leon County

Target Start: Late 2023/Early 2024

Status: Develop Design

19

20

Page 11: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

11

B/CS Association of Realtors – January Meeting January 9, 2020

TxDOT Projects near Texas A&M

Bush-Wellborn Crossing

Status: Construction Plans - 80%

ROW Acquisition Complete

Target Start: Fall 2023

Target Finish: 2025

B/CS Association of Realtors – January Meeting January 9, 2020

Bush-Welborn Crossing

21

22

Page 12: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

12

B/CS Association of Realtors – January Meeting January 9, 2020

Bush-Welborn Crossing

B/CS Association of Realtors – January Meeting January 9, 2020

Projects Beyond 2021

Project: Madisonville Loop - SL 1853

Location: SH 21 West to SH 21 East, Madison County

Target Start: 2025

Status: Preliminary Design Schematic

Project: US 79 Widen to 4-lane Divided

Location: Jewett to Buffalo, Leon County

Target Start: 2025

Status: Preliminary Design Schematic

23

24

Page 13: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

13

B/CS Association of Realtors – January Meeting January 9, 2020

Future Projects &Feasibility Studies

B/CS Association of Realtors – January Meeting January 9, 2020

Future Projects & Feasibility Studies

Project: SH 6 North Widening, Interchange Improvements,

FR improvements and Hearne Relief Route

Location: SH 21 to North Side of Hearne, Brazos and Robertson Counties

Target Start: TBD

Status: Feasibility Study

Project: FM 50 Grade Separation

Location: At UPRR in Mumford, Robertson County

Target Start: 2025

Status: Preliminary Design

25

26

Page 14: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

14

B/CS Association of Realtors – January Meeting January 9, 2020

Future Projects & Feasibility Studies

Project: FM 60

Location: Snook to Lyons (SH 36) , Burleson County

Target Start: TBD per Environmental Wetland Mitigation

Status: 95% Complete Construction Plans

University Drive – Boulevard and Connectivity Study

27

28

Page 15: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

15

University Drive – Boulevard and Connectivity Study

Boulevard Concept

Current (2017)

B/CS Association of Realtors – January Meeting January 9, 2020

Project Website

For additional project information

and updates, go to…

www.txdot.gov

Search: Projects and Studies Bryan District

29

30

Page 16: UPCOMING TXDOT BRYAN DISTRICT PROJECTS...2001/09/20  · TxDOT, Bryan District Office Allison.Kurwitz@txdot.gov (979)778-9788 31 32 Title Microsoft PowerPoint - TxDoT Author director

1/9/2020

16

B/CS Association of Realtors – January Meeting January 9, 2020

Questions

B/CS Association of Realtors – January Meeting January 9, 2020

Thank You!

Allison K Kurwitz, P.E.District Planning Engineer

TxDOT, Bryan District [email protected]

(979)778-9788

31

32