Up-date on Nuclear New Builds & Long Term Operation Projects in Romania Alexandru Havris Director Development and Projects SN Nuclearelectrica SA 4th Central & Eastern Europe Nuclear Industry Congress 2018 Jan. 18-19th | Budapest, Hungary

Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

Up-date on Nuclear New Builds & Long Term Operation Projects in Romania

Alexandru HavrisDirector Development and Projects

SN Nuclearelectrica SA

4th

Cen

tral

& E

aste

rn E

uro

pe N

ucle

ar

Ind

ustr

y C

on

gre

ss 2

018 J

an

. 18

-19th

|

Bu

dap

es

t, H

un

ga

ry

Page 2: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

Nuclear Power Generation in Romania

Page 3: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

WindSolar

Coal

Oil

Gas

Hidro

Nuclear

Biomass

Power generation in Romania

3

Page 4: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

NUCLEARELECTRICA Executive Office Bucharest

Cernavoda NPP – Units 1&2Branch office

Nuclear Fuel Plant PitestiBranch office

• Safe & Efficient operation of Units 1 & 2 • Management of all Company assets in Cernavoda, including Units 3&4

• Manufacturer of nuclear fuel bundles, for own use, based on UO2 powder supplied by Uranium National Company – Romania

Energonuclear Subsidiary (PCO) Units 3& 4 Project

84,65% until 2014

100% starting 2014

4

Nuclearelectrica - overview

Page 5: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

5

Cernavoda NPP ensures the safe operation of Units 1 and 2 – CANDU type

reactor each with an installed power of 700 MW.

Cernavoda NPP Unit 1 was commissioned on December 2th, 1996 and

Cernavoda NPP Unit 2 on September 28th 2007.

Operational results

Page 6: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

CANDU Technology Unit performance U1 + U2 (%) Capacity Factor

(Cumulated 2016: 91.44%)

Global Ranking (the latest update by Nuclear Engineering International-August

2016)

• Capacity Factor since in service

Unit 2-93,33% - ranking 2nd at global level;

Unit 1-89,77% - ranking 9th at global level. • With a Capacity Factor of 91,6% since in service, Romania continues to rank no. 1 at global level.

0

10

20

30

40

50

60

70

80

90

100

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

99.45 98.88 99.72 99.4

59.1455.81

97.42 97.47 97.86 99.29

93.18

99.499.45 99.18

99.37 99.38

91.17

85.3487.1 88.42 89.45 90.45 90.7 91.44

Capacity factor U1 + U2 Cummulated capacity factor U1 + U2

Page 7: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

Nuclear fuel defect rate (%)

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

No. of bundles manufactured 6264 8640 9360 10800 10800 10800 10080 10800 10428 11628 11002

No. of defective bundles (U1+U2) 56 6 7 5 1 4 0 0 2 1 0

Defect rate % 0.899% 0.069% 0.075% 0.046% 0.009% 0.037% 0.000% 0.000% 0.019% 0.009% 0.000%

6264

8640

9360

10800 10800 10800

10080

1080010428

11628

11002

0.000%

0.100%

0.200%

0.300%

0.400%

0.500%

0.600%

0.700%

0.800%

0.900%

1.000%

0

2000

4000

6000

8000

10000

12000

14000

No. of bundles manufactured No. of defective bundles (U1+U2) Defect rate %

Page 8: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

Major projects

Page 9: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

Refurbishment of Cernavoda NPP Unit 1;

Units 3 and 4 Cernavoda NPP Project;

SNN’s priorities for 2015- 2025

Page 10: Up-date on Nuclear New Builds & Long Term Operation ...€¦ · Cernavoda NPP –Units 1&2 Branch office ... 3&4 •Manufacturer of nuclear fuel bundles, for own use, based on UO2

Unit 1 Refurbishment program