Up-date on Nuclear New Builds & Long Term Operation Projects in Romania
Alexandru HavrisDirector Development and Projects
SN Nuclearelectrica SA
4th
Cen
tral
& E
aste
rn E
uro
pe N
ucle
ar
Ind
ustr
y C
on
gre
ss 2
018 J
an
. 18
-19th
|
Bu
dap
es
t, H
un
ga
ry
Nuclear Power Generation in Romania
WindSolar
Coal
Oil
Gas
Hidro
Nuclear
Biomass
Power generation in Romania
3
NUCLEARELECTRICA Executive Office Bucharest
Cernavoda NPP – Units 1&2Branch office
Nuclear Fuel Plant PitestiBranch office
• Safe & Efficient operation of Units 1 & 2 • Management of all Company assets in Cernavoda, including Units 3&4
• Manufacturer of nuclear fuel bundles, for own use, based on UO2 powder supplied by Uranium National Company – Romania
Energonuclear Subsidiary (PCO) Units 3& 4 Project
84,65% until 2014
100% starting 2014
4
Nuclearelectrica - overview
5
Cernavoda NPP ensures the safe operation of Units 1 and 2 – CANDU type
reactor each with an installed power of 700 MW.
Cernavoda NPP Unit 1 was commissioned on December 2th, 1996 and
Cernavoda NPP Unit 2 on September 28th 2007.
Operational results
CANDU Technology Unit performance U1 + U2 (%) Capacity Factor
(Cumulated 2016: 91.44%)
Global Ranking (the latest update by Nuclear Engineering International-August
2016)
• Capacity Factor since in service
Unit 2-93,33% - ranking 2nd at global level;
Unit 1-89,77% - ranking 9th at global level. • With a Capacity Factor of 91,6% since in service, Romania continues to rank no. 1 at global level.
0
10
20
30
40
50
60
70
80
90
100
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
99.45 98.88 99.72 99.4
59.1455.81
97.42 97.47 97.86 99.29
93.18
99.499.45 99.18
99.37 99.38
91.17
85.3487.1 88.42 89.45 90.45 90.7 91.44
Capacity factor U1 + U2 Cummulated capacity factor U1 + U2
Nuclear fuel defect rate (%)
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
No. of bundles manufactured 6264 8640 9360 10800 10800 10800 10080 10800 10428 11628 11002
No. of defective bundles (U1+U2) 56 6 7 5 1 4 0 0 2 1 0
Defect rate % 0.899% 0.069% 0.075% 0.046% 0.009% 0.037% 0.000% 0.000% 0.019% 0.009% 0.000%
6264
8640
9360
10800 10800 10800
10080
1080010428
11628
11002
0.000%
0.100%
0.200%
0.300%
0.400%
0.500%
0.600%
0.700%
0.800%
0.900%
1.000%
0
2000
4000
6000
8000
10000
12000
14000
No. of bundles manufactured No. of defective bundles (U1+U2) Defect rate %
Major projects
Refurbishment of Cernavoda NPP Unit 1;
Units 3 and 4 Cernavoda NPP Project;
SNN’s priorities for 2015- 2025
Unit 1 Refurbishment program