(Up Date 21 Jan 2010 FIN Check List 2010)

Embed Size (px)

Citation preview

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    1/21

    No Equipment Date

    I On Machine Stop1 Porosimeter Tube

    2 Filter

    3 Standardization

    II Weekly 1 Standardization

    2 Standard Coefficients

    III Annualy 1 Porosimeter Tube

    2 Flowmeter

    3 Valve

    4 Tubing/Piping

    5 Filter

    6 Sensor

    7 Standardization

    8 Standard Coefficients

    B04004

    Porosimeter

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    2/21

    Done by Check by

    Approved By:

    MTC Supervisor

    Checklist

    Description

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    3/21

    Location: Finishing

    No

    I Repping Machine

    1 Main air pressure ( 5 kg/cm2 )

    2 Steam Pressure3 Drive speed (rpm)

    4 LubricatingII Filigrain Machine No. 1

    1 Main air pressure ( 5 kg/cm2 )2 Steam Pressure

    3 Drive speed (rpm)

    4 Lubricating

    III Filigrain Machine No. 2

    1 Main air pressure ( 5 kg/cm2 )2 Steam Pressure

    3 Drive speed (rpm)

    4 Lubricating

    IV Filigrain Machine No. 31 Main air pressure ( 5 kg/cm2 )2 Steam Pressure

    3 Drive speed (rpm)

    4 Lubricating

    V Roll Sliter Machine

    1 Main air pressure ( 5 kg/cm2 )2 Drive speed (rpm)

    3 LubricatingVI Ream Cutter Machine

    1 Main air pressure ( 5 kg/cm2 )2 Drive speed (Hz)

    3 Lubricating4 Photo sensore

    5 Deposit Strip

    Done by (MTC):

    Acknowledge by (Production):

    Check by (MTC Supervisor):

    Machine Adjusting/Repairing

    No

    Approved by

    Note:

    " " : Ok" X " : No Ok

    " " : Not Running MTC Manager

    Daily Check List

    Date

    Description

    CheTime Description Remedies Done by

    B01009 Rev. 1

    Eff. Date : 4/Feb/09

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    4/21

    k by

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    5/21

    Location: Finishing Department Section: Roll Slitter Machine

    No

    1 Paper Roll Bearings

    2 Coupling Shaft and Bearings

    3 Unwinding Plain Bearing

    4 Reel Drum and Bearings

    5 Unwinding shaft and Bearings

    6 Counter knife roll

    7 Slitters

    8 Rewind Shaft and Bearing

    Done by (MTC):

    Acknowledge by (Production):

    Check by (MTC Supervisor):

    Machine adjusting/Repairing

    No Time

    Approved By:

    Note:

    " " : Ok" X " : No Ok

    " " : Not Running MTC Manager

    Week II Date Date Week IV D

    Description Remedies

    Weekly Maintenance

    Description Week IIIWeek I Date

    CheckDone By

    B01010 Rev. 1

    Eff. Date : 1/Mei/09

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    6/21

    Location: Finishing Department Section: Repping Mach

    No

    1 Reel

    2 Paper Roll Bearings

    3 Trim Blower4 Top Roll and Bearings

    5 Marking Roll and Bearings

    6 Bottom Roll and Bearings

    7 Slidder Roll Condition

    8 Reel Drum and Bearings

    9 Unwinding shaft and Bearings

    10 Beltings & pulley

    11 Slitters

    12 Elastic Roll and Bearings

    13 Oscillation System Condition

    Done by (MTC):

    Acknowledge by (Production):

    Check by (MTC Supervisor):

    Machine adjusting/Repairing

    No Time

    Approved By:

    Note:

    " " : Ok" X " : No Ok

    " " : Not Running MTC Manager

    Description Remedies CheckDone By

    Weekly Maintenance

    DDescription Week I Date Week II Date Week III Date Week IV

    B01010 Rev. 1

    Eff. Date : 1/Mei/09

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    7/21

    Location: Finishing Department Section: Filligrain Machine No. ( 1 / 2 /

    No

    1 Reel

    2 Paper Roll Bearings

    3 Top Roll and Bearings4 Marking Roll and Bearings

    5 Bottom Roll and Bearings

    6 Paper Roll and Bearings

    7 Reel Drum and Bearings

    8 Unwinding shaft and Bearings

    9 Beltings & pulley

    10 Elastic Roll and Bearings

    11 Oscilating elastic roll (15mm-20mm)

    Done by (MTC):

    Acknowledge by (Production):

    Check by (MTC Supervisor):

    Machine adjusting/Repairing

    No Time

    Approved By:

    Note:

    " " : Ok" X " : No Ok

    " " : Not Running MTC Manager

    CheckDone By

    Weekly Maintenance

    Description Remedies

    Week IV DDescription Week I Date Week II Date Week III Date

    B01010 Rev. 1

    Eff. Date : 1/Mei/09

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    8/21

    Location: Finishing Department Section: Ream Cutter Machin

    No

    1 Rewinding Wheel and Bearing

    2 Paper Roll and Bearings

    3 Safety Fences and Limit Switch4 Unwinding Brake System

    5 Sliding table rail and roller

    6 Cutting System and Electromotor

    7 Air Cylinder for Rewinding Brake

    8 Portable Rewinding Paper Cutter

    9 Unwinding Shaft and bearing

    Done by (MTC):

    Acknowledge by (Production):

    Check by (MTC Supervisor):

    Machine adjusting/Repairing

    No Time

    Approved By:

    Note:

    " " : Ok" X " : No Ok

    " " : Not Running MTC Manager

    Check

    Date

    Weekly Maintenance

    Description Remedies Done By

    Week IV DDescription Week I Date Week II Date Week III

    B01010 Rev. 1

    Eff. Date : 1/Mei/09

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    9/21

    Location: Finishing Department Section: Bobbin Slitter Machine No.

    No

    1 Knife Shaft Bearing

    2 Gear Box

    3 Main Shaft and Bearing/Bushing

    4 Counter Knifes Shaft and Bearings5 Paper Roll and Bearings

    6 Rewinding Shaft and bushing

    7 Arm of Rewinding Shaft

    8 Unwinding Shaft and Bushing

    9 Unwinding Stand and Plain Bearing

    10 Belting and Pulley

    Done by (MTC):

    Acknowledge by (Production):

    Check by (MTC Supervisor):

    Machine adjusting/Repairing

    No Time

    Approved By:

    Note:

    " " : Ok" X " : No Ok

    " " : Not Running MTC Manager

    Week II Date Week III Date DDescription Week I Date

    Weekly Maintenance

    Description Remedies

    Week IV

    CheckDone By

    B01010 Rev. 1

    Eff. Date : 1/Mei/09

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    10/21

    Location: Finishing Department Section: Bobbin Reclaimer Machine No

    No

    1 Rewinding Drum

    2 Arm of Rewinding Chuck

    3 Unwinding chuck

    Done by (MTC):

    Acknowledge by (Production):

    Check by (MTC Supervisor):

    Machine adjusting/Repairing

    No Time

    Approved By:

    Note:

    " " : Ok" X " : No Ok

    " " : Not Running MTC Manager

    Week IV DWeek III Date

    Description Remedies

    Description Week I Date Week II Date

    Weekly Maintenance

    CheckDone By

    B01010 Rev. 1

    Eff. Date : 1/Mei/09

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    11/21

    te

    y

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    12/21

    e

    y

    te

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    13/21

    )

    y

    te

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    14/21

    y

    te

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    15/21

    te

    y

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    16/21

    .

    te

    y

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    17/21

    Location: Finishing Department

    No Equipment Date

    I Repping Machine

    1 Gear, Gear Box & Motor Condition

    2 Belting, Chain Drive & Pulley

    3 Vacuum Motor4 Un/Rewinding Plain Bearing

    5 Hydraulic/Air Supply Parts Condition

    6 Electric Wiring & instrument

    7 Lubricating

    8 Bearing Condition

    II Roll Slitter Machine

    1 Gear, Gear Box & Motor Condition

    2 Belting, Chain Drive & Pulley

    3 Vacuum Motor

    4 Un/Rewinding Plain Bearing

    5 Hydraulic/Air Supply Parts Condition

    6 Electric Wiring & instrument

    7 Lubricating8 Bearing Condition

    III Filligrain Machine I

    1 Gear, Gear Box & Motor Condition

    2 Belting, Chain Drive & Pulley

    3 Brake System Condition

    4 Un/Rewinding Plain Bearing

    5 Hydraulic/Air Supply Parts Condition

    6 Electric Wiring & instrument

    7 Lubricating

    8 Bearing Condition

    IV Filligrain Machine II

    1 Gear Box & Motor Condition2 Belting, Chain Drive & Pulley

    3 Brake System Condition

    4 Un/Rewinding Plain Bearing

    5 Hydraulic/Air Supply Parts Condition

    6 Electric Wiring & instrument

    7 Lubricating

    8 Bearing Condition

    V Filligrain Machine III

    1 Gear Box & Motor Condition

    2 Belting, Chain Drive & Pulley

    3 Brake System Condition

    4 Un/Rewinding Plain Bearing

    5 Hydraulic/Air Supply Parts Condition6 Electric Wiring & instrument

    7 Lubricating

    8 Bearing Condition

    VI Ream Cutter Machine

    1 Cutting System Electromotor Condition

    2 Belt ing Condition

    3 Air Supply Parts Condition

    4 Lubricating

    5 Electric Wiring & instruments

    6 Blade Condition

    7 Bearing Condition

    VII Bobbin Slitter/Bobbin Reclamer/Core Slitter1 Gear Box & Motor Condition

    2 Belt ing & Pulley

    Monthly Maintenance

    Description

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    18/21

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    19/21

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    20/21

    Check by

  • 8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)

    21/21

    Check by