8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
1/21
No Equipment Date
I On Machine Stop1 Porosimeter Tube
2 Filter
3 Standardization
II Weekly 1 Standardization
2 Standard Coefficients
III Annualy 1 Porosimeter Tube
2 Flowmeter
3 Valve
4 Tubing/Piping
5 Filter
6 Sensor
7 Standardization
8 Standard Coefficients
B04004
Porosimeter
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
2/21
Done by Check by
Approved By:
MTC Supervisor
Checklist
Description
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
3/21
Location: Finishing
No
I Repping Machine
1 Main air pressure ( 5 kg/cm2 )
2 Steam Pressure3 Drive speed (rpm)
4 LubricatingII Filigrain Machine No. 1
1 Main air pressure ( 5 kg/cm2 )2 Steam Pressure
3 Drive speed (rpm)
4 Lubricating
III Filigrain Machine No. 2
1 Main air pressure ( 5 kg/cm2 )2 Steam Pressure
3 Drive speed (rpm)
4 Lubricating
IV Filigrain Machine No. 31 Main air pressure ( 5 kg/cm2 )2 Steam Pressure
3 Drive speed (rpm)
4 Lubricating
V Roll Sliter Machine
1 Main air pressure ( 5 kg/cm2 )2 Drive speed (rpm)
3 LubricatingVI Ream Cutter Machine
1 Main air pressure ( 5 kg/cm2 )2 Drive speed (Hz)
3 Lubricating4 Photo sensore
5 Deposit Strip
Done by (MTC):
Acknowledge by (Production):
Check by (MTC Supervisor):
Machine Adjusting/Repairing
No
Approved by
Note:
" " : Ok" X " : No Ok
" " : Not Running MTC Manager
Daily Check List
Date
Description
CheTime Description Remedies Done by
B01009 Rev. 1
Eff. Date : 4/Feb/09
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
4/21
k by
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
5/21
Location: Finishing Department Section: Roll Slitter Machine
No
1 Paper Roll Bearings
2 Coupling Shaft and Bearings
3 Unwinding Plain Bearing
4 Reel Drum and Bearings
5 Unwinding shaft and Bearings
6 Counter knife roll
7 Slitters
8 Rewind Shaft and Bearing
Done by (MTC):
Acknowledge by (Production):
Check by (MTC Supervisor):
Machine adjusting/Repairing
No Time
Approved By:
Note:
" " : Ok" X " : No Ok
" " : Not Running MTC Manager
Week II Date Date Week IV D
Description Remedies
Weekly Maintenance
Description Week IIIWeek I Date
CheckDone By
B01010 Rev. 1
Eff. Date : 1/Mei/09
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
6/21
Location: Finishing Department Section: Repping Mach
No
1 Reel
2 Paper Roll Bearings
3 Trim Blower4 Top Roll and Bearings
5 Marking Roll and Bearings
6 Bottom Roll and Bearings
7 Slidder Roll Condition
8 Reel Drum and Bearings
9 Unwinding shaft and Bearings
10 Beltings & pulley
11 Slitters
12 Elastic Roll and Bearings
13 Oscillation System Condition
Done by (MTC):
Acknowledge by (Production):
Check by (MTC Supervisor):
Machine adjusting/Repairing
No Time
Approved By:
Note:
" " : Ok" X " : No Ok
" " : Not Running MTC Manager
Description Remedies CheckDone By
Weekly Maintenance
DDescription Week I Date Week II Date Week III Date Week IV
B01010 Rev. 1
Eff. Date : 1/Mei/09
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
7/21
Location: Finishing Department Section: Filligrain Machine No. ( 1 / 2 /
No
1 Reel
2 Paper Roll Bearings
3 Top Roll and Bearings4 Marking Roll and Bearings
5 Bottom Roll and Bearings
6 Paper Roll and Bearings
7 Reel Drum and Bearings
8 Unwinding shaft and Bearings
9 Beltings & pulley
10 Elastic Roll and Bearings
11 Oscilating elastic roll (15mm-20mm)
Done by (MTC):
Acknowledge by (Production):
Check by (MTC Supervisor):
Machine adjusting/Repairing
No Time
Approved By:
Note:
" " : Ok" X " : No Ok
" " : Not Running MTC Manager
CheckDone By
Weekly Maintenance
Description Remedies
Week IV DDescription Week I Date Week II Date Week III Date
B01010 Rev. 1
Eff. Date : 1/Mei/09
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
8/21
Location: Finishing Department Section: Ream Cutter Machin
No
1 Rewinding Wheel and Bearing
2 Paper Roll and Bearings
3 Safety Fences and Limit Switch4 Unwinding Brake System
5 Sliding table rail and roller
6 Cutting System and Electromotor
7 Air Cylinder for Rewinding Brake
8 Portable Rewinding Paper Cutter
9 Unwinding Shaft and bearing
Done by (MTC):
Acknowledge by (Production):
Check by (MTC Supervisor):
Machine adjusting/Repairing
No Time
Approved By:
Note:
" " : Ok" X " : No Ok
" " : Not Running MTC Manager
Check
Date
Weekly Maintenance
Description Remedies Done By
Week IV DDescription Week I Date Week II Date Week III
B01010 Rev. 1
Eff. Date : 1/Mei/09
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
9/21
Location: Finishing Department Section: Bobbin Slitter Machine No.
No
1 Knife Shaft Bearing
2 Gear Box
3 Main Shaft and Bearing/Bushing
4 Counter Knifes Shaft and Bearings5 Paper Roll and Bearings
6 Rewinding Shaft and bushing
7 Arm of Rewinding Shaft
8 Unwinding Shaft and Bushing
9 Unwinding Stand and Plain Bearing
10 Belting and Pulley
Done by (MTC):
Acknowledge by (Production):
Check by (MTC Supervisor):
Machine adjusting/Repairing
No Time
Approved By:
Note:
" " : Ok" X " : No Ok
" " : Not Running MTC Manager
Week II Date Week III Date DDescription Week I Date
Weekly Maintenance
Description Remedies
Week IV
CheckDone By
B01010 Rev. 1
Eff. Date : 1/Mei/09
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
10/21
Location: Finishing Department Section: Bobbin Reclaimer Machine No
No
1 Rewinding Drum
2 Arm of Rewinding Chuck
3 Unwinding chuck
Done by (MTC):
Acknowledge by (Production):
Check by (MTC Supervisor):
Machine adjusting/Repairing
No Time
Approved By:
Note:
" " : Ok" X " : No Ok
" " : Not Running MTC Manager
Week IV DWeek III Date
Description Remedies
Description Week I Date Week II Date
Weekly Maintenance
CheckDone By
B01010 Rev. 1
Eff. Date : 1/Mei/09
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
11/21
te
y
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
12/21
e
y
te
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
13/21
)
y
te
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
14/21
y
te
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
15/21
te
y
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
16/21
.
te
y
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
17/21
Location: Finishing Department
No Equipment Date
I Repping Machine
1 Gear, Gear Box & Motor Condition
2 Belting, Chain Drive & Pulley
3 Vacuum Motor4 Un/Rewinding Plain Bearing
5 Hydraulic/Air Supply Parts Condition
6 Electric Wiring & instrument
7 Lubricating
8 Bearing Condition
II Roll Slitter Machine
1 Gear, Gear Box & Motor Condition
2 Belting, Chain Drive & Pulley
3 Vacuum Motor
4 Un/Rewinding Plain Bearing
5 Hydraulic/Air Supply Parts Condition
6 Electric Wiring & instrument
7 Lubricating8 Bearing Condition
III Filligrain Machine I
1 Gear, Gear Box & Motor Condition
2 Belting, Chain Drive & Pulley
3 Brake System Condition
4 Un/Rewinding Plain Bearing
5 Hydraulic/Air Supply Parts Condition
6 Electric Wiring & instrument
7 Lubricating
8 Bearing Condition
IV Filligrain Machine II
1 Gear Box & Motor Condition2 Belting, Chain Drive & Pulley
3 Brake System Condition
4 Un/Rewinding Plain Bearing
5 Hydraulic/Air Supply Parts Condition
6 Electric Wiring & instrument
7 Lubricating
8 Bearing Condition
V Filligrain Machine III
1 Gear Box & Motor Condition
2 Belting, Chain Drive & Pulley
3 Brake System Condition
4 Un/Rewinding Plain Bearing
5 Hydraulic/Air Supply Parts Condition6 Electric Wiring & instrument
7 Lubricating
8 Bearing Condition
VI Ream Cutter Machine
1 Cutting System Electromotor Condition
2 Belt ing Condition
3 Air Supply Parts Condition
4 Lubricating
5 Electric Wiring & instruments
6 Blade Condition
7 Bearing Condition
VII Bobbin Slitter/Bobbin Reclamer/Core Slitter1 Gear Box & Motor Condition
2 Belt ing & Pulley
Monthly Maintenance
Description
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
18/21
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
19/21
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)
20/21
Check by
8/2/2019 (Up Date 21 Jan 2010 FIN Check List 2010)