UOC Creators Report

Embed Size (px)

Citation preview

  • 8/14/2019 UOC Creators Report

    1/38

  • 8/14/2019 UOC Creators Report

    2/38

    Group Members

    Index Reg No Name

    8372 2005s9719 M. R. Salih

    8332 2005s9718 T. I. Sahabdeen

    8335 2005s9541 E. K. Abeysinghe

    8327 2005s9784 L. B. Lokugalappaththi

    8269 2005s9595 K. W. T. C. Fonseka

    8365 2005s9676 H. S. Perera

    8141 2005s9495 E. C. J. Perera

  • 8/14/2019 UOC Creators Report

    3/38

    Contents

    1. Introduction

    1.1 Introduction ...................................................................................................................................... 4

    1.2 Scope of the Study ............................................................................................................................ 5

    2. About the Organization

    2.1 Organization History ......................................................................................................................... 6

    2.2 Organizational Chart ......................................................................................................................... 6

    2.3 Organizational Functions ......................................................................... ......................................... 7

    3. The Existing System

    3.1 Functionality ..................................................................................................................................... 8

    3.2 Drawbacks of the Existing System .................................................................................................... 8

    3.3 System Diagrams ............................................................................................................................ 10

    4. Proposed New System

    4.1 The proposed Database System ..................................................................................................... 12

    4.2 IT Infrastructure ......................................................................... ..................................................... 12

    4.3 Cost Analysis ................................................................................................................................ ... 14

    4.4 Benefits of a Computerized System................................................................................................ 16

    4.5 Impact on the Company Culture ..................................................................................................... 16

    Appendix 1: The Database Structure .......................................................................................................... 19

  • 8/14/2019 UOC Creators Report

    4/38

    Introduction

    1.1 IntroductionThis report is based on a study that has been carried out on the Inventory Control and Job CostingSystem of Leema Creation (Pvt) Ltd, a small, privately owned firm specializing in Interior Design andManufacturing of Furniture. The study focuses on the Inventory Control and Job Costing System, whichis a sub process within the company.

    The current system in place at the company consists of several manual processes which areunstructured and poorly interlinked. The management has understood the need for a new InformationSystem, which would be more efficient at handling the Inventory Control and Job Costing process.

    Main objective of the study was to understand the above Information System of the company andunderstand the various information flows that take place. This report provides an analysis into thestructure and information flows of the existing system. It also proposes a possible IT infrastructure and aDatabase structure for a new Information system that could replace the existing one.

    Objectives of the Study

    Investigating existing system Identifying problems and weaknesses in present system. Identifying volumes of data involved. Identifying future impacts.

    Analyzing present system Documenting the present system and its information flows. Identifying required functions of a new automated System.

    Create alternate solutions Propose a suitable IT infrastructure for a new Information System

    Propose a suitable data structure for the new system Discuss the impact of the new system on the companys culture

  • 8/14/2019 UOC Creators Report

    5/38

    1.2 Scope of the Study

    Even though Designing Interiors and Furniture is a very small function at Leema Creation, it involves lotof activities and sub processes. Therefore, out of the entire system, we selected one of the most criticalsub systems, which we thought would badly need automation. This was the Inventory control and JobCosting subsystem.

    The purchase subsystem concerns the purchasing of Materials & Timber from registered suppliers. TheInventory Control subsystem groups all activities related to storing, accepting the materials & timberwhen they are received and issuing them for manufacturing. The Job Costing system relates to thecosting of individual jobs.

    A detailed study was carried out to reveal all functionalities of the above system. We studied all theoperations within each sub system and analyzed all personals involved in each operation.

    Thereafter we took to analyzing the system using tools such as DFDs. A proposed IT infrastructure anddatabase architecture has also been provided for a suitable new system.

  • 8/14/2019 UOC Creators Report

    6/38

    2 About the Organization

    2.1 Organization History

    LEEMA CREATIONS was established in Year 2000, to cater to the ever growing demand for Interior Dcor& Furniture in the market. Though many companies were catering to this market need, there is anincreasing demand for high quality, innovative & trustworthy products.

    Being a newly established company in Interior Designing & Furniture business, they grew day by day tobe among the most successful & trusted companies in Sri Lanka for Interior Designing & Decorating.They have managed to achieve this recognition by being a customer oriented company.

    2.2 Organizational Chart

    Service Advisor Warranty Manager Part Manger Accounts in-charge

    Chairman

    General Manager

    Service Manager

    Foreman

    Technician

    Peon (Helper)

    Stores Manager

    Stores &Technical

    Officer

    AccountsAssistant 1

    AccountsAssistant 2

  • 8/14/2019 UOC Creators Report

    7/38

    2.3 Organizational Functions

    The total operations of Leema Creation are controlled by Head Office situated at No. 26, Deal Place A,Colombo 03. The main task of Interior Designing is carried out here at the Head Office, which includesthe following.

    Marketing Designing Planning Implementation and Supervision

    The Business Activities of Leema Creation include the following; Designing & Decorating of Commercial, Residential and Recreational Interiors. Manufacturing and installing Partitions, Suspended Ceilings, Venetian / Vertical Blinds, Carpeting,

    Wall coverings, Staircases Fabrication of all types of Household and Office Furniture, Knocked down Furniture, Pantry

    cupboards, Doors & Windrows Kitchen cupboards, Wardrobes, Architectural facades, Doors,Windows and all types of Wooden and other structures.

    Supplying and installing blinds for Offices, Restaurants, Factories, Shops, Homes, Hotels etc

    They also have all necessary modern Wood Processing Machines, such as Planers, Thicknesses, Circularsaws, Bench drills, Routers, Jigsaws etc., for processing Wood, Plywood, Mdf boards and Finishingequipments such as Compressors, Spray Guns and Sanders etc., which has helped us in producing qualityproducts on time.

    Leema Creations strongly believe that their Customers are very important. At the same/time they havetaken all measures to ensure that all their employees benefit from the Organization through their skilledperformance, in order to motivate them in maintaining exclusively superb quality standards.

  • 8/14/2019 UOC Creators Report

    8/38

    3 The Existing System

    3.1 Functionality

    The Warehouse and factory of Leema Creations is situated at Malwatta, Nittambuwa. The StoresManager and his assistants handle the inventory. It includes many types of Items & Machines. AllServices and Customer related activities are handled by the Factory Manager.

    Whenever new Job arrives Factory Manager issues a job card and sends it to the Supervisor and theSupervisor assigns the Job to an Assistant Supervisor, who in turn Informs a particular Carpenter. Afterviewing the Job card Information, the carpenter forwards the Materials requirements to the Assistantsupervisor who in turn enters the Material Requisition and Timber Requisition notes.

    Then the Front Office checks the Material & Timber requisitions and contacts the Supervisor &Storekeeper for approval. Subsequently the storekeeper issues the approved Material & Timber for aparticular job and makes not of them. Then the preparation process starts.

    The storekeeper maintains a stock card for each product. He prepares the purchase requisition andsends it to the Front Office for approval. Then the Front Office prepares the purchase order according tothe purchase requisition & quotations of supplier(s).The front office issues a Goods Received Note afterreceiving invoices of the particular purchase. Consequently, that purchase Report is handed over to theManagement. If there are any differences between the Purchase Order and the Purchase Invoice, theSupply officer should then settle the differences.

    At Leema Creations, there is no Purchasing Department. All Purchases are handled by the Stores andFront Office. Preparing purchase orders, Good Receive Note, purchase return notes are done by FrontOffice.

    3.2 Drawbacks of the Existing System

    If a specific Customer-Transaction information was needed, searches would have to be carried outacross many files written manually, in order to locate that piece of information.Ex: - The Last order date of a particular customer.

    Inability to provide summarized and specific information, without reading and filtering throughscores of data.

    Data has to be manually entered in the relevant files thereby involving the human factor, leading tohuman error

  • 8/14/2019 UOC Creators Report

    9/38

    Analyzing data for the purpose of budgeting and controlling was a very tedious task, if notimpossible, involving manual processes of calculation

    Vulnerability of data if fire, floods or any such disaster were to take place. An automated system onthe other hand, would provide for a back up facility at multiple locations and possible on line accessto minimize system down time.

    Maintaining large volumes of data in files and cabinets led to storage problems and large storagespaces were required for this

  • 8/14/2019 UOC Creators Report

    10/38

    3.3 System Diagrams

    3.3.1 Context Diagram for the Inventory Control and Job Costing System

  • 8/14/2019 UOC Creators Report

    11/38

    A p p r o v e d M a t e r i a l R e q u i s i t i o n I n f o

    A p p r o v e d T i m b e r R e q u i s i t i o n I n f o

    I t e m P r i c e I n f o

    I t e m I n f o

    M a t e r i a l I s s u e s I n f o M a t e r i a l I s s u e s D e t a i l I n f o

    T i m b e r I s s u e s I n f o T i m b e r I s s u e s D e t a i l I n f o

    E m p l o y e e C a t e g o r y I n f o E m p l o y e e I n f o

    E m p l o y e e W o r k i n g H o u r I n f o E m p l o y e e O T H o u r I n f o

    T o t a l J o b C o s t I n f o L a b o r C o s t I n f o

    J o b T i m b e r C o s t I n f o

    J o b M a t e r i a l C o s t I n f o

    J o b L a b o r C o s t I n f o

    T o t a l J o b C o s t i n f o

    G o o d R e c e i v e N o t e D e t a i l I n f o

    M a t e r i a l I s s u e s D e t a i l I n f o

    T i m b e r I s s u e s D e t a i l I n f o

    I t e m S u p p l i e r I n f o

    P u r c h a s e s R e p o r t

    J o b D e t a i l R e p o r t

    J o b C o s t S u m m a r y R e p o r t

    I s s u e s D e t a i l R e p o r t

    J o b C o s t D e t a i l r e p o r t

    I t e m C a t e g o r y I n f o

    S u p p l i e r I n f o

    J o b D e t a i l I n f o

    I t e m U n i t I n f o

    T i m b e r R e q u i s i t i o n D e t a i l I n f o

    M a t e r i a l R e q u i s i t i o n D e t a i l I n f o

    M a t e r i a l I s s u e s I n f o

    M a t e r i a l I s s u e s D e t a i l I n f o

    T i m b e r I s s u e s I n f o

    T i m b e r I s s u e s D e t a i l I n f o

    R e q u i r e d I t e m R e p o r t

    P u r c h a s e R e t u r n I n f o

    I n v o i c e I n f o

    D e l i v e r y n o t e I n f o

    Q u o t a t i o n I n f o

    3.3.2 Level (0) Diagram for the System

  • 8/14/2019 UOC Creators Report

    12/38

    4 Proposed New SystemAlthough at this stage no real software has been developed to automate the current system, we haveanalyzed the system using DFDs, so that it can be modularized and a software system be designed inthis effect. The context diagram and the Level (0) diagram relating to the information flows of thesystem with relevant entities is shown below

    4.1 The proposed Database System

    Although no specific software system has been implemented with respect to the above system, we areable to design the structure of the database with reference to the above DFDs. The proposed Databasesystem has been presented under the Appendices section. The database tables spelled out directly mapwith the DFDs above

    4.2 IT Infrastructure

    The following is an appropriate IT infrastructure for the purpose of maintaining a suitable softwaresystem that would handle an automated Inventory control system for Leema creation.

    Since there is no IT infrastructure currently in place, this suggestion is for a totally new infrastructure forthe company. It is recommended that Leema purchases 8 workstation computers with 1 servercomputer. Other than this, relevant network equipment, air-conditioning and backup devices have also

    been recommended.

    Hardware Requirements

    Computers: 1 Server Computer 08 Workstation Computers

    Networking Requirements: 2 Hubs (24 port / 100 Mbps) 08 Network Cards Cables Twisted Pair: Category 5 Connectors and Terminators

    Environment: Air Conditioned, Fire Protected, Secure Room (for Server) Air Conditioners Fire Proof Cupboards (for Data Storage)

    Other Equipments:

  • 8/14/2019 UOC Creators Report

    13/38

    03 Printers (Bubble Jet; Recommended) Diskettes 09 UPS Ink for Printers Papers

    Tape Drivers (for Backup) Backup Tapes

    Software Requirements

    Network Server Operating System Windows 2000 Server (recommended) Microsoft SQL Server 2000 as the Back end Operating System for Workstations Windows 2000 Prof, Win 98/Me (recommended) Virus Scanners for each Computer

    Live Ware Requirements

    System Administrator Data Entry Operator Users Operator (Staff can be easily trained to use the new system)

    Configuration of a Workstation Computer (Recommended)

    Processor- Intel Core 2 Duo 1.8GHz 512 MB of RAM 80 GB Hard Disk 1 Floppy Drive

    CD-ROM (not essential if budget support) 15 Monitor Keyboard & mouse

    Configuration of the Server Computer (Recommended)

    Processor - Intel Quad Core, 2.6 GHz 2GB RAM 2 Hard Disks (Capacity of 250 GB each) 1 Floppy Drive DVD-ROM Drive 15 Monitor Keyboard & mouse

  • 8/14/2019 UOC Creators Report

    14/38

    4.3 Cost Analysis

    Initial cost will include all the expenses that incur in implementing the new system. In other words initialcost is the cost that incur in the beginning of the system. It consists with:

    Computer and Network Hardware purchasing cost Software purchasing cost Cost to arrange the environment Cost to implement the network Training cost of employee

    Item Quantity Current Market Price

    Computers

    Server Computer 1 80000

    Workstation Computers 08 (45000*8) = 360000

    Networking Devices

    Hubs (24 port / 100 Mbps) 2 (30000*2) = 60000

    Network Cards 08 (2500* 10) = 25000

    Cables Twisted Pair: Category 5 10km 18000

    Connectors and Terminators N/A 4000

    Environment

    Air Conditioned, Fire Protected, Secure Room 1 40000

    Fire Proof Cupboards (for Data Storage) 2 19000

    Air Conditioners (Additional) 1 60000

    Other Equipments

    Printers (Bubble Jet; Recommended) 3 (8500*2) = 17000

    Diskettes 500 (50*500) = 25000

    Online UPS 8 10000

    Tape Drivers (for Backup) 2 5000

  • 8/14/2019 UOC Creators Report

    15/38

    Backup Tapes 10 5000

    Software

    Network Server Operating System 1 25000

    Data Base Management System Software 1 15000

    Operating System for Workstations 10 Copies 10000

    Virus Scanners for each Computer 10 Copies 10000

    Other

    Cost to implement the network N/A 30000

    Training cost of employee N/A 15000

    Software Development Cost N/A 100000

    Average Total Cost = Rs. 883000Rounded Total = Rs. 890, 000

    Initial cost will include all the expenses that incur in implementing the new system. In other words initialcost is the cost that incur in the beginning of the system. It consists of

    Computer and Network Hardware purchasing cost Software purchasing cost Cost to arrange the environment Cost to implement the network Training cost of employee

    The recurring costs to the company from implementing this system would be;

    Maintenance of the Network(Repairs, New Additions, Expansion of Network) Maintenance of Computers

    (Repairs, Services, Upgrading) Purchasing of Computer Accessories

    (Backup Tapes, Floppies, Ink, Papers) Purchasing of new versions of software Staff payment

    (Admin and Data Entry Operator)

  • 8/14/2019 UOC Creators Report

    16/38

  • 8/14/2019 UOC Creators Report

    17/38

    number bottom level employees including Carpenters and unskilled laborers. These individualsmay have never witnessed automated systems or computers for that fact. Thus introducing sucha system to these individuals will be a critical issue for the management

    Employee training : Substantial focus would have to be applied on employee training in order toreap the true benefits of a new computerized system. The management will have to prepare aproper plan on training employees at all levels, lest face the risk of total failure of the system

    System suitability : The suitability of the new system will also be a deciding factor for its successat Leema. The type of system developed should match the styles and culture of the companyand should include user friendly interfaces and options

    Maintenance and Services : The implementation of the system should be followed up with goodmaintenance methods for the systems. Well trained professionals should be assigned toadminister the system. Constant breakdowns and lack of help and support could lead to theincrease in frustration among employees and eventual system failure

  • 8/14/2019 UOC Creators Report

    18/38

    5 ConclusionThe current system in place at Leema Creation is a Manual System, for which the management iscontemplating automation. What we have done in this report is a system study, to help Leemaunderstand its processes and information flows prior to automation. We have also recommended asuitable database structure and an IT infrastructure to support this automation. Furthermore we havediscussed the implications of such a change on the culture of the company.

    The software products we have recommended for Leema are mainly Microsoft products. This is due tothe Cost Effectiveness, Wide use, Compatibility and ease of maintenance.

    We have recommended high performance Server PCs and workstations for Leema. This is inconsideration of the increasingly fast changing technological environment where it is essential topurchase high end computers in order to be compatible with the latest software and features, and to

    work with a higher level of reliability and productivity. It is also important to take in to account the totalcost of ownership. However, management can reduce level of these requirements if they feel this iseconomically not feasible.

    The benefits that Leema would reap by replacing the existing manual system with a computerizedsystem will be huge. The management has to subsequently decide on the development of the systemand how it will be deployed. It will also have to consider other aspects such as resistance to change andthe learning curve for the users.

    We would also recommend a new system to run parallel with the existing manual system for some time.So the two systems can be compared. So if there are incompatibles with the new system and the oldsystem, they can be corrected.

  • 8/14/2019 UOC Creators Report

    19/38

    Appendix

    Appendix 1: The Database Structure

    File Number : D1File Name : UsersDescription : Used to store information about the users in the systemPrimary Key : UserNameForeign Key :

    Field name Field Description Data Type Size

    UserName

    Password

    CreatedDate

    Type

    User Name

    Login Password

    User Created Date

    User type

    Text

    Text

    Date

    Text

    30

    10

    08

    08

    File Number : D2File Name : JobDetailDescription : Used to store information about the jobs in the systemPrimary Key : JobNumberForeign Key : JobResPerCode

    Field name Field Description DataType

    Size

    JobNumber

    JobDescription

    JobCustomerName

    JobStartDate

    JobEndDate

    JobResPerCode

    Job number

    Job description

    Job customer name

    Job start date

    Job end date

    Job responsible personcode

    Text

    Text

    Text

    Date

    Date

    Text

    10

    50

    30

    08

    08

    06

  • 8/14/2019 UOC Creators Report

    20/38

    JobDetailDescription Job detail description Text 300

    File Number : D3

    File Name : SupplierDescription : To record suppliers detailsPrimary Key : SupCodeForeign Key :

    Field name Field Description Data Type Size

    SupCode

    SupName

    SupAddress

    SupTelephone

    SupFax

    SupEmail

    SupContactPersonName

    SupContactPersonTelephone

    Suppliers code

    Suppliers name

    Suppliers address

    Suppliers telephone

    Suppliers fax number

    Suppliers email

    Suppliers contact

    Person name

    Suppliers Contact

    person telephone

    Text

    Text

    Text

    Text

    Text

    Text

    Text

    Text

    06

    30

    100

    10

    10

    50

    50

    10

    File Number : D4File Name : ItemDescription : To record details of itemsPrimary Key : ItmCodeForeign Key : ItmCategoryCode, ItmUnitCode

    Field name Field Description Data Type Size

    ItmCode Item code Text 10

  • 8/14/2019 UOC Creators Report

    21/38

    ItmDescription

    ItmCategoryCode

    ItmUnitCode

    ItmReOrderLevel

    ItmReOrderQty

    Item description

    Item Category Code

    Item Unit Code

    Item Re-Order Level

    Item Re-Order Quantity

    Text

    Text

    Text

    Number

    Number

    100

    05

    05

    06

    06

    File Number : D5File Name : ItemUnitDescription : To record item unit detailPrimary Key : ItmUntCodeForeign Key :

    Field name Field Description Data Type Size

    ItmUntCode

    ItmUntDescription

    Item unit code

    Item unit description

    Text

    Text

    05

    50

    File Number : D6

    File Name : ItemCategoryDescription : To record the item category detailPrimary Key : ItmCatCodeForeign Key :

    Field name Field Description Data Type Size

    ItmCatCode

    ItmCatDescription

    Item category code

    Item category

    description

    Text

    Text

    05

    50

    File Number : D7File Name : ItemSupplierDescription : To record Item price according to each SupplierPrimary Key :

  • 8/14/2019 UOC Creators Report

    22/38

    Foreign Key : ItmCode, SupCode

    Field name Field Description Data Type Size

    ItmCode

    SupCode

    ItemPrice

    IsCurrentSupplier

    Item Code

    Supplier Code

    Item Price

    Current Supplier

    Text

    Text

    Money

    Boolean

    10

    06

    20

    10

    File Number : D8File Name : MaterialRequisition

    Description :To record Material Requisitions

    Primary Key : MatReqCodeForeign Key : MatReqJobNumber, MatReqRequisitionedByCode,

    MatReqApprovedByCode

    Field name Field Description Data Type Size

    MatReqCode

    MatReqJobNumber

    MatReqRequisitionDate

    MatReqRequisitionedBy

    Code

    MatReqApprovedDate

    MatReqApprovedBy

    Code

    Material requisition code

    Material requisition job number

    Material requisition date

    Material requisitioned by code

    Material requisition approveddate

    Material requisition approved bycode

    Material requisition status

    Material requisition remarks

    Text

    Text

    Date

    Text

    Date

    Text

    10

    10

    08

    10

    08

    10

  • 8/14/2019 UOC Creators Report

    23/38

    MatReqStatus

    MatReqRemarks

    Text

    Text

    10

    100

    File Number : D9File Name : MaterialRequisitionDetailDescription : To record the details of Material RequisitionsPrimary Key :Foreign Key : MatReqCode, ItemCode

    Field name Field Description Data Type Size

    MatReqCode

    ItemCode

    ReqiredQty

    ApprovedQty

    Material requisition code

    Item code

    Required quantity

    Approved quantity

    Text

    Text

    Number

    Number

    10

    10

    08

    08

    File Number : D10

    File Name : TimberRequisitionDescription : To record Timber RequisitionsPrimary Key : TimReqCodeForeign Key : TimReqJobNumber, TimReqRequisitionedByCode,

    TimReqApprovedByCode

    Field name Field Description Data Type Size

    TimReqCode

    TimReqJobNumber

    TimReqProduct

    Timber requisition code

    Timber requisition job number

    Timber requisition product

    Timber requisition part

    Timber requisition date

    Text

    Text

    Text

    10

    10

    50

  • 8/14/2019 UOC Creators Report

    24/38

    TimReqPart

    TimReqRequisitionDate

    TimReqRequisitionedBy

    Code

    TimReqApprovedDate

    TimReqApprovedBy

    Code

    TimReqStatus

    TimReqRemarks

    Timber requisitioned by code

    Timber requisition approveddate

    Timber requisition approvedby code

    Timber requisition status

    Timber requisition remarks

    Text

    Date

    Text

    Date

    Text

    Text

    Text

    50

    08

    10

    08

    10

    10

    100

    File Number : D11File Name : TimberRequisitionDetailsDescription : To record detaileds of Timber RequisitionsPrimary Key :Foreign Key : TimReqCode, ItemCode

    Field name Field Description Data Type Size

    TimReqCode

    ItemCode

    ExactLength

    ExactWidth

    Material requisition code

    Item code

    Exact length

    Exact width

    Exact height

    Text

    Text

    Number

    Number

    10

    10

    08

    08

  • 8/14/2019 UOC Creators Report

    25/38

    ExactHeight

    ExactNoOfPieces

    ApproximateLength

    ApproximateWidth

    ApproximateHeight

    ApproximateNoOf

    Pieces

    ReqiredQty

    ApprovedQty

    Exact no of pieces

    Approximate length

    Approximate width

    Approximate height

    Approximate no of pieces

    Required quantity

    Approved quantity

    Number

    NumberNumber

    NumberNumber

    Number

    Number

    Number

    08

    08

    08

    08

    08

    08

    08

    08

    File Number : D12File Name : MaterialIssueDescription : To record Material IssuesPrimary Key : MatIssCodeForeign Key :

    Field name Field Description Data Type Size

    MatIssCode

    MatIssDate

    MatIssMatReqCode

    MatIssByCode

    MatIssRemarks

    Material issue code

    Material issue date

    Material requisition code

    Material issued by code

    Material issue remarks

    Text

    Date

    Text

    Text

    Text

    10

    08

    10

    10

    100

    File Number : D13File Name : MaterialIssueDetailDescription : To record detailed information about MaterialIssuePrimary Key :

  • 8/14/2019 UOC Creators Report

    26/38

    Foreign Key : MatIssCode, ItemCode

    Field name Field Description Data Type Size

    MatIssCode

    ItemCode

    IssuedQty

    Material issue code

    Item code

    Issued quantity

    Text

    Text

    Number

    10

    10

    08

    File Number : D14File Name : TimberIssue

    Description :To record Timber Issues

    Primary Key : TimIssCodeForeign Key :

    Field name Field Description Data Type Size

    TimIssCode

    TimIssDate

    TimIssMatReqCode

    TimIssByCode

    TimIssRemarks

    Timber issue code

    Timber issue date

    Timber requisition code

    Timber issued by code

    Timber issue remarks

    Text

    Date

    Text

    Text

    Text

    10

    08

    10

    10

    100

    File Number : D15File Name : TimberIssueDetailDescription : To record detailed information about Timber IssuePrimary Key :Foreign Key : TimIssCode, ItemCode

  • 8/14/2019 UOC Creators Report

    27/38

    Field name Field Description Data Type Size

    TimIssCode

    ItemCode

    IssuedQty

    Timber issue code

    Item code

    Issued quantity

    Text

    Text

    Number

    10

    10

    08

    File Number : D16File Name : ItemQuantityDescription : To record item Quantity detailPrimary Key :Foreign Key : ItmCode

    Field name Field Description Data Type Size

    ItmCode

    QtyInHand

    Item code

    Quantity in hand

    Text

    Number

    10

    08

    File Number : D17File Name : RequiredPurchaseItem

    Description : To record required purchase itemsPrimary Key : ReqItmCodeForeign Key :

    Field name Field Description Data Type Size

    ReqItmCode

    ReqItmDate

    Required item code

    Required date

    Text

    Date

    06

    08

    File Number : D18File Name : RequiredPurchaseItemDetailDescription : To record required purchase item DetailsPrimary Key :Foreign Key : ReqItmCode, ItmCode

  • 8/14/2019 UOC Creators Report

    28/38

    Field name Field Description Data Type Size

    ReqItmCode

    ItmCode

    Status

    Required item code

    Item code

    Status(New, Requested,

    Completed)

    Text

    Text

    Text

    06

    10

    10

    File Number : D19File Name : PurchaseRequisitionDescription : To record purchase requisitionsPrimary Key : PerReqCode

    Foreign Key :PerReqSuupilerCode, PerReqPreparedByCode

    Field name Field Description DataType

    Size

    PerReqCodePerReqDate

    PerReqSupilerCode

    PerReqPreparedBy

    Code

    Purchase requisition code

    Purchase requisition date

    Purchase requisition suppliercode

    Purchase requisition

    Prepared by code

    Text

    Date

    Text

    Text

    10

    08

    10

    10

    File Number : D20File Name : PurchaseRequisitionDetailDescription : To record details of purchase requisitionsPrimary Key :Foreign Key : PerReqCode, ItmCode

    Field name Field Description Data Type Size

    PerReqCodeItmCode

    Purchase requisition code Text 10

  • 8/14/2019 UOC Creators Report

    29/38

    Item code Text 10

    File Number : D21File Name : QuotationDescription : To record about quotationsPrimary Key : QuoCodeForeign Key : QuoSuupilerCode

    Field name Field Description Data Type Size

    QuoCode

    QuoDate

    QuoSuupilerCode

    QuoRemarks

    Quotation code

    Quotation date

    Quotation supplier code

    Quotation remarks

    Text

    Date

    Text

    Text

    10

    08

    10

    100

    File Number : D22File Name : QuotationDetailDescription : To record detail of quotations

    Primary Key :Foreign Key : QuoCode, ItmCode

    Field name Field Description Data Type Size

    QuoCode

    ItmCode

    UnitPrice

    Quotation code

    Item code

    Unit price

    Text

    Text

    Money

    10

    10

    08

    File Number : D23File Name : PurchaseOrderDescription : To record information about purchase OrderPrimary Key : PerOrdCodeForeign Key : PerOrdSuppilerCode, PerOrdPreparedByCode

  • 8/14/2019 UOC Creators Report

    30/38

    Field name Field Description Data Type Size

    PerOrdCode

    PerOrdDate

    PerOrdSuppiler

    Code

    PerOrdPreparedBy

    Code

    Purchase order number

    Purchase order date

    Purchase order supplier code

    Purchase order prepared by code

    Text

    Date

    Text

    Text

    10

    08

    10

    10

    File Number : D24File Name : PurchaseOrderDetailDescription : To record detailed information about purchase orderPrimary Key :Foreign Key : PerOrdCode, ItmCode

    Field name Field Description Data Type Size

    PerOrdCode

    ItmCode

    Quantity

    Purchase order number

    Item code

    Quantity

    Text

    Text

    Number

    10

    10

    08

    File Number : D25File Name : DeliveryNoteDescription : To record delivery note dataPrimary Key : DelNoteCodeForeign Key : DelNoteSupplierCode, DelNoteEnteredByCode

    Field name Field Description Data Type Size

    DelNoteCode

    DelNoteSupplier Code

    Delivery note code

    Suppliers code

    Text

    Text

    10

    10

  • 8/14/2019 UOC Creators Report

    31/38

    DelNoteDate

    DelNoteEnteredBy

    Code

    DelNoteGRNIssued

    Date of delivery

    Delivery note

    Entered by code

    GRN issued or not

    Date

    Text

    Boolean

    08

    10

    05

    File Number : D26File Name : DeliveryNoteDetailDescription : To record detailed information about delivery notePrimary Key :Foreign Key : DelNoteCode, ItmCode

    Field name Field Description Data Type Size

    DelNoteCode

    ItmCode

    Quantity

    Delivery note code Item code

    Quantity

    Text

    Text

    Number

    10

    10

    08

    File Number : D27File Name : GRNDescription : To record good received note dataPrimary Key : GRNCodeForeign Key : GRNSupplierCode, GRNDelNoteCode, GRNPreparedByCode

    Field name Field Description Data Type Size

    GRNCode

    GRNSupplierCode

    GRNDelNoteCode

    GRNPreparedDate

    Good received code

    Suppliers code

    Delivery note code

    Prepare date of GRN

    Text

    Text

    Text

    Date

    10

    10

    10

    08

  • 8/14/2019 UOC Creators Report

    32/38

    GRNPreparedByCode

    GRNRemarks

    Prepared by code

    GRN remarks

    Text

    Text

    10

    100

    File Number : D28File Name : GRNDetailDescription : To record detailed information about good received notePrimary Key :Foreign Key : GRNCode, ItmCode

    Field name Field Description Data Type Size

    GRNCode

    ItmCode

    Quantity

    Good received note code

    Item code

    Received Quantity

    Text

    Text

    Number

    10

    10

    08

    File Number : D29File Name : InvoiceDescription : To record information about invoice data

    Primary Key : InvNumberForeign Key : InvSupplierCode, InvEnteredByCode

    Field name Field Description Data Type Size

    InvNumber

    InvDate

    InvSupplierCode

    InvEnteredByCode

    InvTotalVal

    Invoice number

    Entered date of invoice

    Supplier code

    Entered person code

    Total value of invoice

    Text

    Date

    Text

    Text

    Money

    10

    08

    10

    10

    08

    File Number : D30File Name : InvoiceDetail

  • 8/14/2019 UOC Creators Report

    33/38

    Description : To record detailed information about invoice dataPrimary Key :Foreign Key : InvNumber, ItmCode

    Field name Field Description Data Type Size

    InvNumber

    ItmCode

    UnitPrice

    Quantity

    Value

    Invoice number

    Item code

    Unit price

    Quantity

    Value

    Text

    Text

    MoneyNumberMoney

    10

    08

    08

    08

    08

    File Number : D31File Name : PurchaseReturnsDescription : To record purchase returns detailsPrimary Key : PurRetCodeForeign Key : PurRetGRNCode, PurRetPreparedByCode

    Field name Field Description Data Type Size

    PurRetCode

    PurRetGRNCode

    PurRetPrepared

    Date

    PurRetPrepared

    ByCode

    PurRetRemarks

    Purchase return code

    Good receive note code

    Prepared date of purchase return

    Prepared persons code of purchasereturn

    Purchase return remarks

    Text

    Text

    Date

    Text

    Text

    10

    10

    08

    10

    300

    File Number : D32File Name : PurchaseReturnsDetailsDescription : To record purchase returns detailsPrimary Key :

  • 8/14/2019 UOC Creators Report

    34/38

    Foreign Key : PurRetCode, ItmCode

    Field name Field Description Data Type Size

    PurRetCode

    ItmCode

    Quantity

    Purchase return code

    Item code

    Returned quantity

    Text

    Text

    Number

    10

    10

    08

    File Number : D33File Name : EmployeeCategoryDescription : To record employee category detailsPrimary Key : EmpCategoryCode

    Foreign Key :

    Field name Field Description Data Type Size

    EmpCategoryCode

    EmpCategoryDescription

    EmpCategoryMonthly

    Salary

    EmpCategoryHalfDay

    Salary

    Emp CategoryOTHour

    Payment

    Employee category code

    Employee category description

    Monthly salary of that category

    Half day salary of that category

    Over time hour payment

    of that category

    Text

    Text

    Money

    Money

    Money

    06

    30

    08

    08

    08

    File Number : D34File Name : EmployeeDescription : To record employee detailsPrimary Key : EmpCodeForeign Key :

  • 8/14/2019 UOC Creators Report

    35/38

    Field name Field Description Data Type Size

    EmpCode

    EmpCategoryCode

    EmpName

    EmpAddress

    EmpTelephone

    EmpRemarks

    Employees code

    Employee category Code

    Employees name

    Employees address

    Employees telephone

    Employee remarks

    Text

    Text

    Text

    Text

    Text

    Text

    06

    06

    50

    100

    10

    100

    File Number : D35

    File Name : EmployeeWorkingHourDescription : To record employee working hour detailsPrimary Key :Foreign Key : EmpWorkHourEmpNumber, EmpWorkHourJobNumber

    Field name Field Description Data Type Size

    EmpWorkHourDate

    EmpWorkHourEmp

    Number

    EmpWorkHourJob

    Number

    EmpWorkHourTime

    Date of work

    Relevant employee number

    Relevant job number

    Time of work

    Date

    Text

    Text

    Text

    08

    10

    10

    10

    File Number : D36

    File Name : EmployeeOTHourDescription : To record employee over time hour detailsPrimary Key : EmpOTHourCodeForeign Key : EmpOTHourEmpNumber, EmpOTHourJobNumber

    Field name Field Description Data Type Size

  • 8/14/2019 UOC Creators Report

    36/38

    EmpOTHourCode

    EmpOTHourDate

    EmpOTHourEmp

    Number

    EmpOTHourJob

    Number

    EmpOTHours

    Over time code

    Over time date

    Relevant employee number

    Relevant job number

    Over time hours

    Text

    Date

    Text

    Text

    Text

    10

    08

    10

    10

    10

    File Number : D37

    File Name : JobMaterialCostDescription : To record material costPrimary Key : JobMatCostCodeForeign Key : JobMatCostJobNumber

    Field name Field Description Data Type Size

    JobMatCostCode

    JobMatCostJobNumber

    JobMatCostDate

    JobMatCost

    Job material cost code

    Relevant job number

    Date of cost

    Material cost

    Text

    Text

    Date

    Money

    06

    10

    08

    08

    File Number : D38File Name : JobTimberCostDescription : To record timber costPrimary Key : JobTimCostCodeForeign Key : JobTimCostJobNumber

    Field name Field Description Data Type Size

    JobTimCostCode

    JobTimCostJobNumber

    Job timber cost code

    Relevant job number

    Text

    Text

    06

    10

  • 8/14/2019 UOC Creators Report

    37/38

    JobTimCostDate

    JobTimCost

    Date of cost

    Timber cost

    Date

    Money

    0808

    File Number : D39File Name : JobLabourCostDescription : To record labour costPrimary Key : JobLabCostCodeForeign Key : JobLabCostJobNumber

    Field name Field Description Data Type Size

    JobLabCostCode

    JobLabCostJobNumber

    JobLabCostDate

    JobLabCost

    Job labour cost code

    Relevant job number

    Date of cost

    Labour cost

    Text

    Text

    Date

    Money

    06

    10

    08

    08

    File Number : D40File Name : TotalJobCost

    Description : To record total job costPrimary Key : TotalJobCostCodeForeign Key : TotalJobCostJobNumber, JobMatCostCode,

    JobTimCostCode, JobLabCostCode

    Field name Field Description Data Type Size

    TotalJobCostCode

    TotalJobCostJobNumber

    TotalJobCostDate

    JobMatCostCode

    JobTimCostCode

    JobLabCostDate

    Total job cost code

    Relevant job number

    Date of cost

    Job material cost code

    Job timber cost code

    Job labour cost code

    Text

    Text

    Date

    Text

    Text

    Text

    06

    10

    08

    06

    06

    06

  • 8/14/2019 UOC Creators Report

    38/38

    TotalJobCost Total job cost Money 08

    File Number : D41File Name : TemporaryItemDescription : To record temporary itemPrimary Key : Foreign Key : ItemCode

    Field name Field Description Data Type Size

    ItemCode

    TotIssuedQty

    Item code

    Total issued quantity

    Text

    Number

    10

    08