Leveling-Theory, Methods, Equipments, Filed procedure and Computation Dr. Khalil Al-Juboori UOB Department of Civil Engineering and Architecture Semester 2 2013-2014 3/21/2014 Dr. Khalil Al-Juboori 1

UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

  • Upload
    lenhi

  • View
    214

  • Download
    1

Embed Size (px)

Citation preview

Page 1: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Leveling-Theory, Methods, Equipments, Filed procedure and Computation

Dr. Khalil Al-Juboori UOB

Department of Civil Engineering and Architecture Semester 2 2013-2014

3/21/2014 Dr. Khalil Al-Juboori 1

Page 2: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Outline

• Definitions (vertical line, level surface, horizontal line, vertical datum, elevation, mean sea level, Bench mark, control points)

• Leveling equipments (lab illustrated)

• Element of the surveyor level 4.1

• Curvature and refraction errors in leveling 4.8

• Procedure in leveling. HPC methods, Flying leveling, Series leveling

• Inverted staff

• Trigonometric leveling

3/21/2014 Dr. Khalil Al-Juboori 2

Page 3: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 3

Example Applications

Design highways, railroads, canals, sewers, water supply systems.

Establish new vertical control (BM ).

Develop maps showing general ground configuration and pprovide spot heights or contours on a plan.

Calculate volumes of earth work and Provide data for road cross-sections.

Provide a level or inclined plane in the setting out of construction works.

Set grades and elevations for construction projects

Investigate drainage.

To determine the topography of sites for design projects

Page 4: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 4

Page 5: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

• Level surface

– A surface over which water will not flow

– The direction of gravity is always normal to a level surface

• Horizontal surface

– A horizontal surface will be tangent to a level surface

– Over short distances (<100 m) the horizontal surface and the level surface will coincide

Basic Definition

3/21/2014 5 Dr. Khalil Al-Juboori

Hamid
Sticky Note
نتيجة تتوافق مع بحثكcoincide
Page 6: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

limit of practical coincidence (~100 m)

direction of gravity

level surface

horizontal surface

Definition

3/21/2014 6 Dr. Khalil Al-Juboori

Page 7: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 7

Page 8: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

8

Automatic Levels

Digital Levels

Categories of Leveling

Instruments

• Dumpy levels • Hand levels • Tilting levels • Automatic levels • Precise levels • Digital levels • Electronic laser levels

All leveling instruments create horizontal plane through the telescope ( Plane of Collimation).

3/21/2014 Dr. Khalil Al-Juboori

Page 9: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Dr. Rami Al-Ruzouq CENG 131 Surveying: Fall 2011

• Early age levels are

–Dumpy levels.

–Tilting levels.

Leveling Instruments-Old levels

3/21/2014 9 Dr. Khalil Al-Juboori

Page 10: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

10

1. Leveling Instruments

3/21/2014 Dr. Khalil Al-Juboori

Page 11: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

11

1. Leveling Instruments

3/21/2014 Dr. Khalil Al-Juboori

Page 12: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

12

Surveying Telescope

3/21/2014 Dr. Khalil Al-Juboori

Page 13: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

• Now most commonly used leveling instruments are - Auto level.

• Auto level, as name sounds it has a auto level compensator and corrects automatically if instrument goes out of level.

• Survey work can be done fast

• Less chances of error,

• Magnification available is more,

• Range is more,

Automatic Level

3/21/2014 13 Dr. Khalil Al-Juboori

Hamid
Sticky Note
التكبير
Page 14: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Dr. Khalil Al-Juboori

Equipment: Staff/Pole

• Wood, aluminum

• INVAR type for high precision leveling

Conventional (“E”-type) Barcode for Digital Levels

3/21/2014 14

Page 15: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Dr. Khalil Al-Juboori

Equipment: Bubble

• Keep the pole upright

– Any tilt will disturb your readings

3/21/2014 15

Page 16: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

0.3

0.33

0.339

Reading an “E-Face Staff”

3/21/2014 16 Dr. Khalil Al-Juboori

Page 17: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Dr. Khalil Al-Juboori

Reading a Staff

1422

• Read the [m], [dm] & [cm] • Estimate the [mm]

• Check yourself for frequent used numbers (2/3) or (7/8)

3/21/2014 17

Hamid
Sticky Note
قدر
Hamid
Sticky Note
ملاخظة : الرقم يبدا من الE من فوووووق
Page 18: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

18

Reading an “E-Face Staff”

3/21/2014 Dr. Khalil Al-Juboori

Page 19: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

• They are not popular instead auto levels are more extensively used.

• The Trimble DiNi Digital Level : Determine accurate height information 60% faster than with automatic leveling

• The surveyor don’t need to read the staff thus Eliminate human errors. And

• There is no need to focus the instrument on the stuff , this is done automatically.( Average of 36 reading)

• Transfer data to the office easily

Digital Level

3/21/2014 19 Dr. Khalil Al-Juboori

Hamid
Sticky Note
الاوتو ليفل مشهور اكتر لكن الديجتل اسرع ٦٠ % في الديجتل سيقرا الاستف لوحده ولا داعي ل لان بقراها شخص كما في الاوتو ليفل ولا داعي للفوكس عليها يقول بعمل ٣٦ قراءة وياخد المتوسط اسهل في نقل المعلومات
Page 20: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

20

Digital Level

3/21/2014 Dr. Khalil Al-Juboori

Page 21: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Field Procedures and Computations

3/21/2014 Dr. Khalil Al-Juboori 21

Page 22: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 22

Page 23: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 23

Page 24: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 24

Page 25: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 25

If ε = 0, the level is working perfect, if not make sure to balance BS and FS at all time. If not possible make proper correction

Page 26: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 26

Field Procedures and Computations

Page 27: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Definitions

3/21/2014 Dr. Khalil Al-Juboori 27

• Back sight (BS)

– The first reading from a new instrument stand point (i.e. take the height to the instrument)

• Fore sight (FS)

– The last reading from the current instrument station (i.e. give the height to a benchmark)

• Intermediate sight (IS)

– Any sighting that is not a back sight or fore sight

Page 28: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 28

Page 29: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

29

Difference in Elevation

• Horizontal Plane through point B is serving as datum.

• The height of point A and C are required relative to this datum.

• The height in large scale survey maps are measured relative to datum which is the Mean Sea Level (MSL).

3/21/2014 Dr. Khalil Al-Juboori

Page 30: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 30

Page 31: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 31

Page 32: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 32

Leveling methods

Page 33: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

33

Observation Procedures

All Levelling surveys must be checked ( i.e. closed) , otherwise there is no confidence in the results. There are two methods of checking levelling survey: i. The levelling begins and finishes on the same point, via the same or

different route, in which case the difference in level should be zero.

ii. The levelling begins in one point of known level and finishes on another, in which case the observed differences in level should equal the know differences.

3/21/2014 Dr. Khalil Al-Juboori

Page 34: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

34

Observation Procedures

(a) Procedure with Automatic Levels

Side View

Top View

3/21/2014 Dr. Khalil Al-Juboori

Page 35: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

35

Determine the Reduced level of points B,C,D,E,F, and G relative to point (A). which is the bench mark.

The Levelling is to be closed on the second bench Mark (H). The instrument has to be set up twice in particular cases Every time the instrument set :

The First Sight Taken from that position is called BACK sight (BS). The Last Sight Taken from that position is called FORE sight (FS). Any Other sight observed between backsight and foresights is

called INTERMEDIATE sight (IS). Point G, Inverted Stuff Reading Point E , where a foresight followed by backsight is taken is called ,

change point. Each point is given a separate line in the field book , either BS, FS or IS.

What about Point E ? At each point ,the Staff holder hold the staff on the mark and ensure

that it is held vertically. Focus and Multiple Reading

Observation Procedures

(a) Procedure with Automatic Levels

3/21/2014 Dr. Khalil Al-Juboori

Page 36: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

36

a) Levelling between two points.

(HPC) Method

3/21/2014 Dr. Khalil Al-Juboori

Page 37: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

37

b) Series Levelling.

(HPC) Method

Points Observed from single Instrument

3/21/2014 Dr. Khalil Al-Juboori

Page 38: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

38

(HPC) Method

• One setup, • One line of collimation, • All points refers to the same

HPC

3/21/2014 Dr. Khalil Al-Juboori

Page 39: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

39

(HPC) Method

Misclosure Check

3/21/2014 Dr. Khalil Al-Juboori

Page 40: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

40

(HPC) Method

Arithmetic Check

Last Reduced level - First Reduced level

Sum (BS ) – Sum ( FS)

=

If B is calculated wrongly to be 104.9, the above check would not detect the Error.

3/21/2014 Dr. Khalil Al-Juboori

Page 41: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

41

(HPC) Method

Arithmetic Check

• Sum of reduced Levels Except first = 104.31+107.11+107.11+105.47+105.81 = 529.81 • Sum of Each HPC x number of IS and FS = 108.03 x 5 = 540.15 • Sum ( IS Column + FS column) = ( 8.12 + 2.22) = 10.34 • Therefore :

529.81 = 540.15 - 10.34

3/21/2014 Dr. Khalil Al-Juboori

Page 42: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

42

b) Series Levelling.

(HPC) Method

Multiple Instrument Settings

3/21/2014 Dr. Khalil Al-Juboori

Page 43: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

43

(HPC) Method

3/21/2014 Dr. Khalil Al-Juboori

Page 44: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

44

Misclosure Check

Arithmetic Check

(HPC) Method

= ± 10 mm

Last Reduced level - First Reduced level

Sum (BS ) – Sum ( FS) =

3/21/2014 Dr. Khalil Al-Juboori

Page 45: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

45

Example 2

c) Series Levelling

Calculate the reduced level of the stations and determine which , if any, stations have been wrongly observed.

3/21/2014 Dr. Khalil Al-Juboori

Hamid
Sticky Note
؟؟؟
Page 46: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 46

For Construction projects m= 6 is acceptable

Page 47: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

47

1.56

1.43

1.09

0.59 1.07 2.48 1.98

1.76 1.50

1.35 1.50 1.63

2.76 2.35

0.95 0.74

Example 3

3/21/2014 Dr. Khalil Al-Juboori

Page 48: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

48

Inverted Staff Reading

Example 1

Rise and Fall

3/21/2014 Dr. Khalil Al-Juboori

Page 49: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

49

Inverted Staff Reading

Example 2

HPC

3/21/2014 Dr. Khalil Al-Juboori

Page 50: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Leveling loop

3/21/2014 Dr. Khalil Al-Juboori 50

Page 51: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 51

BS IS FS HPC RL Comments

2.596 10.000 A

1.384

Page 52: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 52

Simple Loop Adjustment based on Distances

Error of closure is +0.24 ft d is computed difference in elevation

Page 53: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 53

Page 54: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 54

Page 55: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Three wire Leveling

Reading on upper, middle and lower wire

More precise leveling

Provide a check on rod reading mistake

It can be used for determine horizontal distance needed for balancing BS and FS.

3/21/2014 Dr. Khalil Al-Juboori 55

Page 56: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Sta. BS Stadia FS Stadia RL

BM A 103.8432

0.718 1.131

0.633 8.5 1.051 8.0 +0.6337

0.550 8.3 0.972 7.9 104.4769

Ʃ1.901/3 16.8 Ʃ3.154/3 15.9 -1.0513

0.6337 -1.0513

TP1 103.4256

1.151 1.041

1.082 6.9 0.969 7.2 1.0820

1.013 6.9 0.897 7.2 104.5076

Ʃ3.246 13.8 Ʃ2.907 14.4 -0.9690

1.0820 -0.9690

TP2 103.5386

3/21/2014 Dr. Khalil Al-Juboori 56

Three wire Leveling

Page 57: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Sta. BS Stadia FS Stadia RL

TP2 103.5386

1.908 1.246

1.841 1.194

1.774 1.123

Ʃ

BM B

Ʃ

Page check

3/21/2014 Dr. Khalil Al-Juboori 57

Three wire Leveling

Page 58: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Sources of Errors in Leveling

Instrumental Errors Line of sight Cross-hear not exactly horizontal Rod not correct length Tripod legs loose

Natural Errors Curvature of the earth Refraction Temperature variations Wind Settlement of the instrument Settlement of a turning point

3/21/2014 Dr. Khalil Al-Juboori 58

Page 59: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Personal Errors

Bubble not centered

Parallax

Faulty rod reading

Rod handling

Target setting

3/21/2014 Dr. Khalil Al-Juboori 59

Sources of Errors in Leveling

Page 60: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Mistakes Improper use of a long rod,

Holding a rod in different places for the plus and minus

sights on a turning point.

Reading a foot too high.

Waving a flat bottom rod while holding it on a flat surface

Recording notes

Touching tripod or instrument during reading process

3/21/2014 Dr. Khalil Al-Juboori 60

Sources of Errors in Leveling

Page 61: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Reducing Errors and Eliminating Mistakes by Carefully adjusting and manipulating both instrument and

rod. Establishing standard filed methods and routines. The following routines prevent most large errors or quickly disclose mistakes: Checking the bubble before and after each reading. Using a rod level. Keeping the horizontal lengths of plus and minus sights

equal. Making the usual field-book arithmetic checks

3/21/2014 Dr. Khalil Al-Juboori 61

Sources of Errors in Leveling

Page 62: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

62

Curvature and Refraction

Curvature

C: Curvature Correction

Curvature and Refraction

3/21/2014 Dr. Khalil Al-Juboori

Page 63: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

63

Curvature and Refraction

3/21/2014 Dr. Khalil Al-Juboori

Page 64: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 64

Short line

For long line more than 120 m Combine earth curvature and refraction must be considered

Page 65: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 65

ΔZCD = V = S sin α = S cos z or ΔZCD = V = H cot z OR V = H tan α Correction for combine earth curvature and refractions ΔZAB = hi + V – r + 0.0673 H2 OR ZB = ZA + hi + S sin α – r + 0.0673 S2 ZB= ZA + hi + H cot z – r + 0.0673 H2

For long line longer than 120 meter

Page 66: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Example

3/21/2014 Dr. Khalil Al-Juboori 66

The slope distance and zenith angle between points A and B were observed with a total station instrument as 9585.26 m and 81°42’ 20 “respectively. The hi and rod reading r were equal. If the elevation of A is 1238.42 m, compute the elevation of B. V=Scosz = 9585.26 cos(81°42’ 20 )= 1382.772 H=scos α = 9585.26 cos (90- 81°42’ 20 )= 9504.0 Combine earth and refraction correction= 0.0673(9504/1000)2

C-R= 6.078 m V=1382.772+6.078=1388.85 ZB = ZA + hi + S sin α – r + 0.0673 S2

ZB = 1238.42+1388.85=2727.27 m

Page 67: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

67

Reciprocal Leveling

B-A

3/21/2014 Dr. Khalil Al-Juboori

Page 68: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

68

Reciprocal Leveling

Fall Y = X – 0.365 = 352.71 – 0.365 = 352.345 m

3/21/2014 Dr. Khalil Al-Juboori

Page 69: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Grid, Cross-Section or Borrow-pit Leveling

Grid leveling is a method for locating contours.

Rectangular blocks, say 50 by 100 ft or 20 by 30 m, that have the longer sides roughly parallel with the direction of most contour lines may be preferable on steep slopes. The grid size chosen depends on the project extent, ground roughness, and accuracy required.

3/21/2014 Dr. Khalil Al-Juboori 69

Page 70: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Homework

1) Book the leveling data shown in the Table below using HPC method.

2) Determine the elevations of points (A, B, C, D, E, and F), perform all the necessary checks.

3) Determine the hight difference between A and F?

4) Determine the gradient between A and F?

3/21/2014 Dr. Khalil Al-Juboori 70

Page 71: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

3/21/2014 Dr. Khalil Al-Juboori 71

Page 72: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

72 3/21/2014 Dr. Khalil Al-Juboori

Page 73: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Example-Continue

BS IS FS HPC RL Remarks

3/21/2014 Dr. Khalil Al-Juboori 73

Page 74: UOB Semester 2 2013-2014 · PDF fileSemester 2 2013-2014 ... All Levelling surveys must be checked ... The following routines prevent most large errors or quickly

Leveling methods

3/21/2014 Dr. Khalil Al-Juboori 74