Date Safety Message to be delivered
(if topic not applicable select one from the Unscheduled section)
DM#
N/A Safety Message TEMPLATE 561768
Wednesday, May 24, 2017
select from unscheduled safety messages
Thursday, May 25, 2017
select from unscheduled safety messages
Friday, May 26, 2017
select from unscheduled safety messages
Saturday, May 27, 2017
select from unscheduled safety messages
Sunday, May 28, 2017
select from unscheduled safety messages
Monday, May 29, 2017 Shutdown Safety
561768
Tuesday, May 30, 2017 Locking and Tagging
561929
Wednesday, May 31, 2017
Total Fall Distance 561975
Thursday, June 01, 2017
New / Young Workers 561775
Friday, June 02, 2017
Confined Space Hazards 561780
Saturday, June 03, 2017 Save Your Eyes
561779
Sunday, June 04, 2017 Housekeeping 561772
Monday, June 05, 2017
Barricades, Tags & Warnings 561923
Tuesday, June 06, 2017
Fall Protection Anchor Points 561995
Wednesday, June 07, 2017
Musculoskeletal Disorders 712832
Thursday, June 08, 2017 Hand Protection
561999
Friday, June 09, 2017
Storm Warnings / Lightning Strikes 561924
Saturday, June 10, 2017
Black Day Safety 718184
Sunday, June 11, 2017
Working Around Cranes 561971
Monday, June 12, 2017 Sources of Energy
561770
Tuesday, June 13, 2017 Ladder Safety
719179
Wednesday, June 14, 2017
Material Storage, Piling and Stacking
561970
Thursday, June 15, 2017
Access & Egress 562018
Friday, June 16, 2017 Scaffolding 561981
Saturday, June 17, 2017
Rigging Materials & Slinging 562006
Sunday, June 18, 2017 HiVis Clothing
1270291
Monday, June 19, 2017
Housekeeping & Tripping Hazards 561997
Tuesday, June 20, 2017 Commissioning 562010
Wednesday, June 21, 2017
Daily Equipment Inspections 561927
Thursday, June 22, 2017 Hearing Protection
561925
Friday, June 23, 2017 Plant Start Up
1122692
Saturday, June 24, 2017
select from unscheduled safety messages
Sunday, June 25, 2017
select from unscheduled safety messages
Monday, June 26, 2017
select from unscheduled safety messages
Tuesday, June 27, 2017
select from unscheduled safety messages
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561768
Ontario Operations
Shutdown Safety
Context: Planned Maintenance Periods always include a lot of work,
and the 2017 PMP includes even more work than usual - so extra
precautions need to be taken.
• Construction and maintenance jobsites can be dangerous places if
hazards are not identified and managed well.
• There will be a lot of people onsite, including sub-contractors,
delivery people, and others.
• For some of them, it will be their first time at that
jobsite.
• There may be a lot of people working in an area at the same
time.
Careful planning and scheduling has been done to help make the
worksites safe and minimize interference between work groups.
• Watch out for changes that could affect those plans!
Reminders: • Does everyone have the required
training? Plant Orientation ZES locking and tagging Working at
Heights Confined Space Entry Equipment Operation (forklift,
manlift, chainsaw, etc…)
• Has everyone had a Jobsite Orientation? Site tour Review of the
PHR and other safety
documents
• Does everyone know where to lock and tag out for their work? Will
that change during the job?
• Does everyone know who their direct supervisor is? Will that
change?
• Are Permits needed for this job? Work Permit Hot Work Permit
(fire prevention) Confined Space Entry Permit
• Will two or more groups be working in close proximity?
• Will people be working above other people?
• Will a crane or other overhead device be used in this area?
Does anyone have any questions about how to do their job safely
today?
DM # 561768
and adhere to site pedestrian/vehicle traffic rules.
Only perform work that you are trained, qualified, authorized and
fit to perform.
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561768
Ontario Operations
2017 PMP - Daily Safety Message Details
Shutdown Safety Context: Planned Maintenance Periods always include
a lot of work, and the 2017 PMP includes even more work than usual
- so extra precautions need to be taken. Construction and
maintenance jobsites can be dangerous places if hazards are not
identified and managed well. There will be a lot of people onsite,
including sub-contractors, delivery people, and others. For many of
them, it will be their first time at that jobsite. There may be a
lot of people working in an area at the same time. Careful planning
and scheduling has been done to help make the worksites safe and
minimize interference between work groups. Watch out for changes
that could affect those plans!
Reminders: All workers must know who their direct supervisor is,
how to contact them and who the supervisors designate is in their
absence. All personnel must receive a Jobsite Orientation,
including a site tour and a review & sign-off of the
appropriate PHR and other safety documents. This could include a
review of the Contract-Specific Safety Plan and the Contract-
Specific Requirements document (“Section 3”). All safety procedures
such as Zero Energy State (Lock & Tagout), Vessel Entry
(Confined Spaces) and hot work / fire prevention must be
understood. Ensure lock out tag-out requirements are understood and
followed. Be sure to obtain permits and/or locates for the work
when required. If you are not trained and qualified to perform a
task - do not do it. If you do not know or are unsure of any
process, ask your supervisor. Ensure all your training and
qualifications are valid. Be sure there is good communication
between all Contractors and Vale workers with regards to working
being done overhead or in close proximity to other work
groups.
Does anyone have any questions about how to do their job safely
today?
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561768
Reference Material:
• Occupational Health and Safety Act o O. Reg. 213/91 o O. Reg.
854
• Vale Golden Rules o Rule # 1. The Fundamental Requirements
Only perform work that you are trained, qualified, authorized and
fit to perform.
• Vale SPI’s, Standards & Policies - see Extranet Site
http://extportal.vale.com/PMO/ o SAF-SPI-17 Guidelines for
Plant/Mine Specific Contractor Orientation
Guidelines for site specific orientation of contractor
employees.
o Vale Confined Space Program o Vale Zero Energy State Program
(ZES)
• Vale Contract Requirement Documents - see Extranet Site
http://extportal.vale.com/PMO/ o General Requirements for Ontario
Operations
Section 1.1.1 Applicable Standards Section 1.1.2 Training &
Certification Requirements Section 1.1.9 ZES Locking and Tagging
Section 1.1.18 Hot Work Section 1.7.5 Supervisors Section 1.7.9
Qualification Requirements & Training Records
• Vale Extranet Site http://extportal.vale.com/PMO/ o click on
Schedules and Job Site Plot Plans, under Planned Maintenance
Periods
(PMP), for: PMP Area Schedules PMP Area Jobsite Plot Plans showing
work locations, etc…
o click on PMP Safety, under Planned Maintenance Periods (PMP),
for: various PMP Daily Safety Messages
o click on Training & Presentations, for: Vale Minimum Training
Requirements
o click on Forms, for: NAV-TP-0161 Contractor / Consultants
Training Requirements Summary Template NAV-TP-0411 Job Site
Specific Orientation Checklist
• IHSA Website
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Plant:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Did you receive a safety message today? 2 What was the topic of
the safety message? 3 Do you know who your Supervisor is, and how
to contact them? 4 Did you get a Jobsite Orientation? 5 Did it
include a tour and a PHR Review? 6 Who showed you where to lock and
tag out for your work today?
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A. Field Audit - Conditions / Documents Acceptable
Unacceptable
1 Jobsite Orientation (Led by Vale Rep or Contractor’s Supervisor /
SHE Rep. Workers signed off.)
2 PHR Review (Led by Vale Rep or Contractor’s Supervisor / SHE Rep.
Workers signed off.)
3 Contract Contact List (Supervisor & SHE Rep’s names &
contact info listed. Vale Rep & JHSC listed)
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 561768
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561768
Ontario Operations
Locking and Tagging
Context: Workers can be seriously hurt if equipment is energized
without warning, or if process materials start to flow. This won’t
happen if the ZES program is followed. ZES stands for ZERO ENERGY
STATE. There are many kinds of Energy, like electricity, rotating
shafts or other things that move, pressure in piping systems,
stored energy in springs or suspended loads, chemical energy,
etc…
Protect yourself from all energy sources.
Lock and tag out before you start work each day!
Reminders: • Training All workers must have ZES training
• Personal Protection Tags Only use the approved red tag. Use a new
tag every day. Fill out every line on the tag. Print clearly on the
tag, including
your name. Do not check off the “Project” check
box on the tag (that’s only for the Designated Tagger for the
project).
• Personal Protection Locks Every worker must lock out.
(One Person – One Lock) Ask your supervisor where to lock
out for your work. It may change from day to day!
Make sure you are locking out the right equipment – your tasks must
be listed on the lock-box tagging form.
Only use an approved red lock for Personal Protection.
Make sure your lock is completely closed and your tag is
secured.
If there is only one hole left on the Lock-box, use a lock extender
to ensure other workers can lock out. Make sure that the lock
extender is closed properly.
Remove your lock at end of your shift.
Does anyone have any questions about how to do their job safely
today?
DM # 561768
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561768
Ontario Operations
2017 PMP - Daily Safety Message Details
Locking and Tagging Context: Workers performing construction,
maintenance, or other work onsite can be at risk if there is an
unexpected energization, mechanical movement, or material flow in
the process. The ZES program, training and procedures have been put
in place to reduce that risk. ZES stands for ZERO ENERGY STATE.
There are many kinds of Energy, like electricity, rotating shafts
or other things that move, pressure in piping systems, stored
energy in springs or suspended loads, chemical energy, etc…
Protect yourself from all energy sources. Lock and tag out before
you start work each day!
Lock Boxes: All of the sources of energy that workers could be
exposed to are listed on the lock-box tagging list for the work.
This could include electrical disconnect switches, valves, etc… The
Plant Operations rep will isolate and lock out those items, and
will test to confirm ZES. The keys for the field isolation devices
are placed in the lock-box, and the Designated Tagger uses a blue
“Project” lock to secure those keys in in the lock-box. A “Project”
tag is secured to the blue lock to identify the Designated Tagger
and other project information.
Personal Protection Tags: Only use an approved red tag for Personal
Protection, and use a new tag every day. Fill out every line on the
tag. Print all information neatly on the tag, including your name,
in case we need to contact you. Do not check off the “Project”
check box on the tag.
Personal Protection Locks: Every worker must lock out individually:
(One Person – One Lock). Ask your supervisor where to lock out for
your work. It may change from day to day! Make sure you are locking
out the right equipment – your tasks must be listed on the lock-box
tagging list. Only use an approved red lock for Personal
Protection. Make sure your lock is completely closed and your tag
is secured. If there is only one hole left on the Lock-box, use a
lock extender to ensure other workers can lock out. Make sure that
the lock extender is closed properly. Remove your lock at end of
your shift.
Does anyone have any questions about how to do their job safely
today?
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561768
Reference Material:
• Occupational Health and Safety Act o O. Reg. 854 for Mines and
Mining Plants s.160, s.185 o O. Reg. 213/91 for Construction
Projects s.190, 191, 194
• Vale Golden Rules o Rule # 4. Energy and Machinery
Isolation
Only work on equipment if all energy sources have been identified,
tagged appropriately, locked with your personal lock and tested to
ensure that they are at a zero energy state.
• Vale SPI’s, Standards & Policies - see Extranet Site
http://extportal.vale.com/PMO/ o Vale ZES Program
ZES Rules, Flowcharts & Procedures ZES Training Requirements
(Awareness, Tagging, Supervisor) ZES Forms ZES Audit Form (Detailed
Audit)
• Vale Contract Requirement Documents - see Extranet Site
http://extportal.vale.com/PMO/ o General Requirements for Ontario
Operations
Section 1.1.2 Training & Certification Requirements Section
1.1.9 ZES Locking and Tagging
• Vale Extranet Site http://extportal.vale.com/PMO/ o click on
Minimum Training Req'mts, under Training & Presentations
for:
list of ZES Training modules, delivery method, and validity
periods
o click on PMP Safety, under Planned Maintenance Periods (PMP) for:
PMP Daily Safety Message Locking and Tagging DM# 561768 PMP Daily
Safety Message Sources of Energy DM# 561770 Other resources and
information
• IHSA Website IHSA - Web Page - Electrical Hazards IHSA - Training
Program - Lockout/Tagout: Electrical/Mechanical/Gaseous IHSA -
E-course - Lockout/Tagout IHSA - The Pocket Lockout Guide IHSA
Safety Talk - Lockout and Tagging
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Plant:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Did you receive a safety message today? 2 What was the topic of
the safety message? 3 Where did you lock out for your work today?
(Supervisor, SHE Rep?) 4 Who showed you where to lock out for your
work? (Supervisor, SHE Rep?) 5 What color is a Personal Protection
Tag? 6 Are you comfortable using ZES?
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A. Field Audit - Conditions / Documents Acceptable
Unacceptable
1 Lockbox (Lockbox accessible. Tagging List, Project Lock and
Project Tag all in place.)
2 Personal Locks (One person – One lock. Locks closed. No keys left
in locks.)
3 Personal Tags (Personal Tags in place on eachlock, all lines
completed properly, and printed legibly.)
4 Tagging List (Workers tasks listed.)
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 561768
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561975
Ontario Operations
Total Fall Distance and Bottoming Out
Context: Bottoming Out occurs when the “Total Fall Distance” is
more than the distance from the work surface to the level below, or
some other hazard.
Fall Distance Calculations: The “Total Fall Distance”
includes
• Length of lanyard
• Height of worker
• Safety factor If your anchor point is less than 20 feet above the
next level down, you could bottom out! Use an SRL anchored directly
overhead to reduce your fall distance.
Reminders: • Training All workers must have WAH training.
• Planning Fall-Arrest systems must be
planned, designed and installed to prevent any risk of Bottoming
Out.
All workers must know the fall clearance requirements for their
shock absorbing lanyard and / or retractable lifeline.
Always choose an anchorage above the back D-ring!
• Alternatives Eliminate the risk of falls by installing
scaffolding or guardrails, or by changing how the work is
done.
Reduce the risk of falls by using manlifts or other
equipment.
Mitigate the risk by using self- retracting lanyards.
Protect yourself from falls!
Does anyone have any questions about how to do their job safely
today?
DM # 561975
SM
FFD
SAE
DS
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561975
Ontario Operations
2017 PMP - Daily Safety Message Details
Total Fall Distance and Bottoming Out Context: Bottoming Out occurs
when the “Total Fall Distance” is more than the distance from the
work surface to the level below, or some other hazard.
Fall Distance Calculations: The “Total Fall Distance”
includes
• Length of lanyard
• Safety factor
Reminders: • Eliminate the risk of falls by installing scaffolding
or guardrails, or by changing how the work
is done. Reduce the risk of falls by using manlifts or other
equipment. If WAH is required, mitigate the risk by using
Self-Retracting Lanyards (review SRL manuals for
limitations).
• Workers doing WAH must have current WAH training from an
MOL-approved provider.
• When working within 2 metres of a Fall Hazard, where there is a
hazard of falling 1.8 meters (6 feet) or more, appropriate fall
protection equipment must be used. Appropriate anchor points must
be installed and used. See SPI-6 and the Vale Engineering
Standards.
• Written rescue plans, suitable rescue equipment, and qualified
personnel must be supplied wherever fall protection equipment is
used. Rescue plans must be reviewed by the Vale Representative and
by all workers and rescue personnel involved, before starting the
work.
• When fall protection is needed, fall clearance distance must be
considered and appropriate measures taken. Best-practice: tie off
overhead, using an SRL where possible, and watch out for
swing-falls and other hazards below. Inspect all WAH equipment and
PPE daily.
• For work at heights being done outside, all supervision, workers
and rescue team members must know what to do if a storm warning is
issued or lightning is seen (see MGUID-50004 in the Reference
Material section of this ): communication protocols, suspension of
outdoor work at heights.
Does anyone have any questions about how to do their job safely
today?
If your anchor point is less than 20 feet above the next level
down, you could
bottom out! Use an SRL anchored directly overhead to reduce your
fall distance.
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561975
Reference Material:
• Occupational Health and Safety Act o O. Reg. 854 Mines &
Mining Plants sec.14 (4) (a) - max. free fall distance is 1m (3ft)
o O. Reg. 213/91 Construction sec. 26.6(4) - The fall arrest system
shall be arranged so
that a worker cannot hit the ground, or an object, or level below
the work.
• Vale Golden Rules o Golden Rule #2: Working at Heights
Where there is a hazard of falling 1.8 metres or more, approved,
maintained and certified equipment for fall arrest and travel
restraint must be used.
• Vale SPI’s, Standards & Policies
o SPI-SAF-06 Fall Protection Standard for Fall Protection to
safeguard employees who work within 2 metres of a
Fall Hazard
A fall arrest system consists of a full body harness, an energy
absorber, a suitable connecting device, a suitable anchor point and
a written rescue plan.
o MGUID-50004 Working During Storms or Lightning Occurrences
Precautionary Guideline
If a storm warning has been issued or if lightning is detected,
suspend all outdoor work that poses an elevated risk due to
lightning strikes (such as work at heights being done outside) and
proceed to a safe area.
• Vale Contract Requirement Documents o Section 1.1.14 Working At
Heights
Written rescue plans, suitable rescue equipment, and qualified
personnel must be supplied wherever fall protection equipment is
used … all workers and rescue personnel involved must review the
rescue plans before starting the work
When developing measures for fall protection, fall clearance
distances must be considered and appropriate mitigation measures
taken
Appropriate tie off points must be installed / used
• Vale Extranet Site http://extportal.vale.com/PMO/ o click on
Working at Heights, under Reference Information, for:
numerous Toolbox Talks and Formal Safety Messages WAH Training
Resource links WAH Policies / Programs / Procedures / Guidelines /
Best Practices Templates for WAH Risk Assessments, Rescue Plans and
Fall Protection Plans WAH Audit forms Other WAH Resource
information
• IHSA Web Page - Fall Prevention & Working at Heights
• MOL Web Page – Fall Hazards
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Plant:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Will you have to do any Work At Heights today, or during the PMP?
2 Where did you get your WAH training? When? 3 What hazards are
associated with WAH on your jobsite? 4 What kinds of WAH PPE and
equipment will you use? 5 How do you identify your WAH anchor
points? 6 Do you know how to calculate Total Fall Distance, to
avoid Bottoming Out? 7 What is the Rescue Plan if you fall? 8 Is
there a better / safer way to do this task? (Hierarchy of
Controls)
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A. Field Audit - Conditions / Documents Acceptable
Unacceptable
1 Barricades & Signs (Area barricaded. “Danger: Open Hole”
signs in place at each entry point.)
2 Jobsite (Workers can tie off without fall hazard. No
slipping/tripping/head-knocker hazards near open holes.)
2 Anchor Point Type (Engineered. Secured to suitable
structure.)
3 Anchor Point Location (No risk of bottoming-out. No risk of swing
falls into hazards. Convenient to use.)
4 Lanyard / Rope Grab Assembly (Good condition. Correct
length/type. Correct usage.)
5 Shock Absorber / SRL (Good condition. Correct weight range.
Correct usage as per SRL manual.)
6 Harness (Good condition. Correct size & adjustment.)
7 Fall Zone (Clear of obstructions, no swing fall hazards.)
8 100% Tie-off At All Times (Workers tied off, equipment in place
to transfer to 2nd tie-off point if needed.) 9 Rescue Plan (Rescue
equipment in place, plan would work and doesn’t put rescue team at
risk.)
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 561975
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561775
Ontario Operations
New / Young Workers
Context: According to the MOL, new and young workers are three
times more likely to be injured in their first month on the job
than at any other time. Communication is the key in helping to
prevent this.
• There will be a lot of people onsite during the PMP.
• Some of them will be New / Young Workers, and it may be their
first time at that jobsite, or at any jobsite.
• New / Young workers want to make a good impression – they may be
afraid to ask questions. Make sure we all communicate!
Reminders for New / Young Workers: • Get Your Training NORCAT
Orientation (Tier 1) Surface Plant Orientation (Tier 2) Plant/Area
Orientation (Tier 3) WHMIS ZES Locking and Tagging Working at
Heights (if needed) Confined Space Entry (if needed) Equipment
Operation (forklift,
manlift, chainsaw, cut-off saw, etc…)
• Get Your Jobsite Orientation Site tour (job locations,
emergency
assembly areas, lunch trailer, etc…) Review of the PHR and other
safety
documents
• Ask Who Your Supervisor Is Ask how to contact them. Ask if the
Supervisor might change.
• Get Instructions From Your Supervisor Ask where to lock and tag
out for
your work. Ask if that might change. Ask where you’re allowed to
go, and
where you’re not allowed to go. Listen to instructions carefully –
ask
if you don’t understand something! Be honest – don’t try to
do
something that you can’t handle. Only do things you were asked to
do. Follow all the safety rules.
• Wear the Gear Ask what PPE you need. Ask how to use and maintain
it.
• Tell Your Supervisor About Issues Report hazards that you see.
Report all injuries & incidents to your
supervisor, no matter how minor.
• Talk to your family. They might know something you don’t!
There are NO “stupid” questions … if you don’t know, ask!
Does anyone have any questions about how to do their job safely
today?
DM # 561775
and adhere to site pedestrian/vehicle traffic rules.
Only perform work that you are trained, qualified, authorized and
fit to perform.
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561775
Ontario Operations
2017 PMP - Daily Safety Message Details
New / Young Workers Context: According to the MOL, new and young
workers are three times more likely to be injured in their first
month on the job than at any other time. Communication is the key
to avoid these injuries. Planned Maintenance Periods always include
a lot of work, and the 2017 PMP includes even more work than usual
- so extra precautions need to be taken. Construction and
maintenance jobsites can be dangerous places even for experienced
workers.
• There will be a lot of people onsite, including sub-contractors,
delivery people, and others.
• Some will be New / Young Workers, and it may be their first time
at that, or any, jobsite.
• New / Young workers want to make a good impression & may be
afraid to ask questions. Make sure we all communicate!
Reminders: All workers must know who their direct supervisor is,
how to contact them and who their designate is in their absence.
All workers must receive a Jobsite Orientation, including a site
tour, what to do in an emergency, and a review of the PHR and other
safety documents. Don’t assume you can do something without
instruction, guidance or supervision. If you are not trained and
qualified to perform a task - do not do it. Don’t do anything you
haven’t been asked to do or have been told specifically not to do.
If you are unsure of a safety rule or task specific process, ask
your supervisor. Ask for a physical demonstration of tasks that
you’re unsure of, including what to watch out for – especially for
operation of equipment. Don’t attempt something that you can’t
handle - if a task is too much for you, say so! All safety
procedures such as ZES Locking & Tagging, Work At Heights,
Confined Space entry and hot work / fire prevention must be
understood and followed. Wear the personal protective equipment
required for the task – it must be used and maintained properly to
protect you. Before you start a job, ask where to Lock & Tag
Out, and ask if that will change during the job. Identify risks and
report unsafe practices or situations to your supervisor. Tell your
supervisor if you see anything hazardous, even if it involves
another worker. No matter how minor, report all injuries and
incidents to your supervisor. Safety rules are there to protect
you. Learn them and follow them. Learn your rights and obligations
under to OHSA. Talk to your family about the work you are doing,
they may know something you don’t! Training specifically for New /
Young workers is available from the Workers Health & Safety
Centre (~ 8 hours) and USW 6500.
Remember, there are no “stupid” questions.
Does anyone have any questions about how to do their job safely
today?
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561775
Reference Material:
• Occupational Health and Safety Act, O. Reg. 213/91 for
Construction Projects, and O. Reg. 854 for Mines and Mining
Plants
• Vale Golden Rules o Rule # 1. The Fundamental Requirements
Only perform work that you are trained, qualified, authorized and
fit to perform.
• Vale SPI’s, Standards & Policies - see Extranet Site
http://extportal.vale.com/PMO/ o SAF-SPI-17 Guidelines for
Plant/Mine Specific Contractor Orientation o Vale Confined Space
Program o Vale Zero Energy State Program (ZES)
• Vale Contract Requirement Documents - see Extranet Site
http://extportal.vale.com/PMO/ o General Requirements for Ontario
Operations
Section 1.1.2 Training & Certification Requirements
• Vale Extranet Site http://extportal.vale.com/PMO/ o click on PMP
Safety, under Planned Maintenance Periods (PMP), for PMP Daily
Safety
Messages o click on Training & Presentations, for Vale Minimum
Training Requirements
o click on Forms, for: NAV-TP-0161 Contractor / Consultants
Training Requirements Summary Template NAV-TP-0411 Job Site
Specific Orientation Checklist
• IHSA Website o NEW WORKER ORIENTATION GUIDE (WSPS) o Tips for
Young Workers (Ontario MOL)
https://www.labour.gov.on.ca/english/atwork/yw_tips_youngworkers.php
o Tips for Employers – New / Young Workers in Your Workplace
(Ontario MOL)
https://www.labour.gov.on.ca/english/atwork/yw_tips_workplaces.php
o Tips for Parents – Is the Workplace Safe? (Ontario MOL)
o Orientation on Health and Safety for New Workers – E-course
(WSPS)
http://wsps.ca/Shop/Training/E-Courses/Orientation-on-Health-and-Safety-for-New-Workers-(.aspx
Note: there is a fee for this E-course
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Plant:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Did you receive a safety message today? 2 What was the topic of
the safety message? 3 Do you know who your Supervisor is, and how
to contact them? 4 Did you get a Jobsite Orientation? 5 Did it
include a tour and a PHR Review? 6 Who showed you where to lock and
tag out for your work today?
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A. Field Audit - Conditions / Documents Acceptable
Unacceptable
1 Jobsite Orientation (Led by Vale Rep or Contractor’s Supervisor /
SHE Rep. Workers signed off.)
2 PHR Review (Led by Vale Rep or Contractor’s Supervisor / SHE Rep.
Workers signed off.)
3 Contract Contact List (Supervisor & SHE Rep’s names &
contact info listed. Vale Rep & JHSC listed)
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 561775
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561780
Ontario Operations
Confined Space Hazards
Context: Confined space entry is not something to be undertaken
lightly! It requires training, protective equipment, correct
procedures and authorization.
Confined Space Hazards: • Atmospheric Hazards: lack of
Oxygen,
or toxic gases.
• Fire and Explosion Hazards: explosive gases or liquids.
• Fall Hazards: Work At Heights may be required and anchor points
may not be available or well-placed.
• Mechanical Hazards: rotating equipment like agitator shafts,
falling objects, etc…
• Electrocution Hazards: from existing wiring / equipment, or from
temporary power supplies for lighting or ventilation.
• Chemical Hazards: process materials or cleaning agents may be
present as liquids, gases, or airborne dust.
• Engulfment Hazards: from shifting materials such as sand, slimes,
etc…
• Temperature Hazards: extreme heat or extreme cold.
• Slip & Trip Hazards: wet or slippery surfaces, sharp edges or
points that workers could fall on or against, etc…
• Communication Hazards: noise, poor visibility, poor radio
signals, etc…
Make sure you know how to protect yourself from Confined Space
Hazards!
Reminders: • Never enter a Confined Space without
training. Make sure you understand the hazards.
• No part of your body is allowed to “cross the plane of the goal
line” at the entry point without an Entry Permit!
• Risk Assessments, Entry Permits, Entry Procedures, and Rescue
Plans are mandatory for Confined Space work.
• Practice the Rescue Plan in the field if practical, or if
required by the Risk Assessment.
• Test the air quality as per the entry procedure. Use calibrated
test equipment – DO NOT rely on sight, taste or smell to detect
toxic or explosive atmospheres!
• Provide proper ventilation to prevent accumulation of toxic gases
or hazardous airborne substances, or a lack of oxygen.
• Wear a full body harness to facilitate emergency rescue, unless
the risk assessment identifies that it isn’t required or poses a
greater hazard.
• In the event of a Storm Warning, exit the Confined Space. Review
the procedure to be followed before re-entry.
• In the event of an emergency, follow the Rescue Plan – don’t put
rescuers at risk.
Does anyone have any questions about how to do their job safely
today?
DM # 561780
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561780
Ontario Operations
Confined Space Hazards Context: Confined space entry is not
something to be undertaken lightly! It requires training,
protective equipment, correct procedures and authorization.
Confined Space Hazards: Workers may not recognize that they are
entering a confined space if they do not know or understand what a
confined space is. A “confined space” is a fully or partially
enclosed space that is not designed and constructed for continuous
human occupancy, and, in which atmospheric hazards may occur
because of its construction, location, or contents - or because of
the work that is to be done in it. These could include: furnaces,
roasters, baghouses, bins, etc... Examples for construction sites
include: vaults, manholes, tanks, etc… Never enter a confined space
without training and understanding of the site specific hazards. No
part of your body is allowed to “cross the plane of the goal line”
at the entry point without an Entry Permit! Written Risk
Assessments, Entry Procedures, Rescue Plans, and Entry Permits are
essential for safe entry. Atmospheric hazards cause most deaths in
confined spaces. A Confined Space Entry Permit includes provisions
for air quality testing with properly calibrated testing equipment.
Some detectors have sensors that check for oxygen content,
explosive gases or vapours, and a range of toxic gases. Some have
only one or two sensors and may not detect certain types of
hazards. You may need a selection of detectors—one detector may not
test for everything. DO NOT rely on sight, taste or smell to detect
toxic or explosive atmospheres! Other dangers of a Confined Space
may include poor ventilation causing an accumulation of toxic gases
or hazardous airborne substances, or a lack of oxygen. There may be
moving equipment, slippery or dangerous surfaces, electric shock
hazards, falling objects, water or other liquid contents, chemicals
or extreme temperatures. Noise, poor visibility or shifting
materials such as slimes or sand could be present. Fire and
explosion are other dangers that may be present in confined spaces.
Not following the Rescue Plan puts the rescuer at risk. More than
half of confined space fatality victims are rescuers. All personnel
who enter a confined space must wear a full body harness to
facilitate emergency extraction unless the Risk Assessment
identifies that a full body harness is not required, or that it
poses greater hazards to the entry personnel due to restricted
areas of the confined space. Practice the Rescue Plan in the field
if practical, or if required by the Risk Assessment. In the event
of a Storm Warning, exit the Confined Space. Review the procedure
to be followed before re-entry – there may be specific requirements
for your work.
Does anyone have any questions about how to do their job safely
today?
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561780
Reference Material:
• Occupational Health and Safety Act o O. Reg 632/05 – Confined
Spaces o MOL Confined Space Guideline July 2011
• Vale Golden Rules o Rule # 6. Confined Space
Only enter a Confined space if you are trained, qualified and
authorized and after having reviewed the permit.
• Vale SPI’s, Standards & Policies o Vale Confined Space
Program o MGUID-50004 Working During Storms or Lightning
Occurrences Precautionary Guideline
Also see PMP Daily Safety Message Storm Warnings / Lightning
Strikes DM# 561924
• Contract Requirement Documents o General Requirements for Ontario
Operations
Section 1.1.15 Confined Space – Procedures Section 1.1.16 Confined
Space – Equipment & Personnel Section 1.1.16 Rescue Equipment
& Personnel
• Extranet Site http://extportal.vale.com/PMO/ under Policies,
Programs, SPI’s o Confined Space Training (Awareness, Entry,
Rescuer, and Confined Space Test Booklet) o Confined Space Forms
(all are available within one workbook, as individual “tabs”)
Confined Space Work Risk Assessment Form, Confined Space
Coordination Form, Work Rescue Plan Form, Record of Rescue Plan
Test, Rescue and Communication Equipment Inspection Record, CS
Entry & Rescue Plan / Procedure Specific Training Record,
Confined Space Work Permit, Hot Work Provision and Air Quality Test
Form, Employee Entry & Exit Record, Final Inspection and
Hand-Over Form, PMO Confined Space Work Permit Log
o Frequently Asked Questions (FAQ’s) o click on PMP Safety, under
Planned Maintenance Periods (PMP) for:
PMP Daily Safety Message Dangers of Confined Space DM# 561780 PMP
Daily Safety Message Storm Warnings / Lightning Strikes DM# 561924
PMP Daily Safety Message Access & Egress DM# 562018 Other
resources and information
• IHSA Resource Page – Confined Spaces IHSA Resource Page –
Confined Spaces IHSA - Health and Safety Manual - Confined Spaces
IHSA - Safety Meeting Package - Confined Space Entry IHSA - Safe
Practices Guide - Entry and Work in Confined Spaces IHSA Safety
Talk - Confined spaces – Definition IHSA Safety Talk - Confined
spaces – Dangerous Atmospheres IHSA Safety Talk - Confined spaces –
Physical Hazards
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Plant:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Did you receive a safety message today? 2 What was the topic of
the safety message? 3 Does your work involve any Confined Space
entry? 4 Who reviewed the C.S. Entry Procedure and Rescue Plan with
you? 5 What hazards are associated with that particular Confined
Space? 6 Do you think all of those hazards are being controlled
properly?
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A. Field Audit - Conditions / Documents Acceptable
Unacceptable
1 Documents (C.S. Assessment / Entry Plan / Rescue Plan / Permit
forms all in place, and filled out.)
2 Lockout (Isolation Device Locks & Tags in place. Lockbox
accessible. Workers’ Locks & Tags all in place.)
3 Confined Space Training Records (Spot Audit: worker training
current, C.S. Attendant is verifying.)
4 Confined Space Attendant (Attendant understands duties, is alert,
no cell phone use.)
5 Access & Egress (Equipment in place, conforms to Entry
Procedure, good conditions.)
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 561780
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561779
Ontario Operations
Save Your Eyes
Context: A serious eye injury can change your life forever. We have
more injuries to eyes every PMP than to any other body part. The
good news is, eye injuries have steadily declined over the last few
years. Let’s keep that trend going!
Preventing Eye Injuries: • Plan and organize the work to
eliminate
hazards – protect your eyes from: o Acid or other hazardous liquids
o Sparks and hot particles from
grinding or sandblasting o Airborne dust o Welding flash o
Projectiles o Other hazards
• Select the right PPE for the best protection: o Full-face
respirators o Face-shields o Goggles o Smoggles o Safety glasses o
Welding shields / Burning goggles
• Make sure your safety glasses fit properly: o There should only
be a small gap
between your face and the glasses, to keep dust and particles
out.
o If the glasses fit too tightly, they will fog up.
o A gap of about 10mm is ideal.
• Wear the PPE that’s provided.
• Talk to your Supervisor if your eye protection isn’t suitable for
the task you’re doing, or it doesn’t fit properly.
• Be careful when removing your eye protection – eye injuries can
happen when dust from your face shield or respirator falls into
your eyes.
Protect your Eyes – every day, on every task!
Does anyone have any questions about how to do their job safely
today?
DM # 561779
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561779
Ontario Operations
2017 PMP - Daily Safety Message Details
Save Your Eyes Context: A serious eye injury can change your life
forever. We have more injuries to eyes every PMP than to any other
body part. The good news is, eye injuries have steadily declined
over the last few years. Let’s keep that trend going! By law,
employers and supervisors are responsible for ensuring that PPE
“necessary to protect the worker against the hazards to which the
worker may be exposed” is worn by the worker. The employer must
provide the PPE and maintain it in good condition, and train the
worker in the use and care of this equipment. Workers have a duty
to wear / use the PPE required by law and any required by the
employer. Workers must report any missing or defective PPE to the
employer or supervisor and must not remove the PPE or make it
ineffective.
Preventing Eye Injuries: Plan and organize the work to eliminate
hazards like: acids or other hazardous liquids, sparks and hot
particles from grinding or sandblasting, airborne dust, welding
flash, projectiles and other hazards. Look into what PPE has worked
well in the past for your tasks, and talk about it with your
Supervisor or the Vale Rep for the work. If any chemicals are being
used, consult the MSDS for the eye / face protection requirements.
Select the right PPE for the best protection. Welding and burning
operations require special tinted lenses - welding helmets with
auto-darkening shields provide the best combination of protection
and convenience. Full-face respirators are ideal if the work is in
dusty environments where both a respirator and goggles or a
face-shield would be required. In areas where a respirator is not
required, Smoggles (safety glasses with a foam seal) provide better
protection than regular safety glasses, if fans or the wind
sometimes kicks up dust in the work area. At a minimum, all workers
must wear properly fitted safety glasses. There should only be a
small gap between your face and the glasses, to keep dust and
particles out. However, the glasses will fog up if they fit too
tightly – a gap of about 10mm is ideal. Fitting kits are available
from PPE suppliers, and the Fit-Checking process is described in
Vale’s Eye Wear Fit System, SPI-SAF-35. Wear the PPE that’s
provided, and talk to your Supervisor if your eye protection isn’t
suitable for the task you’re doing, or it doesn’t fit properly. Be
careful when removing your eye protection – eye injuries can happen
when dust from your hardhat, face shield or respirator falls into
your eyes. Lean forward when removing PPE so the dust falls away
from your face. Get in the habit of wiping off the top edge of your
full-face respirator before loosening the straps. Face-shields are
also available that include a piece of cloth or leather between the
frame and the shield, to prevent dust falling in your face when the
shield is lifted up.
Protect your Eyes – every day, on every task!
Does anyone have any questions about how to do their job safely
today?
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561779
Reference Material:
• Occupational Health and Safety Act - sections 25, 27 and 28 o O.
Reg. 213/91 s.21, s.24, s.112(1.2), s.117(3) o O. Reg. 854 s.5.2,
s.12(3)(4), s.95(1)(2), s.193(3),(4), s.282(2)
• Vale Golden Rules o Golden Rule #9. Chemicals and Hazardous
Substances
Only handle hazardous substances within the prescribed
controls.
• Vale SPI’s, Standards & Policies - see Extranet Site
http://extportal.vale.com/PMO/ o SAF-01 Eye Protection
Standard for purchase specifications, care and use of eye
protection from flying debris or against visible & near visible
light. Covers different types and styles available. Proper
selection of eye protection for different applications is
essential.
o SAF-35 Eye Wear Fit System Guide to help trained fit testers in
the proper fit testing / selection for the best eye
protection available for each individual to maximize safety and
minimize eye injuries.
• Vale Contract Requirement Documents - see Extranet Site
http://extportal.vale.com/PMO/ o General Requirements for Ontario
Operations
Section 1.1.12 Personal Protective Equipment
o Also review the Area / Plant Specific Requirements for each work
location Section 4.1.1 PPE Requirements (Plant) Section 4.1.3, etc…
PPE Requirements (Individual Plant Areas)
• Vale Extranet Site http://extportal.vale.com/PMO/ o click on PMP
Safety, under Planned Maintenance Periods (PMP), for:
PMP Daily Safety Messages Other resources and information
• IHSA Website IHSA Resource Page – PPE IHSA Safety Talk – Eye
Protection IHSA Construction Health and Safety Manual – Eye
Protection IHSA – DVD – Sight on Site (Note: there is a fee for
this DVD from IHSA)
• CSA Standard Z94.3-07 – Eye and Face Protectors
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Plant:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Did you receive a safety message today? 2 What was the topic of
the safety message? 3 What kinds of Eye injury hazards might come
up for your work? 4 What kinds of Eyewear will you use today for
your work? 5 Do you have access to all of the safety eyewear that
you might need? 6 Did anyone show you how to do a fit-check for
your safety glasses?
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A. Field Audit - Conditions / Documents Acceptable
Unacceptable
1 Eye / Face Protection (Eyewear suited for the task, good
condition, and appears properly fitted.)
2 Other PPE (PPE suited for the task, good condition, and appears
properly fitted and used.)
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 561779
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561772
Ontario Operations
Housekeeping
Context: Many injuries and other incidents result from poor
housekeeping, improper storage of materials, and cluttered work
areas. Cleaning up the worksite throughout the shift will help
eliminate tripping and falling hazards, and allow you to work more
safely and efficiently. After you have completed a task, always
clean up before moving on to the next task. This includes removing
all debris, and any tools and equipment that are no longer being
used.
Housekeeping: • Jobsite cleanup is mandatory on each
shift, as per the OHSA Construction Regulations.
• Good housekeeping is the responsibility of each worker.
• Keep stairs, walkways and emergency exits clear at all
times.
• Don’t obstruct emergency equipment such as safety showers,
eyewash stations, or firefighting equipment.
• Do not store materials within 3 feet of any electrical
panel.
• Control dust when cleaning up.
• Get permission before using a water hose to clean up.
• The area below must be guarded before allowing any material to
fall freely from one level to another.
• All flammable materials must be kept in suitable containers with
proper labels.
• Dispose of scrap in the proper bins, to avoid injuries at the
disposal sites.
• Keep domestic garbage bins closed and keep the area around them
clean, so bears and other wildlife don’t become a problem!
• Keep extension cords and hoses well away from stairs and walkways
– hang them overhead if you can.
Material Storage: Only store materials in the designated area
assigned for that job.
• Stacks or piles of materials must be secure.
• Use warehouse boxes for smaller items, and don’t overload
shelving or racking.
• Do not store materials under overhead power lines or hazardous
process pipelines.
• Secure all loose or light-weight material stored on roofs or
scaffolding, so the wind can’t blow them off.
Following good housekeeping practices will prevent injuries and
incidents!
Does anyone have any questions about how to do their job safely
today?
DM # 561772
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561772
Ontario Operations
2017 PMP - Daily Safety Message Details
Housekeeping Context: Many injuries and other incidents result from
poor housekeeping, improper storage of materials, and cluttered
work areas. Cleaning up the worksite throughout the shift will help
eliminate tripping and falling hazards, and allow you to work more
safely and efficiently. After you have completed a task, always
clean up before moving on to the next task. This includes removing
all debris, and any tools and equipment that are no longer being
used.
Housekeeping: Jobsite cleanup is mandatory on each shift, as per
the OHSA Construction Regulations. Good housekeeping is the
responsibility of each worker. Keep stairs, walkways and emergency
exits clear at all times, and don’t obstruct emergency equipment
such as safety showers, eyewash stations, or firefighting
equipment. Keep hoses and extension cords well away from stairs and
walkways – hang them overhead and/or route them under the floor
below if possible. Control dust when cleaning up. Get permission
before using a water hose to clean up. Use proper PPE for all
clean-up tasks. Dispose of scrap material in the proper bins, to
avoid injuries at the disposal sites. Keep domestic garbage bins
closed and keep the area around them clean, so bears and other
wildlife don’t become a problem! Do not move bins – they’ve been
placed to provide good access for users, and to minimize hazards
while emptying them such as overhead power lines & process
piping, proximity to walkways, etc…. The area below must be guarded
before allowing any material to fall freely from one level to
another, and dust, noise, etc… must be controlled. Openings in the
floor or swing-gates used for access to chutes / dumpsters must be
guarded and warning signs posted.
Material Storage: Only store materials in the designated area
assigned for that job. Feed or unconsolidated materials must be
piled with the proper angle of repose to prevent uncontrolled run
of material. Stacks or piles of other materials must be secure. Use
warehouse boxes for smaller items, and don’t overload shelving or
racking. Do not store materials within 3 feet of any electrical
panel. Do not store materials under overhead power lines or
hazardous process pipelines. As per the Ministry of Labour Health
and Safety Guideline (August 2004), the only way to eliminate the
hazard of mobile equipment contacting an energized overhead
transmission line is to prohibit the storage or placement of any
material under those lines. Secure all loose or light-weight
material stored on roofs or scaffolding, so the wind can’t blow
them off. Even light wind can blow sheet materials, insulation,
plywood etc. off of roofs or platforms when not well secured. Metal
siding, pipe cladding etc… can seriously injure workers
below.
Does anyone have any questions about how to do their job safely
today?
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561772
Reference Material:
• Occupational Health and Safety Act o O. Reg. 213/91, s.35(1) –
(5) o O. Reg. 854,s. 44(2), , s.53(b)
• Vale Golden Rules o Rule # 9. Chemicals and Hazardous
Substances
Only handle hazardous substances in accordance with the prescribed
controls.
• Vale SPI’s, Standards & Policies - see Extranet Site
http://extportal.vale.com/PMO/ o ENV-WM01 - Vale 3R’S Program
Waste bins are color coded: Domestic Waste - Red bins, Industrial
Waste (Solid Non- Hazardous) - Yellow bins, Scrap metal - Gray
bins, Recyclable Materials - Blue bins
O.Reg.102/94 – demolition projects must have a waste reduction work
plan as per the MOE Guideline “A Guide to Waste Audits and Waste
Reduction Work Plans for Construction and Demolition Projects”. The
contractor is responsible for the work plan.
• Vale Contract Requirement Documents - see Extranet Site
http://extportal.vale.com/PMO/ o General Requirements for Ontario
Operations
Section 1.1.19 Fire / Explosives Protection Section 1.1.20
Housekeeping Section 1.3.1 Waste Disposal Section 1.8.5 Storage and
Laydown Areas
• Vale Extranet Site http://extportal.vale.com/PMO/ o click on PMP
Safety, under Planned Maintenance Periods (PMP), for:
PMP Daily Safety Message Housekeeping DM# 561772 PMP Daily Safety
Message Housekeeping & Tripping Hazards DM# 561997 PMP Daily
Safety Message Material Storage, Piling and Stacking DM# 561970 PMP
Daily Safety Message Material Storage – Fire & Explosion
Hazards DM# xxxxxx Other resources and information
• IHSA Website IHSA Housekeeping Poster IHSA - W202 Housekeeping
Poster IHSA Safety Talk - Housekeeping
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Did you receive a safety message today? 2 What was the topic of
the safety message? 3 What hazards are associated with Housekeeping
on your jobsite? 4 Do you think all of those hazards are being
controlled properly? 5 Is there a better / safer way to manage
those risks? (Hierarchy of Controls) 6 How often do you do site
cleanup and housekeeping?
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A. Field Audit - Conditions / Documents Acceptable
Unacceptable
1 Site Access (Good housekeeping. No slipping / tripping hazards,
etc…)
2 Walkways / Stairways / Emergency Exits (No slipping / tripping
hazards. No combustibles.)
2 Work Areas (General housekeeping, no tripping hazards, well
organized work layout, etc…)
3 Electrical Panels (No materials stored within 1 meter. Protected
from water hazards during cleanup.)
4 Emergency Equipment (No obstructions at eyewash stations, safety
showers or firefighting equipment.)
5 Storage of Materials (Secure storage & stacking, Flammables
Storage labelled, etc…)
6 Trailer Sites (Stairs & walkways clear. Domestic waste &
combustibles disposed of.)
7 Laydown Areas (Stacks / piles of materials secured. Travelways
clear. Lightweight materials secured.)
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 561772
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561923
Ontario Operations
Barricades, Tags and Hazard Warning Signs
Context: Barricades, Tags and Warning Signs are used to protect
others from the hazards associated with our work.
• Construction and maintenance jobsites can be dangerous places if
hazards are not identified.
• There will be a lot of people onsite, including sub-contractors,
delivery people, and new/young workers.
• The hazards in an area may change at any time.
Barricades are also there to protect us from the hazards that we
don’t know about!
Get permission to enter a Roped-Off area every time you need to
enter!
Barricades, Tags and Signs: • Barricading or roping off an area
is
required if the area has: Fall hazards Overhead hazards Confined
Space hazards Hot work hazards, or fire / explosion
hazards Hazardous walkways Other hazards that could injure
someone
• The scene of a critical injury must also be roped off until the
MOL releases the site.
• Barricades: o Rope off with ¼” chain or 3/8”
polypropylene rope for temporary barricades, or install a solid
barricade with a gate.
o Note: “Caution Tape” can only be used for 24 hrs, and is not
allowed for Construction Projects.
• Tags & Signs: o Place a yellow “Roped Off Area”
tag at each entry point to a work area
o Each tag must include a contact name, department/company, cell
phone #, and the hazard(s) present.
o On Construction Projects, “DANGER DUE TO …” signs identifying the
hazards are also required at each entry point.
Accessing a Roped-off Area: • Get permission from the person
who
roped off the area, each and every time you need access.
• Conditions within the barricaded area may change at any
time.
Crossing a barricade without permission may put you or others in
serious danger!
Does anyone have any questions about how to do their job safely
today?
DM # 561923
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561923
Ontario Operations
2017 PMP - Daily Safety Message Details
Barricades, Tags and Hazard Warning Signs Context: Construction and
maintenance jobsites can be dangerous places if hazards are not
identified and managed well. There will be a lot of people onsite,
including sub-contractors, delivery people, and others. For many of
them, it will be their first time at that jobsite. Barricades, Tags
and Warning Signs are used to protect others from the hazards
associated with our work, and to protect us from the hazards we
don’t know about!
Barriers, Tags and Signs: Barricading or roping off an area is
required when work is being done that creates a hazard, where an
unsafe condition has been identified, or following a critical
injury or incident. Fall hazards such as open holes, damaged
flooring or handrails, or unguarded leading edges must be
barricaded at least 6 feet from point someone is exposed to a fall
hazard. Barricades must also be put up where there is potential for
materials falling from overhead, such as lifting or hoisting
operations, other work being done on the level above, or unsecured
structures. Hot work being done or other fire / explosion hazards,
confined spaces with possible atmospheric hazards, slippery or
otherwise unsafe walkways, or any other condition that could result
in an injury or incident are other examples of when to rope off or
otherwise barricade an area. The immediate area where a critical
injury has occurred must also be barricaded, pending an MOL
investigation or release of the site by the MOL. Use ¼” chain or
3/8” polypropylene rope for temporary barricades. Solid barricades
should be used wherever practical, or if barricading will be
required for more than 3 months. Note: “Caution Tape” does not meet
the requirements of the Construction Regulations, and even for
other work, it can only be used for 24 hrs. An approved yellow
“Roped Off Area” tag must be placed on the barricade at each entry
point to a work area, complete with a contact name,
department/company, cell phone #, and the hazard(s) present. On
Construction Projects, “DANGER DUE TO …” signs identifying the
hazards present are also required at each entry point.
Accessing a Roped-off Area: You must get permission from the person
who erected the barricade to enter each and every time you need to
access the barricaded area. Conditions within the barricaded area
may change at any time. Crossing a barricade without specific
permission may put you or others in serious danger.
Does anyone have any questions about how to do their job safely
today?
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561923
Reference Material:
• Occupational Health and Safety Act o O. Reg. 213/91 s.44(1) Signs
meeting the requirements of subsection (2) shall be posted in
prominent locations and in sufficient numbers to warn workers of a
hazard on a project. o O. Reg. 213/91 s.67 Traffic control,
barricades. o O. Reg. 854
• Vale Golden Rules o Rule # 1. The Fundamental Requirements
Only perform work that you are trained, qualified, authorized and
fit to perform.
• Vale SPI’s, Standards & Policies - see Extranet Site
http://extportal.vale.com/PMO/ o SAF-SPI-18 Barricading in Surface
Plants
Procedures to protect personnel from overhead hazards, open holes
or any other condition that must be protected using barricades in
surface plants.
• Vale Contract Requirement Documents - see Extranet Site
http://extportal.vale.com/PMO/ o General Requirements for Ontario
Operations
Section 1.1.11 Barricades • The Contracting Party is to secure the
work site with yellow tape/rope or suitable
barricades as per Vale’s SPI-18 Barricading in Surface Plants. •
Information on the yellow tag will be legible and include the cell
phone number of the
applicable authorizing person. • When the work is performed in
areas open to the Public, the Contracting Party shall
provide, erect and maintain adequate barricades, warning signs,
and/or traffic controls to provide for public safety.
• Warning signs and traffic controls in public areas shall be
illuminated and placed at a sufficient distance from the work to
allow members of the public to respond safely to the directions
provided, and visible in daylight or at night.
• Vale Extranet Site http://extportal.vale.com/PMO/ o click on PMP
Safety, under Planned Maintenance Periods (PMP), for:
various PMP Daily Safety Messages
• MOL Website
• IHSA Website
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Plant:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Did you receive a safety message today? 2 What was the topic of
the safety message? 3 Do you know who your Supervisor is, and how
to contact them? 4 Did you get a Jobsite Orientation? 5 Did it
include a tour and a PHR Review? 6 Who showed you where to lock and
tag out for your work today?
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A. Field Audit - Conditions / Documents Acceptable
Unacceptable
1 Barricades (In place where needed. Proper rope / chain or solid
barriers used. Access is reasonable.)
2 Tags & Signs (In place at all entry points. Proper tags /
signs used. Filled out properly & legible.)
3 Contract Contact List (Supervisor & SHE Rep’s names &
contact info listed. Vale Rep & JHSC listed)
4 Walkways / Stairways / Emergency Exits (Not obstructed, or
suitable alternate routes provided.)
5 Work Areas (No overlapping roped-off areas. Suitable space left
between areas for access by others.)
6 Electrical Panels (Not obstructed by barricades.)
7 Emergency Equipment (Not obstructed by barricades, or suitable
temporary measures in place.)
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 561923
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561995
Ontario Operations
Fall Protection – Anchor Points
Context: A fall protection system is only as good as its anchor
point. It doesn’t matter how well trained personnel are, how good
the equipment is, or whether or not the employee tied off correctly
– if the anchor point fails, the system fails.
Your anchor point will see very large forces if you fall. Think of
it this way – would you hang your truck from that anchor point? If
not, don’t use it!
Reminders: • Anchor Points: Anchor points must be selected by
a
competent person. When practical, anchor points should
be painted or tagged so workers know where to tie-off.
Permanent anchors must be engineered to Vale standards.
Temporary anchors must be able to withstand any load they might be
exposed to.
Don’t tie off to handrails, cable trays or piping systems.
Anchor points should be placed directly above the worker if
possible, to reduce the risk of Bottoming Out, and to avoid
swing-falls.
• Training All workers must have WAH training,
including anchor point requirements, and how to calculate fall
clearance distances.
• Alternatives Eliminate the risk of falls by installing
scaffolding or guardrails, or by changing how the work is
done.
Reduce the risk of falls by using manlifts or other
equipment.
Mitigate the risk by using a Self- Retracting Lanyard anchored
directly overhead.
Protect yourself from falls!
Does anyone have any questions about how to do their job safely
today?
DM # 561995
SM
FFD
SAE
DS
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561995
Ontario Operations
2017 PMP - Daily Safety Message Details
Fall Protection – Anchor Points Context: A fall protection system
is only as good as its anchor point. It doesn’t matter how well
trained personnel are, how good the equipment is, or whether or not
the employee tied off correctly – if the anchor point fails, the
system fails.
Anchor Points: Your anchor point will see very large forces if you
fall. Think of it this way – would you hang your truck from that
anchor point? If not, don’t use it! • Anchor points must be
selected by a competent person.
• When practical, anchor points should be painted or tagged so
workers know where to tie-off.
• Permanent anchors must be engineered to Vale standards.
• Temporary anchors must be able to withstand any load they might
be exposed to.
• Don’t tie off to handrails, cable trays or piping systems.
• Use an SRL anchored directly above the worker if possible, to
reduce the risk of Bottoming Out, and to avoid swing-falls. If your
anchor point is less than 20 feet above the next level down, with a
regular lanyard and shock absorber, you could bottom out.
Reminders: • Eliminate the risk of falls by installing scaffolding
or guardrails, or by changing how the work
is done. Reduce the risk of falls by using manlifts or other
equipment. If WAH is required, mitigate the risk by using
Self-Retracting Lanyards (review SRL manuals for
limitations).
• Workers doing WAH must have current WAH training from an
MOL-approved provider.
• When working within 2 metres of a Fall Hazard, where there is a
hazard of falling 1.8 meters (6 feet) or more, appropriate fall
protection equipment must be used. Appropriate anchor points must
be installed and used, as per Vale Engineering Standards and
SPI-35.
• Written rescue plans, suitable rescue equipment, and qualified
personnel must be supplied wherever fall protection equipment is
used. Rescue plans must be reviewed by the Vale Representative and
by all workers and rescue personnel involved, before starting the
work.
• When developing measures for fall protection, fall clearance
distances must be considered and appropriate mitigation measures
taken. Inspect all WAH equipment and PPE daily.
Does anyone have any questions about how to do their job safely
today?
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561995
Reference Material:
• Occupational Health and Safety Act o O. Reg. 854 Mines &
Mining Plants sec.14 (4) (a) - max. free fall distance is 1m (3ft)
o O. Reg. 213/91 Construction sec. 26.6(4) - The fall arrest system
shall be arranged so
that a worker cannot hit the ground, or an object, or level below
the work.
• Vale Golden Rules o Golden Rule #2: Working at Heights
Where there is a hazard of falling 1.8 metres or more, approved,
maintained and certified equipment for fall arrest and travel
restraint must be used.
• Vale SPI’s, Standards & Policies
o SPI-SAF-06 Fall Protection Standard for Fall Protection to
safeguard employees who work within 2 metres of a
Fall Hazard
A fall arrest system consists of a full body harness, an energy
absorber, a suitable connecting device, a suitable anchor point and
a written rescue plan.
o MGUID-50004 Working During Storms or Lightning Occurrences
Precautionary Guideline
If a storm warning has been issued or if lightning is detected,
suspend all outdoor work that poses an elevated risk due to
lightning strikes (such as work at heights being done outside) and
proceed to a safe area.
• Vale Contract Requirement Documents o Section 1.1.14 Working At
Heights
Written rescue plans, suitable rescue equipment, and qualified
personnel must be supplied wherever fall protection equipment is
used … all workers and rescue personnel involved must review the
rescue plans before starting the work
When developing measures for fall protection, fall clearance
distances must be considered and appropriate mitigation measures
taken
Appropriate tie off points must be installed / used
• Vale Extranet Site http://extportal.vale.com/PMO/ o click on
Working at Heights, under Reference Information, for:
numerous Toolbox Talks and Formal Safety Messages WAH Training
Resource links WAH Policies / Programs / Procedures / Guidelines /
Best Practices Templates for WAH Risk Assessments, Rescue Plans and
Fall Protection Plans WAH Audit forms Other WAH Resource
information
• IHSA Web Page - Fall Prevention & Working at Heights
• MOL Web Page – Fall Hazards
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Plant:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Will you have to do any Work At Heights today, or during the PMP?
2 Where did you get your WAH training? When? 3 What hazards are
associated with WAH on your jobsite? 4 What kinds of WAH PPE and
equipment will you use? 5 How do you identify your WAH anchor
points? 6 Do you know how to calculate Total Fall Distance, to
avoid Bottoming Out? 7 What is the Rescue Plan if you fall? 8 Is
there a better / safer way to do this task? (Hierarchy of
Controls)
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A. Field Audit - Conditions / Documents Acceptable
Unacceptable
1 Barricades & Signs (Area barricaded. “Danger: Open Hole”
signs in place at each entry point.)
2 Jobsite (Workers can tie off without fall hazard. No
slipping/tripping/head-knocker hazards near open holes.)
2 Anchor Point Type (Engineered. Secured to suitable
structure.)
3 Anchor Point Location (No risk of bottoming-out. No risk of swing
falls into hazards. Convenient to use.)
4 Lanyard / Rope Grab Assembly (Good condition. Correct
length/type. Correct usage.)
5 Shock Absorber / SRL (Good condition. Correct weight range.
Correct usage as per SRL manual.)
6 Harness (Good condition. Correct size & adjustment.)
7 Fall Zone (Clear of obstructions, no swing fall hazards.)
8 100% Tie-off At All Times (Workers tied off, equipment in place
to transfer to 2nd tie-off point if needed.) 9 Rescue Plan (Rescue
equipment in place, plan would work and doesn’t put rescue team at
risk.)
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 561995
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 712832
Ontario Operations
Musculoskeletal Disorders (MSD’s)
Musculoskeletal disorders (MSDs) are injuries to muscles,
connective tissues, or joints.
MSDs usually develop gradually over time and can become chronic
conditions.
Nearly half of all injuries reported are MSDs!
MSD’s:
o Exerting high forces,
o Doing repetitive tasks,
Examples of MSD’s include:
o Strains and sprains
o Lower back disorders
o Hand-arm vibration syndrome
o Carpal tunnel syndrome
o Pain, with or without movement
o Swelling and tenderness
o Stiffness
Prevent MSD’s by:
o Avoid over-exerting – get help or use a mechanical device.
o Avoid working in awkward positions, especially for long
periods.
o Avoid doing repetitive tasks for long periods – break up the
activity, or trade tasks with your partner.
o Use tools that are comfortable and easy to use.
o Control vibration exposure by selecting tools that transmit less
vibration, and using anti-vibration gloves.
Eliminate or control MSD hazards on your own if you can.
Talk to your supervisor:
o If you have concerns about MSD hazards.
o Or if you have suggestions on how to eliminate MSD hazards.
Report early signs and symptoms of MSD’s to your supervisor, and to
your doctor!
Does anyone have any questions about how to do their job safely
today?
DM # 712832
M S
D R
I S
K S
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 712832
Ontario Operations
Musculoskeletal Disorders (MSD’s)
Context:
Musculoskeletal disorders (MSD’s) are injuries of the muscles,
nerves, tendons, ligaments, joints, cartilage, or spinal discs.
Trades work can be physically demanding, involving lifting and
carrying heavy materials or equipment, standing / kneeling for
extended periods, climbing ladders, and working at heights or in
confined spaces. Exertion, awkward positions, hand-arm and
whole-body vibration, contact stress, and repetitive tasks can add
up over time to produce MSD’s such as chronic back pain or shoulder
problems, Hand-Arm Vibration Syndrome, Carpal tunnel syndrome or
Tendonitis. Nearly half of all injuries reported are MSDs!
Signs and symptoms include pain (with or without movement),
swelling, reduced range of motion, stiffness, tingling and / or
numbness.
Preventing MSD’s:
Plan and organize the work. Plan ahead to minimize material
handling tasks. Provide easy access to work materials. Store
equipment and materials between chest level and knee level to
minimize back, arm and shoulder strain. Store heavy items close to
the work location to reduce carrying distances, and use mobile
equipment to deliver materials as close to work areas as possible.
Have material delivered “just in time”, with package sizes &
quantities that minimize handling requirements. Use ramps when
moving materials up stairs or over uneven walkways. Reduce the
weight of toolboxes by removing any tools not needed for the job.
When practical, use a power elevated work platform to allow work to
be done at the optimal height, reducing stress on the neck and
upper arms.
Avoid overexertion. Use handling equipment and use proper lifting
& handling techniques. Eliminate or reduce manual lifting,
carrying, pushing, and pulling - use material-handling equipment
such as carts, dollies, pallet jacks, or lift trucks. Don’t lift a
load directly off the floor - use a three-point method to lift
heavy objects or long material by yourself: squat and lift one end
of the object, walk up the load, then lift the object from the
ground. Always use proper lifting techniques (use your legs, do not
bend over or lift with your back, keep the load close to your
body). Lifting from below waist height can put severe stress on
your back. Avoid forceful or jerky pushing or pulling movements.
Get help with large loads. Making more trips with small loads puts
less stress on the back than making fewer trips with large
loads.
Avoid awkward positions. Avoid constantly working on the floor, to
avoid injuries to back, hips, and knees from kneeling and bending
forward. Use a workbench a good work height. Position the work
between knee level and shoulder level when possible and avoid
working above shoulder level. To reduce muscle tension and improve
circulation, change your body position often, alternate tasks, and
stretch throughout the day. Do stretching and warm-up exercises
before starting work.
Avoid contact stress. Use mats, kneepads and elbow pads to protect
against contact stress when appropriate. Use a shoulder pad when
carrying heavy objects on your shoulder, to spread the load.
Select the right tools for the job And reduce vibration exposure.
Hand and power tools should have a comfortable handle with a good
grip, designed to be used with either hand, and should not require
a lot of force to operate. Choose lightweight power tools with low
vibration, and low kickback. Repeated exposure to moderate- and
high-intensity hand-arm vibration from hand-held power tools
(hammer drills, grinders, chipping guns, jackhammers, etc.) can
cause permanent health problems. Use tools that transmit less
vibration, use anti-vibration gloves, and limit the exposure
periods.
Report early signs and symptoms of MSDs to your supervisor, and to
your doctor!
Does anyone have any questions about how to do their job safely
today?
Supervisors / Vale Reps – review as preparation for Toolbox Talks /
Line-ups / Audits.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 712832
Reference Material:
o O. Reg. 213/91 s.37(1)
o O. Reg. 854
o Golden Rule #1. The Fundamental Requirements
Only perform work that you are trained, qualified, authorized and
fit to perform.
Vale SPI’s, Standards & Policies - see Extranet Site
http://extportal.vale.com/PMO/
Vale Contract Requirement Documents - see Extranet Site
http://extportal.vale.com/PMO/
Vale Extranet Site http://extportal.vale.com/PMO/
o click on PMP Safety, under Planned Maintenance Periods (PMP),
for:
PMP Daily Safety Message, Hand Protection – DM # 561999
PMP Daily Safety Message, Hand Injuries Interfere with Your Life –
DM # 562025
PMP Daily Safety Message, Musculoskeletal Disorders – DM #
712832
Other resources and information
OHSCO Resource Manual for the MSD Prevention Guideline for
Ontario
IHSA Guide W327 - Musculoskeletal Hazards and Controls: ICI - Pipe
Trades
IHSA MSD Risk Factors Safety Meeting Package
IHSA Resource Page – PPE
Reducing MSD hazards in the workplace
CSA Website
Personal Protective Equipment
The details listed above may not be up-to-date, always refer to the
source documents.
Audit Date:
Plant:
Interactive Audit - Workers #1 #2 #3 #4 #5 #6
1 Did you receive a safety message today?
2 What was the topic of the safety message?
3 What kinds of MSD injury hazards might come up in your
work?
4 What kinds of MSD prevention measures will you use today for your
work?
5 Do you have access to all of the tools and PPE that you might
need?
Were the worker’s responses appropriate? (Yes or No). Leave blank
if N/A.
Field Audit - Conditions / Documents Acceptable Unacceptable
1 Exerting High Forces
3 Repetitive Tasks
4 Vibration Exposure
Indicate the # of items observed under Acceptable and under
Unacceptable. Leave blank if N/A.
Please send Audits to
[email protected] DM # 712832
Auditor’s Comments:
Supervisors – review with your crew as part of your Toolbox Meeting
/ Line-up.
SHE Coordinators – complete the attached Jobsite Audit form and
submit. DM # 561999
Ontario Operations
Hand Protection
Context: You use your hands every day to work, and you also use
them to play sports or guitar or piano, and to pick up your
children. A serious hand injury can change your life forever. We
have more injuries to hands every PMP than to any other body part
except the eyes. The good news is, hand injuries are easy to
prevent!
Preventing Hand Injuries: • Plan and organize the work to
eliminate
hazards – keep hands away from: o Pinch points o Sparks and hot
particles from
grinding, or hot metal or slag from welding and burning
operations
o Abrasive particles from sand- blasting or media-blasting
o Solvents, acids and other hazardous materials
o Very hot or very cold surfaces o Sharp or jagged edges, or poin