UNOFFICIAL WEBSITE
COPY
2
NOT TO SCALEPHASE II
MILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\IS
_01.d
gn
16:4
605-
AU
G-2019
INDEX OF SHEETSLSI
UNOFFICIAL WEBSITE
COPY
3
NOT TO SCALEPHASE II
MILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
AR_
01.d
gn
16:4
705-
AU
G-2019
REVISIONS
ADDENDA AND LSI
UNOFFICIAL WEBSITE
COPY
?
MB
EXISTING SYMBOLS PROPOSED SYMBOLS
DRAINAGE SURVEY CONTROL & MONUMENTATION
UTILITY
MANMADE ROADSIDE FEATURES
NATURAL ROADSIDE FEATURES
UTILITY COMPANY FACILITIES
RIGHT-OF-WAY SYMBOLSRIGHT-OF-WAY SYMBOLS
TRAFFIC
LANDSCAPING
IDENTIFIERSCONSTRUCTION UTILITY COMPANY FACILITIES
PROPERTY MARKER - CONCRETE MON.
PROPERTY MARKER - IRON PIPE
HISTORIC RIGHT-OF-WAY BASELINE
EXISTING RIGHT-OF-WAY
EXISTING PROPERTY LINE
EXISTING EASEMENT
EXISTING DENIAL OF ACCESS
EXISTING R/W & DENIAL OF ACCESS
WOODS LINE BOUNDARY
DELINEATED WETLAND BOUNDARY LINE
SHRUBBERY
TREE STUMP
TREE - DECIDUOUS
TREE - CONIFEROUS
MARSH BOUNDARY LINE
HEDGEROW OR THICKET
GRASS LAWN
WALL - STONE
WALL - BRICK OR BLOCK
TRAFFIC SIGN AND POST
PILLAR OR MISCELLANEOUS POST
PILE - BRIDGE
PAVEMENT - RIGID
PAVEMENT - FLEXIBLE
PARKING METER AND POST
MAILBOX
LAMP AND POST - RESIDENTIAL
GUARDRAIL - WIRE ROPE
GUARDRAIL - STEEL BEAM
FLAG POLE
FENCE - STOCKADE OR SPLIT RAIL
CURB AND GUTTER
FENCE - CHAINLINK OR STRANDED
CURB
BOLLARD - WOOD POST
BOLLARD - STEEL POLE
RIPRAP - LINEAR FEATURE
RIPRAP - AREA FEATURE
DRAINAGE PIPE HEADWALL
DRAINAGE PIPE AND FLOW ARROW
DRAINAGE MANHOLE
DRAINAGE JUNCTION BOX
DRAINAGE INLET
DIRECTIONAL STREAM FLOW ARROW
DITCH OR STREAM CENTERLINE SURVEY BENCHMARK LOCATION
SURVEY TIE POINT LOCATION
SURVEY TRAVERSE POINT
POINT OF CURVATURE OR TANGENCY
POINT OF INTERSECTING TANGENTS
SOIL BORING LOCATION
UTILITY TEST HOLE LOCATION
CABLE TV DISTRIBUTION BOX
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC TRANSFORMER
POLE MOUNTED LUMINAIRE
GAS MANHOLE
GAS METER
GAS VALVE
GAS PUMP - SERVICE STATION
RAILROAD TRACKS
SANITARY SEWER MANHOLE
SANITARY SEWER VALVE
SANITARY SEWER CLEANOUT OR VENT
SEPTIC DRAIN FIELD
TELEPHONE BOOTH
TELEPHONE MANHOLE
S.D.F.
TELEPHONE TEST POINT
TRAFFIC - CONDUIT JUNCTION WELL
TRAFFIC - LIGHT POLE AND BASE
TRAFFIC - PEDESTRIAN POLE & BASE
TRAFFIC - SIGNAL CABINET & BASE
TRAFFIC - SIGNAL POLE AND BASE
UTILITY BOX
UTILITY POLE GUY WIRE ANCHOR
UTILITY POLE
WATER - FIRE HYDRANT
WATER METER
WATER VALVE
WELL HEAD
MANHOLE - UNDETERMINED OWNER
(X) REPRESENTS ASCE DEFINED SUE QUALITY LEVEL
R/W-DA
DA
EASEMENT TYPE
100+00
PL
PROPOSED RIGHT-OF-WAY BASELINE
TEMPORARY CONSTRUCTION EASEMENT
RIGHT-TO-ENTER
PROPOSED R/W & DENIAL OF ACCESS
PROPOSED RIGHT-OF-WAY
PROPOSED PERMANENT EASEMENT
PROPOSED DENIAL OF ACCESS
PROPOSED RIGHT-OF-WAY MONUMENT
UNDERDRAIN OUTLET
UNDERDRAIN
FOR CHANNELIZATION ISLANDS.)P.C.C. SIDEWALK - 6" (USE 8" DEPTH
P.C.C. SIDEWALK - 4"
RIPRAP
PIPE & DIRECTIONAL FLOW ARROW
TOPSOIL, SEED AND MULCHPAVEMENT REMOVAL -
PAVEMENT PATCH
MANHOLE
MAILBOX
LIMIT OF CONSTRUCTION
LATERAL OFFSET
JUNCTION BOX - DRAINAGE
IMPACT ATTENUATOR
GUARDRAIL END TREATMENT, TYPE 3
GUARDRAIL END TREATMENT, TYPE 2
GUARDRAIL END TREATMENT, TYPE 1
GUARDRAIL END ANCHORAGE
GUARDRAIL, TYPE 3
GUARDRAIL, TYPE 2
GUARDRAIL, TYPE 1
FLARED END / SAFETY END SECTION
FENCE - METAL / FENCE - WOOD
DITCH
DRAINAGE INLET
CURB OPENING WITH SIDEWALK
CURB OPENING - SUMP / ON GRADE
CURB & GUTTER, TYPE 4
CURB & GUTTER, TYPE 3
CURB & GUTTER, TYPE 2
CURB & GUTTER, TYPE 1
CURB, TYPE 2
CURB, TYPE 1 & TYPE 3
CONSTRUCTION SAFETY FENCE
CONSTRUCTION BASELINE
CLEAR ZONE
BUTT JOINT
BRICK PATTERNED SURFACE
BIOFILTRATION SWALE
CONCRETE SAFETY BARRIER - PERMANENT ADJUST BY CONTRACTOR
ADJUST BY OTHERS
CONCRETE SAFETY BARRIER
CURB OR CURB & GUTTER
CONVERT TO JUNCTION BOX
CONVERT TO DRAINAGE MANHOLE
CURB OPENING - SUMP / ON GRADE
CURB OPENING WITH SIDEWALK
CONSTRUCTION SAFETY FENCE
DRAINAGE INLET
DO NOT DISTURB
ENERGY DISSIPATOR
FENCE
FLARED END SECTION
FILL WITH FLOWABLE FILL
FILTRATION STRUCTURE
GUARDRAIL
JUNCTION BOX
MANHOLE
MONUMENT - RIGHT-OF-WAY
PIPE
RELOCATE BY CONTRACTOR
RELOCATE BY OTHERS
RELOCATE BY PROPERTY OWNER
REMOVE BY CONTRACTOR
REMOVE BY TRAFFIC CONTRACTOR
REMOVE BY OTHERS
SAFETY END SECTION
UNDERDRAIN / LENGTH
UNDERDRAIN OUTLET PIPE
LANDSCAPE PLANTINGS
SHRUBBERY
CONIFEROUS TREE
DECIDUOUS TREE
ITMS CONDUIT
SIGNAL CONDUIT
CONDUIT JUNCTION WELL
LUMINAIRE
PAVEMENT MARKINGS
PAVEMENT STRIPING
TRAFFIC SIGN
TOWN OF MILTON - WATERB.M.
T.P.
TV
E
EM
E
G
G.M.
G.V.
G.P.
S
S.V.
S.C.O.
B
T
T
J.W.
U
F.H.
W.M.
WV
WELL
D.I.
J.B.
C.B.
?
D
SIZE/TYPE LABEL
(TYPE LABEL)
(TYPE LABEL)
F.P.
LAMP
MB
P.M.
WL
C.M.
I.P.
100+00
TCE
RTE
R/W-DA
R/W
DA
PE
LOC
LO
100+00
CSF
CZ
BFS
RM
TC
A
C
A
C
B
XXX
C
XXX
CJB
XXX
CMH
XXX
C
O
CO
SW
PC
XX
PC-N
XXX
DI
XXX
DND
ED
XXX
F
XXX
FES
XXX
FF
C
GR
XXX
JB
XXX
MH
XXX
P
XXX
RL
C
RL
O
RL
PO
RM
C
RM
O
SES
XXX
UD
XXX
UDO
XXX
M
XXX
FS
XXX
CSF
ITMS-CON
SIG-CON
LS
XXX
PEDESTRIAN CONNECTION / TYPE
WITHOUT SIDEWALK SURFACE DETECTABLE WARNING SYSTEM
PEDESTRIAN CONNECTION / TYPE
TMIL-W
VER-C VERIZON - CABLE
LEGEND
4
PAVEMENT SECTION(S)
5" GRADED AGGREGATE BASE COURSE, TYPE B4" SUPERPAVE, TYPE C HOT-MIX
LSI
DELMARVA POWER AND ELECTRIC - UNDERGROUNDDPE-UG
PATCHING8" GRADED AGGREGATE BASE COURSE, TYPE B, 3" SUPERPAVE, BCBC, PATCHING3" SUPERPAVE, TYPE B HOT-MIX, PATCHING2" SUPERPAVE, TYPE C HOT-MIX, PATCHING
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\lg
_01.d
gn
16:4
705-
AU
G-2019
UNOFFICIAL WEBSITE
COPY
5
NOTESNOT TO SCALE
ADHERING TO THE STANDARDS SHALL BE INCIDENTAL TO THE OVERALL CONTRACT COSTS.
AS DETAILED IN SECTION 3.6 OF THE "DELAWARE EROSION AND SEDIMENT CONTROL HANDBOOK". ALL COSTS ASSOCIATED WITH
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADHERING TO THE CONSTRUCTION SITE POLLUTION PREVENTION SPECIFICATIONS6.
THE ADDITIONAL IMPERVIOUS AREA CREATED BY THIS PROJECT IS 0.8321 ACRES.5.
THE DISTURBED AREA FOR THIS PROJECT IS 0.2280 ACRES.4.
RIGHT-OF-WAY PLANS (WILL BE MADE AVAILABLE TO THE AWARDED CONTRACTOR)
CROSS SECTIONS
PROJECT FILES THAT WILL BE MADE AVAILABLE TO THE CONTRACTOR, INCLUDE:3.
BE SIGNED BY ALL PARTIES PRIOR TO THE DELIVERY OF ANY ELECTRONIC PROJECT FILES.
NOTE: THE DOCUMENT ENTITLED "RELEASE FOR DELIVERY OF DOCUMENTS IN ELECTRONIC FORM TO A CONTRACTOR" MUST
TERRAIN MODEL (DTM).
DESIGN FILE, IN .DGN FILE FORMAT, CONTAINING ONLY THE PROPOSED 3D TRIANGLES OF THE PROPOSED DIGITAL
BY DELDOT.
PROPOSED DIGITAL TERRAIN MODEL, IN .DTM FILE FORMAT, COMPATIBLE WITH SOFTWARE CURRENTLY USED
BY DELDOT.
EXISTING DIGITAL TERRAIN MODEL, IN .DTM FILE FORMAT, COMPATIBLE WITH SOFTWARE CURRENTLY USED
ASCII DATA FILES WITH COORDINATES AND ELEVATIONS FOR PROPOSED POINTS AS SELECTED BY THE ENGINEER.
ALL PLAN SHEETS, IN PDF FORMAT.
PROJECT FILES THAT WILL BE MADE AVAILABLE TO THE AWARDED CONTRACTOR, INCLUDE:2.
NONE
DETAILS", DATED 2018, INCLUDING ALL REVISIONS UP TO THE DATE OF ADVERTISEMENT.
SPECIFICATIONS", DATED AUGUST 2016 AND THE DELAWARE DEPARTMENT OF TRANSPORTATION "STANDARD CONSTRUCTION
THIS PROJECT IS TO BE CONSTRUCTED IN ACCORDANCE WITH THE DELAWARE DEPARTMENT OF TRANSPORTATION "STANDARD1.
7.
THE NEW PAVEMENT IS TO TIE INTO THE EXISTING PAVEMENT.
ALL PAVED AREAS (INCLUDING DRIVEWAYS) TO BE RECONSTRUCTED OR WIDENED SHALL BE SAWCUT AT THE POINT WHERE12.
NO ADDITIONAL PAYMENT WILL OCCUR FOR OFFSITE STOCKPILING.
TO THE APPROVAL OF THE ENGINEER, STOCKPILE AREA MAY BE LOCATED OUTSIDE OF THE PROJECT LIMITS, IF NECESSARY,
MATERIAL REQUIRED FOR THE PROJECT IN ACCORDANCE WITH SECTION 908.01 OF THE STANDARD SPECIFICATIONS. SUBJECT
THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AN AREA SUITABLE FOR STOCKPILING BORROW, TOPSOIL, AND OTHER FILL14.
DEPARTMENT'S STORMWATER ENGINEER OR THE APPROPRIATE CONSTRUCTION ENGINEER.
SUPPORT SECTION. A COPY OF THE GENERAL PERMIT OR THE NOI CAN BE OBTAINED UPON REQUEST FROM EITHER THE
GENERAL PERMIT AND NOI IS KEPT ON FILE IN EACH OF THE CONSTRUCTION OFFICES AND THE DEPARTMENT'S TEAM
WITH THE NPDES INDUSTRIAL PERMITTING REQUIREMENTS FOR THIS CONSTRUCTION PROJECT. A COPY OF THE NPDES
COMPLIANCE WITH DELDOT'S APPROVED SEDIMENT AND STORMWATER MANAGEMENT PLANS WILL CONSTITUTE COMPLIANCE
THIS PROJECT IS COVERED UNDER A "NPDES" GENERAL PERMIT FOR CONSTRUCTION, UNDER THE GENERAL PERMIT,13.
SECTION 900
CONSTRUCTION. CONTACT THE CITY MANAGER AT 302-684-2649.
THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION ACITIVTY WITH THE TOWN OF MILTON PRIOR TO THE START OF 25.
EQUIPMENT
THE CONTRACTOR SHALL NOT USE THE RECONSTRUCTED TIMBER BRIDGE AS A HAUL ROAD FOR MATERIALS, VEHICLES, OR 23.
THE CONTRACTOR SHALL NOT USE THE PROPOSED TRAIL AS A HAUL ROAD AFTER IT HAS BEEN PAVED.22.
MATERIALS WITHIN THE CONTRACT LIMITS.
GRADE, AND PAVE THE TRAIL TO THE PLANNED GEOMETRY, AND/ OR FOR SUPPLY AND MOVEMENT OF ALL REQUIRED
CONSIDERED FOR SITE ACCESS, REQUIRED NON-CONVENTIONAL EQUIPMENT, THE CONTRACTORS ABILITY TO EXCAVATE,
MATERIALS TO THE WORK AREA, AND TO SUCCESSFULLY PAVE THE TRAIL. NO ADDITIONAL COMPENSATION WILL BE
NON-CONVENTIONAL PAVING EQUIPMENT AND SMALL TRUCKS MAY BE REQUIRED TO SUPPLY ALL OR A PORTION OF THE
AVAILABLE WORKING SPACE, AND MOVEMENT OF MATERIALS AND EQUIPMENT WITHIN THE WORK ZONE. SMALL,
THE CONTRACTOR IS ENCOURAGED TO VISIT THE SITE PRIOR TO BIDDING. ATTENTION SHOULD BE PAID TO SITE ACCESS, 21.
ENGINEER. ALL COSTS INCIDENTAL TO THE CONTRACT.
THE CONTRACTOR SHALL MAINTAIN ACCESS TO ALL RESIDENTS AND BUSINESSES, UNLESS OTHERWISE DIRECTED BY THE 17.
ADA STANDARDS. ALL COSTS ARE INCIDENTAL TO THE ITEMS BEING INSTALLED.
PROPOSED CONSTRUCTION. ALL DRIVEWAY CROSSING AND CURB RAMPS SHALL CONFORM TO CURRENT DEPARTMENT AND
CROSS SLOPES SHALL BE A MAXIMUM OF 2% AND ALL TRAIL RUNNING SLOPES SHALL BE A MAXIMUM OF 5% ALONG THE
DELDOT PEDESTRIAN ACCESSIBILITY STANDARDS FOR FACILITIES IN THE PUBLIC RIGHT OF WAY MANUAL. ALL PATH
THE CONTRACTOR SHALL INSTALL ALL PATHS TO CONFORM TO CURRENT ADA STANDARDS OUTLINED IN THE 2018 16.
IMPACTED. SEE THE ENVIRONMENTAL COMPLIANCE SHEETS FOR THE LOCATIONS OF THOSE RESOURCES.
15. NO ENVIRONMENTAL PERMITS ARE REQUIRED FOR THIS WORK PROVIDED NO JURISDICTIONAL WETLANDS OR WATERS ARE
( )
( )
( X )
( )
( )
( )
( )
( )
PROJECT NOTESGENERAL NOTES MISCELLANEOUS
CONNECTION OR ADJACCENT SIDEWALK PANELS IS INCURRED AS A RESULT OF CONSTRUCTION ACCESS.
INTERSECTION OF THE TRAIL AND FEDERAL STREET, AS DIRECTED BY THE ENGINEER, IF DAMAGE TO THE PEDESTRIAN
THE CONTRACTOR SHALL RECONSTRUCT THE PEDESTRIAN CONNECTION AND/ OR ADJACENT SIDEWALK PANELS AT THE 27.
LSI
AT THE DISCRETION OF THE ENGINEER, SHALL BE REPAIRED AND/OR REPLACED IN KIND AT THE CONTRACTOR'S EXPENSE.
ANY DAMAGE DONE BY THE CONTRACTOR TO ITEMS NOTED TO BE RELOCATED OR RESET BY OTHERS OR BY THE CONTRACTOR,1.
SECTION 100
HYDRAULIC DATA:
25 YEARSDESIGN FREQ.: 12.303 sq. miles DRAINAGE AREA:
122.18 cfs100-YEAR DISCHARGE: 122.48 cfs DESIGN DISCHARGE:
8.99 ftPROPOSED (DESIGN STORM) WSE: 9.00 ft EXISTING (DESIGN STORM) WSE:
2.07 fpsPROPOSED (DESIGN STORM) VELOCITY: 1.69 fps EXISTING (DESIGN STORM) VELOCITY:
9.76 ftPROPOSED 100-YEAR WSE: 9.69 ft EXISTING 100-YEAR WSE:
2.16 fpsPROPOSED 100-YEAR VELOCITY: 1.72 fps EXISTING 100-YEAR VELOCITY:
1035 sq. ftPROPOSED WATERWAY OPENING: 1109 sq. ft EXISTING WATERWAY OPENING:
(A) DELDOT BRIDGE DESIGN MANUAL, 2019 EDITION
2016.
(B) PROVIDE MATERIALS AND PERFORM WORK IN ACCORDANCE WITH THE DELDOT STANDARD SPECIFICATIONS, AUGUST
SCOUR ANALYSIS:
25 YEARS SCOUR DESIGN FREQUENCY:
221.05 cfsSCOUR DESIGN FLOOD DISCHARGE:
2.07 fps (AT BRIDGE OUTLET)SCOUR DESIGN FLOOD VELOCITY:
7.42 ft (IMMEDIATELY UPSTREAM OF BRIDGE)WATER SURFACE ELEVATION:
2.33 (PIERS)
1.5 ft (ABUTMENTS)CALCULATED SCOUR DEPTH AT EACH SUBSTRUCTURE UNIT:
LOADING:
-DEAD LOADS DO NOT INCLUDE FUTURE WEARING SURFACE OR STAY-IN-PLACE FORMS
-DESIGN LIVE LOADS INCLUDE PEDESTRIAN AND H20 LOADING.
-LIVE LOAD DEFLECTION SHALL BE LIMITED TO L/1200.
-BARRIERS HAVE BEEN DESIGNED FOR NCHRP 350 TEST LEVEL 2 (TL-2).
BRIDGE DESIGN SPECIFICATIONS:
-ALL EXISTING DIMENSIONS AND ELEVATIONS SHOWN ARE BASED ON THE BEST AVAILABLE INFORMATION AND ARE
APPROXIMATE ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DIMENSIONS, GEOMETRY, AND ELEVATIONS AS
NECESSARY PRIOR TO ORDERING ANY MATERIALS AND COMMENCING CONSTRUCTION TO ENSURE PROPER FIT OF THE
PROPOSED CONSTRUCTION. PAYMENT SHALL BE INCIDENTAL TO ITEM #763501 - CONSTRUCTION ENGINEERING.
-THE CONTRACTOR SHALL NOT CONSIDER ANY OF THE DATA ON THE EXISTING STRUCTURE SUPPLIED IN THE ORIGINAL
DESIGN DRAWINGS OR MADE AVAILABLE BY THE DEPARTMENT OR ITS AUTHORIZED AGENTS AS POSITIVE REPRESENTATIONS
OF ANY OF THE CONDITIONS THAT WILL BE ENCOUNTERED IN THE FIELD.
OF THE CONTRACTOR AND INCIDENTAL TO THE PIPE ITEM THAT IS BEING VIDEO INSPECTED.
CLEANING PRIOR TO VIDEO INSPECTION AND MAINTENANCE OF TRAFFIC DURING THE VIDEO INSPECTION ARE THE RESPONSIBILITY
EXPENSE. THE DEPARTMENT WILL VIDEO INSPECT NEW PIPE RUNS TO CONFIRM CONDITION PRIOR TO ACCEPTANCE. PIPE
DRAINAGE STRUCTURES DUE TO CONTRACTOR OPERATIONS SHALL BE REPAIRED OR REPLACED IN-KIND AT THE CONTRACTOR'S
THE FINAL DRAINAGE SYSTEM AND AGREE ON THE CONDITION PRIOR TO CONSTRUCTION. DAMAGES TO EXISTING PIPES AND
THE DEPARTMENT AND THE CONTRACTOR SHALL INSPECT ALL EXISTING PIPES AND DRAINAGE STRUCTURES TO BE USED IN8.
SECTION 600
28.
29.
30.
31.
32.
DIRECTED BY THE ENGINEER. ALL COSTS ARE PAID UNDER THE RESPECTIVE ITEMS BEING INSTALLED.
ALL DISTURBED AREAS WITHIN THE LIMIT OF CONSTRUCTION, SHALL BE TOPSOILED (6" MINIMUM), AND SEEDED AS11.
FOR UNDER ITEM #762001 - SAWCUTTING, CONCRETE, FULL DEPTH.
FULL DEPTH, UNLESS OTHERWISE NOTED ON THE PLANS OR DIRECTED BY THE ENGINEER AND SHALL BE PAID
BE SAWCUT AT THE TIE-IN POINT OR MEET THE NEAREST EXISTING SIDEWALK JOINT. ALL SAW CUTTING SHALL BE
WHERE PROPOSED CONCRETE SIDEWALK IS CONSTRUCTED TO MEET EXISTING SIDEWALK, THE EXISTING SIDEWALK SHALL10.
TRANSITIONING SHALL BE INCIDENTAL TO THE PROPOSED CURB ITEM.
CURB SHALL BE TRANSITIONED IN 10 LINEAR FEET OR AS DIRECTED BY THE ENGINEER IN THE FIELD. PAYMENT FOR
IN AREAS WHERE PROPOSED CURB MEETS EXISTING CURB AND THE TWO CURB TYPES ARE NOT SIMILAR, THE PROPOSED9.
SECTION 700
DIRECTRED BY THE ENGINEER IN THE FIELD. ALL COSTS PAID FOR UNDER ITEAM #201000 - CLEARING AND GRUBBING
THE CONTRACTOR SHALL REMOVE ALL DEAD TREES AND LIMBS OVERHANGING THE TRAIL WITHIN THE PROJECT LIMITS, AS 20.
EXISTING CONDITIONS:
PRIOR TO INSTALLATION. ALL COSTS INCIDENTAL TO ITEM #763621 - CONSTRUCTION ENGINEERING, REHABILITATION.
THE LOCATIONS OF ALL ABOVE GROUND ITEMS TO BE INSTALLED, SUCH AS SIGNS, ETC. SHALL BE VERIFIED BY THE ENGINEER 18.
CONSTRUCTION AT 302-576-6006.
THE CONTRACTOR SHALL CONTACT THE CHIEF OF SCHEDULING FOR DART FIRST STATE, 14 DAYS PRIOR TO THE START OF 19.
AND FINAL DISPOSAL SHALL BE INCIDENTAL TO THE ITEM #202000 - EXCAVATION AND EMBANKMENT.
STOCKPILING MATERIAL, MOVING ANY MATERIAL FROM ANY STOCKPILES, WETTING AND/OR DRYING THE MATERIAL, OR REMOVAL
ELSEWHERE ON THE PROJECT SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR. ALL COSTS ASSOCIATED WITH
BE MEASURED FOR PAYMENT. ALL MATERIALS ENCOUNTERED IN THE EXCAVATIONS OF THE PROJECT THAT ARE NOT USED
REQUIREMENTS. HOWEVER, MOVING THE MATERIAL FROM THE STOCKPILE AND THEN UTILIZING THE MATERIALS SHALL NOT
OF ITS INTENDED USE. THE CONTRACTOR MAY, WITH APPROVAL OF THE ENGINEER, STOCKPILE MATERIALS TO MEET THESE
CONTRACTOR TO DRY OR WET THE MATERIALS, IF NEEDED, SO THAT THE MATERIALS WILL MEET THE REQUIREMENTS
ENGINEER SHALL BE INCIDENTAL TO THE ITEM THAT GENERATED THE MATERIAL. IT SHALL BE THE RESPONSIBILITY OF THE
ELSEWHERE WITHIN THE PROJECT. PAYMENT FOR PLACING THESE BORROW MATERIALS AT LOCATIONS AS DIRECTED BY THE
MATERIALS AS MAY BE FOUND IN THE EXCAVATIONS THAT ARE DETERMINED BY THE ENGINEER TO BE SUITABLE FOR USE
THE CONTRACTOR, WITH THE APPROVAL OF THE ENGINEER, SHALL BE DIRECTED TO USE ON THE PROJECT BORROW6.
SHALL BE INCIDENTAL TO ITEM #202000 - EXCAVATION AND EMBANKMENT.
DISPOSED OF OUTSIDE THE PROJECT AREA. ALL COSTS ASSOCIATED WITH THE REMOVAL AND DISPOSAL OF THIS MATERIAL
UNSUITABLE MATERIALS FROM ROADWAY AND UNDERCUT EXCAVATION SHALL NOT BE USED AS FILL AND SHALL BE LEGALLY5.
WITH THIS WORK SHALL BE INCIDENTAL TO ITEM #211000 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS.
HAZARDOUS MATERIALS (i.e. creosote timber) SHALL BE HANDLED AS PER SPECIAL PROVISIONS 202560. ALL COSTS INVOLVED
THE CONTRACTOR IS ADVISED THAT THE EXISTING STRUCTURE OVER INGHRAM BRANCH MAY CONTAIN CREOSOTED TIMBER. ALL 4.
NOT BE LIMITED TO THE FOLLOWING: EXISTING TIMBER ABUTMENTS, WING WALLS, AND RAILROAD TIES ON THE TIMBER STRUCTURE
ITEMS TO BE REMOVED UNDER ITEM # 211000 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS SHALL INCLUDE BUT3.
ITEM #201000 - CLEARING AND GRUBBING.
DAYS PRIOR TO THE PRUNING OPERATION. ALL COSTS ASSOCIATED WITH THE ABOVE WORK TO BE PAID UNDER
CONTRACTOR SHALL NOTIFY DELDOT'S ROADSIDE ENVIRONMENTALIST ADMINISTRATOR AND/OR HIS DESIGNEE, AT LEAST TWO (2)
EXISTING TREE AND SHRUB BRANCHES, WHICH OVERHANG THE TRAIL, IN ACCORDANCE WITH I.S.A. STANDARDS. THE
ON EITHER SIDE OF THE TRAIL CENTERLINE. THE CONTRACTOR SHALL PRUNE
ACHIEVE A VERTICAL CLEAR SPACE OF 15 FEET ABOVE THE PROPOSED TRAIL ELEVATION AND A 12 FOOT HORIZONTAL CLEARNCE
IN AREAS WHERE TREES OR SHRUBS WILL BE OVERHANGING THE PROPOSED TRAIL, PRUNING MAY BE NECESSARY TO2.
SECTION 200
WHICH IS DONE BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED IN KIND AT THE CONTRACTOR'S EXPENSE.
DIRECTED BY THE ENGINEER. ALL COSTS SHALL BE INCIDENTAL TO ITEM #201000. ANY DAMAGE TO THESE AMENITIES
ARE NOTED BY "DND" SHALL BE PROTECTED BY THE CONTRACTOR WITH SAFETY FENCE OR OTHER MEASURES AS
ROADSIDE AMENITIES WITHIN THE LIMITS OF CONSTRUCTION OR EASEMENT AREAS THAT ARE TO REMAIN IN PLACE AND
TIME OF EXCAVATION. ALL COSTS PAID FOR UNDER ITEM #202000 - EXCAVATION AND EMBANKMENT.
FOLLOW THE CONTAMINATED MATERIAL MANAGEMENT PLAN FOR INSTRUCTION ON HOW TO HANDLE THE MATERIALS AT THE
THE CONTRACTOR SHALL CONSIDER ALL SOIL EXCAVATED FROM THE RAIL BED TO BE HAZARDOUS. THE CONTRACTOR SHALL 24.
THE ENGINEER IN THE FIELD. ALL COSTS PAID UNDER ITEM #201000 - CLEARING AND GRUBBING.
FIELD. THE CONTRACTOR SHALL REMOVE ANY TRASH AND/ OR DEBRIS WITHIN THE RAILROAD RIGHT-OF-WAY AS DIRECTED BY
THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE THOUGHOUT PROJECT LIMITS AS DIRECTED BY THE ENGINEER IN THE 26.
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
PN.d
gn
16:4
805-
AU
G-2019
UNOFFICIAL WEBSITE
COPY
L F LLC
4"
NOT TO SCALE
O.G. O.G.
GRADING
SAFETY
GRADING
SAFETY
VARIES
5"
L B
VARIES
D I H G
3" 3" 2"
VARIES
EXISTING
MATCH
AND
SAWCUT
LAVINIAN ROAD
8"
MAX3:1
MAX
6:1
MAX
6:1
MAX
3:1
TYPICAL SECTION - LAVINIA ROAD BIKE LANE
2% MAX *
*CROSS SLOPE INVERTED
*STATION 129+33.00 TO STATION 134+40.00
AND
STATION 125+00.00 TO STATION 127+00.00
AND
STATION 101+45.00 TO STATION 123+00.00
6
A
B
C
D
F
G
LEGEND
ITEM 209006 - BORROW, TYPE F
ITEM 301001 - GRADED AGGREGATE BASE COURSE, TYPE B
ITEM 301002 - GRADED AGGREGATE BASE COURSE, TYPE B, PATCHING
ITEM 401005 - BIT. CONC., SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE)
H
I
K
L
ITEM 401030 - BIT. CONC., SUPERPAVE TYPE B, PG 64-22 (CARBONATE STONE), PATCHING
ITEM 401031 - BIT. CONC., SUPERPAVE BCBC, PG 64-22 (CARBONATE STONE), PATCHING
ITEM 908004 - TOPSOIL, 6" DEPTH
LOC
SEE GRADES AND GEOMETRICS
VARIES
R/W BASELINE
O.G.
AND R/W BASELINE
CONSTRUCTION
R/W
EXISTING
R/W
EXISTING
LOC LOC
TYPICAL SECTION - RAIL TRAIL
EXISTING 12' HOTMIX TRAVEL LANE
R/W
EXISTING
MAX
3:1
L
VARIES LOC
ITEM 908014 - PERMANENT GRASS SEEDING, DRY GROUND
NOTES:
EXISTING DRAINAGE SWALES TO REMAIN UNLESS OTHERWISE NOTED ON PLANS.3.
PROJECT.
THE PAY ADJUSTMENT FACTOR FOR COMPACTION WILL BE WAIVED FOR THIS 4.
PGA
ITEM 727510 - WOOD RAIL FENCE (SEE CONSTRUCTION DETAILS, SHEET 31)
ITEM 401029 - BIT. CONC., SUPERPAVE TYPE C, 160 GYR., PG 64-22 (CARBONATE STONE), PATCHING
MEET THE DELDOT STANDARD SPECIFICATIONS.
APPRIOVED MATERIAL. THE CONTRACTOR SHALL COMPACT ALL MATERIALS TO
SHALL BE EXCAVATED TO THE DEPTH OF STABLE SOIL AND BACKFILLED WITH
PLACEMENT OF THE SUBBASE COURSE. ALL UNSUITABLE MATERIAL FOUND
THE CONTRACTOR SHALL LOAD TEST ALL SUBGRADE SOIL PRIOR TO THE 1.
ITEM 207021 - STRUCTURAL BACKFILL (BORROW, TYPE C)
STATION 302+70.00 TO STATION 303+50.00
J ITEM 708001 - GEOTEXTILE, STABILIZATION
32.5' 32.5'
SEE SHEET 10
HOTMIX TRAIL
OF PROPOSED 10'
INTERSECTION
CURB RAMP AT
PROPOSED PCC
TIE IN TO
PGA - PROFILE GRADE APPLICATION
O.G. - ORIGINAL GROUND
LOC - LIMITS OF CONSTRUCTION
ITEM 908020 - EROSION CONTROL BLANKET MULCH
E ITEM 302002 - DELAWARE NO. 3 STONE
TYPICAL SECTION - RAIL TRAIL - BRIDGE APPROACH
D K F DKC
VARIESVARIES
MAX
2:1
2% MAX *
MAX2:
1
4" 5"
AND R/W BASELINE
CONSTRUCTION
R/W
EXISTING
R/W
EXISTING
LOCLOC
PGA
O.G.
O.G.
*CROSS SLOPE INVERTED
*STATION 128+85.00 TO STATION 129+33.00
AND
STATION 127+00.00 TO STATION 127+60.00
CONCRETE, TYPE 'C', ITEM #401005.
THE CONTRACTOR SHALL PLACE ONE (1) FOUR-INCH LIFT OF BITUMINOUS 2.
6" MAX
VARIES
6" MAX
VARIES
A
VARIES
2.0' 10.0' HOTMIX TRAIL 3.0'
32.5' 32.5'
10.0' HOTMIX PATH
15.0' 13.0'
8.0' SHOULDER PATCH
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
TS_
01a.d
gn
10:2
516-
AU
G-2019
TYPICAL SECTIONSLSI
UNOFFICIAL WEBSITE
COPY
NOT TO SCALE
F C LC L
5"4"6"
GRADING
SAFETY
VARIES
L F C
L
K L5"4"
VARIES
B
VARIES
A
VARIES
ADJACENT TO RAIL TRAIL
TYPICAL SECTION - CONNECTOR PATH
ADJACENT TO CONNECTOR PATH
TYPICAL SECTION - RAIL TRAIL
MAX
3:1
MAX
6:12% MAX
MAX
3:1
MAX
6:12% MAX
MAX
3:1
7
NOTES:
A
B
C
E
F
G
LEGEND
ITEM 209006 - BORROW, TYPE F
ITEM 301001 - GRADED AGGREGATE BASE COURSE, TYPE B
ITEM 301002 - GRADED AGGREGATE BASE COURSE, TYPE B, PATCHING
ITEM 401005 - BIT. CONC., SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE)
H
I
J
K
ITEM 401030 - BIT. CONC., SUPERPAVE TYPE B, PG 64-22 (CARBONATE STONE), PATCHING
ITEM 401031 - BIT. CONC., SUPERPAVE BCBC, PG 64-22 (CARBONATE STONE), PATCHING
ITEM 908004 - TOPSOIL, 6" DEPTH
EXISTING DRAINAGE SWALES TO REMAIN UNLESS OTHERWISE NOTED ON PLANS.3.
PROJECT.
THE PAY ADJUSTMENT FACTOR FOR COMPACTION WILL BE WAIVED FOR THIS 4.
LOC
LOC
R/W
EXISTING
R/W
EXISTING
PE
EXISTING
O.G.
O.G.
AND R/W BASELINE
CONSTRUCTION
BASELINE
CONSTRUCTION
ITEM 908014 - PERMANENT GRASS SEEDING, DRY GROUNDL
PGA
PGA
ITEM 727510 - WOOD RAIL FENCE (SEE CONSTRUCTION DETAILS, SHEET 31)
ITEM 401029 - BIT. CONC., SUPERPAVE TYPE C, 160 GYR., PG 64-22 (CARBONATE STONE), PATCHING
MEET THE DELDOT STANDARD SPECIFICATIONS.
APPRIOVED MATERIAL. THE CONTRACTOR SHALL COMPACT ALL MATERIALS TO
SHALL BE EXCAVATED TO THE DEPTH OF STABLE SOIL AND BACKFILLED WITH
PLACEMENT OF THE SUBBASE COURSE. ALL UNSUITABLE MATERIAL FOUND
THE CONTRACTOR SHALL LOAD TEST ALL SUBGRADE SOIL PRIOR TO THE 1.
ITEM 207021 - STRUCTURAL BACKFILL (BORROW, TYPE C)
L F LLC
4"
O.G.
O.G.
GRADING
SAFETY
GRADING
SAFETY
VARIES
5"
L B
VARIES
VARIES
K
MAX
6:1
MAX
3:1
AND R/W BASELINE
CONSTRUCTION
R/W
EXISTING
R/W
EXISTING
LOC LOC
PGA
MAX
3:1MAX
6:12% MAX
B
VARIES
TRANSITION TO EMBANKMENT
TYPICAL SECTION - CONNECTOR PATH
TYPICAL, SEE BELOW
RAIL TRAIL -
2'
B
VARIES
A
SHOWN FROM PERSPECTIVE OF 200+00 ALIGNMENT - FACING WEST
STATION 200+50.00 TO STATION 200+80.00
SHOWN FROM PERSPECTIVE OF 100+00 ALIGNMENT- FACING EAST
STATION 123+00.00 TO STATION 125+00.00
SHOWN FROM PERSPECTIVE OF 100+00 ALIGNMENT - FACING EAST
STATION 200+80.00 TO STATION 202+50.00
ITEM 708001 - GEOTEXTILE, STABILIZATION
J
J
PGA - PROFILE GRADE APPLICATION
O.G. - ORIGINAL GROUND
LOC - LIMITS OF CONSTRUCTION
32.5'32.5'
32.5' 32.5'
MAX
3:1
L
ITEM 908020 - EROSION CONTROL BLANKET MULCH
D
ITEM 302002 - DELAWARE NO. 3 STONE
CONCRETE, TYPE 'C' - ITEM #401005.
THE CONTRACTOR SHALL PLACE ONE (1) FOUR-INCH LIFT OF BITUMINOUS 2.
NOTE 5
SEE
VARIES
NOTE 5
SEE
VARIES
15.0'
10.0' HOTMIX TRAIL 2.0'
1.0' 10.0' HOTMIX TRAIL 3.0'
2.0' 10.0' HOTMIX TRAIL 2.0'
ORIGINAL GROUND.
SHALL PLACE STRUCTURAL BACKFILL BENEATH THE BASE MATERIAL TO
GRAETER THAN 2'. ANY BACKFILL DEPTH LESS THAN 2', THE CONTRACTOR
- ITEM #207021) BENEATH THE BASE MATERIAL FOR ANY BACKFILL DEPTH
THE CONTRACTOR SHALL PLACE 2' OF STRUCTURAL BACKFILL (BARROW, TYPE C 5.
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
TS_
03.d
gn
11:1
516-
AU
G-2019
TYPICAL SECTIONSLSI
UNOFFICIAL WEBSITE
COPY
NOT TO SCALE
L F LLC
5"
8
A
B
C
D
F
G
LEGEND
ITEM 209006 - BORROW, TYPE F
ITEM 301001 - GRADED AGGREGATE BASE COURSE, TYPE B
ITEM 301002 - GRADED AGGREGATE BASE COURSE, TYPE B, PATCHING
ITEM 401005 - BIT. CONC., SUPERPAVE TYPE C, PG 64-22 (CARBONATE STONE)
H
I
J
K
ITEM 401030 - BIT. CONC., SUPERPAVE TYPE B, PG 64-22 (CARBONATE STONE), PATCHING
ITEM 401031 - BIT. CONC., SUPERPAVE BCBC, PG 64-22 (CARBONATE STONE), PATCHING
ITEM 908004 - TOPSOIL, 6" DEPTH
PE
PROPOSED
PE
PROPOSED
O.G.
O.G.
BASELINE
CONSTRUCTION
ITEM 908014 - PERMANENT GRASS SEEDING, DRY GROUNDL
PGA
ITEM 401029 - BIT. CONC., SUPERPAVE TYPE C, 160 GYR., PG 64-22 (CARBONATE STONE), PATCHING
4"
2% MAX 12:1 MAX
LOCVARIES
L
L F LC
5"
K
PE
PROPOSED
PE
PROPOSED
O.G.
BASELINE
CONSTRUCTION
PGA
4"
LOC LOC
PEDESTRIAN CONNECTION
TRANSITION TO MATCH
STATION 202+50.00 TO STATION 203+50.00
STATION 203+50.00 TO STATION 204+02.00
TYPICAL SECTION - CONNECTOR PATH - MATCH PEDESTRIAN CONNECTION
6:1 MAX6:1 MAX
VARIESVARIES
ITEM 207021 - STRUCTURAL BACKFILL (BORROW, TYPE C)
ITEM 727510 - WOOD RAIL FENCE (SEE CONSTRUCTION DETAILS, SHEET 31)
ITEM 708001 - GEOTEXTILE, STABILIZATION
2:1 MAX
LOC
B
ITEM 908020 - EROSION CONTROL BLANKET MULCH
NOTES:
EXISTING DRAINAGE SWALES TO REMAIN UNLESS OTHERWISE NOTED ON PLANS.3.
PROJECT.
THE PAY ADJUSTMENT FACTOR FOR COMPACTION WILL BE WAIVED FOR THIS 4.
MEET THE DELDOT STANDARD SPECIFICATIONS.
APPRIOVED MATERIAL. THE CONTRACTOR SHALL COMPACT ALL MATERIALS TO
SHALL BE EXCAVATED TO THE DEPTH OF STABLE SOIL AND BACKFILLED WITH
PLACEMENT OF THE SUBBASE COURSE. ALL UNSUITABLE MATERIAL FOUND
THE CONTRACTOR SHALL LOAD TEST ALL SUBGRADE SOIL PRIOR TO THE 1.
PGA - PROFILE GRADE APPLICATION
O.G. - ORIGINAL GROUND
LOC - LIMITS OF CONSTRUCTION
O.G.
E ITEM 302002 - DELAWARE NO. 3 STONE
CONCRETE, TYPE 'C', ITEM #401005.
THE CONTRACTOR SHALL PLACE ONE (1) FOUR-INCH LIFT OF BITUMINOUS 2.
8.5'
2.5'
4.5'
15.0' 10.0'
3.0'6.0' 10.0' HOTMIX TRAIL
10.0' HOTMIX TRAIL
10.0'
TYPICAL SECTION - CONNECTOR PATH
15.0'
L K L
K L
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
TS_
04.d
gn
11:2
216-
AU
G-2019
TYPICAL SECTIONSLSI
UNOFFICIAL WEBSITE
COPY
TP7
TP8
TP1
TP2
TP3
TP4
TP5
TP6
STATION NORTHING EASTING
CIRCULAR CURVE
N
3
STATION NORTHING EASTING STATION NORTHING EASTING
CIRCULAR CURVE 4 CIRCULAR CURVE 5 CIRCULAR CURVE 6
Delta: 1°05'38.18" Right
Tangent: 55.0186
Middle Ordinate: 0.2626
External: 0.2626
Tangent Direction: S 88°23'11.61" E
Radial Direction: S 1°36'48.39" W
Chord Direction: S 88°56'00.70" E
Radial Direction: S 0°31'10.20" W
Tangent Direction: S 89°28'49.80" E
PI ( 1012 ) 129+88.62 280404.8616 684420.7789
FEDERAL STREET
LAVINIA RO
AD
100+00
105+00
110+00
115+00
120+00
125+00
130+00 135+00
PO
B 10
0+00.00
PC 10
4+15.97
PR
C12
6+44.17
PR
C12
6+80.83
PT 12
7+38.64
PC 12
9+23.42
PR
C12
9+72.35
PR
C13
0+04.89
PT 13
1+14.92
POE 135+59.51
PI 11
5+44.16
PI 12
6+62.51
PI 12
7+09.76
PI 12
9+47.90
PI 12
9+88.62
PI 13
0+59.91
200+00
1
1
12
23
3445 6
4 5 6
7
7
7
88
9
8
9
9
STATION NORTHING EASTING STATION NORTHING EASTING
CIRCULAR CURVE 1 CIRCULAR CURVE 2
STATION NORTHING EASTING STATION NORTHING EASTING
CIRCULAR CURVE 8 CIRCULAR CURVE 9
STATION NORTHING EASTING
CIRCULAR CURVE 7
281046.3338 681951.6113 PC ( 1002 ) 104+15.97
2801046.3338 681951.6113 PI ( 1003 ) 115+44.16
286165.2087 684599.3136 CC ( )
280413.3542 684077.2440 PRC ( 1004 ) 126+44.17
Radius: 5763.0902
Delta: 22°09'08.95" Left
Degree of Curvature(Arc): 0°59'39.07"
Length: 2228.2057
Tangent: 1128.1920
Chord: 2214.3530
Middle Ordinate: 107.3525
External: 109.3902
Tangent Direction: S 62°39'00.18" E
Radial Direction: S 27°20'59.82" W
Chord Direction: S 73°43'34.66" E
Radial Direction: S 5°11'50.87" W
Tangent Direction: S 84°48'09.13" E
PRC ( 1004 ) 126+44.17 280425.8140 684077.2440
PRC ( 1006 ) 126+80.83 280421.3797 684113.6314
Radius: 600.0000
Delta: 3°30'03.56" Right
Degree of Curvature(Arc): 9°32'57.47"
Length: 36.6623
Tangent: 18.3368
Chord: 36.6566
Middle Ordinate: 0.2800
External: 0.2801
Tangent Direction: S 84°48'09.13" E
Radial Direction: S 5°11'50.87" W
Chord Direction: S 83°03'07.35" E
Radial Direction: S 8°41'54.43" W
Tangent Direction: S 81°18'05.57" E
280417.0053 684142.2237 PI ( 1007 ) 127+09.76
280421.3797 684113.6314 PRC ( 1006 ) 126+80.83
281014.4785 684204.3719 CC ( )
280415.4015 684171.1043 PT ( 1008 ) 127+38.64
Radius: 600.0000
Delta: 5°31'12.00" Left
Degree of Curvature(Arc): 9°32'57.47"
Length: 57.8053
Tangent: 28.9250
Chord: 57.7830
Middle Ordinate: 0.6960
External: 0.6968
Tangent Direction: S 81°18'05.57" E
Radial Direction: S 8°41'54.43" W
Chord Direction: S 84°03'41.57" E
Radial Direction: S 3°10'42.43" W
Tangent Direction: S 86°49'17.57" E
Radius: 600.0000
STATION NORTHING EASTING
PC ( 1009 ) 129+23.42 280405.1563 684355.5981
Delta: 4°40'21.01" Left
Degree of Curvature(Arc): 9°32'57.47"
Length: 48.9303
Tangent: 24.4787
Chord: 48.9168
Middle Ordinate: 0.4987
External: 0.4991
Tangent Direction: S 86°49'17.57" E
Radial Direction: S 3°10'42.43" W
Chord Direction: S 89°09'28.08" E
Radial Direction: S 1°29'38.59" W
Tangent Direction: S 88°30'21.41" E
PRC ( 1011 ) 129+72.35 280404.4373 684404.5096
Radius: 600.0000
Delta: 3°06'26.97" Right
Degree of Curvature(Arc): 9°32'57.47"
Length: 32.5416
Tangent: 16.2748
Chord: 32.5416
Middle Ordinate: 0.2206
External: 0.2207
Tangent Direction: N 88°30'21.41" E
Radial Direction: S 1°29'38.59" E
Chord Direction: S 89°56'25.10" E
Radial Direction: S 1°36'48.39" E
Tangent Direction: S 88°23'11.61" E
PRC ( 1013 ) 130+004.89 280404.4034 684437.0472
Radius: 5763.0902
Degree of Curvature(Arc): 0°59'39.07"
Length: 110.0339
Chord: 110.0322
280469.0952 683895.1692 PT ( 2003 ) 201+15.59
280370.4563 683878.7263 CC ( )
Radius: 100
Delta: 37°34'57.34" Left
Degree of Curvature(Arc): 57°17'44.81"
Length: 65.5940
Tangent: 34.0258
Chord: 64.4244
Middle Ordinate: 5.3302
External: 5.6303
Tangent Direction: N 42°57'12.11" W
Radial Direction: N 47°02'47.89" E
Chord Direction: N 61°44'40.78" W
Radial Direction: S 9°27'50.55" E
Tangent Direction: N 80°32'09.45" W
280499.9266 683771.0317 CC ( )
280501.4145 683761.1431 PT ( 2006 ) 202+58.66
Radius: 10.0000
Delta: 89°05'33.08" Right
Degree of Curvature(Arc): 212°57'28.06"
Length: 15.5496
Tangent: 9.8429
Chord: 14.0297
Middle Ordinate: 2.8732
External: 4.0315
Tangent Direction: N 80°32'09.45" W
Radial Direction: N 9°27'50.55" E
Chord Direction: N 35°59'22.91" W
Radial Direction: S 81°26'36.37" E
Tangent Direction: N 8°33'23.63" E
PC ( 2007 ) 203+53.28 280594.9830 683775.2214
Radius: 50.0000
Delta: 19°05'52.81" Left
Degree of Curvature(Arc): 114°35'29.61"
Length: 16.6662
Tangent: 8.4111
Chord: 16.5891
Middle Ordinate: 0.6928
External: 0.7025
Tangent Direction: N 8°33'23.63" E
Radial Direction: S 81°26'36.37" E
Chord Direction: N 0°59'32.78" E
Radial Direction: N 79°27'30.82" E
Tangent Direction: N 10°32'29.18" W
PC 200+50.0
0
PI 2
00+84.0
3
PT 20
1+15.5
9
PC 20
2+43.11
PT 20
2+58.6
6
PI 202+52.95
PC 203+53.28
PT 203+69.95 PI 203
+61.69P
OE 20
4+50.
00
POB 200+00.0
0
9
300 450
SCALE
1500
FEET
AMERICAN DATUM, NAD 83 (2007)
VERTICAL DATUM (NAVD, 1988) AND HORIZONTAL DATUM NORTH
ALL ELEVATIONS ARE BASED ON THE NATION GEODETIC
HORIZONTAL / VERTICAL CONTROL DATA
POINT NO. STATION OFFSET NORTHING EASTING ELEV.
100+28.00 231.41 281018.5734 681501.5774TP-1 30.13
106+74.61 823.29 280185.2095 681838.8850TP-2 30.58
113+06.93 600.01 280130.6500 682581.0974TP-3 30.91
119+69.93 510.57 280026.3890 683305.5849TP-4 32.40
119+97.61 234.90 280290.2627 683390.6382TP-5 32.78
115+03.17 167.51 280480.0455 682910.8475TP-6 33.48
110+29.12 177.92 280628.2903 682445.6672TP-7 30.39
105+37.20 158.65 280849.3516 681989.9653TP-8 29.98
1014
101310
10
1007
1006
2000
2001
2002
2003
1003
1002
2009
2007
2005
2010
2008
2006
2004
1001
1004
1005
1008 10
09
1011
1012 10
15
1016
279804.6413 684420.1535 CC ( )
PI ( 1014 ) 130+59.91 280402.8543 684437.0472
286165.2087 685499.3136 CC ( )
PT ( 1015 ) 131+14.92 280402.3554 684547.0603
281004.2333 684388.8657 CC ( )
PI ( 1010 ) 129+47.90 280403.7990 684380.0392
PRC ( 1011 ) 129+72.35 280404.4373 684404.5096
279828.2809 684022.8909 CC ( )
PI ( 1005 ) 126+62.51 280424.1529 684095.5055
PC ( 2001 ) 200+50.00 280438.5966 683951.9172
PI ( 2002 ) 200+84.03 280463.5004 683928.7319
PC ( 2004 ) 202+43.11 280490.0627 683769.3875
PI ( 2005 ) 202+52.95 280491.6812 683759.6786 PI ( 2008 ) 203+61.69 280603.3005 683776.4729
280602.4223 683725.7779 CC ( )
PT ( 2009 ) 203+69.95 280611.5696 683774.9341
PRC ( 1013 ) 130+04.89 280404.4034 684437.0472
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
HV.d
gn
16:5
205-
AU
G-2019
VERTICAL CONTROL
HORIZONTAL AND LSI
301+
00
302+00
304+00
305+00
306+00
307+00
PO
B 300+00.0
0
PO
E 307+01.9
7
401+
00
402+00
403+00
PC 400+00.00
PT 400+61.6
2
PC 402+98.12
PT 403+35.7
5
PI 4
00+30.8
4
PI 4
03+16.9
4
UNOFFICIAL WEBSITE
COPY
N
10
CP-01
CONSTRUCTION PLANPHASE II
MILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CP_
01.d
gn
17:0
005-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
100+00101+00
102+00103+00
104+00105+00 106+00
PC
1
DETAILS, SHEET 32)
(SEE CONSTRUCTION
ITEM NO. 720556
BOLLARD
PLACE 1 REMOVABLE
SHOULDER
MATCH PROPOSED
MATCH EXISTING
SAWCUT AND
EXISTING SIDEWALK
SAWCUT AND MATCH
DETAILS, SHEET 32)
(SEE CONSTRUCTION
STONE TRENCH
WV
+
+
+
+
+
CO
NC.
SID
EW
AL
K
LA
VINIA
RD
ABANDONED TRACK
WEST SHORE DR
301+00
302+00
303+00
304+00
305+00
306+00
307+00
PB 84-280
D/R 3301-160
EDWIN H. & VICTORIA K. HOFF, H/W
TP# 235-20.00-379.00
101 104 105 106
PB 84-280
D/R 3415-176
WILLIAM H. IRELAND
ROBERT A. IRELAND &
TP# 235-20.00-376.00
PB 84-280
D/R 3499-1
DEBORAH K. GUIDA, H/W
MICHAEL J. &
TP# 235-20.00-378.00
102
103
PB 84-280
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-381.00
PB 84-280
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-380.00
100
D/R 3770-221
CHARLES DAVID CAREY, III, TRUSTEE
TP# 235-20.00-2.00
201
D/R 2785-103
C.D.CAREY FARMS, LLC
TP# 235-20.00-14.00 200
32.5'
32.5'
32.5'
32.5'
PE
R
P.B. 84-280
EXIS
TIN
G 15' P
E
EXIS
TIN
G
PE
EXIS
TIN
G
PE
EXIS
TIN
G
PE
15'
15'
15'
MILTON R/W
TOWN OF
PB 84-280
D/R 3457-313
LORRAINE WASSERMAN
TP# 235-20.00-377.00
84-280
PE P
ER
P.B.
EXIS
TIN
G 15'
VARIES
D/R 1139-350
DELAWARE TRANSPORTATION AUTHORITY
STATE OF DELAWARE ACTING THROUGH THE
TP# 235-20.00-11.00
D/R 2614-328
SU-SAX ACRES, LLC
TP# 235-20.00-12.00
202
107
PB 84-280
D/R 4354-65
SIMMS
A. LIVINGSTON & BEATRICE L.
RICHARD J. LIVINGSTON, GALE
TP# 235-20.00-375.00
MA
TC
HLIN
E S
TA 10
6+
00
UNOFFICIAL WEBSITE
COPY
N
CP-02
CONSTRUCTION PLAN
11
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CP_
02.d
gn
17:0
005-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
106+00 107+00 108+00109+00
110+00
111+00
112+00
113+00
ABANDONED TRACK
ABANDONED TRACKABANDONED TRACK
107
108 109 110 111 112 113
PB 84-280
D/R 3388-346
EDWARD TETI
TP# 235-20.00-369.00
PB 84-280
D/R 3562-105
JOHN W. & LINDA SCHNEIDER
TP# 235-20.00-370.00
PB 84-280
D/R 4354-65
SIMMS
A. LIVINGSTON & BEATRICE L.
RICHARD J. LIVINGSTON, GALE
TP# 235-20.00-375.00
PB 84-280
D/R 3558-241
SANDRA H. ROSKOS
EDWARD J. &
TP# 235-20.00-374.00
PB 84-280
D/R 3515-159
MIKLOS G. & SUSAN A. MATHE
TP# 235-20.00-373.00
PB 84-280
D/R 4587-213
H/W
DANIEL A. & DIANE BITTERLE,
TP# 235-20.00-372.00
PB 84-280
D/R 3429-225
BYORICK
ROBERT B. & TERRY R.
TP# 235-20.00-371.00
202
D/R 2614-328
SU-SAX ACRES, LLC
TP# 235-20.00-12.00 200
32.5'
32.5'
32.5'
32.5'
32.5' 3
2.5'
PB 84-280
D/R 3340-42
CLAUDETTE CORSON
TP# 235-20.00-368.00
114
D/R 1139-350
DELAWARE TRANSPORTATION AUTHORITY
STATE OF DELAWARE ACTING THROUGH THE
TP# 235-20.00-11.00
115
PB 84-280
D/R 3300-104
SPRINGER, H/W
EDWARD G. & DELORES O.
TP# 235-20.00-367.00
MA
TC
HLIN
E S
TA 10
6+
00
MA
TC
HLIN
E S
TA 11
3+
00
UNOFFICIAL WEBSITE
COPY
SCALE
FEET
0 30 60 90
N
CP-03
CONSTRUCTION PLAN
12
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CP_
03.d
gn
17:0
005-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
113+00114+00 115+00 116+00
117+00118+00
119+00
120+00
ABANDONED TRACKABANDONED TRACK
TP6
115
PB 84-280
D/R 3300-104
SPRINGER, H/W
EDWARD G. & DELORES O.
TP# 235-20.00-367.00
116 117 118 119 120
PB 84-280
D/R 3355-102
HEIDI M. BORYS, H/W
EDWARD A. &
TP# 235-20.00-366.00
PB 84-280
D/R 3318-330
JOYCE P. QUINNAN, H/W
JOSEPH G. &
TP# 235-20.00-365.00
PB 84-280
D/R 3317-285
MARSHA D. SOMERS, H/W
RAYMOND E. &
TP# 235-20.00-362.00
PB 84-280
D/R 4623-131
SCHMIDT, TRUSTEES
CYNTHIA LUCY BOGART
JOHN C. SCHMIDT &
TP# 235-20.00-364.00
121
PB 84-280
D/R 3314-7
9 ROY & JOAN TURCI, H/W
TP# 235-20.
00-361.00
122
123
PB 84-280
D/R 3295-2
18 PATTERSON, H/WWILLIAM T. & KATHLEEN J. TP# 235-20.
00-359.00
200
32.5'
32.5'
32.5'
32.5'
PB 84-280
D/R 3886-145
PATRICIA A. ETTINGER
TP# 235-20.00-363.00
PB 84-280
D/R 3290-2
42WALTER A. HOFFTP# 235-20.
00-360.00
D/R 1139-350
DELAWARE TRANSPORTATION AUTHORITY
STATE OF DELAWARE ACTING THROUGH THE
TP# 235-20.00-11.00
202
D/R 2614-328
SU-SAX ACRES, LLC
TP# 235-20.00-12.00
MA
TC
HLIN
E S
TA 11
3+
00
MA
TC
HLIN
E S
TA 12
0+
00UNOFFICIAL
WEBSITE COPY
SCALE
FEET
0 30 60 90
N
DRAINAGE PIPE SCHEDULE
NO. SIZE / TYPE CLASS LENGTH SLOPE DIS. EL.INVERT EL.
CP-04
CONSTRUCTION PLAN
13
CURB SCHEDULE
NO. ITEM DESCRIPTION / TYPE LENGTH
1 25.00'P.C.C. CURB AND GUTTER, TYPE 3-8
FENCE SCHEDULE
NO. QTY. DESCRIPTION NOTES
3 190 LF WOOD RAIL FENCE, 4 FT. HIGH (ITEM 727510) STA. 200+75, 7.0' LT. TO STA. 202+50, MATCH F1
1 WOOD RAIL FENCE, 4 FT. HIGH (ITEM 727510) STA. 202+50, 14.0' LT. TO STA. 203+96, 14.0' RT. (+/-)
2 52 LF WOOD RAIL FENCE, 4 FT. HIGH (ITEM 727510) STA. 203+46, 9.0' RT. TO STA. 203+96, 9.0' RT. (+/-)
150 LF 21.1623.200.0196104V1 RCP12"
FLARED END SECTION SCHEDULE
NO. SIZE / TYPE SLOPE SAFETY GRATE
1 0.0196 NO12" RCP
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CP_
04.d
gn
17:0
105-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
EXISTING SIDEWALK
SAW-CUT AND MATCH
EXISTING SIDEWALK
SAW-CUT AND MATCH
120+00121+00 122+00 123+00 124+00
125+00126+00
P
1
F
1
F
2
C
1
PC
2
PER P.B. 84-280
AND ACCESS EASEMENT
EX. 15' DRAINAGE, UTILITY,
W.V.
F.H.
DND
DND
TMIL-W
TMIL-W
TMIL-W
(SEE CONSTRUCTION DETAILS, SHEET 32)
ITEM NO. 720556
PLACE 1 REMOVABLE BOLLARDEXISTING ROADWAY
SAW-CUT AND MATCH
09/31/2019
BETWEEN 04/15/2019 AND
SCHEDULED TO OCCUR
WATER MAIN INSTALLATION
PROPOSED TOWN OF MILTON
200+00
201+00202+00
203+00
204+00
204+52
204+52
F
3
14 S.Y. R-4 RIPRAP
RIPRAP
4 S.Y. R-4
SHEET 22)
GRADES AND GEOMETRICS,
FENCE POST 12:1 (SEE
GRADE EDGE OF PATH TO
STA 121+00 TO 123+00
DITCH
DRAINAGE OF EXISTING
ENSURE POSITIVE
MATCH SURROUNDING TO
REGRADE EMBANKMENT TO
DPE-
UG
DPE-UG
FES
1
ABANDONED TRACK
ABANDONED TRACK
WV
WV
WV
WEST SHORE DR
124 125 126
127
203
D/R 1500-34
ELAINE SMITH
TP# 235-20.00-10.00
202
D/R 2614-328
SU-SAX ACRES, LLC
TP# 235-20.00-12.00
PB 84-280
D/R 3309-33
COLLETTE, H/W
LAWRENCE J. & REGINA M.
TP# 235-20.00-356.00
PB 84-280
D/R 3309-30
THOMPSON, H/W
ROBERT H. & MARIE H.
TP# 235-20.00-357.00
PB 84-280
D/R 4004-18
PROPERTIES, LLC
GESSLER HORNING
TP# 235-20.00-358.00PB 84-280
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-560.00
200
32.5'
32.5'
32.5'
32.5'
D/R 1139-350
TRANSPORTATION AUTHORITY
THROUGH THE DELAWARE
STATE OF DELAWARE ACTING
TP# 235-20.00-11.00
123
PB 84-280
D/R 3295-218
PATTERSON, H/W
WILLIAM T. & KATHLEEN J.
TP# 235-20.00-359.00
MA
TC
HLIN
E S
TA 12
0+
00
MA
TC
HLIN
E S
TA 12
6+
50UNOFFICIAL
WEBSITE COPY
N
CP-05
CONSTRUCTION PLAN
14
FENCE SCHEDULE
NO. QTY. DESCRIPTION NOTES
4 60 LF WOOD RAIL FENCE, 4 FT. HIGH (ITEM 727510) STA. 127+00, 5' LT. TO STA. 127+60, 5' LT. (+/-)
5 60 LF WOOD RAIL FENCE, 4 FT. HIGH (ITEM 727510) STA. 127+00, 5' RT. TO STA. 127+60, 5' RT. (+/-)
6 48 LF WOOD RAIL FENCE, 4 FT. HIGH (ITEM 727510) STA. 128+85, 5' LT. TO STA. 129+33, 5' LT. (+/-)
7 48 LF WOOD RAIL FENCE, 4 FT. HIGH (ITEM 727510) STA. 128+85, 5' RT. TO STA. 129+33, 5' RT. (+/-)
B-1B-2
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CP_
05.d
gn
17:0
105-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
126+00127+00 128+00
129+00
130+00
F
4
F
6
F
7F
5
MILT-W
TMIL-W
DETAILS, SHEETS 25-30)
BRIDGE (SEE BRIDGE
PROPOSED PEDESTRIAN
84-280
PER P.B.
EASEMENT
ACCESS
UTILITY, AND
DRAINAGE,
EX. 15'
09/31/2019
BETWEEN 04/15/2019 AND
SCHEDULED TO OCCUR
WATER MAIN INSTALLATION
PROPOSED TOWN OF MILTON
RIPRAP
R-4
10 S.Y.
ABANDONED TRACK
127
PB 84-280
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-560.00
128
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-561.00129
PB 80-69
D/R 3651-145
KC LAND HOLDINGS, LLC
TP# 235-20.11-9.00
204
D/R 1979-216
AARON W. & ELAINE E. SMITH
TP# 235-20.00-9.00
200
32.5'
32.5'
D/R 1139-350
TRANSPORTATION AUTHORITY
THROUGH THE DELAWARE
STATE OF DELAWARE ACTING
TP# 235-20.00-11.00
MA
TC
HLIN
E S
TA 13
0+
50
MA
TC
HLIN
E S
TA 12
6+
00 UNOFFICIAL
WEBSITE COPY
SCALE
FEET
0 30 60 90
N
CP-06
CONSTRUCTION PLAN
15
CURB SCHEDULE
NO. ITEM DESCRIPTION / TYPE LENGTH
2 25.00'P.C.C. CURB, TYPE 1-8
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CP_
06.d
gn
17:0
105-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
CURB RAMP
MATCH EXISTING
131+00
132+00
133+00
134+00
135+00135+60135+60
W.V.
F.H.
W.V.
F.H.
DND
VER-C
VER-C
VER-C
TMIL-W
TMIL-W
09/31/2019
BETWEEN 04/15/2019 AND
SCHEDULED TO OCCUR
WATER MAIN INSTALLATION
PROPOSED TOWN OF MILTON
PC
2
C
2
DETAILS, SHEET 32)
(SEE CONSTRUCTION
ITEM NO. 720556
BOLLARD
PLACE 1 REMOVABLE
DND
WV
+
+
+
+
+
+
WV
ABANDONED TRACK
ABANDONED TRACK
FEDER
AL ST
FEDER
AL ST
ABANDONED TRACK
400+
00
401+00
402+00
403+00
403+36
PARK ST
129
PB 80-69
D/R 3651-145
KC LAND HOLDINGS, LLC
TP# 235-20.11-9.00
EXIS
TIN
G
R/
W
EXIS
TIN
G
R/
W
R/
W
EXIS
TIN
G
130
131
206
207
208
205
D/R 3539-59
LANCE L. COCHRAN
TP# 235-20.11-10.00
TRACT 1
D/R 3802-102
DRY ACRES, LLC
TP# 235-20.11-11.00
D/R 3337-74
GREENE PROPERTIES, LLC
P# 235-20.11-18.00
D/R 3751-66
THE TOWN OF MILTON
TP# 235-20.11-20.00
PB 118-290
D/R 4057-229
MACLAREN, LLC
TP# 235-20.11-19.00
PB 1-136
D/R 3651-145
KC LAND HOLDINGS, LLC
TP# 235-20.11-9.00
200
30'
32.5'
32.5'
30'
20'
20'
D/R 1139-350
DELAWARE TRANSPORTATION AUTHORITY
STATE OF DELAWARE ACTING THROUGH THE
TP# 235-20.00-11.00
204
D/R 1979-216
AARON W. & ELAINE E. SMITH
TP# 235-20.00-9.00
MA
TC
HLIN
E S
TA 13
0+
50 UNOFFICIAL
WEBSITE COPY
100+00 100+50 101+00 101+50 102+00 102+50 103+00 103+50 104+00 104+50 105+00 105+50 106+00 106+50 107+00 107+50 108+00
ELE
VA
TIO
N (F
T)
ELE
VA
TIO
N (F
T)
STATION
20
30
40
20
30
40
108+00 108+50 109+00 109+50 110+00 110+50 111+00 111+50 112+00 112+50 113+00 113+50 114+00 114+50 115+00 115+50 116+00
ELE
VA
TIO
N (F
T)
ELE
VA
TIO
N (F
T)
STATION
Ele
v. 31.
73
Ele
v. 31.
97
PVI 101+
43.00
2.00%
30
20
40
30
20
40
GRADE
PROPOSED
0
3
6
9
T
E
E
F
E
L
A
C
S
L
A
C
I
T
R
E
V
STATION 100+00 TO STATION 116+00
MAINLINE RAIL TRAIL PROFILE
GRADE
PROPOSED
16
Ele
v. 31.
00
PVI 101+
82.50
0.37%
GRADE
EXISTING
GRADE
EXISTING
PVI 104+50.00
Ele
v. 32.00
PVI 101+
31.
00
-0.08%
PVI 107
+00.00
Ele
v. 31.
80
0.27%
PVI 110
+50.00
Ele
v. 32.75
0.27%
PVI 112
+50.00
Ele
v. 31.
75
-0.50%
-0.67%
-2.46%
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
AT THE SPECIFIC LOCATION EACH BORING WAS PERFORMED AND ONLY TO THE DEPTH PENETRATED.
NOTE: THE BORING DATA PROVIDED ON THE PROFILE SHEETS INDICATES THE SOIL CONDITION ONLY
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
PF_
01.d
gn
08:2
319-
AU
G-2019 SCALE
FEET
0 30 60 90PROFILES
LSI
UNOFFICIAL WEBSITE
COPY
20
30
40
20
30
40
116+00 116+50 117+00 117+50 118+00 118+50 119+00 119+50 120+00 120+50 121+00 121+50 122+00 122+50 123+00 123+50 124+00
ELE
VA
TIO
N (F
T)
ELE
VA
TIO
N (F
T)
STATION
0
3
6
9
T
E
E
F
E
L
A
C
S
L
A
C
I
T
R
E
V
0
3
6
9
T
E
E
F
E
L
A
C
S
L
A
C
I
T
R
E
V
STATION 116+00 TO STATION 132+00
MAINLINE RAIL TRAIL PROFILE
124+00 124+50 125+00 125+50 126+00 126+50 127+00 127+50 128+00 128+50 129+00 129+50 130+00 130+50 131+00 131+50 132+00
ELE
VA
TIO
N (F
T)
ELE
VA
TIO
N (F
T)
STATION
Ele
v. 22.51
PVI 130
+73.27
40
30
20 20
30
40
124+00 124+50 125+00 125+50 126+00 126+50 127+00 127+50 128+00 128+50 129+00 129+50 130+00 130+50 131+00 131+50 132+00
ELE
VA
TIO
N (F
T)
ELE
VA
TIO
N (F
T)
STATION
Ele
v. 22.75
PVI 125
+18.00
Ele
v. 21.
00
PVI 126
+50.00
PVI 127
+00.00
Ele
v. 21.
75
PVI 127
+60.00
Ele
v. 21.
80
PVI 128
+60.00
Ele
v. 21.
20
PVI 129+50.00
Ele
v. 22.51
PVI 130
+73.27
-1.09%
-1.33%
0.92% 0.05% -0.67% 0.84%
0.60%
40
30
20 20
30
40
GRADE
PROPOSED
GRADE
PROPOSED
-0.70%
Ele
v. 24.50
-0.85%
Ele
v. 21.
20
PVI 119
+00.00
PVI 123
+12.50
P
1
17
GRADE
EXISTING
GRADE
EXISTING
Ele
v. 27.40
-0.67%
0.40%
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
AT THE SPECIFIC LOCATION EACH BORING WAS PERFORMED AND ONLY TO THE DEPTH PENETRATED.
NOTE: THE BORING DATA PROVIDED ON THE PROFILE SHEETS INDICATES THE SOIL CONDITION ONLY
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
PF_
02.d
gn
17:0
205-
AU
G-2019
SCALE
FEET
0 30 60 90PROFILES
LSI
UNOFFICIAL WEBSITE
COPY
20
30
40
20
30
40
132+00 132+50 133+00 133+50 134+00 134+50 135+00 135+50
ELE
VA
TIO
N (F
T)
ELE
VA
TIO
N (F
T)
STATION
Ele
v. 26.16
PVI 134+78.78
20
30
40
20
30
40
200+00 200+50 201+00 201+50 202+00 202+50 203+00 203+50 204+00 204+50
ELE
VA
TIO
N (F
T)
ELE
VA
TIO
N (F
T)
STATION
Ele
v. 22.75
PVI 2
00
+50.00
Ele
v. 30.25
PVI 2
02
+15.00
Ele
v. 31.
00
PVI 2
03
+50.00
Ele
v. 29.40
PVI 2
04+02.00
2.00%
5.00
%
0.56% -3.08%
-2.00%
0
3
6
9
T
E
E
F
E
L
A
C
S
L
A
C
I
T
R
E
V
STATION 132+00 TO STATION 135+60
MAINLINE RAIL TRAIL PROFILE
STATION 200+00 TO STATION 204+50
CONNECTOR PATH PROFILE
Ele
v. 23.25
PVI 2
00
+75.00
PATHWAY
MAINLINE
TIE-IN TO
GRADE
PROPOSED
GRADE
PROPOSED
GRADE
EXISTING
CURB-RAMP
EXISTING
TIE-IN TO
DRIVE
WEST SHORE
TIE-IN TO
Ele
v. 29.17
PVI 2
04+12.00
18
GRADE
EXISTING
PVI 133
+25.00
Ele
v. 23.75
PVI 134+50.00
Ele
v. 25.25
1.20%
0.60%
3.17%
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
AT THE SPECIFIC LOCATION EACH BORING WAS PERFORMED AND ONLY TO THE DEPTH PENETRATED.
NOTE: THE BORING DATA PROVIDED ON THE PROFILE SHEETS INDICATES THE SOIL CONDITION ONLY
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
PF_
03.d
gn
17:0
205-
AU
G-2019
SCALE
FEET
0 30 60 90PROFILES
LSI
UNOFFICIAL WEBSITE
COPY
LA
VINIA
RD
WEST SHORE DR
MA
TC
HLIN
E S
TA 10
6+
00
SCALE
FEET
0 30 60 90
100+00101+00
102+00103+00
104+00105+00 106+00
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1015
10161017
1021
1022
1023
1024
2%
2%
R=38.00'
R=37.
00'
R=10.00'
1014
1019
10181020
VARIES
OFF.: -10.00
ELE.: 30.40
OFF.: -10.50
ELE.: 30.20
SCALE
FEET
0 30 60 90
N
GG-01
GEOMETRICS
GRADES AND
COORDINATE LIST
POINT NO. STATION OFFSET NORTHING EASTING ELEVATION
1001
1002
1003
1004
1005
1006
1007
1008
101+12.30
101+43.39
101+19.67
101+39.59
101+29.23
101+33.40
101+43.40
101+43.40
-24.79
-49.67
27.89
-46.87
-5.00
-5.00
31.65
31.85
31.85
32.05
281163.8237 681670.5001
681732.3268281215.6768
281157.6887 681737.6968
281209.7450 682302.1421
681694.6305281173.6260
281180.5897 681702.9337
281167.1160 681707.2164
681711.8107281175.9982
5.00
31.50
5.00
1009
1010
1011
1012
101+40.35
101+63.58
101+56.34
101+65.39
-5.00
-16.00
31.90
31.30
31.32
681706.8025281172.9593
281166.6635 681729.8577
281176.0493 681726.4070
681736.4061281175.9123
0.00
1013
1014
1015
1016
101+62.27
101+98.15
101+82.54
102+04.69
-33.17
-35.88
31.35
30.85
681745.6247281200.3006
281175.8630 681773.4061
281158.0156 681746.5770
681780.4371281175.2635
1017
1018
1019
101+66.98
105+02.00
105+50.00 -15.00
31.40
30.00
30.00
681749.0223281196.6035
281020.8010 682035.0173
682077.9719280999.5970
-11.75
-42.12
-5.00
-40.40
-15.00
1020
1022
1023
105+98.00
105+00.00
105+00.00
106+00.00
-10.50
-10.50
30.00
30.50
30.40
30.50
682121.0353280978.7830
281017.6673 682031.2188
281025.7205 682035.2365
682120.9030280973.8585
-15.00
-19.50
1024 106+00.00 -19.50 30.50682124.7768280981.9819
1021
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
GG
_01.d
gn
17:0
305-
AU
G-2019
LSI
301+00
302+00
303+00
304+00
305+00
306+00
307+00
19
MATCH ORIGINAL GRADEFROM BOTTOM OF DITCH TO GRADE BACKSLOPE 3:1
SHEET 32)CONSTRUCTION DETAILS, STONE TRENCH (SEE
UNOFFICIAL WEBSITE
COPY
MA
TC
HLIN
E S
TA 10
6+
00
MA
TC
HLIN
E S
TA 11
3+
00
SCALE
FEET
0 30 60 90
106+00 107+00 108+00109+00
110+00
111+00
112+00
113+00
2%
2%
OFF.: -11.00
ELE.: 30.20
OFF.: -10.50
ELE.: 30.40
OFF.: -10.25
ELE.: 30.60
OFF.: -9.90
ELE.: 30.80OFF.: -9.60
ELE.: 31.00OFF.: -9.30
ELE.: 31.20OFF.: -9.00
ELE.: 31.40OFF.: -8.70
ELE.: 31.60
SCALE
FEET
0 30 60 90
N
GG-02
GEOMETRICS
GRADES AND
MATCH ORIGINAL GRADEFROM BOTTOM OF DITCH TO GRADE BACKSLOPE 3:1
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
GG
_02.d
gn
17:0
305-
AU
G-2019
LSI
20
UNOFFICIAL WEBSITE
COPY
TP6
MA
TC
HLIN
E S
TA 11
3+
00
MA
TC
HLIN
E S
TA 12
0+
00
SCALE
FEET
0 30 60 90
113+00114+00 115+00 116+00
117+00118+00
119+00
120+00
2%
2%
SCALE
FEET
0 30 60 90
N
GG-03
GEOMETRICS
GRADES AND
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
GG
_03.d
gn
17:0
405-
AU
G-2019
LSI
21
UNOFFICIAL WEBSITE
COPY
WEST SHORE DR
MA
TC
HLIN
E S
TA 12
0+
00
MA
TC
HLIN
E S
TA 12
6+
50
SCALE
FEET
0 30 60 90
120+00121+00 122+00 123+00 124+00
125+00126+00
2001
20022003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2%
2%
2%
200+00
201+00202+00
203+00
204+00
204+52
204+52
2%
CONNECTION (0.3%)
MACTH PEDESTRIAN
FROM 2.0% TO
OF CROSS SLOPE
BEGIN TRANSITION
OFF.: -11.00
ELE.: 30.40
OFF.: -11.00
ELE.: 29.90
OFF.: -11.00
ELE.: 29.60
OFF.: -25.75
ELE.: 29.40
OFF.: -8.50
ELE.: 24.20
OFF.: 26.45
ELE.: 20.00
2013
2014
SCALE
FEET
0 30 60 90
N
GG-04
GEOMETRICS
GRADES AND
COORDINATE LIST
POINT NO. STATION OFFSET NORTHING EASTING ELEVATION
2001
2002
2003
2004
200+71.45
200+74.04
200+73.98
202+50.41
-7.99
-7.45
-5.00
-13.54
23.00
23.15
29.50
280446.0469 683931.1774
683929.4971280447.8344
280449.8525 683930.8920
280486.4080 683745.2415
2005
2006
2007
2008
204+02.00
204+02.00
204+12.50
204+12.50
-5.00
-5.00
29.29
29.26
29.19
29.16
280642.3021 683764.1293
683773.9606280644.1315
280652.1206 683762.3016
280654.3283 683772.0631
2009
2010
2011
2012
204+07.13
204+12.10
204+08.28
204+13.12
-13.83
-13.84
12.40
11.47
30.16
29.42
29.80
29.06
280645.5887 683754.5362
683753.6141280650.4844
280651.5162 683780.1065
280656.1093 683778.3094
5.00
5.00
204+16.78 10.82
280654.0911 683752.9359
280659.5881 683777.0127
2013
2014
204+15.78 -13.86
SCALE
FEET
0 30 60 90
N
GG-04
GEOMETRICS
GRADES AND
COORDINATE LIST
POINT NO. STATION OFFSET NORTHING EASTING ELEVATION
2001
2002
2003
2004
200+71.45
200+74.04
200+73.98
202+50.41
-7.99
-7.45
-5.00
-13.54
23.00
23.15
29.50
280446.0469 683931.1774
683929.4971280447.8344
280449.8525 683930.8920
280486.4080 683745.2415
2005
2006
2007
2008
204+02.00
204+02.00
204+12.50
204+12.50
-5.00
-5.00
29.29
29.26
29.19
29.16
280642.3021 683764.1293
683773.9606280644.1315
280652.1206 683762.3016
280654.3283 683772.0631
2009
2010
2011
2012
204+07.13
204+12.10
204+08.28
204+13.12
-13.83
-13.84
12.40
11.47
30.16
29.42
29.80
29.06
280645.5887 683754.5362
683753.6141280650.4844
280651.5162 683780.1065
280656.1093 683778.3094
5.00
5.00
204+16.78 10.82
280654.0911 683752.9359
280659.5881 683777.0127
2013
2014
204+15.78 -13.86
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
GG
_04.d
gn
17:0
405-
AU
G-2019
LSI
22
R=2.5'
22
R=2.5'
UNOFFICIAL WEBSITE
COPY
MA
TC
HLIN
E S
TA 13
0+
50
MA
TC
HLIN
E S
TA 12
6+
00
SCALE
FEET
0 30 60 90
FROM 2% TO 0%
OF CROSS SLOPE
BEGIN TRANSITION
FROM -2% TO 0%
OF CROSS SLOPE
BEGIN TRANSITION
126+00127+00 128+00
129+00
130+00
1025
1026
1027
1028
DETAILS, SHEETS 25-30)
BRIDGE (SEE BRIDGE
PROPOSED PEDESTRIAN
2% -2
%
SCALE
FEET
0 30 60 90
N
GG-05
GEOMETRICS
GRADES AND
COORDINATE LIST
POINT NO. STATION OFFSET NORTHING EASTING ELEVATION
1025
1026
1027
1028
127+00.00
127+00.00
129+33.00
129+33.00
-6.00
-6.00
20.95
21.15
20.85
20.65
280412.8196 684131.9491
684133.3648280424.7358
280398.8315 684361.8926
280410.8232 684362.3438
6.00
6.00
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
GG
_05.d
gn
17:0
405-
AU
G-2019
LSI
23
UNOFFICIAL WEBSITE
COPY
FEDER
AL ST
FEDER
AL ST
PARK ST
MA
TC
HLIN
E S
TA 13
0+
50
SCALE
FEET
0 30 60 90
1030
1029
131+00
132+00
133+00
134+00
135+00135+60135+60
1032
1034
1031
1035
1036
1033
1037
1038
1040
1039
-2
%
-2
%
SCALE
FEET
0 30 60 90
N
GG-06
GEOMETRICS
GRADES AND
COORDINATE LIST
POINT NO. STATION OFFSET NORTHING EASTING ELEVATION
1029
1030
134+78.75
134+78.75
26.15
26.05
280404.0563 684910.9330
684910.8423280394.0567
-5.00
5.00
1031 25.98684914.1926280394.02635.00
1032 141+91.03 26.02684923.2026280403.9451
1033 134+85.83 26.05684917.9380280390.64958.30
1034 134+93.98 25.88684926.1786280407.2152
1035 134+88.82 25.85684920.9012280393.96555.00
1036 134+97.78 25.95684929.9505280403.8839
134+82.11
-8.30
-5.00
-5.00
CONNECTION (-1.0%)
TO MATCH PEDESTRIAN
CROSS SLOPE FROM -2.0%
BEGIN TRANSITION OF
1037 134+84.20 25.60684936.2234280410.8072
1038 135+04.00 25.28684916.2147280388.753112.00
-10.88
1039 134+86.21 684918.2199280386.9213
1040 135+05.90 684938.1594280408.9020-10.14
12.07
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
GG
_06.d
gn
17:0
505-
AU
G-2019
LSI
400+
00
401+00
402+00
403+00
403+36
24
UNOFFICIAL WEBSITE
COPY
BMC
L
128+00
AND SECTION
BRIDGE PLAN, ELEVATION
6•
"3'-
6"
N
L
PIER (TYP.)
C EXISTING
L
BEAM (TYP.)
EXISTING BRIDGE
SPAN 2 SPAN 3 SPAN 4 SPAN 5 SPAN 6 SPAN 7
8"
10'-
0"
12'-9"± 11'-3"±
3'-
6"
5'-
0"
12'-3"± 11'-0"± 10'-6"±
W.P.1
W.P.3
W.P.4
W.P.2
W.P.7
W.P.5
W.P.6
W.P.9
W.P.8 W.P.10
NO. STATION
WORKING POINT SCHEDULE
WP-1
OFFSET NORTHING EASTING
VERTICAL CONTROL SHEET.
DETAIL, REFER TO THE HORIZONTAL AND
FOR PROPOSED CONSTRUCTION BASELINE
NOTE:
N86°49'18"W
7'-10•"±
5'-
0"
5'-0" 5'-0"
20'-0" 20'-0"
16'-
0"
8'-
0"
8'-
0"
CL
EA
R
REFER TO THE STRUCTURE REMOVAL SHEET.
FOR EXSTING STRUCTURE REMOVAL DETAILS,
NOTE:
FL
OW
BR
AN
CH
IN
GR
AM
SEE ABUTMENT PLAN SEE ABUTMENT PLAN 2"
TYPICAL SECTION
RAILING. SEE
PROPOSED BRIDGE
SEE GLULAM PANEL NOTE ON TYPICAL SECTION SHEET
10'-10"± 9'-3"±
20'-0"
LAMINATED TIMBER DECK
PROPOSED 6•" GLUE
EXIST. SPAN 1 EXIST.SPAN 8
WP-2
WP-4
WP-6
WP-8
WP-3
WP-5
WP-7
WP-9
WP-10
280413.0671 684213.1409
280408.4137 684296.9394
280421.0548 684213.5845
280405.0794 684212.6974
280422.1637 684193.6153
280406.1883 684192.7281
280416.4014 684297.3830
684296.4959
280415.2924 684317.3522
280399.3171 684316.4651
280400.4260
2 SPACES @ 8'-0" = 16'-0"11 SPACES @ 8'-0" (MAX.) = 88'-0"
OUT-TO-OUT OPENING = 83'-11„"
2 SPACES @ 8'-0" = 16'-0"
SPAN 8PROPOSED
6'-3…"±
PROPOSEDSPAN 1
(TYP.)
STREAM
EDGE OF
CAP
NOTE: NEGATIVE OFFSET DENOTES LEFT OF BASELINE
EL.9.76
100 YEAR STORM
EL. 7.42
NORMAL WSE
+50+50
AND EXISTING BRIDGE
MILTON RAIL TO TRAIL
CONSTRUCTION B
12'-0"±
0.00'
0.00'
-8.00'
8.00'
-8.00'
8.00'
-8.00'
8.00'
-8.00'
8.00'
127+80.74
127+80.74
127+80.74
127+60.74
127+60.74
128+64.67
128+64.67
128+64.67
128+84.67
128+84.67
ABUTMENT A ABUTMENT B
10'-0" CLEAR
SCALE AS SHOWN
25
20'-0"
16'-
0"
8'-
0"
8'-
0"
2'-6"2'-6"
2"
PIER 3PIER 2 PIER 4 PIER 5 PIER 6 PIER 7
PIER 8
AT ABUTMENT
PIER 1
AT ABUTMENT
PIER 9
TO BE REMOVED
ABUTMENT A
PIER 1 AT
PIER 2 PIER 3 PIER 4 PIER 6 PIER 7PIER 5
TO BE REMOVED
ABUTMENT A
PIER 9 AT
PIER 8
(TYP.)
AND WINGWALLS
ABUTMENT A
EXISTING
(TYP.)
(GRS-IBS) ABUTMENT AND WINGWALLS
SOIL - INTEGRATED BRIDGE SYSTEM
PROPOSED GEOSYNTHETIC REINFORCED
TO BE REMOVED (TYP.)
AND WINGWALLS
EXISTING ABUTMENT
WINGWALLS (TYP.)
ABUTMENT B AND
EXISTING
PLAN‰" = 1'-0"
TYPICAL
EL. 8.24
TYPICAL
EL. 22.07
RAILING (TYP.)
PROPOSED BRIDGE
PIER (TYP.)
EXISTING
(TYP.)
SCOUR EL.10.36
ANTICIPATED MAX.
SECTION‰"" = 1'-0"
ELEVATION‰"" = 1'-0"
TYPICAL
EL. 9.99
ITEM 707001 - RIPRAP, R4
OF ABUTMENT (TYP.)
DELAWARE NO. 57 STONE IN FRONT
PROPOSED R-4 RIPRAP CHOKED WITH
TIMBER BEAM
C EXISTING TRIPLE
PIER CAP AND PILES
EXISTING TIMBER
LEVELING BOARDS (TYP.)
PROPOSED 2" x 12" (NOMINAL)
RAILING (TYP.)
PROPOSED BRIDGE
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
$D
AT
E$
$TIM
E$
$FIL
E$
PHASE IIMILTON RAIL TRAIL
3-810P
CEI
UNOFFICIAL WEBSITE
COPY
BMC
L
N
FL
OW
SPAN 1 SPAN 2 SPAN 3 SPAN 4 SPAN 5 SPAN 6 SPAN 7 SPAN 8
L
12'-3"± 12'-9"± 11'-3"±
STRUCTURE REMOVAL
REMOVED
AND WING WALLS TO BE
EXISTING TIMBER ABUTMENT
9'-3"±10'-6"±12'-0"±10'-10"±
BR
AN
CH
IN
GR
AM
TO REMAIN
PIERS 2-8 (TYP.)
WALLS TO BE REMOVED
ABUTMENT AND WING
EXISTING TIMBER
3.
2.
1.
CAP
2
1
REMOVAL AND EXCAVATION
PROPOSED STRUCTURE
AND BACKFILL
PROPOSED ABUTMENT
C EXISTING ANDL
EXISTING WING WALL (TYP.)
O.G.
O.G.
PROPOSED ABUTMENT FOOTER
TYP.
1'-
6"
PILE 2'-0" MIN. BELOW BOTTOM OF PROPOSED FOOTER
IF PILE IS BROKEN DURING REMOVAL, EXCAVATE AND CUT OFF
PILES AND PILE CAP AT ABUTMENT TO BE REMOVED (TYP.),
~
PAY LIMITS BELOW
TO BE REMOVED. SEE
PIER 9 AT ABUTMENT
VA
RI
ES
VA
RI
ES
EXISTING STRUCTURE
ITEM 607010 - MODULAR BLOCK RETAINING WALLS
PROPOSED GRS-IBS ABUTMENT, WING WALLS AND BACKFILL
ITEM 621001 - WOOD STRUCTURES, TIMBER
PROPOSED APPROACH RAILING
EXISTING ABUTMENT
PROPOSED ABUTMENT FOOTER
ITEM 727510 - WOOD RAIL FENCEITEM 621001 - WOOD STRUCTURES, TIMBER
VARIES
SEE SECTION
TO BE REMOVED.
PIER 1 AT ABUTMENT
O.G.O.G.
SEE EXISTING TIMBER NOTES
REMOVED AND STORED THEN RESET.
BEAMS IN SPAN 1 AND 8 TO BE
SCALE AS SHOWN
26
C BEARING TO C BEARING = 89'-10‚"
11'-0"±
STRUCTURE REMOVAL - PLAN‰" = 1'-0"
STRUCTURAL REMOVAL AND PROPOSED EXCAVATION‚" = 1'-0"
ABUTMENT EXCAVATION PAY LIMITS‚" = 1'-0"
ABUTMENT BACKFILL PAY LIMITS‚" = 1'-0"
ITEM 707001 - RIPRAP, R-4
RIPRAP IN FRONT OF PROPOSED ABUTMENT
128+00 +50N86°49'18"W
+50
L
AND EXISTING BRIDGE
MILTON RAIL TO TRAIL
CONSTRUCTION B
HOT MIX TRAIL PAID UNDER ITEM 401005
2'-0"
2'-0"2'-0"
2'-0"
TIMBER RAIL TIES TO BE REMOVED
2'-0"
LIMITS OF BRIDGE RAILING FENCE FOR TRAIL
ITEM 207021 - STRUCTURAL BACKFILL (BORROW TYPE C)
ITEM 209006 - BORROW, TYPE F
ITEM 202000 - EXCAVATION AND EMBANKMENT
ITEM 211000 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ITEM 607XXX - GRS ABUTMENT AND WING WALLS
EXCAVATION AND BACKFILL FOR STRUCTURES
ITEM 607XXX - GRS ABUTMENT AND WING WALLS
ITEM 211000 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
EXISTING TIMBER BEAMS IS INCLUDED UNDER
ALL REMOVAL, STORAGE, AND RE-ERECTION OF
POOR CONDITION
TIMBER BRIDGE ELEMENTS TO REMAIN ARE IN
THE CONTRACTOR SHALL CONTACT THE ENGINEER IF
AS PER SECTION 621.03 OF THE SPECIFICATIONS
SPAN 1 AND 8 TIMBER BEAMS TO BE STORED
EXISTING TIMBER NOTES:
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
$D
AT
E$
$TIM
E$
$FIL
E$
PHASE IIMILTON RAIL TRAIL
3-810P
CEI
UNOFFICIAL WEBSITE
COPY
2
1
C
C C
10'-0"
16'-0"20'-0" 20'-0"
CLEAR WIDTH
…" = 1'-0"
ABUTMENT ELEVATION
…" = 1'-0"
ABUTMENT PLAN
DATUM EL. 5.00
2
1
3'-0" 3'-0"UNFOLDED WING WALLUNFOLDED WING WALL
REINFORCED SOIL FOUNDATION
A
A
90°
TYP.
90°
B
B
C
20'-0"
21'-9"
1'-9"
8'-
0"
8'-
0"
16'-
0"
FOR DETAILS SEE BRIDGE PLAN SHEET
WORKING POINT (TYP.)
L
1'-
9"
1'-
9"
8'-0" 2'-6" 2'-0‹"8'-0"
L
ABUTMENT B SIMILAR.
ABUTMENT A SHOWN.
NOTE:
1" = 1'-0"
SECTION A-A
ELEVATION AND SECTION
ABUTMENT PLAN,
8" x 3" FOAM PLUG
4" ALUMINUM FASCIA
DECK PANEL OVERHANG
PROPOSED GLULAM BRIDGE
SEE SUBFOUNDATION DETAILS
BEFORE PLACEMENT OF DOWEL)
(CUT FABRIC OR BURN HOLE
SET WITH CONCRETE
NO. 5 DOWEL 2" CLEAR EACH END
CMU AT TOP OF ABUTMENT FACE:
CL
EA
R
SP
AC
E
3" (T
YP.)
BMC
FACE OF CMU WALL (TYP.)
SOIL FOUNDATION (TYP.)
EDGE OF REINFORCED
3"
CL
EA
R
SP
AC
E
BETWEEN BEAMS AND AT GLULAM OVERHANGS
CONTINUE GRS LAYERS IN VOID
CAP
SEE SUBFOUNDATION SHEET
FOR ADDITIONAL DETAILS
NOTE:
B CONSTRUCTION
N
SEE SUBFOUNDATION DETAIL
FOR SECTION B-B AND C-C,
NOTE:
SCALE AS SHOWN
27
2‚
"3'-
2„
"
*ZONE B*
HOLLOW CORE CMU
6 ROWS
*ZONE B*
HOLLOW CORE CMU
15 ROWS
TOP OF WALL EL. 22.07
SEE SUBFOUNDATION DETAILS
TO BE FILLED WITH CONCRETE AND REBAR.
TOP ROWS OF BLOCK IN ABUTMENT
*ZONE A*
SOLID CMU
4 ROWS
~
SUBFOUNDATION DETAILS
AND DETAIL A ON
SEE RAILING POST NOTE
LONG TIMBER RAILING POST
C 4 x 4 (NOMINAL) x 8'-0"
EL. 9.99
TOP OF FOOTER
EL. 8.24
BOTTOM OF FOOTER
SEE SUBFOUNDATION DETAILS
FILLED WITH CONCRETE AND REBAR (TYP.).
TOP 3 ROWS OF BLOCK IN WINGWALLS TO BE
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
$D
AT
E$
$TIM
E$
$FIL
E$
PHASE IIMILTON RAIL TRAIL
3-810P
CEI
UNOFFICIAL WEBSITE
COPY
SUBFOUNDATION DETAILS
…" = 1'-0"
SECTION B-B
…" = 1'-0"
SECTION C-C
19'-6"
1'-9"1'-9"
1'-9"
1'-
9"
20'-0"
3'-2"
~
LEGEND
16'-0"
4'-8"
BEAM SEAT AREA - 4" THICK LAYERS WRAPPED IN TYPE A GEOTEXTILE
4" HIGH SOLID CMU
4" ALUMINUM FASCIA
8" x 3" FOAM PLUG
*ZONE A*
4 ROWS SOLID CMU
#57 STONE WRAPPED IN GEOTEXTILE
REINFORCED SOIL FOUNDATION (RSF)
EL. 8.24
EL. 8.24
GEOTEXTILE
INTERMEDIATE
BMC
DELAWARE NO. 10 STONE
FABRIC SHALL BE
(TYP.). BACKFILL BETWEEN
GEOSYNTHETIC REINFORCEMENT
ƒ" = 1'-0"
DETAIL A
MI
N.
1'-
6"
3'-
6"
•"
3"
3"
SEE DETAIL A
PER SIDE (TYP.)
USING 2 - •" STEEL ANCHORS
EMBEDDED IN CONCRETE ANCHOR
4•" x 4•" x ‰" STEEL HSS
RAILING POST AT ABUTMENT
FORMWORK
GEOTEXTILE AROUND CONCRETE
POST FOOTER (TYP.). PLACE
1'-0" DIA. CONCRETE RAILING
WITH NUT AND WASHERS (TYP.)
‡" HIGH STRENGTH BOLT
GEOTEXTILE
INTERMEDIATE
TOP OF TRAIL
EXISTING TIMBER BEAM
SEE PCC CONCRETE MASONRY NOTE
(BURN HOLE BEFORE PLACEMENT OF DOWEL)
SET WITH CONCRETE IN EACH VOID - 3 BLOCK MIN.
NO. 5 DOWEL 2" CLEAR EACH END
CMU AT TOP OF ABUTMENT FACE:
ZONE
TRAIL INTEGRATION
1:1 CUT SLOPE
CAP
DELAWARE NO. 10 STONE
FABRIC SHALL BE
(TYP.). BACKFILL BETWEEN
GEOSYNTHETIC REINFORCEMENT
SHEET FOR PAYMENT LIMITS
SEE STRUCTURE REMOVAL
LIMIT OF EXCAVATION
APPROACH PLACEMENT NOTE
ZONE. SEE INTEGRATED
TRAIL INTEGRATION
SEE PLAN SHEET
OF FOOTERS,
FOR LOCATION
NOTE:
SCALE AS SHOWN
28
21'-9"
*ZONE B*
HOLLOW CORE CMU
15 ROWS
*ZONE A*
SOLID CMU
4 ROWS
*ZONE B*
HOLLOW CORE CMU
11 ROWS BELOW BEAMS
9'-
6…
"2'-
6•
"1'-
9"
~
IN GEOTEXTILE
#57 STONE WRAPPED
FOUNDATION (RSF)
REINFORCED SOIL
SEE PCC CONCRETE MASONRY NOTE
(BURN HOLE BEFORE PLACEMENT OF DOWEL)
SET WITH CONCRETE IN EACH VOID - 3 BLOCK MIN.
NO. 5 DOWEL 2" CLEAR EACH END
CMU AT TOP OF WINGWALL (TYP.):
WIDE WIDTH TENSILE STRENGTH
INTERMEDIATE LAYER GEOTEXTILE (4800 LBS/FT)
GEOTEXTILE (4800 LBS/FT) WIDE WIDTH TENSILE STRENGTH
IBS - INTEGRATED BRIDGE SYSTEM
GRS - GEOSYNTHETIC REINFORCED SOIL
CMU - CONCRETE MASONRY UNIT
AND 2 x 12 (NOMINAL) LEVELING BOARDS
PROPOSED GLULAM BRIDGE DECK
SEE DETAIL B
2"
NOT TO SCALE
DETAIL B
7†"COPING AT TOP OF WALL
BLOCK AS SHOWN TO CREATE
CONTINUE CONCRETE ABOVE FINAL
11
3'-0"
PAYMENT INCIDENTAL TO ITEM 621001: WOOD STRUCTURES, TIMBER.
CAUSE DAMAGE OR MISALIGNMENT TO THE WALL FACING ELEMENTS.
SHEET. FOOTINGS SHALL BE PRE-SET IN THE GEOTEXTILE LAYERS SO AS TO NOT
THE TIMBER RAILING POSTS AT THE ABUTMENTS AS SHOWN IN DETAIL A ON THIS
THE CONTRACTOR SHALL INSTALL CONCRETE FOOTINGS AND STEEL HSS SLEEVES FOR
RAILING POST:
THE FOLLOWING ITEMS SHALL BE INCIDENTAL TO THE RESPECTIVE ITEM:
PADS ARE SIZED FOR LESS THAN 4000 PSF NEAR THE FACE OF THE ABUTMENT WALL.
EQUIPMENT CAN BE POSITIONED ON THE GRS ABUTMENT PROVIDED THE OUTRIGGER
EQUIPMENT PLACEMENT:
IN THE VOID BETWEEN THE BEAMS AND THE OVERHANG AREAS.
AREA.THE BEAM SEAT AREA ALSO INCLUDES THE AREA UP TO THE GLULAM DECKING
TO AID IN SEATING THE FOOTING AND TO MAXIMIZE CONTACT WITH THE BEARING
THE SURFACE AGGREGATE OF THE BEAM SEAT SLIGHTLY HIGHER, TO ABOUT 0.5 INCHES,
OUTSIDE THE BEAMS.BEFORE FOLDING FINAL WRAP, IT MAY BE NECESSARY TO GRADE
BEAM SEAT AREA DIRECTLY BELOW THE GLULAM DECK BEARING AREAS BETWEEN AND
AREA. WRAP 4-INCH LIFTS ACROSS THE BEAM SEAT. REPEAT THIS PROCESS FOR THE
HALF-HEIGHT SOLID CMU BLOCKS ON TOP OF THE FOAM BOARD IN THE BEAM BEARING
BEARING BED REINFORCEMENT BUT AGAINST THE FACE OF THE CMU BLOCK. SET
OF WRAPPED-FACE GRS. PLACE PRECUT 3-INCH THICK FOAM BOARD ON TOP OF THE
TO THE BOTTOM OF THE BEAMS AND CONSISTS OF A MINIMUM OF FOUR 4-INCH LIFTS
BEAM SEAT PLACEMENT: THICKNESS OF THE BEAM SEAT IS APPROXIMATELY 20 INCHES
GEOSYNTHETIC REINFORCED SOIL-INTEGRATED BRIDGE SYSTEM NOTES:
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
$D
AT
E$
$TIM
E$
$FIL
E$
PHASE IIMILTON RAIL TRAIL
3-810P
CEI
UNOFFICIAL WEBSITE
COPY
10'-0"
5'-0" 5'-0"
TO MATCH CAP
BEVEL EDGE OF TOP RAIL
MI
N.
2'-7•"± 2'-7•"±
L
THIS SHEET
SEE DETAIL
TIMBER RAILING.
L
PILE (TYP.)
EXISTING TIMBER
15'-3"±
1'-4"
±
10'-1"
3‚" 3‚"
2'-10"± (TYP.)
MI
N.
6"
3"
AND DETAILS
TYPICAL SECTION BMC
GLULAM DECK PANEL
GLULAM PANEL
END OF PROPOSED
RAI
LI
NG
HEI
GH
T
SHEET
(TYP.). SEE DETAIL
CONNECTION ANGLE
BENT PLATE
ON DETAIL SHEET
FABRICATED STEEL NOTE
AND NUT (TYP.).SEE
MALEABLE IRON WASHER
BUTTON HEAD BOLT WITH
‡" DIA. HIGH STRENGTH
CAP
(TYP.).
LAG SCREW AND WASHER
ASTM A307 HEX HEAD
†" DIA.x 8" LONG
B CONSTRUCTION
PA
NE
L
DE
CK
GL
UL
AM
15°
3'-6"
2'-11"
2'-0"
1'-0•
"
6•
"
1"
SEE DETAIL SHEET
UPPER RAILING BRACKET.
SEE DETAIL SHEET
LOWER RAILING BRACKET.
SPECIFICATIONS
SHALL BE ACCORDING TO SECTION 727 OF THE
MATERIALS AND CONSTRUCTION OF TIMBER RAILING
NOTE:
1'-4"
±
1"
SCALE AS SHOWN
29
TYPICAL SECTION1" = 1'-0"
RAILING DETAIL1•" = 1'-0"
STAINLESS STEEL SCREWS
ATTACH TO POST WITH (3) #10 x 3•"
2" x 6" (NOMINAL) TIMBER RAILING (TYP.),
4" x 4" (NOMINAL) TIMBER POST
TIMBER BEAM SUPERSTRUCTURE (TYP.)
C EXISTING TRIPLE 11•"± x 1'-4"±
OR MICRONIZED COPPER AZOLE (MCA).
ALKALINE COPPER QUATERNARY (ACQ)
TIMBER SHALL BE TREATED WITH
GLUE-LAMINATED DECK PANELS.
ITEM 621003 - WOOD STRUCTURES,
BOARDS (TYP.). INCIDENTAL TO
2" x 12" (NOMINAL) TIMBER LEVELING
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
$D
AT
E$
$TIM
E$
$FIL
E$
PHASE IIMILTON RAIL TRAIL
3-810P
CEI
UNOFFICIAL WEBSITE
COPY
1•" = 1'-0"
RAILING BRACKET DETAIL
3"
3"
3"
6"
3"
3"
3"
4" 2" 3"
DECK PLATE
END PLATE
BRACKET ONLY)
(UPPER RAILING
BENT POST PLATE
L
PLAN VIEW
6"
END PLATE
1ƒ"
DECK PLATE
END PLATE
BRACKET ONLY)
(UPPER RAILING
BENT POST PLATE
2•"
BRACKET ONLY)
(LOWER RAILING
STIFFENER (TYP.)
1‡
"
4‚" L
HOLE (TYP.)
SLOTTED BOLT
C 1" x 1‡" DIA.
5"
1"
DECK PLATE
4†"•" •"
BEHIND END PLATE
BENT POST PLATE
1"
‹" TO MISS WELD
CHAMFER CORNER
STIFFENER (TYP.)4†"•" •"
L
4‚
"
HOLE (TYP.)
C 1" DIA. BOLT
6"
6"9"
5/16E60
DECK PLATE
5/16E60
5/16E60
5/16E60
4„
"
2•"
4‡"
2•
"
10"
6"
3"3"
1•" = 1'-0"
CONNECTION ANGLE DETAIL
3" 3"
5/16E60
3ƒ"
5"
TO FIT
CHAMFER CORNER
STIFFENER (TYP.)
1'-0"
9"
3"
9"
5"
6"
6"
5"
3ƒ
"
2'-0"
1‡
"
6"
7•
"
ƒ" = 1'-0"
GLULAM PANEL CONNECTION DETAILS
GL
UL
AM
DE
CK
PA
NE
L
2.
1.
AND DETAILS
TYPICAL SECTION
TYPICAL - SEE NOTES
GLULAM DECK PANEL
ELEVATION - LOWER RAILING BRACKET
ELEVATION - UPPER RAILING BRACKET
DECK PLATE
FRONT VIEW - LOWER RAILING BRACKET
FRONT VIEW - UPPER RAILING BRACKET
HOLE (TYP.)
C 1" DIA. BOLT
END PLATE
2…"
BMC
C RAILING BRACKET (TYP.)
(TYP.)
EXISTING TIMBER BEAM
C CONNECTION ANGLE (TYP.)
SEE DETAIL THIS SHEET
CONNECTION ANGLE (TYP.)
NOTES THIS SHEET
SEE GLULAM DECK PANEL
DECK PANEL (TYP.)
PROPOSED GLULAM BRIDGE
(TYP.)
EXISTING TIMBER BEAM
RAILING NOT SHOWN FOR CLARITY
RAILING POST (TYP.).
8'-0" POST SPACING (MAX.) (TYP.)
SEE GLULAM NOTES
1'-6" 1'-0"3'-0" 1'-6"1'-6"6"
SIMPLE SPAN BUTT JOINT
EXISTING TIMBER BEAM
1'-6"
9" MIN.
2…
"2
…"
2…
"
2'-5"
±2'-10"
±2'-10"
±
2…
"9†
"±
9†
"±
4'-0"
10'-1"
8'-0"8'-0"
SEE CONNECTION DETAIL
AND EXISTING TIMBER BEAM BUTT JOINTS.
DIMENSION MAY BE INCREASED TO AVOID PIER CAP
WIDTH OF GLULAM PANELS ARE MINIMUM DIMENSION.
E = 1,600 KSI
Fv = 300 KSI
Fc = 0.26 KSI
Fb = 1700 KSI
STRENGTH VALUES OF:
REQUIREMENTS OF ANSI/AITC A190.1 AND MINIMUM
ALL GLUE LAMINATED TIMBER SHALL MEET THE
GLULAM DECK PANEL NOTES:
TYP.
6"6" 6"
TYP.TYP.
2'-0" 2'-0"
MIN. MIN.
MIN. MIN.MIN. MIN.
6.
5.
4.
3.
2.
1.
L
L
CAP
STEEL PLATE
…" BENT
SCALE AS SHOWN
30
CAP AND PILE
EXISTING PIER
ITEM 621003 - WOOD STRUCTURES, GLUE-LAMINATED DECK PANELS
CONNECTION ANGLE AND FASTENERS INCIDENTAL TO
ITEM 621001 - WOOD STRUCTURES, TIMBER
RAILING BRACKET AND FASTENERS INCIDENTAL TO
ASTM A325 STEEL BOLTS
‡" DIA. HIGH STRENGTH GALVANIZED OR STAINLESS STEEL
ALL BOLT HOLES NOT SPECIFIED ARE 1" DIA. TO RECEIVE
FABRICATION.
BE STAINLESS STEEL OR HOT DIPPED GALVANIZED AFTER
STEEL RAILING BRACKETS AND CONNECTION ANGLES SHALL
ALL PLATE STEEL SHALL BE …" THICK.
PLATE STEEL SHALL CONFORM TO ASTM A36 GRADE 36.
FABRICATED STEEL NOTES:
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
$D
AT
E$
$TIM
E$
$FIL
E$
PHASE IIMILTON RAIL TRAIL
3-810P
CEI
UNOFFICIAL WEBSITE
COPY
(FT.)
DEPTHNO. REMARKSCLASS./G.I.SAMPLE DESCRIPTION
DEPTH
SAMPLE Blows/6"
1
2.0'
2
BORING: B-1
NOT TO SCALE
NORTHING: 280413.795 EASTING: 684220.439
1
2
2
1 17" RECOVERY
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
A-2-4(0)
15" RECOVERY
2
24.0'
13" RECOVERY
2
2
WR
WR6.0'
3
10" RECOVERY
2
2
1
28.0'
4 A-1-b
14" RECOVERY
5
4
5
4
5
13" RECOVERY
3
4
6
6
14" RECOVERY
4
5
6
6
7
10" RECOVERY
7
5
6
7
8
13" RECOVERY
3
3
3
4
9
A-2-4(0)
3
WET VERY LOOSE BROWN SILTY FINE SAND W/ SOME COARSE SAND
6" RECOVERY
6
4
3
3
10 A-1-b
5" RECOVERY
5
3
11
26.0'
24.0'
20.0'
18.0'
16.0'
14.0'
12.0'
10.0'
6" RECOVERY
10
6
5
331.0'
29.0'12
4
2
A-1-b
6" RECOVERY
5
5
6
1036.0'
34.0'13 A-1-b
7" RECOVERY
7
7
9
1140.0'
38.0'14 A-1-b
0.0
END OF BORING.
ELEVATION: N/A
COMMENTS: NEGATIVE OFFSET DENOTES LEFT OF BASELINE.
SOIL BORING LOGSBMC
CAP
TRACE OF FINE GRAVEL.
MOIST VERY LOOSE BROWN FINE TO COARSE SAND W/ SOME SILT,
2
2GRAVEL AND SILT.
WET VERY LOOSE BROWN FINE TO COARSE SAND W/ SOME FINE A-2-4(0)
TRACE OF SILT.
WET VERY LOOSE BROWN FINE TO COARSE SAND AND FINE GRAVEL, A-1-b
SATURATED LOOSE BROWN SILTY FINE SAND W/ SOME COARSE SAND.
FINE GRAVEL AND SILT.
SATURATED LOOSE BROWN FINE TO COARSE SAND W/ TRACE A-3
SOME FINE GRAVEL, TRACE OF SILT.
SATURATED MEDIUM DENSE BROWN FINE TO COARSE SAND W/ A-3
TRACE FINE GRAVEL AND SILT.
SATURATED MEDIUM DENSE BROWN FINE TO COARSE SAND W/ A-3
SOME FINE GRAVEL, TRACE OF SILT.
SATURATED VERY LOOSE BROWN COARSE TO FINE SAND W/ A-1-b
FINE GRAVEL, TRACE OF SILT.
SATURATED LOOSE BROWN COARSE TO FINE SAND AND
TRACE OF FINE GRAVEL AND SILT.
SATURATED LOOSE BROWN COARSE SAND W/ SOME FINE SAND, A-1-b
W/ SOME FINE SAND, TRACE OF SILT.
SATURATED MEDIUM DENSE BROWN COARSE SANDY FINE GRAVEL
W/ SOME FINE SAND, TRACE OF SILT.
SATURATED MEDIUM DENSE BROWN COARSE SAND AND FINE GRAVEL
W/ TRACE FINE SAND AND SILT.
SATURATED MEDIUM DENSE BROWN FINE GRAVELLY COARSE SAND
STATION: 127+87.99 OFFSET: -1.131
(FT.)
DEPTHNO. REMARKSCLASS./G.I.SAMPLE DESCRIPTION
DEPTH
SAMPLE Blows/6"
1
2.0'
2
BORING: B-2NORTHING: 280412.852 EASTING: 684284.593
6
3
3
2 3" RECOVERY
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
3" RECOVERY
10
44.0'
12" RECOVERY
5
2
2
26.0'
3
14" RECOVERY
2
2
28.0'
4 A-1-b
11" RECOVERY
3
5
5
4
5
14" RECOVERY
4
4
2
6
19" RECOVERY
3
3
2
2
7
15" RECOVERY
5
4
4
6
8
13" RECOVERY
5
5
5
5
9
3
MOIST VERY LOOSE BROWN COARSE TO FINE SAND W/ SOME SILT.
10 RECOVERY
5
7
8
11
10 A-1-b
14" RECOVERY
6
3
11
26.0'
24.0'
20.0'
18.0'
16.0'
14.0'
12.0'
10.0'
18" RECOVERY
6
5
4
531.0'
29.0'12
5
3
A-1-b
9" RECOVERY
6
7
9
836.0'
34.0'13 A-1-b
11" RECOVERY
6
7
8
1240.0'
38.0'14 A-1-b
0.0
END OF BORING.
ELEVATION: N/A
COMMENTS: NEGATIVE OFFSET DENOTES LEFT OF BASELINE.
5
7
A-2-4(0)
A-1-b
STATION: 128+52.10 OFFSET: -3.75DATE DRILLED: 4/13/2018 DATE DRILLED: 4/12/2018
OF FOUNDATION
APPROXIMATE BOTTOM
OF FOUNDATION
APPROXIMATE BOTTOM
FINE TO COARSE SAND.
NO SIEVE ANALYSIS - INDICATION OF MOIST LOOSE BROWN SILTY
MOIST MEDIUM DENSE BROWN SILTY FINE TO COARSE SAND.
TRACE OF FINE GRAVEL.
MOIST VERY LOOSE BROWN FINE TO COARSE SAND W/ SOME SILT, A-2-4(0)
2
TRACE OF FINE GRAVEL.
MOIST LOOSE BROWN COARSE SAND W/ SOME FINE SAND AND SILT, A-1-b
TRACE OF FINE GRAVEL AND SILT.
MOIST LOOSE BROWN COARSE SAND W/ SOME FINE SAND, A-1-b
FINE GRAVEL AND SILT.
WET LOOSE BROWN COARSE SAND W/ SOME FINE SAND, TRACE OF A-1-b
AND FINE GRAVEL.
WET LOOSE BROWN COARSE SAND W/ SOME SILT, TRACE OF FINE SAND A-1-b
A-2-4(0)
FINE SAND AND SILT.
WET LOOSE BROWN SILTY FINE TO COARSE SAND W/ TRACE
AND SILT.
WET MEDIUM DENSE BROWN COARSE SAND W/ TRACE FINE SAND
FINE GRAVEL AND SILT.
WET LOOSE BROWN COARSE SAND W/ SOME FINE SAND, TRACE OF
AND FINE GRAVEL, TRACE OF SILT.
WET LOOSE BROWN COARSE SAND W/ SOME FINE SAND
AND FINE GRAVEL, TRACE OF SILT.
WET MEDIUM DENSE BROWN COARSE SAND W/ SOME FINE SAND
GRAVEL AND FINE SAND, TRACE OF SILT.
WET MEDIUM DENSE BROWN COARSE SAND W/ SOME FINE
LOCATION OF BORINGS ARE REFERENCED TO THE BRIDGE PLAN AND LABELED AS 'B-1' AND 'B-2'. 2.
CONDITIONS WHICH MAY BE ENCOUNTERED DURING CONSTRUCTION. SEE SECTION 102.05 OF THE DELDOT STANDARD SPECIFICATIONS FOR MORE DETAIL.
THE INFORMATION SHOWN ON THIS SHEET IS BASED ON LIMITED INVESTIGATIONS, AND IS NO WAY WARRENTED TO BE INDICATIVE OF ACTUAL 1.
NOTES:
31
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.
$D
AT
E$
$TIM
E$
$FIL
E$
PHASE IIMILTON RAIL TRAIL
3-810P
CEI
UNOFFICIAL WEBSITE
COPY
15°
NOT TO SCALE
LOC
ROW
48" M
AX
MAX
6" (TYP.)
PATH
CLASS B CONCRETE
POSTS 8' ON STRAIGHT RUNS, 4' AROUND CURVES
HOTMIX TRAIL
GRADING
SAFETY
VARIES 10.0'
33.0'
9.0' 2.0'
MAX3:1
6:1 2.0%MAX
3:1O.G.
GALVANIZED RING NAILS (TYP.)
ATTACH WITH 4-12d HOT DIP
PATH
N.T.S.N.T.S.
RAILS SHALL BE FLUSH TO THE POSTS AT THE END POSTS.3.
RAILS SHALL NOT END ON THE SAME POST.
ALL JOINTS SHALL BE ATTACHED WITH 3 - 12d NAILS AND TWO ADJACENT 2.
ALL RAIL JOINTS SHALL BE CENTERED AT THE POSTS.1.
NOTES:
SEE NOTE 2
(TYP.)
" 215
WOOD RAIL FENCE DETAIL
WOOD RAIL FENCE - TYPICAL FRONT
WOOD RAIL FENCE - TYPICAL JOINT DETAIL
WOOD RAIL FENCE - TYPICAL FENCE POST
32
3.0'
NOT TO SCALE
SECTION
PLAN VIEW
4 3/4" O.D. YELLOW POLYETHYLENE
THERMOPLASTIC BOLLARD SLEEVE OVER
4" SCH. 40 PVC PIPE (SEE NOTE 2)
4" SCH. 40 PVC PIPE. ATTACH BOLLARD
SLEEVE WITH 8 STAINLESS STEEL SELF
TAPPING SCREWS PLACED IN GROUPS OF
2 AT 90 DEGREES TO EACH OTHER.
7/8" DIA. HOLE THRU STEEL & PLASTIC
3/4" DIA. X 8" ROUND BAR W/ 3/4" GRADE
8 USS FLAT WASHER WELDED TO END.
DRILL 3/8" HOLE TO ACCEPT PADLOCK.
3000 PSI CONCRETE CLASS B
18" DIA. SONOTUBE
5" SCH. 40 GALVANIZED STEEL PIPE
DRILL 7/8" HOLE TO ACCEPT REBAR.
WELD 3/4" X 13" REBAR
3/4" DIA. HOLE THRU STEEL PIPE
6" #57 STONE
WELD 3/4"X13" REBAR
2'-6"
1'-6"
9"
1'-2.5
"
2'-0" 4 1/2"
5.0' 2.0'2.0'
N.T.S.
BOLLARD
TO ITEM NO. 720556 - BOLLARD.
EXCAVATION, INSTALLATION AND ALL MATERIALS SHOWN ARE INCIDENTAL3.
OR AN APPROVED EQUAL.
BY BOLLARDS AND SLEEVES, LLC (1-800-914-4771),DISTRIBUTED
REMOVEABLE BOLLARD SLEEVE IS MODEL #BPD-YL-3 1/2-66-S 2.
ALL STEEL SHALL BE HOT DIPPED GALVANIZED AFTER FABRICATION.1.
NOTES:
STONE TRENCH
3.5'
1.0'
12"
#708002) ON ALL SIDES
INSTALL GEOTEXTILE, SEPERATION (ITEM
OVERLAP
1.0' MIN
PERMANENT SEED - DRY GROUND AND EROSION CONTROL BLANKET.
THE SAME DAY THAT THE TRENCH IS COMPLETED, PERMANENTLY STABILIZE THE DISTURBED AREA AROUND THE TRENCH WITH 5.
WITH INFILTRATION STONE, NO. 3, SO GEOTEXTILE DOES NOT MOVE.
AFTER STONE PLACEMENT, IMMEDIATELY COVER THE ENTIRE TOP OF THE TRENCH WITH THE EXCESS GEOTEXTILE AND SECURE 4.
ADD INFILTRATION STONE, NO. 3. 3.
COMPLETELY AFTER STONE IS PLACED AND HAVING AT LEAST 1 FOOT OF OVERLAP OF THE GEOTEXTILE.
INSTALL GEOTEXTILE ON ALL TRENCH SIDES MAKING SURE TO HAVE ENOUGH EXTRA TO COVER THE TOP OF THE TRENCH 2.
EMBANKMENT, AND SCARIFY THE BOTTOM
EXCAVATE THE TRENCH TO THE DIMENSIONS SHOWN ON THE PLANS, PAID UNDER ITEM #202000 - EXCAVATION AND 1.
ALL EXCAVATION WITH HEAVY EQUIPMENT SHALL BE DONE FROM THE SIDE.
ABSOLUTELY NO EQUIPMENT SHALL BE IN THE ACTUAL TRENCH AREA ONCE CONSTRUCTION ON THE TRENCH HAS STARTED.
BEFORE CONSTRUCTION OF THE STONE TRENCH, ALL AREAS DRAINING TO THE TRENCH MUST BE AT FINAL GRADE AND STABILIZED.
STONE TRENCH CONSTRUCTION SEQUENCE:
1060.01.G AND BE PAID UNDER ITEM #708002 - GEOTEXTILE, SEPERATION.
ALL GEOTEXTILES USED IN THE TRENCH SHALL CONFORM TO THE UNDERDRAIN GEOTEXTILE SPECIFICATION OF SECTION 4.
PAID UNDER ITEM #910003 - INFILTRATION STONE, NO. 3
ALL STONE USED IN THE TRENCH SHALL CONFORM TO THE INFILTRATION STONE SPECIFICATION OF SECTION 910.02.A AND BE 3.
STONE TRENCH WIDTH IS 5 FEET AND DEPTH IS 3 FEET.2.
CONSTRUCTION AND GRADES AND GEOMETRICS PLANS (SHEET 10 AND 19).
STONE TRENCH LENGTH IS 100-FEET AND TO BE INSTALLED FROM STA. 105+00 TO STA. 106+00 AS INDICATED ON 1.
NOTES:
33" MIN.
2" x 6" (NOMINAL) RED CEDAR RAILS (TYP.)
POSTS (TYP.)
TREATED PINE
4" x 4" (NOMINAL)
GRADE
SURROUNDING
MATCH
SONOTUBE TO
FROM EDGE OF
DRESS BACKFILL
(SHEET 6, 7, 8)
SECTIONS
SEE TYPICAL
VARIES
TO DRAIN
SLOPE CONCRETE
TOP RAIL
POST TO MATCH
BEVEL EDGE OF
12" DIA. MIN
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
DT_
02.d
gn
11:2
616-
AU
G-2019
CONSTRUCTION DETAILSLSI
UNOFFICIAL WEBSITE
COPY
N
SCALE
FEET
0 150 300 450
LAVINIA RO
AD
FEDERAL STREET
LEGEND
WETLAND BOUNDARY (CORPS)
2. NATURAL RESOURCE ISSUES:
3. CULTURAL RESOURCE ISSUES
4. PROTECTION OF RESOURCES:
1. GENERAL NOTES:
THE DEPARTMENT TO COORDINATE WITH THE APPROPRIATE RESOURCE AGENCIES FOR APPROVAL.
RESOURCE ISSUES)IS NECESSARY,THE ENVIRONMENTAL STUDIES SECTION SHALL BE CONTACTED AT (302)760-2264 TO ALLOW
B. IF A DEPARTURE FROM THE APPROVED PLANS (WHICH WOULD AFFECT ANY OF THE NATURAL AND/OR CULTURAL
B. STAGING, STOCKPILING, AND DISPOSAL
MEASURES,ETC.REQUIRED BY THE APPROPRIATE REGULATORY AGENCY FOR UTILIZING OFF- SITE SPOIL AREAS.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PLANS, PERMITS, EROSION AND SEDIMENTATION CONTROL
DIFFICULTY IN FINDING NECESSARY DISPOSAL SITES TO MEET THE TIME FRAMES AND CAPACITIES REQUIRED. THE
CONSIDER ANY DELAYS OR MONETARY CLAIMS OF ANY NATURE RESULTING FROM THE CONTRACTOR'S FAILURE OR
SITE(S) FROM THE CORPS OF ENGINEERS AND THE STATE HISTORIC PRESERVATION OFFICE. THE DEPARTMENT WILL NOT
DISPOSAL/WASTING OPERATION SHALL COMMENCE UNTIL THE PERMITTEE OBTAINS WRITTEN APPROVAL OF ANY DISPOSAL
BE PROPERLY CONTAINED AND STABILIZED TO PREVENT ITS ENTRY INTO ANY ADJACENT WETLANDS OR WATERWAYS. NO
BE DISPOSED OF IN UPLAND, NON - WETLAND DISPOSAL SITE(S) OR SENSITIVE SITE(S). THE EXCAVATED MATERIAL SHALL
2. ALL EXCESS EXCAVATED MATERIAL NOT USED IN HIGHWAY OR COMPENSATORY MITIGATION SITE CONSTRUCTION SHALL
THESE AREAS IS STRICTLY PROHIBITED.
WETLANDS AND WATERS COME WITHIN TWENTY (20) FEET OF THE LIMITS OF CONSTRUCTION. THE CONTRACTOR'S ACCESS INTO
PROJECT,SILT FENCE OR PROTECTIVE FENCING SHALL BE PLACED AT THE LIMITS OF CONSTRUCTION AT ALL LOCATIONS WHERE
A. PROTECTION OF RESOURCES (WETLANDS/WATERS/NATURAL AREA):IN ORDER TO PROTECT RESOURCES LOCATED ALONG THE
COMPLIANCE SHEETS. IMPACTS TO THESE RESOURCES SHALL BE AVOIDED.
JURISDICTIONAL RESOURCES ARE PRESENT WITH THE PROJECT LIMITS AS SHOWN ON THESE ENVIRONMENTAL
A. THERE ARE NO ENVIRONMENTAL PERMITS ASSOCIATED WITH THIS PROJECT, HOWEVER, CORPS/ DNREC
EC_02
EC-01
COMPLIANCE PLAN
ENVIRONMENTAL
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
C:\
Users\p
aul.
moser\D
ocu
ments\Proje
cts\Milton Rail Trail\Fin
al
Desig
n\S
heets\E
C.d
gn
17:0
6
05-A
UG-2
019
X
33
PHASE IIMILTON RAIL TRAIL T201701301
SUSSEX
PM
TF
COMPLIANCE.
A. DELDOT SUBMITTED "FINDING OF NO ADVERSE EFFECTS" OF HISTORIC PROPERTIES TO SHPO AS PART OF ENVIRONMENTAL
ENDANGERED SPECIES - NONE
MIGRATORY BIRDS - NONE
CAN BE DONE
THERE IS A TIME OF YEAR RESTRICTION BETWEEN MARCH 1 - JUN 30, AT WHICH TIME NO IN-WATER WORK
FISHERIES - THE CURRENT SCOPE OF THIS PROJECT DOES NOT INCLUDE IN-WATER WORK. IF PROJECT SCOPE CHANGES,
A. CONSTRUCTION RESTRICTIONS:
[email protected]) CAN PROVIDE FURTHER GUIDANCE REGARDING THIS METHOD OF INSTALLATION.
THE SILT FENCE IS INCIDENTAL TO ITEM 905001 - SILT FENCE. THE ENVIRONMENTAL STUDIES SECTION (TREVOR MCCOLLEY,
CFL'S (AND CONTENTS) MUST BE REMOVED IN THEIR ENTIRETY WHEN NO LONGER NEEDED. SANDBAGS/CFL USED TO SECURE
WETLANDS IN LIEU OF TRENCHING UNLESS PROPER EROSION AND SEDIMENT CONTROL CANNOT BE MAINTAINED. SANDBAGS AND
B. USE SANDBAGS OR COMPOST FILTER LOG (CFL) TO SECURE SILT FENCE AT AREAS ADJACENT TO WOODED UPLANDS/ ALL
SHEETS LAST UPDATED: 8/1/2019
SHEETS PREPARED BY: PAUL MOSER
2.0 (2010).
AND GULF COASTAL PLAIN REGIONAL SUPPLEMENT VERSION
WETLAND DELINEATION MANUAL AND THE CORPS ATLANTIC
ON 9 SEPTEMBER 2017, IN ACCORDANCE WITH THE CORPS
WETLAND DELINEATION BY CENTURY ENGINEERING, INC.
ON THIS SHEET
WATERS OF THE U.S., INCLUDING WETLANDS,
NOTE: THERE ARE NO IMPACTS TO THE
ORDINARY HIGH WATER
ORDINARY HIGH WATER/ WETLAND
LSI
MORE DETAILS.
APPROPRIATE REGULATORY AGENCY FOR UTILIZING OFF- SITE DISPOSAL AREAS. SEE ENVIRONMENTAL STATEMENT FOR
RESPONSIBLE FOR ALL PLANS,PERMITS, EROSION AND SEDIMENTATION CONTROL MEASURES,ETC.REQUIRED BY THE
NECESSARY DISPOSAL SITES TO MEET THE TIME FRAMES AND CAPACITIES REQUIRED. THE CONTRACTOR SHALL BE
OR MONETARY CLAIMS OF ANY NATURE RESULTING FROM THE CONTRACTOR'S FAILURE OR DIFFICULTY IN FINDING
APPROVED BY THE STATE HISTORIC PRESERVATION OFFICE (SHPO). THE DEPARTMENT WILL NOT CONSIDER ANY DELAYS
1. STOCKPILING,STAGING,AND DISPOSAL MUST BE IN UPLAND, NON-ARCHAEOLOGICALLY SENSITIVE SITES REVIEWED AND
WV
WV
WV
LAVINIA RD
FEDERAL ST
FEDER
AL ST
TP1
TP8
TP7
TP6
TP5
TP4
TP3
TP2
WES
T SHORE D
R
300+
00
301+
00
302+
00
303+
00
304+
00
305+
00
306+
00
307+
00
400+00
401+
00
402+
00
403+
00
403+36
WV
WV
WV
WES
T SH
ORE
DR
PARK ST
100+00
101+00
102+00
103+00
104+00
105+00
106+00
107+00
108+00
109+00
110+00
111+00
112+00
113+00
114+00
115+00
116+00
117+00
118+00
119+00
120+00
121+00
122+00
123+00
124+00
125+00
126+00
127+00
128+00129+00 130+00 131+00 132+00 133+00 134+00 135+00 135+60135+60
PER P.B. 84-280
AND ACCESS EASEMENT
EX. 15' DRAINAGE, UTILITY,
84-280
PER P.B.
EASEMENT
ACCESS
UTILITY, AND
DRAINAGE,
EX. 15'
200+
00
201+00
202+00
203+00
204+00
204+52
204+52
14 S.Y. R-4 RIPRAP
RIPRAP
R-4
10 S.Y.
RIPRAP
4 S.Y. R-4
PB 84-280
D/R 3301-160
EDWIN H. & VICTORIA K. HOFF, H/W
TP# 235-20.00-379.00
101
104
105
106
PB 84-280
D/R 3415-176
WILLIAM H. IRELAND
ROBERT A. IRELAND &
TP# 235-20.00-376.00
PB 84-280
D/R 3499-1
DEBORAH K. GUIDA, H/W
MICHAEL J. &
TP# 235-20.00-378.00
102
103
PB 84-280
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-381.00
PB 84-280
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-380.00
100
D/R 3770-221
CHARLES DAVID CAREY, III, TRUSTEE
TP# 235-20.00-2.00
201
D/R 2785-103
C.D.CAREY FARMS, LLC
TP# 235-20.00-14.00
107
108
109
110
111
112
113
PB 84-280
D/R 3388-346
EDWARD TETI
TP# 235-20.00-369.00
PB 84-280
D/R 3562-105
JOHN W. & LINDA SCHNEIDER
TP# 235-20.00-370.00
PB 84-280
D/R 4354-65
SIMMS
A. LIVINGSTON & BEATRICE L.
RICHARD J. LIVINGSTON, GALE
TP# 235-20.00-375.00
PB 84-280
D/R 3558-241
SANDRA H. ROSKOS
EDWARD J. &
TP# 235-20.00-374.00
PB 84-280
D/R 3515-159
MIKLOS G. & SUSAN A. MATHE
TP# 235-20.00-373.00
PB 84-280
D/R 4587-213
H/W
DANIEL A. & DIANE BITTERLE,
TP# 235-20.00-372.00
PB 84-280
D/R 3429-225
BYORICK
ROBERT B. & TERRY R.
TP# 235-20.00-371.00
202
D/R 2614-328
SU-SAX ACRES, LLC
TP# 235-20.00-12.00 115
PB 84-280
D/R 3300-104
SPRINGER, H/W
EDWARD G. & DELORES O.
TP# 235-20.00-367.00
116
117
118
119
120
PB 84-280
D/R 3355-102
HEIDI M. BORYS, H/W
EDWARD A. &
TP# 235-20.00-366.00
PB 84-280
D/R 3318-330
JOYCE P. QUINNAN, H/W
JOSEPH G. &
TP# 235-20.00-365.00
PB 84-280
D/R 3317-285
MARSHA D. SOMERS, H/W
RAYMOND E. &
TP# 235-20.00-362.00
PB 84-280
D/R 4623-131
SCHMIDT, TRUSTEES
CYNTHIA LUCY BOGART
JOHN C. SCHMIDT &
TP# 235-20.00-364.00
121
PB 84-280
D/R 3314-79
ROY & JOAN TURCI, H/W
TP# 235-20.00-361.00122
123
124
125
126127
203
D/R 1500-34
ELAINE SMITH
TP# 235-20.00-10.00
202
D/R 2614-328
SU-SAX ACRES, LLC
TP# 235-20.00-12.00
PB 84-280
D/R 3309-33
COLLETTE, H/W
LAWRENCE J. & REGINA M.
TP# 235-20.00-356.00
PB 84-280
D/R 3295-218
PATTERSON, H/W
WILLIAM T. & KATHLEEN J.
TP# 235-20.00-359.00
PB 84-280
D/R 3309-30
THOMPSON, H/W
ROBERT H. & MARIE H.
TP# 235-20.00-357.00PB 84-280
D/R 4004-18
PROPERTIES, LLC
GESSLER HORNING
TP# 235-20.00-358.00
PB 84-280
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-560.00127
PB 84-280
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-560.00
128
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-561.00
129
PB 80-69
D/R 3651-145
KC LAND HOLDINGS, LLC
TP# 235-20.11-9.00
129
PB 80-69
D/R 3651-145
KC LAND HOLDINGS, LLC
TP# 235-20.11-9.00
204
D/R 1979-216
AARON W. & ELAINE E. SMITH
TP# 235-20.00-9.00
200
EXIS
TIN
G
R/
W
EXIS
TIN
G
R/
W
R/
W
EXIS
TIN
G
130
131
206
207
208205
D/R 3539-59
LANCE L. COCHRAN
TP# 235-20.11-10.00
TRACT 1
D/R 3802-102
DRY ACRES, LLC
TP# 235-20.11-11.00
D/R 3337-74
GREENE PROPERTIES, LLC
P# 235-20.11-18.00
D/R 3751-66
THE TOWN OF MILTON
TP# 235-20.11-20.00
PB 118-290
D/R 4057-229
MACLAREN, LLC
TP# 235-20.11-19.00
PB 1-136
D/R 3651-145
KC LAND HOLDINGS, LLC
TP# 235-20.11-9.00
200
30'
32.5'
32.5'
200
200
200
200
32.5'
32.5'
32.5'
32.5'
PER P.B. 84-2
80
EXIS
TIN
G 15' PE
EXIS
TIN
G PE
EXIS
TIN
G PE
EXIS
TIN
G PE
15'
15'
15'
MIL
TO
N R/
W
TO
WN
OF
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
PB 84-280
D/R 3457-313
LORRAINE WASSERMAN
TP# 235-20.00-377.00
PB 84-280
D/R 3886-145
PATRICIA A. ETTINGER
TP# 235-20.00-363.00
PB 84-280
D/R 3290-242
WALTER A. HOFF
TP# 235-20.00-360.00
84-2
80
PE PER P.B.
EXIS
TIN
G 15'
VARIE
S
PB 84-280
D/R 3340-42
CLAUDETTE CORSON
TP# 235-20.00-368.00
114
30'
20'
20'
D/R 1139-350
DELAWARE TRANSPORTATION AUTHORITY
STATE OF DELAWARE ACTING THROUGH THE
TP# 235-20.00-11.00
D/R 1139-350
DELAWARE TRANSPORTATION AUTHORITY
STATE OF DELAWARE ACTING THROUGH THE
TP# 235-20.00-11.00
D/R 1139-350
DELAWARE TRANSPORTATION AUTHORITY
STATE OF DELAWARE ACTING THROUGH THE
TP# 235-20.00-11.00
D/R 1139-350
TRANSPORTATION AUTHORITY
THROUGH THE DELAWARE
STATE OF DELAWARE ACTING
TP# 235-20.00-11.00
D/R 1139-350
TRANSPORTATION AUTHORITY
THROUGH THE DELAWARE
STATE OF DELAWARE ACTING
TP# 235-20.00-11.00
D/R 1139-350
DELAWARE TRANSPORTATION AUTHORITY
STATE OF DELAWARE ACTING THROUGH THE
TP# 235-20.00-11.00
D/R 2614-328
SU-SAX ACRES, LLC
TP# 235-20.00-12.00
202
107
PB 84-280
D/R 4354-65
SIMMS
A. LIVINGSTON & BEATRICE L.
RICHARD J. LIVINGSTON, GALE
TP# 235-20.00-375.00
202
D/R 2614-328
SU-SAX ACRES, LLC
TP# 235-20.00-12.00
204
D/R 1979-216
AARON W. & ELAINE E. SMITH
TP# 235-20.00-9.00
115
PB 84-280
D/R 3300-104
SPRINGER, H/W
EDWARD G. & DELORES O.
TP# 235-20.00-367.00
123
PB 84-280
D/R 3295-218
PATTERSON, H/W
WILLIAM T. & KATHLEEN J.
TP# 235-20.00-359.00UNOFFICIAL WEBSITE
COPY
N
60 90
SCALE
300
FEET
EC-02
COMPLIANCE PLAN
ENVIRONMENTAL
MA
TC
HLIN
E S
TA 12
5+
50
MA
TC
HLIN
E S
TA 13
3+
00
ON THIS SHEET
WATERS OF THE U.S., INCLUDING WETLANDS,
NOTE: THERE ARE NO IMPACTS TO THE
LEGEND
WETLAND BOUNDARY (CORPS)
ORDINARY HIGH WATER
ORDINARY HIGH WATER/ WETLAND
34
126+00
127+00
128+00129+00 130+00 131+00 132+00 133+00
84-280
PER P.B.
EASEMENT
ACCESS
UTILITY, AND
DRAINAGE,
EX. 15'
200+
00
RIPRAP
R-4
10 S.Y.
127
PB 84-280
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-560.00
128
D/R 2966-82
MILTON PROPERTIES, LLC
TP# 235-20.00-561.00
129
PB 80-69
D/R 3651-145
KC LAND HOLDINGS, LLC
TP# 235-20.11-9.00
PB 80-69
D/R 3651-145
KC LAND HOLDINGS, LLC
TP# 235-20.11-9.00
204
D/R 1979-216
AARON W. & ELAINE E. SMITH
TP# 235-20.00-9.00
200
200
32.5'
32.5'
32.5'
32.5'
D/R 1139-350
TRANSPORTATION AUTHORITY
THROUGH THE DELAWARE
STATE OF DELAWARE ACTING
TP# 235-20.00-11.00
D/R 1139-350
DELAWARE TRANSPORTATION AUTHORITY
STATE OF DELAWARE ACTING THROUGH THE
TP# 235-20.00-11.00
204
D/R 1979-216
AARON W. & ELAINE E. SMITH
TP# 235-20.00-9.00
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
EC
_02.d
gn
17:3
005-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
UNOFFICIAL WEBSITE
COPY
TRAFFIC CONTROL NOTES
( X )
THE CONTRACTOR SHALL NOT BE REQUIRED TO HAVE AN ATSSA SUPERVISOR ASSIGNED TO THIS PROJECT.
801000.
PROJECT STAFF MAY BE THE ATSSA SUPERVISOR. PAYMENT FOR ATSSA SUPERVISOR IS INCIDENTAL TO THE ITEM
GENERAL SUPERINTENDENT FOR THIS PROJECT OR ANOTHER ATSSA CERTIFIED MEMBER OF THE CONTRACTOR'S
THE CONTRACTOR SHALL HAVE AN ATSSA SUPERVISOR ASSIGNED TO THIS PROJECT. THE CONTRACTOR'S
THE ATSSA SUPERVISOR. PAYMENT FOR ATSSA SUPERVISOR SHALL BE PAID FOR UNDER ITEM 801000.
DEVICES FOR THIS PROJECT. THE CONTRACTOR'S GENERAL SUPERINTENDENT FOR THIS PROJECT SHALL NOT BE
SOLE JOB SHALL BE SUPERVISION OF THE INSTALLATION, OPERATION AND MAINTENANCE OF TRAFFIC CONTROL
THE CONTRACTOR SHALL HAVE AN ATSSA SUPERVISOR ASSIGNED TO THE PROJECT. THE ATSSA SUPERVISOR'S
( )
( )
NOT TO SCALE
FOR THIS PROJECT.
AMERICAN TRAFFIC SAFETY SERVICES ASSOCIATION (ATSSA) CERTIFIED TRAFFIC CONTROL SUPERVISOR REQUIREMENT 3.
35
EXTENSION WITH ANY APPROPRIATE MODIFICATIONS.
THE APPROVED SEDIMENT AND STORMWATER MANAGEMENT PLANS. ACCEPTANCE OF THE PROJECT IS ANTICIPATED TO
SEDIMENT AND STORMWATER MANAGEMENT PLAN AND ISSUE AN ENGINEER THREE MONTHS PRIOR TO THE EXPIRATION OF
EXTEND BEYOND THE FIVE YEARS, THE CONTRACTOR WILL INFORM THE STORMWATER ENGINEER WILL REVIEW THE CURRENT
PERIOD, BEGINNING ON THE DATE THE STORMWATER ENGINEER SIGNED THE CONSTRUCTION TITLE SHEET. IF THE FINAL
DELDOT'S DELEGATED AUTHORITY. THE SEDIMENT AND STORMWATER MANAGEMENT PLANS ARE VALID FOR A FIVE YEAR
THE SEDIMENT AND STORMWATER MANAGEMENT PLANS HAVE BEEN APPROVED BY DELDOT'S STORMWATER ENGINEER UNDER 1.
THE DISTURBED AREA FOR THIS PROJECT IS 2.5440 ACRES.2.
THE ADDITIONAL IMPERVIOUS AREA CREATED BY THIS PROJECT IS 0.8321 ACRES.3.
EROSION AND SEDIMENT CONTROL NOTES
TRM NOTES
NONE( ) INSIGNIFICANT
( ) MINOR
( X ) MAJOR
SOTRMWATER REGULATIONS
CONTRACTOR TRAINING PROGRAM, AS DEFINED IN SECTION 6.2 OF THE DELAWARE SEDIMENT AND
PHASE
CSF
XXX
CSF
CONSTRUCTION PHASING & M.O.T
BARRICADE, TYPE 3
CONCRETE SAFETY BARRIER - PORTABLE
CONSTRUCTION SAFETY FENCE / LENGTH
CONSTRUCTION SAFETY FENCE
CONSTRUCTION WARNING SIGN LOCATION
CONSTRUCTION WARNING SIGN
CRASH CUSHION ARRAY
DRUM - TRAFFIC CONTROL
FLAGGER LOCATION
PHASING TRAFFIC FLOW ARROW
TEMPORARY CONSTRUCTION
TEMPORARY PAVEMENT MARKING ARROW
TRUCK WITH MOUNTED ATTENUATOR
WORK AREA - ACTIVE PHASE
ROAD WORK
END
CFL
SSF
SSF
RSF
EROSION & SEDIMENT CONTROL
COMPOST FILTER LOG
COMPOST FILTER LOG / LENGTH
DEWATERING BAG
DEWATERING BASIN
EARTH DIKE
INLET SEDIMENT CONTROL
PERIMETER DIKE/SWALE
PORTABLE SEDIMENT TANK
SANDBAG DIKE
SANDBAG DIVERSION
STONE CHECK DAM
STABILIZED CONSTRUCTION ENTRANCE
SILT FENCE / LENGTH
SILT FENCE
REINFORCED SILT FENCE / LENGTH
REINFORCED SILT FENCE
SUPER SILT FENCE / LENGTH
SUPER SILT FENCE
SUMP PIT
SEDIMENT TRAP / NUMBER
SEDIMENT TRAP
SEDIMENT TRAP WITH INLET AS OUTLET
SEDIMENT TRAP PIPE OUTLET
CFL
SP
ST
ST
ST
DWB
ED
RSF
SCE
SF
PST
SB
SBD
SF
ST
STILLING WELL
TEMPORARY SWALE
TEMPORARY SLOPE DRAIN
TURBIDITY CURTAIN / LENGTH
TURBIDITY CURTAINT
TSD
SW
VERTICAL DIFFERENCES SHALL BE CORRECTED IN ACCORDANCE WITH TABLE 6G-1 OF THE DELAWARE MUTCD.
ROADWAY AT WHICH TIME THE MATERIAL WOULD BE PAID FOR UNDER THE RESPECTIVE CONTRACT MATERIAL ITEM.
USED TO PROTECT EDGE DROP-OFFS, UNLESS THE MATERIAL IS EVENTUALLY UTILIZED AS PART OF A PERMANENT
PAY ITEM. NO SEPARATE PAYMENT SHALL BE MADE FOR MILLINGS OR GABC TEMPORARY ROADWAY MATERIAL (TRM)
PUSHED AHEAD AND USED IN THE NEXT SEGMENT AND SHALL BE INCIDENTAL TO THE PARTICULAR BASE COURSE
THE SLOPE SPECIFIED IN TABLE 6G-1 AND SHALL BE COMPACTED. EXCESS BASE COURSE MATERIAL SHALL BE
NO. 801000 - MAINTENANCE OF TRAFFIC. THE BASE COURSE MATERIAL SHALL BE PLACED AT NO GREATER THAN
LANES AND PAVEMENT BOX, EDGE OF TRAVELWAY, DRIVEWAY OR ENTRANCE ACCESS SHALL BE INCIDENTAL TO ITEM
GRADING AND MAINTAINING BASE COURSE THAT IS BEING USED FOR ROADWAY WEDGE/FILLET BETWEEN TRAVEL
EDGE OF ROADWAY DROP-OFFE.
CONSTRUCTION
EDGE DROP-OFFS ADJACENT TO LIVE ROADWAY(LANES AND SHOULDER) AND THE PROPOSED ROAD D.
LOW VOLUME ACCESS RAMPS (IDENTIFIED IN THE CONTRACT DOCUMENTS)C.
ENTRANCESB.
DRIVEWAYSA.
COMPACTED TO HELP PREVENT THE MATERIAL FROM UNRAVELLING:
ENGINEER TO USE BITUMINOUS CONCRETE OR COLD PATCH. ALL MILLINGS AND GABC WILL BE ROLLED AND
EDGE DROP OFF NEEDS TO BE MAINTAINED UNLESS OTHERWISE NOTED IN THE PLANS OR DIRECTED BY THE
MILLINGS OR GABC SHALL BE USED AT THE FOLLOWING LOCATIONS WHERE ACCESS TO A BUSINESS, RESIDENCE, OR
CONCRETE SHALL BE PAID UNDER THE BITUMINOUS CONCRETE MILLING ITEM.
OR BITUMINOUS CONCRETE WEDGE SHALL BE PAID AS NOTED IN THE CONTRACT DOCUMENTS.TAPER MILL BITUMINOUS
THE CONTRACT DOCUMENTS OR APPROVED BY THE ENGINEER. PAYMENT FOR COLD PATCH, BITUMINOUS CONCRETE
PLANS. USE COLD PATCH, BITUMINOUS CONCRETE, BITUMINOUS CONCRETE WEDGE, OR TAPER MILL, AS NOTED IN
AND PAVING OPERATIONS) IS PROHIBITED UNLESS IT IS OTHERWISE DESIGNATED TO BE USED IN THE CONTRACT
SURFACE, POTHOLE REPAIR, TAPERED EDGE FOR UTILITIES, BUTT JOINTS, AND LONGITUDINAL DROP-OFFS (MILLING
WAY, HIGH VOLUME ENTRANCES AND ACCESS RAMP FOR THE PURPOSE OF PROVIDING A TEMPORARY ROADWAY
THE USE OF MILLINGS AND GRADED AGGREGATE BASE COURSE (GABC) IN THE TRAVEL WAY, TEMPORARY TRAVEL 1.
THE INSTALLATION OF THE PERMANENT SIGNS IN THE APPROPRIATE LOCATION.
THAT A UTILITY CONFLICT EXISTS, WHICH SHALL BE VERIFIED BY THE ENGINEER; OR CONCRETE MEDIANS PREVENT
SIGN. THE USE OF SKID-MOUNTED SIGN SUPPORTS IS NOT ALLOWED UNLESS THE CONTRACTOR CAN DEMONSTRATE
POSTS AND SHALL BE MOUNTED AT A HEIGHT OF 7 FEET, MEASURED FROM THE ROADWAY TO THE BOTTOM OF THE
ADVANCE WARNING SIGNS SHALL BE GROUND-MOUNTED ON TWO NCHRP-350 OR MASH APPROVED BREAKAWAY
SHALL BE PLACED AT A DISTANCE NOT LESS THAN 500 FEET DOWNSTREAM OF THE WORK AREA. ALL PERMANENT
FROM THE WORK AREA. ON INTERSECTING ROADWAYS WITHIN THE PROJECT LIMITS, A "ROAD WORK AHEAD" SIGN
WORK AREA IN BOTH DIRECTIONS. AN "END ROAD WORK ZONE" SIGN SHALL BE LOCATED 500 FEET DOWNSTREAM
WITHIN THE MAINLINE WORK AREA, PERMANENT ADVANCE WARNING SIGNS SHALL BE INSTALLED IN ADVANCE OF THE 2.
UNLESS DIRECTED OTHERWISE BY THE DELDOT DISTRICT SAFETY OFFICER: TYPICAL APPLICATION 3, 10, 11B.
TRAFFIC CONTROL AND SAFETY REQUIREMENTS. THIS PROJECT IS SUBJECT TO THE FOLLOWING TYPICAL APPLICATIONS
TYPICAL APPLICATIONS PER THE DELAWARE MUTCD SHALL BE INCORPORATED TO ACHEIVE REQUIRED TEMPORARY 1.
DATEDELDOT STORMWATER ENGINEER
CONSTRUCTION WILL BE ACCOMPLISHED PURSUANT TO THE PLAN."OF THE DELAWARE SEDIMENT AND STORMWATER REGULATIONS AND THAT ALL CLEARING, GRADING, AND"I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THESE PLANS MEET THE REQUIREMENTS
LSI
SEDIMENT AND STORMWATER REGULATIONS.
CERTIFIED CONSTRUCTION REVIEWER (CCR), AS DEFINED IN SECTION 6.3 OF THE DELAWARE
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
X1.d
gn
08:0
920-
AU
G-2019
CONTROL PLAN
M.O.T., AND EROSION
CONSTRUCTION PHASING,
UNOFFICIAL WEBSITE
COPY
N
SCALE
FEET
0 150 300 450
FEDERAL STREET
LAVINIA RO
AD
PHASE 3 - LAVINIA RD TO TIMBER BRIDGE
TO TIMBER BRIDGE
PHASE 4 - FEDERAL ST
BRIDGE REHAB
PHASE 1 - TIMBER
CONNECTOR
WAGAMONS WEST
PHASE 2 -
CONNECTOR
PATCH AND SIDEWALK
PHASE 5 - BIKE LANE
(APPROX. 2500')
(APPROX. 500')
CONTRACT
COUNTYDESIGNED BY:
CHECKED BY:
BRIDGE NO.ADDENDA / REVISIONS SECTION
SHEET NO.
C:\
Users\p
aul.
moser\D
ocu
ments\Proje
cts\Milton Rail Trail\Fin
al
Desig
n\S
heets\C
S_01.d
gn
17:0
8
05-A
UG-2
019
X
CONTROL PLAN
M.O.T., AND EROSION
CONSTRUCTION PHASING,
36
T201701301
SUSSEX
PM
TF
PHASE IIMILTON RAIL TRAIL LSI
LAVINIA RD
FEDERAL ST
FEDER
AL ST
TP1
TP8
TP7
TP6
TP5
TP4
TP3
TP2
WES
T SHORE D
R
300+
00
301+
00
302+
00
303+
00
304+
00
305+
00
306+
00
307+
00
400+00
401+
00
402+
00
403+
00
403+36
WES
T SH
ORE
DR
PARK ST
200+
00
201+00
202+00
203+00
204+00
204+52
100+00
101+00
102+00
103+00
104+00
105+00
106+00
107+00
108+00
109+00
110+00
111+00
112+00
113+00
114+00
115+00
116+00
117+00
118+00
119+00
120+00
121+00
122+00
123+00
124+00
125+00
126+00
127+00
128+00129+00 130+00 131+00 132+00 133+00 134+00 135+00 135+60135+60
BEGINING PHASE 3
BARRICADE PRIOR TO
PLACE TYPE 3
MILT-W
W.V.
W.V.
F.H.
W.V.
F.H.
F.H.
VER-C
VER-C
VER-C
TMIL-W
TMIL-W
TMIL-W
TMIL-W
TMIL-W
TMIL-W
EXIS
TIN
G
R/
W
EXIS
TIN
G
R/
W
R/
W
EXIS
TIN
G
30'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
15'
15'
15'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
32.5'
VARIE
S
30'
20'
20'
UNOFFICIAL WEBSITE
COPY
N
PHASE 1 - TIMBER BRIDGE REHAB
WORK IN THIS PHASE
WORK COMPLETED
SHADING LEGEND
37
SEQUENCE OF CONTRUCTION - PHASE 1
CONCURRENCE FROM THE STORMWATER ENGINEER.
15. REMOVE EROSION AND SEDIMENT CONTROLS AS DIRECTED BY THE ENGINEER WITH
TOPSOIL, SEED, AND MULCH.
14. STABILIZE ALL DISTURBED AREAS WITHIN THIS PHASE OF CONSTRUCTION WITH
13. INSTALL APPROACH AND BRIDGE RAILINGS.
12. CONSTRUCT TRAIL INTEGRATION ZONE AS SHOWN IN SHEET 28.
11. INSTALL GLULAM DECK PANELS.
10. RE-INSTALL TIMBER BEAMS IN SPAN 1 AND 8.
IN SHEETS 27 AND 28.
9. INSTALL GRS-IBS ABUTMENTS INCLUDING APPROACH RAILING FOOTINGS AS SHOWN
8. REMOVE EXISTING ABUTMENTS AND EXCAVATE FOR PROPOSED ABUTMENTS.
STRUCTURE REMOVAL SHEET, SHEET 26 STORE AS NOTED.
7. REMOVE AND STORE TIMBER BEAMS FROM SPANS 1 AND 8 AS SHOW IN
6. REMOVE TIMBER TIES AND CURB.
5. CLEAR AND GRUB LIMITS OF CONSTRUCTION IN THIS PHASE.
AND LAVINIA STREET.
4. INSTALL TYPE 3 BARRICADE AT LAVINIA STREET SIDEWALK, AND FEDERAL STREET
3. CONSTRUCT STABILZED CONSTRUCTION ENTRANCES.
PLAN AND AS SPECIFIED BY THE ENGINEER.
2. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THIS
1. INSTALL ALL ADVANCED WARNINGS SIGNS.
126+00127+00 128+00
129+00
130+00
SSF
95
SSF
80
84-280
PER P.B.
EASEMENT
ACCESS
UTILITY, AND
DRAINAGE,
EX. 15'
CFL
8
CFL
8
32.5'
32.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
001.d
gn
17:0
805-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 1
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
MA
TC
HLIN
E S
TA 13
0+
50
MA
TC
HLIN
E S
TA 12
6+
00 UNOFFICIAL
WEBSITE COPY
N
SHADING LEGEND
WORK IN THIS PHASE
WORK COMPLETED
PHASE 2 - WAGAMONS WEST CONNECTOR PATH
CURB RAMP
COMPLETION OF
BARRICADE UPON
PLACE TYPE 3
38
CLOSED
TRAIL
SEQUENCE OF CONSTRUCTION - PHASE 2
DIRECTED BY THE ENGINEER WITH CONCURRENCE FROM THE STORMWATER ENGINEER.
10. REMOVE EROSION AND SEDIMENT CONTROLS AFTER PERMANENT STABILIZATION AS
TOPSOIL, SEED, AND MULCH.
9. STABILIZE ALL DISTURBED AREAS WITHIN THIS PHASE OF CONSTRUCTION WITH
8 INSTALL FENCING.
OR AS DIRECTED BY THE ENGINEER.
7 REGRADE EMBANKMENT TO MEET LOWER TIER TRAIL AT A DESIRED SLOPE OF 3:1
6. CONSTRUCT PCC CURB RAMP AT WEST SHORE DRIVE.
5. CONSTRUCT HOT-MIX TRAIL.
OUTFALL POINT.
4. CONSTRUCT DITCHING AND STORM DRAINAGE SYSTEM WORKING UP STREAM FROM
TRAIL.
3. EXCAVATE AND REGRADE EMBANKMENT TO MATCH PROFILE FOR THE CONNECTOR
2. CLEAR AND GRUB THE LIMITS OF THIS PHASE OF CONSTRUCTION.
PLAN AND AS SPECIFIED BY THE ENGINEER.
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THIS
(TYP.)
PLASTIC DRUMS, 25'
CFL
8
SF
155
CFL
8
120+00121+00 122+00 123+00 124+00
125+00126+00
SF
145
PER P.B. 84-280
AND ACCESS EASEMENT
EX. 15' DRAINAGE, UTILITY,
W.V.
F.H. TMIL-W
TMIL-W
TMIL-W
CFL
8
200+00
201+00202+00
203+00
204+00
204+52
204+52
WEST SHORE DR
32.5'
32.5'
32.5'
32.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
002.d
gn
17:0
805-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 2
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
MA
TC
HLIN
E S
TA 12
0+
00
MA
TC
HLIN
E S
TA 12
6+
50UNOFFICIAL
WEBSITE COPY
N
SHADING LEGEND
WORK IN THIS PHASE
WORK COMPLETED
PHASE 2 - WAGAMONS WEST CONNECTOR PATH
39
SEQUENCE OF CONSTRUCTION - PHASE 2
DIRECTED BY THE ENGINEER WITH CONCURRENCE FROM THE STORMWATER ENGINEER.
10. REMOVE EROSION AND SEDIMENT CONTROLS AFTER PERMANENT STABILIZATION AS
TOPSOIL, SEED, AND MULCH.
9. STABILIZE ALL DISTURBED AREAS WITHIN THIS PHASE OF CONSTRUCTION WITH
8 INSTALL FENCING.
OR AS DIRECTED BY THE ENGINEER.
7 REGRADE EMBANKMENT TO MEET LOWER TIER TRAIL AT A DESIRED SLOPE OF 3:1
6. CONSTRUCT PCC CURB RAMP AT WEST SHORE DRIVE.
5. CONSTRUCT HOT-MIX TRAIL.
OUTFALL POINT.
4. CONSTRUCT DITCHING AND STORM DRAINAGE SYSTEM WORKING UPSTREAM FROM
TRAIL.
3. EXCAVATE AND REGRADE EMBANKMENT TO MATCH PROFILE FOR THE CONNECTOR
2. CLEAR AND GRUB THE LIMITS OF THIS PHASE OF CONSTRUCTION.
PLAN AND AS SPECIFIED BY THE ENGINEER.
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THIS
CFL
8
126+00127+00 128+00
129+00
130+00
MILT-W
TMIL-W
CFL
8
CFL
8
CFL
8
CFL
8
84-280
PER P.B.
EASEMENT
ACCESS
UTILITY, AND
DRAINAGE,
EX. 15'
32.5'
32.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
003.d
gn
17:0
805-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 2
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
MA
TC
HLIN
E S
TA 13
0+
50
MA
TC
HLIN
E S
TA 12
6+
00 UNOFFICIAL
WEBSITE COPY
SCALE
FEET
0 30 60 90
N
PHASE 3 - LAVINIA ROAD TO TIMBER BRIDGE
SHADING LEGEND
WORK IN THIS PHASE
WORK COMPLETED
40
SEQUENCE OF CONSTRUCTION - PHASE 3
DIRECTED BY THE ENGINEER WITH CONCURRENCE FROM THE STORMWATER ENGINEER.
6. REMOVE EROSION AND SEDIMENT CONTROLS AFTER PERMANENT STABILIZATION AS
SHOWN ON SHEET 32.
5. CONTRUCT PROPOSED STONE TRENCH BETWEEN STATION 105+00 AND 106+00 AS
WITH TOPSOIL, SEED, AND MULCH.
4. GRADE AND STABILZE ALL DISTURBED AREAS WITHIN THIS PHASE OF CONSTRUCTION
3. CONSTRUCT PROPOSED HOT-MIX TRAIL.
2. CLEAR AND GRUB LIMITS OF CONSTRUCTION WITHIN THIS PHASE OF CONSTRUCTION.
AND AS SPECIFIED BY THE ENGINEER.
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THIS PLAN
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
004.d
gn
17:0
905-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 3
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
SCE100+00
101+00102+00
103+00104+00
105+00 106+00
CLOSED
SIDEWALK
24" x 12"
R9-9
CSF
905
CSF
325
LA
VINIA
RD
WEST SHORE DR
301+00
302+00
303+00
304+00
305+00
306+00
307+00
32.5'
32.5'
32.5'
32.5'
15'
15'
15'VARIES
MA
TC
HLIN
E S
TA 10
6+
00
UNOFFICIAL WEBSITE
COPY
PHASE 3 - LAVINIA ROAD TO TIMBER BRIDGE
N
SHADING LEGEND
WORK IN THIS PHASE
WORK COMPLETED
41
SEQUENCE OF CONSTRUCTION - PHASE 3
DIRECTED BY THE ENGINEER WITH CONCURRENCE FROM THE STORMWATER ENGINEER.
6. REMOVE EROSION AND SEDIMENT CONTROLS AFTER PERMANENT STABILIZATION AS
SHOWN ON SHEET 32.
5. CONTRUCT PROPOSED STONE TRENCH BETWEEN STATION 105+00 AND 106+00 AS
WITH TOPSOIL, SEED, AND MULCH.
4. GRADE AND STABILZE ALL DISTURBED AREAS WITHIN THIS PHASE OF CONSTRUCTION
3. CONSTRUCT PROPOSED HOT-MIX TRAIL.
2. CLEAR AND GRUB LIMITS OF CONSTRUCTION WITHIN THIS PHASE OF CONSTRUCTION.
AND AS SPECIFIED BY THE ENGINEER.
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THIS PLAN
106+00 107+00 108+00109+00
110+00
111+00
112+00
113+00
CFL
8
CFL
8CSF
905
32.5'
32.5'
32.5'
32.5'
32.5' 3
2.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
005.d
gn
17:0
905-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 3
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
MA
TC
HLIN
E S
TA 10
6+
00
MA
TC
HLIN
E S
TA 11
3+
00
UNOFFICIAL WEBSITE
COPY
PHASE 3 - LAVINIA ROAD TO TIMBER BRIDGE
N
SHADING LEGEND
WORK IN THIS PHASE
WORK COMPLETED
42
SEQUENCE OF CONSTRUCTION - PHASE 3
DIRECTED BY THE ENGINEER WITH CONCURRENCE FROM THE STORMWATER ENGINEER.
6. REMOVE EROSION AND SEDIMENT CONTROLS AFTER PERMANENT STABILIZATION AS
SHOWN ON SHEET 32.
5. CONTRUCT PROPOSED STONE TRENCH BETWEEN STATION 105+00 AND 106+00 AS
WITH TOPSOIL, SEED, AND MULCH.
4. GRADE AND STABILZE ALL DISTURBED AREAS WITHIN THIS PHASE OF CONSTRUCTION
3. CONSTRUCT PROPOSED HOT-MIX TRAIL.
2. CLEAR AND GRUB LIMITS OF CONSTRUCTION WITHIN THIS PHASE OF CONSTRUCTION.
AND AS SPECIFIED BY THE ENGINEER.
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THIS PLAN
113+00114+00 115+00 116+00
117+00118+00
119+00
120+00
CFL
8
CFL
8
TP6
32.5'
32.5'
32.5'
32.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
006.d
gn
17:0
905-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 3
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
MA
TC
HLIN
E S
TA 11
3+
00
MA
TC
HLIN
E S
TA 12
0+
00UNOFFICIAL
WEBSITE COPY
N
PHASE 3 - LAVINIA ROAD TO TIMBER BRIDGE
WORK IN THIS PHASE
WORK COMPLETED
SHADING LEGEND
43
SEQUENCE OF CONSTRUCTION - PHASE 3
DIRECTED BY THE ENGINEER WITH CONCURRENCE FROM THE STORMWATER ENGINEER.
6. REMOVE EROSION AND SEDIMENT CONTROLS AFTER PERMANENT STABILIZATION AS
SHOWN ON SHEET 32.
5. CONTRUCT PROPOSED STONE TRENCH BETWEEN STATION 105+00 AND 106+00 AS
WITH TOPSOIL, SEED, AND MULCH.
4. GRADE AND STABILZE ALL DISTURBED AREAS WITHIN THIS PHASE OF CONSTRUCTION
3. CONSTRUCT PROPOSED HOT-MIX TRAIL.
2. CLEAR AND GRUB LIMITS OF CONSTRUCTION WITHIN THIS PHASE OF CONSTRUCTION.
AND AS SPECIFIED BY THE ENGINEER.
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THIS PLAN
CFL
8
120+00121+00 122+00 123+00 124+00
125+00126+00
CFL
8
CFL
8
PER P.B. 84-280
AND ACCESS EASEMENT
EX. 15' DRAINAGE, UTILITY,
BEGINING PHASE 3
BARRICADE PRIOR TO
PLACE TYPE 3
CFL
8
200+00
201+00202+00
203+00
204+00
204+52
204+52
CLOSED
SIDEWALK
24" x 12"
R9-9
WEST SHORE DR
32.5'
32.5'
32.5'
32.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
007.d
gn
17:1
005-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 3
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
MA
TC
HLIN
E S
TA 12
0+
00
MA
TC
HLIN
E S
TA 12
6+
50UNOFFICIAL
WEBSITE COPY
N
SHADING LEGEND
WORK COMPLETED
WORK IN THIS PHASE
PHASE 4 - FEDERAL STREET TO TIMBER BRIDGE
44
DIRECTED BY THE ENGINEER WITH CONCURRENCE FROM THE STORMWATER ENGINEER.
6. REMOVE EROSION AND SEDIMENT CONTROLS AFTER PERMANENT STABILIZATION AS
ENGINEER, IF DAMAGED AS A RESULT OF CONSTRUCTION ACCESS.
AT THE INTERSECTION OF THE TRAIL AND FEDERAL STREET, AS DIRECTED BY THE
5. RECONSTRUCT THE PEDESTRIAN CONNECTION AND/ OR ADJACENT SIDEWALK PANELS
SEED, AND MULCH.
4. STABILIZE ALL DISTURBED AREAS WITHIN THIS PHASE OF CONSTRUCTION WITH TOPSOIL,
3. CONSTRUCT PROPOSED HOT-MIX TRAIL.
2. CLEAR AND GRUB LIMITS OF CONSTRUCTION WITHIN THIS PHASE OF CONSTRUCTION.
AND AS SPECIFIED BY THE ENGINEER.
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THIS PLAN
SEQUENCE OF CONSTRUCTION - PHASE 4
CFL
8
126+00127+00 128+00
129+00
130+00
84-280
PER P.B.
EASEMENT
ACCESS
UTILITY, AND
DRAINAGE,
EX. 15'
CFL
8
32.5'
32.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
008.d
gn
17:1
005-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 4
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
MA
TC
HLIN
E S
TA 13
0+
50
MA
TC
HLIN
E S
TA 12
6+
00 UNOFFICIAL
WEBSITE COPY
CFL
8CFL
8CFL
8
CFL
8CFL
8
SF
125
131+00
132+00
133+00
134+00
135+00135+60135+60
CSF
190
(TYP.)
PLASTIC DRUMS, 25'
FEDER
AL ST
FEDER
AL ST
400+
00
401+00
402+00
403+00
403+36
PARK ST
EXIS
TIN
G
R/
W
EXIS
TIN
G
R/
W
R/
W
EXIS
TIN
G
30'
32.5'
32.5'
30'
20'
20'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
009.d
gn
17:1
005-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 4
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
MA
TC
HLIN
E S
TA 13
0+
50
N
SHADING LEGEND
WORK IN THIS PHASE
WORK COMPLETED
PHASE 4 - LAVINIA ROAD TO TIMBER BRIDGE
45
SEQUENCE OF CONSTRUCTION - PHASE 3
DIRECTED BY THE ENGINEER WITH CONCURRENCE FROM THE STORMWATER ENGINEER.
6. REMOVE EROSION AND SEDIMENT CONTROLS AFTER PERMANENT STABILIZATION AS
ENGINEER, IF DAMAGED AS A RESULT OF CONSTRUCTION ACCESS.
AT THE INTERSECTION OF THE TRAIL AND FEDERAL STREET, AS DIRECTED BY THE
5. RECONSTRUCT THE PEDESTRIAN CONNECTION AND/ OR ADJACENT SIDEWALK PANELS
SEED, AND MULCH.
4. STABILIZE ALL DISTURBED AREAS WITHIN THIS PHASE OF CONSTRUCTION WITH TOPSOIL,
3. CONSTRUCT PROPOSED HOT-MIX TRAIL.
2. CLEAR AND GRUB LIMITS OF CONSTRUCTION WITHIN THIS PHASE OF CONSTRUCTION.
AND AS SPECIFIED BY THE ENGINEER.
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THIS PLAN
UNOFFICIAL WEBSITE
COPY
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
CS_
00010.d
gn
17:3
605-
AU
G-2019
SCALE
FEET
0 30 60 90
CONTROL PLAN - PHASE 5
M.O.T., AND EROSION
CONSTRUCTION PHASING, LSI
100+00101+00
102+00103+00
104+00105+00 106+00
(TYP.)
PLASTIC DRUMS, 40'
CSF
905
CSF
325
LA
VINIA
RD
WEST SHORE DR32.5'
32.5'
32.5'
32.5'
15'
15'
15'VARIES
MA
TC
HLIN
E S
TA 10
6+
00
N
SHADING LEGEND
WORK IN THIS PHASE
WORK COMPLETED
SIDEWALK
PHASE 5 - BIKE LANE PATCH AND
46
SEQUENCE OF CONSTRUCTION - PHASE 5
DIRECTED BY THE ENGINEER WITH CONCURRENCE FROM THE STORMWATER ENGINEER.
7. REMOVE EROSION AND SEDIMENT CONTROLS AFTER PERMANENT STABILIZATION AS
CONSTRUCTION.
6. TOPSOIL AND SEED DISTURBED AREAS WITHIN THIS PHASE OF
ROAD TO CONSTRUCT SIDEWALK TIE-IN TO EXISTING SIDEWALK ALONG LAVINIA ROAD.
5. UTILIZE 'RIGHT TURN LANE CLOSED' SIGN TO CLOSE THE RIGHT TURN LANE OF LAVINIA
4. UTILIZE TA-3 TO CONSTRUCT PCC CURB RAMP ALONG LAVINIA ROAD.
CONSTRUCT FULL DEPTH SHOULDER PATCH.
3. UTILIZE TA-10 TO CLOSE THE NORTHBOUND LANE OF LAVINIA ROAD TO SAWCUT AND
2. EXCAVATE AND CONSTRUCT HOT-MIX PATHWAY WITHIN THIS PHASE OF CONSTRUCTION.
1. INSTALL ALL EROSION AND SEDIMENT CONTROL MEASURES.
UNOFFICIAL WEBSITE
COPY
N
SS-01
AND CONDUIT PLAN
SIGNING, STRIPING
47
100+00101+00
102+00103+00
104+00105+00 106+00
WV
+
+
+
+
+
LA
VINIA
RD
WEST SHORE DR
301+00
302+00
303+00
304+00
305+00
306+00
307+00
32.5'
32.5'
32.5'
32.5'
15'
15'
15'VARIES
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
SS_
01.d
gn
17:1
105-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
MA
TC
HLIN
E S
TA 10
6+
00
PAVEMENT MARKINGS LEGEND
ITEM QUANTITYSYM
B 67 LF5" SOLID (ITEM 817013)
EPOXY RESIN PAINT PAVEMENT STRIPING, WHITE
A 1 EACHWHITE, BIKE SYMBOL (ITEM 817015)
PREFORMED THERMOPLASTIC PAVEMENT MARKING
C 4 LF5" DOTTED - 2' LINE & 6' GAP (ITEM 817013)
EPOXY RESIN PAINT PAVEMENT STRIPING, WHITE
A
B
SS-1
6B
SS-1
6A
SS-1
5
SS-1
2
SIGN WITH LANDSCAPING
WAGAMONS WEST SHORE
SIGN WITH LANDSCAPING
WAGAMONS WEST SHORE SS-1
1
SS-1
3
STOP
STOP
SS-1
4
SS-1
7
Welcome To
Wagamon's
West Shore
C
STRIPING
DASHED BIKELANE
MATCH TO EXISTING UNOFFICIAL WEBSITE
COPY
N
SS-02
AND CONDUIT PLAN
SIGNING, STRIPING
48
106+00 107+00 108+00109+00
110+00
111+00
112+00
113+00
32.5'
32.5'
32.5'
32.5'
32.5' 3
2.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
SS_
02.d
gn
17:1
105-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
MA
TC
HLIN
E S
TA 10
6+
00
MA
TC
HLIN
E S
TA 11
3+
00
UNOFFICIAL WEBSITE
COPY
N
SS-03
AND CONDUIT PLAN
SIGNING, STRIPING
49
113+00114+00 115+00 116+00
117+00118+00
119+00
120+00
TP6
32.5'
32.5'
32.5'
32.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
SS_
03.d
gn
17:1
205-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
MA
TC
HLIN
E S
TA 11
3+
00
MA
TC
HLIN
E S
TA 12
0+
00UNOFFICIAL
WEBSITE COPY
W.V.
F.H. TMIL-W
TMIL-W
TMIL-W
N
SS-04
AND CONDUIT PLAN
SIGNING, STRIPING
50
120+00121+00 122+00 123+00 124+00
125+00126+00
PER P.B. 84-280
AND ACCESS EASEMENT
EX. 15' DRAINAGE, UTILITY,
200+00
201+00202+00
203+00
204+00
204+52
204+52
DPE-
UG
DPE-UG
WV
WV
WV
WEST SHORE DR
32.5'
32.5'
32.5'
32.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
SS_
04.d
gn
17:1
205-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
MA
TC
HLIN
E S
TA 12
0+
00
MA
TC
HLIN
E S
TA 12
6+
50
SS-4
1 BIKE ROUTE
SS-4
2
UNOFFICIAL WEBSITE
COPY
MILT-W
TMIL-W
N
SS-05
AND CONDUIT PLAN
SIGNING, STRIPING
51
126+00127+00 128+00
129+00
130+00
84-280
PER P.B.
EASEMENT
ACCESS
UTILITY, AND
DRAINAGE,
EX. 15'
32.5'
32.5'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
SS_
05.d
gn
17:1
205-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
MA
TC
HLIN
E S
TA 13
0+
50
MA
TC
HLIN
E S
TA 12
6+
00 UNOFFICIAL
WEBSITE COPY
W.V.
F.H.
W.V.
F.H.
TMIL-W
TMIL-W
N
SS-06
AND CONDUIT PLAN
SIGNING, STRIPING
52
131+00
132+00
133+00
134+00
135+00135+60135+60
VER-C
VER-C
VER-C
WV
+
+
+
+
+
+
WV
FEDER
AL ST
FEDER
AL ST
400+
00
401+00
402+00
403+00
403+36
PARK ST
EXIS
TIN
G
R/
W
EXIS
TIN
G
R/
W
R/
W
EXIS
TIN
G
30'
32.5'
32.5'
30'
20'
20'
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
SS_
06.d
gn
17:2
005-
AU
G-2019
SCALE
FEET
0 30 60 90LSI
MA
TC
HLIN
E S
TA 13
0+
50
BIKE ROUTE
YIELD
HERE
TO
STOP
LIMITSPEED
25
STOP
AHEAD
LIMITSPEED
25
YIELD
HERE
TO
HIGHWAYA
ADOPT
NELSON BETTSIN MEMORY OF
PAVEMENT MARKINGS LEGEND
ITEM QUANTITYSYM
ACCESS
CONSTRUCTION
RESULT OF
DAMAGED AS A
BE REPAIRED IF
CROSSWALK TO
A 80 SF24" SOLID (ITEM 817002)
ALKYD-THERMOPLASTIC PAVEMENT STRIPING, WHITE
A
SS-6
3
SS-6
1
SS-6
2
SS-6
5
SS-6
11A
SS-6
11B
SS-6
8
SS-6
7
SS-6
10
SS-6
4A
SS-6
4B
SS-6
9A
SS-6
9B
SS-6
9C
SS-6
6A
SS-6
6B
UNOFFICIAL WEBSITE
COPY
SS-07
AND CONDUIT PLAN
SIGNING, STRIPING
53
PHASE IIMILTON RAIL TRAIL
CONTRACT
T201701301
COUNTYDESIGNED BY:
CHECKED BY:
XBRIDGE NO.
SUSSEX
ADDENDA / REVISIONS SECTION
SHEET NO.PM
TF
C:\
Users\
paul.
moser\
Docu
ments\
Projects\
Milton
Rail Trail\
Fin
al Desig
n\
Sheets\
SS_
07.d
gn
17:1
305-
AU
G-2019
LSI
PERMANENT SIGN SCHEDULE
#NO.
SHEET
IDENTIFIER
PLAN
DESIGNATION
SIGNQTY. DESCRIPTION
(IN)
WIDTH
SIGN
(IN)
HEIGHT
SIGN
(SF)
AREA
SIGN(EACH)
ITEM 819018 SINGLE POST
MULTIPLE SIGN POSTS (SF)
REMOVAL OF TRAFFIC SIGN(S) ON
ITEM 819019 INSTALLATION OR
TYPE
INSTALLATION
POST
(W/ Basepost)
12' Post
Code X11
(EACH)
0-6"
4" HOLE,
ITEM 819016
(EACH)
>6"
4" HOLE,
ITEM 819017
REMARKS
DISPOSITION
SIGNREMOVE INSTALL
DISPOSITION
SIGNREMOVE INSTALL
SS-1 1
REMAIN
SS-1
1
SS-1
SS-1
1
SS-6
SS-6
1 28"
SS-6
SS-6
D3-2-DE1
1 WELCOME TO 36" 32" REMAIN
SS-6
1 DEVELOPMENT NAME 36" 32" REMAIN
SS-6
1
SS-6
1
SS-6
1
SS-6
1
SS-6
1
SS-6
R1-5_L
1 12"
SS-6
1 YIELD HERE TO PEDESTRIANS (Left with Pedestrian Symbol) 36" 36"
STOP 36" 36"
SR1-16-DE STOP (Shared Use Path Only) NEW 1 SOIL 1
R1-1
R2-1-25 24"SPEED LIMIT (25 MPH) REMAIN
REMAIN
STOP (Shared Use Path Only)SR1-16-DE 1 NEW 1 SOIL 1
STOP (Shared Use Path Only)SR1-16-DE 1
R1-5_L 1 YIELD HERE TO PEDESTRIANS (Left with Pedestrian Symbol) 36" 36" REMAIN
W1-10_L COMBINATION HORIZONTAL ALIGNMENT/INTERSECTION (LEFT ARROW) 36" 36" REMAIN
REDUCE SPEED LIMIT AHEAD (25 MPH)W3-5-25
W16-7P_L
36" 36" REMAIN
DE-14-DE 24" 24" REMAIN
D11-1 BIKE ROUTE 24" 18"
9"
W11-2 1 PEDESTRIAN 30" 30" REMAIN
1 24" 12"
REMAIN
REMAIN
PAGE TOTALS 2 6 0 0 5 0 0
2 6 0 0 5 0 0JOB TOTALS
SS-1
SS-1 1
1
3
WAGAMONS WEST SHORES COMMUNITY SIGN
WAGAMONS WEST SHORES COMMUNITY SIGN REMAIN
REMAIN
2
5
6A
6B
BIKE ROUTE1 D11-1 1 24" 18"
NEW 1 SOIL 1
1
SS-4
2
3
W16-7P DOWNWARD DIAGONAL ARROW (PLAQUE)
5
7
8
10
SS-6 11B W16-9P 1 24" 12" REMAINAHEAD (PLAQUE)
SS-6 11A W11-2 1 PEDESTRIAN 30" 30" REMAIN
1 30" 30"SS-1 7 W11-15 BICYCLE/ PEDESTRIAN
NEW 1
NEW 1
SOIL 1
SOIL 130"30"BICYCLE/ PEDESTRIAN1W11-154SS-1 6.25
6.25
18" 18" 2.3
18" 18" 2.3
3
4A
4B
9A
9B
9C M6-1 1
18.55
18.55
12 M6-3 12" 9" 0.75 1SS-4 BICYCLE ROUTE ARROW (THRU ARROW) NEW
REMOVEBICYCLE ROUTE ARROW (RIGHT ARROW)
1
SS-6
SS-6
W11-2 1 PEDESTRIAN 30" 30" REMAIN
1 24" 12" REMAINW16-7P DOWNWARD DIAGONAL ARROW (PLAQUE)
6A
6B
ADOPT A HIGHWAY - IN MEMORY OF NELSON BETTS
REMOVE
18" 18"UNOFFICIAL WEBSITE
COPY
UNOFFICIAL WEBSITE