Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Titan II
Precast Management System
732-866-8686
www.titaniisoftware.com
Top 10 Precast Productivity Killers 1. Double Entry or Triple Entry...entering job infor-
mation into 2 or 3 different systems or spreadsheets…leading to office complexity and mistakes.
2. Having to run around and speak with fellow work-
mates concerning customer job inquires...leading to poor customer service and often leads to an unhealthy dependency on specific employees.
3. Having to run to filing cabinets to find docu-
ments related to Jobs, Customers, Vendors, etc…total time waster.
4. Producing products before they are required by the customer…only to sit in the yard…
decreasing inventory turnover…decreasing profits.
5. Failure to adequately project driver, truck and trailer requirements leading to rush deliveries, half
full loads and emer-gency outsourc-ing...increasing overall delivery costs.
6. Lack of ade-quate quality control…leading
to production mis-takes, dead stock and a decrease in customer satisfac-tion.
7. Generating quotes and sub-
mittal packages using multiple programs and spreadsheets…leads to office complexity and mis-
takes...making it difficult to analyze and follow-up on existing sales leads.
8. Creating endless spreadsheets to analyze data…leads to office complexity and creates additional
data entry requirements.
9. Having inadequate information for decision making…leading to poor decisions and misallocating
company resources.
10. Lack of cost controls and a true costing sys-tem…leading to poor decisions and low profitability.
Top 10 Titan Productivity Tools
1. Enter it Once...Completely
Intergraded System allows infor-mation to flow to over 15 different modules ranging from quote proc-essing and submittal drawing crea-tion through Inventory manage-ment...all the way to Financial Statement Processing.
2. Information at your finger-tips…Comprehensive Job Track-
ing and Customer Relationship Management enables users to find up-to-the-minute information in a moments notice...information is shared company wide.
3. Integrated Document Management Module …leading to
significant reduction in both staff time and office expenses.
4. Powerful Production Scheduling and Inventory Man-agement System…leading to an efficient use of plant re-
sources...reducing company costs across the board.
5. Impressive Dispatch and Load Tracking System…leading
to effective resource management and improved customer service.
6. Comprehensive Quality Control Module…leading to supe-
rior products and an improvement in customer satisfaction.
7. Powerful quoting capabilities and quote management features…enabling all quotes to be generated from one central
source...leading to less mistakes, effective follow-up and more sales.
8. Flexible Custom Report Writer…giving users the capability to
produce up-to-the-minute analytical reports with little effort.
9. Over 140 reports designed specifically for the Precast Industry…including complete financial statement report-
ing...leading to effective decision making.
10. Powerful bill of materials, production processing and inventory costing features…leading to accurate costing and a
more profitable company.
Unlock Your Productivity
Titan’s Customer Relationship Manager (CRM) was designed to empower
the precast sales representative.
The “Customer Dashboard” is the center piece of our CRM system and of-
fers information that only Titan can provide. Our “Contact Management”
screen and “Weekly Planner” screen round out what might be the most pow-
erful CRM system in the precast industry.
Sales representatives can now effectively organize their customer appoint-
ments, create “to-do” lists, email clients and share all this information with
fellow employees.
Our “Drilldown” feature allows users to quickly move between customers,
contacts, jobs and quotes.
Titan’s CRM...vital information at your fingertips.
TITAN II PRECAST MANAGEMENT SY STEM
Customer Relationship Manager
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Customer Dashboard
Weekly Planner Screen
Contacts Screen
Create/Track
Appointments
Create/Track “To-Do”
Track All Customer Jobs
Track Customer Production
Schedule
Track Customer’s Aged
Inventory Items
Track Customer’s Aged
Receivables
Track Customer Shipping
Schedule
Save Email and
Communication History
Quickly Move between
Customer, Contact and Job
(Drilldown feature)
Share Information
Internally and with Other
Plants
Retrieve stored documents with a click of a button using Titan’s Integrated Document Manage-
ment module.
Imagine the possibilities...blue prints, signed delivery tickets, QC documents, production draw-
ings, MSD Sheets...countless critical documents at your fingertips. Retrieve documents by job,
customer, structure, product, vendor, ticket number...any number of ways.
Documents can be saved and indexed in multiple ways including our “Inbox”, “Email Attach-
ment” and “Quick Filing” methods.
Documents can be stored on local hardware and backed up to secured offsite storage.
This module also allows you to email any contact in the Titan II CRM module with a click of a
button. You can email multiple documents at once or just one at a time.
Additionally all emails sent or received can be tracked and linked to jobs, customers, vendors
and contacts for future retrieval...a complete email history system.
Our Email template feature can be used to completely automate the email process. Email tem-
plates can automatically fill-in the subject line, body, email address and required attachments
and is specifically useful with Quotes, Purchase Orders, Invoices and Customer Statements.
TITAN II PRECAST MANAGEMENT SY STEM
Document Management
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Retrieve, View, Reprint and
Email Any Type of Document
File/Index Documents by Job,
Customer, Structure, Product,
Vendor, etc.
Track Email History
Email Template Feature
Track Any Document Type e.g.,
Blue Prints
Signed Quotes
Signed Sales Orders
Customer POs
Production Drawings
Signed Delivery Tickets
Inventory Packing Slips
Vendor Invoices
MSD Sheets
QC Documents
Production Forms
Time Sheets
Customer Checks
Security Features
Archiving Feature
Email Quotes
Email Purchase Orders
Email Customer Invoices
Email Customer Statements
The Visual Takeoff module featured in Titan II is the most advanced and
efficient way to perform takeoffs and piecing up structures. A picture of the
stack and a plan view displays right next to your takeoff to give you a visual
representation of the structure you are working on. With its flexibility you
can piece and re-piece structures until it fits your needs. Titan II allows for
changing one piece at a time or the new Autobuild feature that will piece the
entire structure at once. Autobuild will allow you to use completely different
configurations of the entire structure just by clicking a button. Once the
structure is pieced up, it automatically loads those products into your sales
order or quote.
Sales orders and quotes can be printed in detail or summary format. Pro-
duction drawings are available in many different styles and can be printed
by job or in coordination with the production schedule.
TITAN II PRECAST MANAGEMENT SY STEM
Visual Takeoff Manager
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Automatic Resize Feature Automatic Build Feature Manual Build Feature View Structure while Build-
ing Structure Type Defaults Job Defaults Copy Structure Feature Automatic Loading of Kit
Items Miscellaneous Item Addi-
tions Price Allocation Feature Corner Hole Calculation Corner Hole Push Feature Hole Proximity Warning Numerous Pricing Methods Unlimited Price Levels Job Discount Feature Structure Type Discount
Feature Production Drawings One
Per Page, Two Per Page, Three Per Page, Six Per Page
Print Quotes/Sales Orders by Structure/Product Detail, Structure Summary, or Struc-ture Type Summary
Quote Any Type of Product
By directly integrating with Titan’s Visual Estimator, Titan CAD is a whole new
approach at producing and organizing custom drawings. Titan CAD gives users
the ability to automatically generate drawings directly from dimensions en-
tered into Titan’s Visual Estimator. Drawings can be further customized with
virtually no limits.
Numerous drawing tools enable users to quickly add objects, dimensions, call-
outs and sub drawings. Object groups can be saved and organized as drawing
kits. Objects and sub drawings can be associated with existing product codes
and automatically added as components to a product’s bill of materials. Prod-
uct drawings can be automated using logic fields in conjunction with drawing
kits. Rebar layouts can be automatically created while producing rebar leg-
ends.
Update job detail information, create custom BOMs
and produce custom drawings in a single process using
Titan CAD.
TITAN II PRECAST MANAGEMENT SY STEM
Titan CAD
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.muka.net
TITAN II PRECAST MANAGEMENT SYSTEM
Create Custom Drawings
Automate Drawings
Create Shop Drawings
Create Submittal Drawings
Directly Integrates with Titan’s
Visual Estimator
Enter Job Line Items and
Drawings Simultaneously
Create and Organize Drawing
Kits
Automatically Dimension Ob-
jects
Automate Callouts
Create and Organize Sub-
Drawings (Blocks)
Create Drawing Logic Fields
Automatically load Compo-
nents into Product BOM
Automate Rebar Layouts and
Rebar Legends
Associate Objects with Product
Codes
Use Hole and Object Weight
to Increase/Decrease Finished
Product Weight
The Visual Estimator is designed to make the estimating process for custom
products easy and precise. By enabling users to view a drawing while enter-
ing custom dimensions the Visual Estimator can be configured to automati-
cally create accurate, detailed bills of materials.
Concrete costs, material costs, labor costs, overhead costs and product pric-
ing can all be automatically calculated for the dimensions entered.
There is no limit to the number of “Visual Worksheets” that can be added to
the Titan II Precast Management System. Visual Worksheets can then be
attached to specific product codes. When a user enters that product code
into the job screen the Visual Estimator will automatically popup prompting
the user to enter the required dimensions.
Not-to-Scale production drawings with detailed bill of materials are included
with this powerful feature.
TITAN II PRECAST MANAGEMENT SY STEM
Visual Estimator Feature
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Visually Estimate Custom
Products
Estimate Concrete Costs
Estimate Material Costs
Estimate Labor Costs
Estimate Overhead Costs
Estimate Pricing
Generate Product Descrip-
tion based on Custom Di-
mensions
Copy Custom Products
Generate Not-to-Scale Pro-
duction Drawings
View/Print Numerous Cal-
culations
View/Print Estimating
Sheet
Unlimited Number of
Drawings and Configura-
tions
Track Mark Numbers
Used by Estimators and
Sales Reps
Now with Titan II Precast Management System, anyone in the office can
answer customer questions instantly. No more running around looking for
job folders or running out to the yard looking for pieces.
Informative inquiry screens centralize all critical job information empowering
everyone in the office.
Through the use of customer “anticipation dates”, “schedule dates”,
“production dates”, “pick dates” and “shipped dates”, Titan II brings a
wealth of information to the screen. Job status, pricing, structures, products
and drawings are all at your fingertips.
Titan II will not only improve customer service, it will improve overall com-
pany profitability.
TITAN II PRECAST MANAGEMENT SY STEM
Sales Order Processing
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Feature Rich Job Inquiry
View Quotes, Not Ac-
cepted Quotes, Open Job
Orders, Pending Orders,
Completed Orders
Unlimited Price Levels
Specific Job Pricing
Job Discount Features
Track Structures/Products
Track Price/Yards/
Weights
View Customer Anticipa-
tion Dates
View Schedule Dates
View Production Dates
View Ship/Invoice Dates
View Product Quantities
Record Job Notes
Multi-plant
Titan’s production scheduling features were specifically designed for the
Precast industry. The challenges of tracking and scheduling “special” items
as well as stocked items becomes considerably simpler using Titan II.
Various quantity, capacity and conflict warnings all aid in helping the produc-
tion scheduler fulfill his/her day to day requirements.
Through the use of “Releasing Items”, “Customer Anticipation Dates” and
“Dispatch Dates”, Titan enables the production scheduler to view into the
future and avoid problems before they occur.
Plant efficiency and customer service can be dramatically improved through
the use of the Titan II Precast Management System.
TITAN II PRECAST MANAGEMENT SY STEM
Production Processing
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Track/Schedule Specials
Track/Schedule Inventory
Schedule by “Form”
Availability
Monitor Dispatch Activity
Quantity On Hand
Warnings
Release Items for Production
Identify Scheduling
Conflicts
Create Multiple Production
Departments
View Customer Anticipation
Dates
View Dispatch Dates
Schedule Weeks in Advance
Print Production Schedule
by Department
View Estimated Man-hours
Required by Department
Many Customer/Job Inquiry
Screens
Export Information to Excel
or Word
Titan enables the production scheduler and dispatcher to act as a
cohesive unit.
By sharing information through Titan, both production and dispatch
personnel are given the tools to achieve efficiencies that would otherwise
be unobtainable using a manual system.
Through the use of many features created specifically for the dispatcher, the
balance of client expectations and production resources can be managed
more effectively.
With complete job information at everyone’s fingertips, the continuous task
of answering customer inquires can be distributed throughout the office,
while, the actual time of dispatching products and managing trucks and
drivers will be considerably reduced.
TITAN II PRECAST MANAGEMENT SY STEM
Dispatching
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
View Job, Structure and
Product Status
Easily Create Picking/Load
Tickets
View Load Weight while
Picking
Pick Weeks in Advance
Automatically Create Deliv-
ery Tickets and Invoices
from Picking Tickets
Track Specials
Monitor Production Activity
Share Dispatch Information
with Production Scheduler
Identify Inventory Shortfalls
View Shipping Schedule
Identify Shipping Conflicts
View/Print Drivers Sched-
ules
Export Information to Excel
or Word
Titan II was built with scores of features to enable the Precaster to
successfully manage inventory while improving customer service.
Inventory turnover can be dramatically improved by Titan’s simplified proc-
esses specifically designed for the Precaster. Dispatch and production proc-
essing, bill of materials management, and purchase order processing are all
tightly integrated giving everyone accurate, timely information.
Customer service can be greatly enhanced by the many customer and job
inquiry screens available in Titan II.
Inventory profitability can be tightly monitored using the many analytical
reports available in Titan II.
By sharing vital, accurate information throughout the office, Titan II gives
precasters the ability to meet customers’ expectations, effectively manage
production resources and retain company capital.
TITAN II PRECAST MANAGEMENT SY STEM
Purchase Order Processing Inventory Management
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Multi-plant Capabilities
Track Stock Items
Track Specials
Track Finished Goods
Track Raw Materials
Establish Minimum and Maxi-
mum Quantities
Robust Inventory Inquiry
Screens
Various Inventory Quantity
Warnings
Create/Track Bill of Materials
Tight Integration with Job
Processing, Production, Pur-
chasing and Accounts Payable
Track Product Height, Weight,
Product Line and Associated
Kit Items
Create POs Automatically
Unit of Measure Conversions
Track Vendor Item Numbers,
Pricing and Unit of Measure
Export Information to Excel or
Word
The Accounts Payable module provides all the tools for managing your ex-
penditures. With tight Purchase Order integration, validating vendor invoices
is no longer a cumbersome chore, while selecting invoices for payment is
quick and easy.
Powerful, yet simple to use Accounts Payable offers the ability to process
checks individually or in a batch and offers many reports to highlight key
financial information.
While the Accounts Payable module can be used standalone, coupled with
the rest of the Titan II Precast Management System it is sure to add to your
business insight and improve your decision-making.
TITAN II PRECAST MANAGEMENT SY STEM
Accounts Payable
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.muka.net
TITAN II PRECAST MANAGEMENT SYSTEM
Vendor Maintenance
Invoice Register
Check Register
Unlimited Bank Accounts
Aged Payable Reports
Purchasing Analysis
Integration with PO Sys-
tem
Manual Check Writing
Invoice Payment Process-
ing
Check Batch Printing
Customizable Vendor
Fields
Vendor Default Accounts
Vendor Lists and Labels
Purchase Clearing Ac-
counting
Integration with General
Ledger
Export Information to
Excel or Word
Titan’s Accounts Receivable module provides many tools for tracking and
managing customer account information. Intuitive features coupled with
informative reporting are the hallmark of the Accounts Receivable module.
By simply generating invoices directly form delivery tickets, the accounts
receivable process starts off swift and accurate. It is followed by the ability
to print customer statements in multiple formats, while easily recording and
tracking customer collection notes. Finishing strong, the accounts receivable
process ends with user-friendly cash entry and customer inquiry screens.
Comprehensive and powerful, the Accounts Receivable module is a critical
process within the Titan II Precast Management System.
TITAN II PRECAST MANAGEMENT SY STEM
Accounts Receivable
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Customer Maintenance
Invoice Registers
Cash Receipts Registers
Unlimited Bank Accounts
Aged Receivable Reports
Receivables by Sales Rep
Receivable Report with
Collection Notes
Payment Analysis Reports
Walk-In Screen
Customer Inquiry Screen
Collection Notes Tracking
Customer Statements
Finance Charge Feature
Customer Status Feature
Custom Fields
Export Information to
Excel or Word
The General Ledger module ties together all aspects of Titan II for a com-
plete financial picture of your business. Accounts receivable, accounts pay-
able, inventory receipts and production processing are all tightly integrated
with the General Ledger to give you a clear view of the past. Our “Active
Budgeting” feature will give you a clear view of the future.
With the ability to create unlimited budgeting scenarios, the “Active Budget-
ing” feature enables you to create budgets based on current and projected
sales figures. “Percent of Actual Sales budgeting” as well as “Fixed budget-
ing” give you the tools to create truly flexible and realistic budgets.
Combining ease of use with power and flexibility, Titan’s General Ledger
module will provide you with valuable business insight to lead you to the
next level.
TITAN II PRECAST MANAGEMENT SY STEM
General Ledger
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Chart of Accounts
Active Budgeting
Unlimited Budgeting
Income Statements
Balance Sheets
Statement of Cash Flow
Flexible/Easy Financial
Report Writer
General Ledger
Trial Balance
Working Trial Balance
Transaction Journals
Transaction Journal by
Plant
20 Digit Account
Number
Export Information to
Excel and Word
Unique and powerful, Titan’s “Inter-company Accounting” feature enables
multiple companies to work as one cohesive unit. Related companies can
now be combined under one database while maintaining individual trial bal-
ances and financial statements.
Multiple companies can seamlessly process a single job in Titan. Sales and
expenses will be automatically attributed to individual companies. Intercom-
pany general ledger transactions can automatically be created accurately
reflecting “due to/due from” scenarios.
Sharing production resources, shipping resources, customers, vendors and
product codes dramatically reduces database maintenance while increasing
resource utilization.
All reports, including sales, receivables, payables, inventory and financial
reports, can be printed individually, by company or
combined.
Inter-company Accounting
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Multiple Companies Share
One Database
Individual Company Trial
Balances and Financials
Consolidated Financial
Statements
Share Production Re-
sources
Share Shipping Resources
Share Customers
Share Vendors
Share Product Codes
Multiple Companies can
Process a Single Job
“Due to/Due from” Inter-
company Transactions can
be Automatically Created
Print All Reports by Com-
pany
Print All Reports Com-
bined
TITAN II PRECAST MANAGEMENT SYSTEM
The Payroll Processing Module is an excellent addition to Titan’s family of
products specifically designed for the precast industry. Secure and tightly
integrated with the general ledger, the Payroll Module completes Titan’s fi-
nancial set of modules.
Payroll checks can be swiftly processed using batch processing or single
check processing. All common reporting is available including earnings
analysis reports and deduction/expense analysis reports. With customizable
earnings, deductions and expense codes, the payroll module is full featured
and flexible.
Multi-plant, multi-department features coupled with intuitive inquiry screens
makes Titan’s Payroll Module comprehensive and equipped for the large
precaster as well as the medium and small.
TITAN II PRECAST MANAGEMENT SY STEM
Payroll
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftwre.com
TITAN II PRECAST MANAGEMENT SYSTEM
Multiple Earnings Distribu-
tion
Multiple Plant/Department
Benefit Accrual Reporting
Tax Withholdings
Customizable Deductions
(i.e. 401K, Cafeteria Plan)
Checks and Stubs
Check Register
Direct Deposit Register
Earnings Analysis Reports
Deduction/Expense Analy-
sis Reports
Simple Batch Processing
Single Check Processing
Simple Check Voiding
941/940/W-2
Customizable Fields
Notes and Reminders
Intuitive Inquiry Screens
Plant/Department Expense
Distribution
Titan’s Job Cost Processing module can be utilized to manage costs on large
scale projects, small projects or even capital equipment and facilities.
General Ledger, Payroll, Accounts Payable, Purchase Order Processing, In-
ventory Management, Accounts Receivable, CRM and Document Manage-
ment modules are all tightly integrated with Job Cost Processing.
Create job estimates and budgets by phase and cost code. Compare and
analyze budgeted amounts to actual expenditures by individual cost codes
or by phase. Copy job estimates by job or job template. Job notes and tasks
can be assigned and monitored by individual or by task category.
Certified payroll reports can be generated utilizing the Payroll Module. Re-
tainage features are available in conjunction with the Accounts Receivable
AIA billing features.
Filled with tools to manage cost, Titan’s Job Cost Processing module is es-
sential for both large and small projects.
TITAN II PRECAST MANAGEMENT SY STEM
Job Cost Processing
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.muka.net
TITAN II PRECAST MANAGEMENT SYSTEM
Monitor Job Phases
Track Job Cost Codes
Create Job Estimates
Record Actual Costs
Integrates with General
Ledger, Purchase Order
Processing, Accounts Pay-
able, Payroll, Accounts Re-
ceivable, Inventory Manage-
ment, CRM and Document
Management
Analyze Estimate to Actual
by Phase and Cost Code
Copy Job Estimate Utility
Issue Inventory
Certified Payroll
AIA Billing
Retainage Feature
Export Information to Excel
or Word
Put away your crayons and spray paint, Titan II offers a complete Bar-Code La-
beling system.
Gone are the days of tedious stenciling and spray painting or the unprofessional
look of crayons. Now, with Titan’s Bar-Code and Labeling model, labels can be
easily printed directly from production scheduling, production processing or in-
ventory receipt processing. No need to retype any information or shake a spray
can, the 6” by 12” labels are sure to stick and can be viewed from a long dis-
tance.
The Bar-Coding, along with a handheld scanner, can be used to track the loca-
tion of “specials” or “custom made items”. These locations or sections can then
be displayed on all picking and delivery tickets. No more running around looking
for a product to load on the truck.
Complete inventory accuracy can be achieved by using the handheld scanner to
record and transfer stock status information to Titan II. Specific product delivery
information can be captured and linked to Titan II’s Quality Control Module.
TITAN II PRECAST MANAGEMENT SY STEM
Bar-Coding and Labeling
Muka Development Group, LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
6” by 12” Durable Labels
Viewable from Long Dis-
tance
No Need to Retype Infor-
mation
Print from Production
Scheduling
Print from Production
Processing
Print from Inventory
Receipt
Print from Job Order
Processing
Accepts Inventory Status
Information from Hand-
held Scanner
Record and Track Product
Location Information
Additional Label Size’s
Available
Integrates with Titan II’s
Quality Control Module
Filled with analytical reports and graphs, Titan’s Quality Control Module enables
companies to leverage their QC efforts. Strong integration with Titan’s produc-
tion and production scheduling features makes the onerous tasks of quality con-
trol paperwork - simple.
Identify weak areas in the plant and use Titan’s “QC Score Card Analysis” re-
ports and graphs to track improvement. Analyze pre-pour and post-pour test
results by plant, production department, product-line, product and date range.
Easily generate a “QC Score Card” for any individual item produced showing all
pre-pour, post-pour and concrete test results on one simple-to-read form.
With the ability to customize tests and evaluate a variety of production scenar-
ios, Titan II can turn QC information into a wealth of useful information.
TITAN II PRECAST MANAGEMENT SY STEM
Quality Control
Muka Development Group,LLC 303 West Main Street
Freehold, NJ 07728
Phone: 732-866-8686 Fax: 732-866-8654
E-mail: [email protected]
Web: www.titaniisoftware.com
TITAN II PRECAST MANAGEMENT SYSTEM
Track/Evaluate Pre-pour
Test Results
Track/Evaluate Post-pour
Test Results
Track/Evaluate Concrete
Test Results
Automatically generate
QC Inspection Sheets
from Production Schedule
Customize Pre-pour and
Post-pour Tests
Create Unlimited QC
Types (i.e. “NJDOT”,
“PADOT”)
Generate “QC Score
Cards” by Production
Date, Delivery Ticket, Pro-
duction Department,
Date Range, etc.
Analyze and Graph Nu-
merous Production Sce-
narios
52"
6"
Base
24"Item 1
32"Cone
6"Adjustment Ring
4"Cover
12
270°
0°
90°
180°
1
2
Rim: Invert: Rim to Invert: Precast Height: Overall Height: Floor Height: Wall Thickness: Sump Height:
Constructed in Accordance with ASTM C-478Concrete:FC=4000 PSI @ 28 DaysReinforcing Steel:Welded Wire Fabric ASTM A185
Step Degree: 0
Job Name: Job #: Customer: Structure ID: Type:
(1) 70.3 8 PVC ALOK285 100 0 Base
(2) 70.6 8 PVC ALOK285 278 3.5 Base
Pipe# Elevation Pipe Hole
Type
Angle Up to
Bottom
Item
Manhole Frame 4" High Incl. Cover EA 1 280
24" Adjustment Ring 6" EA 1 600
48" Cone x 3'0" EA 1 1,500
48" Riser x 2' EA 1 2,120
48" Standard Base X 4'0" with Hole EA 1 4,745
A*Lok 285 EA 2 4
3/4" Butyl Rubber EA 2 40
Outside Coating - Bituminous EA 9.5
Description UOM Quantity Weight
Total Structure Weight 9,289
Demo - Job Takeoffs and Submittal05-1608Fisher Construction Corp.mh148" Sanitary Manhole
80'70.3'9.70'9.50'10.37'6.00''5.00''.00'
90°
0°
270°
180°
1
2
48
" 6"
Ba
se
1
2
0°
90°
180°
270°
360°4
8"6"
1
12"
12
"2
12"
12
"
3½"
0°
90°
180°
270°
360°4
8" 6"
1
12"
12
"2
12"
12
"
3½"
Upsi
de D
ow
n V
iew
Outs
ide C
oating -
Bitum
inous
3/4
" Buty
l R
ubber
Kit I
tem
s
Off
ice C
heck
_____________
Set
Up P
ers
on
_____________
Pre
Pour
_
____________
Post
Pour
_____________
Job N
am
e:
Job #
: Cust
om
er:
Str
uct
ure
ID
: Type:
Item
: Pro
duct
ID:
Desc
ription:
Weig
ht:
Unfo
lded V
iew
Insi
de C
lock
wis
e U
psi
de D
ow
n
(1)
0 4
5B
ase
(2)
3.5
24
0B
ase
Pip
eU
p t
oBott
om
Angle
Item
Unfo
lded V
iew
Insi
de C
lock
wis
e
Han S
pring D
raw
ing S
am
ple
s05-1
630
Fis
her
Const
ruct
ion C
orp
.m
h1
48"
Sanitary
Manhole
Base
48SB4W
H48"
Sta
ndard
Base
X 4
'0"
with H
ole
4,7
45
48 6
366
4
1
2
3
0°
90°
180°
270°
360°
48 6
12
3
270°
0°
90°
180°
1
2
3
Rim
: In
vert
: Rim
to I
nvert
: Pre
cast
Heig
ht:
O
vera
ll H
eig
ht:
This
dra
win
g w
as
genera
ted
from
the T
itan I
I Pre
cast
M
anagem
ent
Syst
em
. U
sers
of
the T
itan I
I sy
stem
can
create
their o
wn d
raw
ing
layouts
by t
he s
truct
ure
for
Subm
itta
l D
raw
ings
or
by t
he
pie
ce f
or
Pro
duct
ion
Dra
win
gs.
For
more
info
rmation o
n h
ow
Titan I
I ca
n u
nlo
ck y
our
pro
duct
ivity c
all
(732)
866-
8686.
Ste
p D
egre
e:
0Cust
om
er:
Jo
b N
am
e:
Job #
: Str
uct
ure
ID
: Sta
tion:
Type:
Sale
sPers
on:
(1)
74
15 R
CP
HO
LE
60
0Base
(2)
74.8
15 R
CP
HO
LE
160
9.5
Base
(3)
75.6
12 R
CP
HO
LE
260
19.5
Base
Pip
e#
Ele
vation
Pip
eH
ole
Type
Angle
Up t
oBott
om
Item
Manhole
Fra
me 4
" H
igh I
ncl
. Cover
EA
1280
24"
Adju
stm
ent
Rin
g 6
"EA
1600
48"
Cone x
3'0
"EA
11,5
00
48"
Exte
nded B
ase
x 4
'0"
EA
15,8
37
T
ota
l Str
uct
ure
Weig
ht
8,2
17
Desc
ription
UO
MQ
uantity
Weig
ht
Fis
her
Const
ruct
ion C
orp
.N
ew
Pole
Cente
r05-1
417
st100
1+
44.9
648''
Sto
rm S
truct
ure
Andy N
ort
h
81.9
'74'
7.9
0'
7.5
0'
8.7
8'
48 8
488
1
2
3
1
2
3
27
0°
0°
90
°
18
0°
43 5
29
1
8½
17
31
12
32
70°
0°
90
°
18
0°
26
4
6
38
½
9½
27
0
0
90
18
0
12
3
Rim
: In
vert
: Rim
to I
nvert
: Pre
cast
Heig
ht:
O
vera
ll H
eig
ht:
This
dra
win
g w
as
genera
ted
from
the T
itan I
I Pre
cast
M
anagem
ent
Syst
em
. U
sers
of
the T
itan I
I sy
stem
can
create
their o
wn d
raw
ing
layouts
by t
he s
truct
ure
for
Subm
itta
l D
raw
ings
or
by
the p
iece
for
Pro
duct
ion
Dra
win
gs.
Inse
t dra
win
gs
can b
e a
dded s
uch
as
the
join
t deta
il above.
For
more
info
rmation o
n
how
Titan I
I ca
n u
nlo
ck
your
pro
duct
ivity c
all
(732)
866-8
686.
Const
ruct
ed in A
ccord
ance
with A
STM
C-9
13
Concr
ete
:FC=
4000 P
SI
@ 2
8 D
ays
5' X 3
' Base
, 4' H
eig
ht,
6''
Wall,
8''
Sla
b w
ith H
ole
5' X 3
' R
iser,
4' H
eig
ht,
6''
Wall
with H
ole
Job N
am
e:
Job #
: Cust
om
er:
Str
uct
ure
ID
: Type:
(1)
70
15 R
CP
45
024
Base
(2)
71
15 R
CP
150
12
24
Base
(3)
74.6
15 R
CP
220
724
Item
1
Pip
e#
Ele
vation
Pip
eAngle
Up t
oBott
om
Hole
Heig
ht
Item
5' X 3
' Top S
lab, 8''
Hig
h, 6''
Wall
EA
10.6
72,4
00
5' X 3
' R
iser,
4' H
eig
ht,
6''
Wall
with H
ole
EA
14
5,1
68
5' X 3
' Base
, 4' H
eig
ht,
6''
Wall,
8''
Sla
b w
ith H
ole
EA
14
7,3
36
T
ota
l Str
uct
ure
Weig
ht
14,9
04
Desc
ription
UO
MQ
tyH
eig
ht
in F
eet
Weig
ht
New
Pole
Cente
r05-1
417
Fis
her
Const
ruct
ion C
orp
.cb
100
5' X 3
' Sto
rm
78.5
'70'
8.5
0'
8.6
7'
9.5
4'
0°
90°
180°
270°
36"
60"
36"
60"
60
" 8"
1
34"
34
"
2
24"
24
"
12½"
3
24"
24
"
18½"
1
2
3270°
0°
90°
180°
7"
24
"
17
"
19"
34"
19"
12
"
24
"
12
"
60
" 8"
8"
1
2
3
27
0
0
90
18
0
1
23
Ba
se
1
23
Item
: Pro
duct
ID:
Desc
ription:
Weig
ht:
Kit I
tem
s
Unfo
lded V
iew
Insi
de C
lock
wis
e
Pie
ce P
rofile
Vie
w
Str
uct
ure
Pro
file
Vie
w
Job N
am
e:
Job #
: Cust
om
er:
Str
uct
ure
ID
: Type:
Pie
ce T
op V
iew
Pie
ce S
chem
atic
Top V
iew
(1)
24
RC
PH
OLE
0 9
03
43
4B
ase
(2)
15
RC
PH
OLE
12
.5 1
80
24
24
Ba
se
(3)
15
RC
PH
OLE
18
.5 0
24
24
Ba
se
Pip
e#
Pip
eH
ole
Type
Up t
oBott
oAngle
Hole
Heig
ht
Hole
Wid
thIt
em
Han S
pring D
raw
ing S
am
ple
s05-1
630
Fis
her
Const
ruct
ion C
orp
.nci
3-6
5' X 3
' Sto
rm
Base
5X3BR
5H
6W
8Sw
H5' X 3
' Base
, 5' H
eig
ht,
6''
Wall,
8''
Sla
b w
ith H
ole
8,2
19
0°
90°
180°
270°
36"
60"
36"
60"
48
"
3
24"
24
"
6½"
4
10"
10
"
9"
5
10"
10
"
9"
12
3
45
270°
0°
90°
180°
21"
10"
10"
21"
21¼"
24¾" 2"
42
" 8"
48
"8"
1
2
34
5
27
0
0
90
18
0
3
4
10
in O
FF
SE
T 3
60
5
Ite
m 13
45
Item
: Pro
duct
ID:
Desc
ription:
Weig
ht:
Kit I
tem
s
Unfo
lded V
iew
Insi
de C
lock
wis
e
Pie
ce P
rofile
Vie
w
Str
uct
ure
Pro
file
Vie
w
Job N
am
e:
Job #
: Cust
om
er:
Str
uct
ure
ID
: Type:
Pie
ce T
op V
iew
Pie
ce S
chem
atic
Top V
iew
(1)
24 R
CP
HO
LE
0 9
034
34
Base
(2)
15 R
CP
HO
LE
12.5
180
24
24
Base
(3)
15
RC
PH
OLE
6.5
15
24
24
Ite
m 1
(4)
6 P
VC
HO
LE
9 2
70
10
10
Ite
m 1
(5)
6 P
VC
HO
LE
9 2
70
10
10
Ite
m 1
Pip
e#
Pip
eH
ole
Type
Up t
oBott
oAngle
Hole
Heig
ht
Hole
Wid
thIt
em
Han S
pring D
raw
ing S
am
ple
s05-1
630
Fis
her
Const
ruct
ion C
orp
.nci
3-7
5' X 3
' Sto
rm
Item
15X3R
R4H
6W
wH
5' X 3
' R
iser,
4' H
eig
ht,
6''
Wall
with H
ole
5,0
88
54 8
188
1
23
72
48
24
30
36
6
12
12
88
Item
: Pro
duct
ID:
Desc
ription:
Weig
ht:
Top V
iew
of
Sla
b
Pro
file
Vie
w o
f Sla
b
Str
uct
ure
Pro
file
Job N
am
e:
Job #
: Cust
om
er:
Str
uct
ure
ID
: Type:
New
Pole
Cente
r05-1
417
Fis
her
Const
ruct
ion C
orp
.Top100
5' X 3
' Sto
rm
Top 3
5X3TS8H
6W
CO
5' X 3
' Top S
lab, 8''
Hig
h, 6''
Wall,
Cust
om
Openin
g2,4
00
0° 90° 180° 270° 360°
48Riser1
24
24
10
1 2
18
18
143
24
24
10
0° 90° 180° 270°
48
6
1
17
17
10
3
13
13
24
44
16
24
5
12½
12½
0° 90° 180° 270°
48
6
1
17
17
10
3
13
13
24
44
16
24
5
12½
12½
Normal View
Upside-Down View
0°
90°
180°
270°
360°3
6in
5in
1
23
in
21
8in
6½in
31
8in
6½in
0°
90°
180°
270°
360°3
6in
5in
1
23
in
21
8in
6½in
31
8in
6½in
0°
90°
180°
270°
360°3
6in
5in
1
23
in
21
8in
6½in
31
8in
6½in
0°
90°
180°
270°
360°3
6in
5in
1
23
in
21
8in
6½in
31
8in
6½in
0°
90°
180°
270°
360°3
6in
5in
1
23
in
21
8in
6½in
31
8in
6½in
0°
90°
180°
270°
360°3
6in
5in
1
23
in
21
8in
6½in
31
8in
6½in
Unfo
lded V
iew
with D
oghouse
, Square
and R
ound H
ole
s
Unsi
de-D
ow
n U
nfo
lded V
iew
with D
oghouse
, Square
and R
ound H
ole
s
Unfo
lded V
iew
with D
oghouse
, Square
and R
ound H
ole
s
Unsi
de-D
ow
n U
nfo
lded V
iew
with D
oghouse
, Square
and R
ound H
ole
s
Unfo
lded V
iew
with D
oghouse
, Square
and R
ound H
ole
s
Unsi
de-D
ow
n U
nfo
lded V
iew
with D
oghouse
, Square
and R
ound H
ole
s
80Tee
8
8Base Slab
8
24
8
Monobase
8
36Riser
8
72Reducer
8
36Cone
8
10Cover
PL
AN
LO
NG
ITU
DIN
AL
SE
CT
ION
TR
AN
SV
ER
SE
SE
CT
ION
5' -
6"
Ho
rizo
nta
l S
pa
cin
g 1
2
Ve
rtic
al S
pa
cin
g 1
6''
6'
5'
6'
3' -
6"
5'
2'
2'
Item
: Pro
duct
ID:
Desc
ription:
Weig
ht:
Sch
edule
Date
:
Cre
ate
your
ow
n w
ork
ord
er
layouts
. Cre
ate
Rebar
Legends.
Cre
ate
Cust
om
Bill
of
Mate
rials
.
Mix
: R
072888
Yard
s: 1
.38
Const
ruct
ed in A
ccord
ance
with A
STM
C-4
78
Concr
ete
:FC=
4000 P
SI
@ 2
8 D
ays
Rein
forc
ing S
teel:W
eld
ed W
ire F
abric
ASTM
A185
Pro
duce
d u
sing T
itan C
AD
Job N
am
e:
Job #
: Cust
om
er:
Str
uct
ure
ID
: Type:
RBAR4
16
36
STR
36
00
0
RBAR4
887
U27
33
27
0
RebarI
DPro
duct
Bars
Length
Shape
WX
YZ
HW
I-AG
-2TS-2
52 T
ON
X 3
1/4
" R
ISS P
INS
4
RBAR4
#4 R
ebar
864
Com
pID
/Labor
Desc
ription
Inst
ruct
ions
Est
. Q
ty/H
rsAct
ual
Qty
/Hrs
Titan C
AD
Sam
ple
s05-1
527
Fis
her
Const
ruct
ion C
orp
.BC900:C
B900
CU
STO
M B
ASE V
E 4
8''
X 6
0''
X 3
6''
CU
STBASE
CU
STO
M B
ASE V
E 4
8''
X 6
0''
X 3
6''
6,4
14
4'
4'
4'
4'
4'
5'
5'
5'
5'
5'
4'
4'
4'
4'
4'
6¼
"
1' -
3¾
" 1
' -
3¾
"
4 1
/2"
Du
ct
Te
rmin
ato
r
4"
6"
8¼
"
6¼
" 4
"
6"
6¼
"
6¼
"
2 T
on
x 3
1/4
Ris
s P
ins
4"
4"
2 T
on
x 3
1/4
Ris
s P
ins
24
" N
on
-Me
talic C
ab
le R
ack
1'
6"
6"
6"
24
" N
on
-Me
talic C
ab
le R
ack
1'
6"
8"
1' -
6"
1' -
6"
8"
1' -
6"
1' -
6"
WO
W!
Insid
e F
old
out
Item
: Pro
duct
ID:
Desc
ription:
Weig
ht:
Sch
edule
Date
:
Cre
ate
your
ow
n w
ork
ord
er
layouts
.Cre
ate
Cust
om
Bill
of
Mate
rials
.U
se D
raw
ing K
its.
Mix
: R
072888
Yard
s: 1
.71
Const
ruct
ed in A
ccord
ance
with A
STM
C-4
78
Concr
ete
:FC=
4000 P
SI
@ 2
8 D
ays
Rein
forc
ing S
teel:W
eld
ed W
ire F
abric
ASTM
A185
This
is
a m
em
o…
ente
r w
hat
ever
you w
ould
lik
e.
Pro
duce
d u
sing T
itan C
AD
Job N
am
e:
Job #
: Cust
om
er:
Str
uct
ure
ID
: Type:
HW
I-4-5
PLASTIC
TERM
INATO
R -
4"
ID X
4 1
/2"
OD
PIP
E8
HW
I-AG
-2TS-2
52 T
ON
X 3
1/4
" R
ISS P
INS
4
HW
R-R
24-P
24"
Pla
stic
Cable
Rack
(CR
24-B
)4
Rack
1800
Rack
1800 S
am
ple
2
RBAR4
#4 R
ebar
51
Com
pID
/Labor
Desc
ription
Inst
ruct
ions
Est
. Q
ty/H
rsAct
ual
Qty
/Hrs
Titan C
AD
Sam
ple
s05-1
527
Fis
her
Const
ruct
ion C
orp
.U
T3:U
TB100
UTIL
ITY B
ASE 4
' X 5
' X 4
'
UTIL
BASE
UTIL
ITY B
ASE 4
' X 5
' X 4
'6,8
46
Pla
n V
iew
Fro
nt
Vie
wS
ectio
n V
iew
48
"
42
"
64
"
58
"
12
0"
12
0"
60
"
8"
36
"
42
"
36
"
24
"
6"
6"
36
"Ste
ps
Item
: Pro
duct
ID:
Desc
ription:
Weig
ht:
Sch
edule
Date
:
This
is
a P
roduct
ion M
em
o.
Mix
: #
11 M
anhole
w/
Acc
el
Yard
s: 4
.11
Pro
duce
d u
sing T
itan C
AD
Job N
am
e:
Job #
: Cust
om
er:
Str
uct
ure
ID
: Type:
Han S
pring D
raw
ing S
am
ple
s05-1
630
Fis
her
Const
ruct
ion C
orp
.w
b100:w
b100
WIN
G H
EAD
WALL 6
0''
X 1
20''
WIN
GW
ALL
WIN
G H
EAD
WALL 6
0''
X 1
20''
16,6
23
Titan II Precast Management System…Price List
Module Price
Visual Takeoff Module Visual Takeoff and Enhanced Drawings
Quote Manager
Customer Relationship Manager
Submittal Package Creator
Rapid Quote Module
Notes/Task Manager
$4,000
Management System Complete Job Order Processing
Delivery Ticket and Dispatch Management (Load Manager)
Invoice Processing and Accounts Receivable Processing
Inventory Management
Production Scheduling and Production Processing
Purchase Order Processing
Bill of Materials Processing including LIFO/FIFO and Standard Costing Methods
Visual Estimator Module
Custom Report Writer
$8,000
Accounts Payable $2,000
Accounts Receivable $2,000
General Ledger Integrated General Ledger Processing
Custom Financial Report Writer
$2,000
Payroll Payroll Check Processing, Payroll Tax Processing and Reporting
Custom Report Writer
$2,000
Document Management Integrated Document Management Module
Email History Tracking and Outlook Integration
$4,500
Quality Control Inspection/Product Test Tracking
Concrete Batch Tracking
$3,000
Job Cost Module $3,000
Bar Code Labeling $2,000
Per User Fee $750
Installation and Training per Hour Rate $90
Programming and System Integration per Hour Rate $150
Example Pricing Packages
Visual Takeoff Module 5 Users
Visual Takeoff and Management System
10 Users
Visual Takeoff / Management System/Accounting Modules
10 Users
All Modules10 Users
Excluding Job Cost
Visual Takeoff Module Management System Accounts Payable Accounts Receivable General Ledger Payroll Document Management Quality Control Bar Code Labeling User Fee Installation and Training 24hrs 40hrs 50hrs 55hrs
Package Price $9,910 $23,100 $30,000 $41,950Muka Development Group provides customized Titan Proposals based on client needs. Titan Proposals are created only after an initial product
demonstration and client consultation to determine special requirements.