Issue: Condition of Steam Plant Project Need
“The Steam Plant, a critical
support building, is in the
worst condition of all UND
buildings, with a score
(FCI) of 0.55.
Five of the seven boilers
are well past the design life,
and the other two boilers
are in need of immediate
repairs. The question is not
if the plant will fail; the
question is how soon the
plant will fail.”
Solution: North Dakota Century Code 48-02.1(Infrastructure Development by Private Operators)
• Alternative procurement process allows Developer/Constructor selection based on qualifications
• Enables Public Private Partnerships (P3) and construction of a fee-based facility
• 3rd party ownership over O&M term• Terms as long as 50 years with guaranteed handback
facility condition• Allows other ancillary mechanical and electrical
improvements throughout campus in support of steam plant
Anticipated New Costs for Steam vs Status Quo
$1,000,000
$3,000,000
$5,000,000
$7,000,000
$9,000,000
Projected Status Quo
Distribution System CapEx Allocation
Plant Cap Ex Allocation
Distribution System Operations
Fuel (Coal/Gas)
Plant Operations
New Plant + Efficiency Improvement Debt
$11,000,000
Projected New Plant
Further Cost Reduction Opportunities• Finance Rate• Finance Term• Restructuring Finance• Additional Efficiency
Improvements• Reduced Gas Usage
(beyond Projections)• Lower Construction
Costs• Lower Operating
Costs
$10,700,000$10,700,000
Timeline Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Project Development Agreement
Steam Plant Design Phase
Schematic Design
GMP Design (40-50%)
Air Permitting
Application
Permit Review
Campus Demand Investment Grade Audit
Firm Pricing & Contract Development
UND Review
Contract Executed
Steam Plant Implementation
Final Design
Procurements
Site Prep/Temp Services Prep (if required)
Steam Plant Construction
Steam Plant Commissioning
Steam Plant Production
Demand Side Implementation
2020
Phase 2 Phase 3
2018 2019
Opportunitiesfor Schedule Compression