Goals

Objectives

The University of Missouri Stormwater Master Plan provides an adaptable framework that enables the campus community to improve stormwater quality, maintain regulatory compliance and sustain water resource stewardship. This overall goal is energized by Mizzou’s leading research and innovation engine, a key asset in developing solutions to evolving stormwater challenges.

• Identify an optimal set of site-level stormwater controls and guidelines for new and redevelopment projects.

• Pursue a watershed-scale management approach to e ectively place stormwater controls, assess contributions and evaluate improvements.

• Provide an adaptable framework that enables MU to address evolving regulations and the needs of local waterways.

• Sustain innovation by integrating Mizzou’s education, research and outreach programs into the stormwater planning process.

As water flows downhill o  campus, it collects in Flat Branch and Hinkson Creek. Greater quantities of water gather and flow to those streams when traveling over impervious surfaces such as asphalt or rooftops than it does if soil absorbs the rain. Because of this e ect in urban environments, heavy storms cause flash flooding in local waterways. MU implemented the Stormwater Master Plan in 2012 to set goals and provide guidance for future development on campus.

Flooding is not the only problem. “The faster stormwater moves, the more pollutants it picks up and the opportunity for infiltration is reduced,” says Jennifer Sullivan, facilities project manager. Soil on campus might erode away, as might creek beds downstream. Extra sediment and water heated by pavement may change stream habitats. CONTINUED ON PAGE 8

MU Projects Address Stormwater

UNIVERSITY OF MISSOURI 2015 STORMWATERMASTER PLANAUGUST 2015

A collaborative adaptive management agreement with the University of Missouri, the City of Columbia and Boone County works to improve the health of Hinkson Creek.

Page 2: UNIVERSITY OF MISSOURImasterplan.missouri.edu/masterplan/sites/masterplan/...PHYSICS JESSE HALL HEARNES CENTER MIZZOU ARENA DEVINE PAVILION (NURSING) HOSPITAL & CLINICS (HOSPITAL PARKING

Recent BMPs

Evaluate improvements and implement

adaptive revisions.

1. AssessAssess runo area

characteristics.

Identify BMP opportunities and

watershed priorities.

2. Identify

Iteratively select, size and locate BMPs to achieve priorities.

3. Select and Locate

Assess subwatershed contributions and

track progress.

4. Track

5. Evaluate

Watershed BMPPlanning Process

A watershed is the area of land that is drained by a common river, stream or flow path. Small watersheds feed larger ones where two or more streams come together. Locally, the Grindstone Creek watershed feeds Hinkson Creek, eventually reaching Perche Creek, which drains into the Missouri River. An approach that recognizes the importance of managing stormwater according to watershed boundaries is termed the watershed-based BMP planning process.

Bioretention at Animal Resource Center.Reduces runo� by pooling and filtering excess water.

A grant from the Missouri Department of Natural Resources allows MU researchers to study the e ectiveness of best management practices (BMPs) on preventing water pollution. MU environmental and bioengineering faculty and students collect and sample water as it enters a bioretention cell near the Animal Research Center, then resample water once it runs through the bioretention to identify what pollutants have been removed.

Students tested di erent soils and plant material combinations in a laboratory to determine the best mix for the area and extrapolated how other mixtures might perform in di erent environments. The grant was extended through June 2015 to allow for further data collection from the sites being monitored. Enos Inniss, civil & environmental engineering professor, and Allen Thompson, bioengineering professor, and their student team have found that soil components selection has a strong influence on the e ectiveness of treatment and the retention of water on site.

Testing of the soil components required that students construct several soil columns to test di erent soil mixes, both with and without vegetation present. In addition to collecting and analyzing soil and water samples from the field sites, the student team is researching the e ects of di erent soil mixes on nutrient fate as well as water retention. This research helps MU meet its MS4 permit reporting requirements.

BMP Research Grant

Pervious Pavement at Traditions Plaza.Filters pollutants and reduces runo�.

Green Roof at Patient Care Tower.Reduces and slows stormwater runo�.

What is a Watershed?

Green Roofs

VegetatedSwales

PerviousPavers

Bioretention

ConstructedWetlands

The University of Missouri uses a variety of BMPs to control stormwater runo  throughout the campus. Pervious pavers, swales, green roofs and bioretentions are among the stormwater practices used to help turn a ected areas into environmentally sustainable spaces.

East Campus Stormwater Modeling Case Study

Stormwater TreatmentImproving stormwater quality with structural controls requires that runo  be routed through BMPs. Sizing BMPs to e ectively capture runo  will reduce pollutants through filtration, uptake and settling processes. An initial BMP-sizing goal is to capture or treat 80 percent of post-construction runo .

Volume ReductionFor sites not constrained by existing infrastructure or environmental conditions, a 10 percent reduction in runo  volume serves as a guideline for new and redevelopment projects.

Rate ControlNatural resource agencies are concerned that the frequency of high flow rates in Hinkson Creek are increasing. Preliminary watershed flow-rate reductions could prevent deterioration of aquatic habitat and reduce flooding risks.

Achieving water quality improvements, natural resource enhancements and flood control in urban areas requires a thoughtful balance between controlling sources and treating pollution already mobilized by runo . Construction of structural BMPs such as rain gardens and vegetated swales helps catch and treat stormwater.

3-Tiered Approach to Sizing BMPs

MU engineers are using sophisticated computer models to guide stormwater planning for new and redevelopment projects. A 150-acre watershed located in east campus was selected as a case study area. The goal of the case study was to assess stormwater improvements possible through installation of BMPs.

University engineers modeled three typical situations on campus according to the footprint available for BMP construction. These results are supporting ongoing watershed-based planning and goal-setting e orts.

Areas that are highly developed have fewer

opportunities for BMPs than open areas. A

limited footprint of distributed BMPs for

stormwater control is achievable in constrained

settings.

3

2

Mizzou BMP Model

BMP Planning Options

The addition of a centralized detention basin

(regional control) along with distributed BMPs

increase watershed-level stormwater control.

Watersheds having moderate open-space

but without regional control opportunities.

Significant improvements can be achieved with

investments in widespread installation of site-

level BMPs.

Constrained Situations1

1

2 Moderate Scenarios

3 Optimized Situations

Page 3: UNIVERSITY OF MISSOURImasterplan.missouri.edu/masterplan/sites/masterplan/...PHYSICS JESSE HALL HEARNES CENTER MIZZOU ARENA DEVINE PAVILION (NURSING) HOSPITAL & CLINICS (HOSPITAL PARKING

PHYSICS

JESSE HALL

HEARNESCENTER

MIZZOUARENA

DEVINEPAVILION

(NU

RSIN

G)

HOSPITAL& CLINICS (HOSPITAL

PARKINGGARAGE)

Kappa Sigma

DDDAnnex

Phi M

uAnn

ex

SigmaPhi Epsilon

Farmhouse

Phi Kappa Psi

AlphaGamma Sigma

Tau KappaEpsilon

Evan

sSch

olar

s

VETERINARYMEDICINE

MED SCIENCE

TARAAPARTMENTS

GENERALSERVICESBUILDING

ROCK

QUARRY

CENTER

ANIMAL SCIENCE

RESEARCH CENTER

CLYDESDALE

ALUMNICENTER

DALTON

ELLISLIBRARY

MU STUDENTCENTER

FINEARTS

Kappa AlphaTheta

DeltaSigmaPhi

STUDENTRECREATION

CENTER

Alp

ha C

hiO

meg

a

Delta DeltaDelta

Sig

ma

Pi

MEMORIALSTUDENTUNION

BREWERFIELD HOUSE

HIL

L

LAFFERREHALL

TROWBRIDGE

UNIVERSITYHEIGHTS

RRC

LAB ANIMALCENTER

EMMAIN

OFFICE

GASTURBINEPLANT

MATERIAL HANDLING BOILERS

SWINERESEARCH

CENTER

CO

OLI

NG

TOW

ERS

SCHLUNDT

WALT

ERW

ILLI

AM

S

HEI

NKEL

MAN

OR

HO

USE

SWITZLER

MCREYNOLDS

McALESTER

LEFEVRE

STEWART

PIC

KARD

GAN

NET

T

LEE HILLS

ENGINEERINGWEST

SCHURZ

COLLEGE AVEHALL

BINGHAMCOMMONS

WILLIAM C. STRINGER WING

TUR

BIN

E

MURR

WAREHOUSE

PROVIDENCE POINT

ROLLINSCOMMONS

GILLETT

STUDENTSUCCESSCENTER

STR

ICKLA

ND

MCKEEGYM

HULSTON

MIDDLEBUSH

GWYNN

CROWDER

READ

WOLPERS

ANHEUSER-BUSCHNATURAL RESOURCES

SW

ALL

OW

TATE

ACADEMICSUPPORT CENTER

(LONDON)

LEW

IS

ART

S &

SC

IEN

CE

WH

ITTE

N

LOW

RY

CRITICALCARE

JOHNSTON

HUDSON

PERSHINGCOMMONS

(LAW

S)

(LATHROP)

(DOBBS)PAVILION(JONES)

WATERS

MUMFORD

SEARSGREENHOUSE

TOWNSEND

CENTER HALL

SOUTH HALL

NORTH HALL

(McHANEY)

CHEMISTRYBUILDING

PAR

KER

SC

HW

EITZ

ER

GEOLOGICALSCIENCES

MCDAVID

PSYCHOLOGY

LOEB

REY

NO

LDS

JOU

RN

ALI

SM

INSTI

TUTE

NEFF

LOCUST ST BLDG

NOYES

MARX BLDG

RESEARCH

PARK DEV

RES LIFESHOP

BLACKCULTURE

CTR

CURTISSTANLEY

GENTRY

MARK TWAIN

CO

RN

ELL

CLARK

LOTTESHEALTH

SCIENCESLIBRARY

PHYSICIANSMEDICAL

BLDG

RESPECT

RESPONSIBILITY

DISCOVERY

EXCELLENCE

PLAZA900

CONNAWAY

WEST

ECKLES

EAST

HATCH

AGRICULTURALENGINEERING

VETERINARYSCIENCE

UNIVERSITYGARAGE

SURP

LUS

WAR

EHOU

SE

NAN

O &

MO

LECU

LAR

MED

ICIN

E

GREENTENNIS

UNIVERSITYHALL

1105

CAR

RIE

DEFOE-GRAHAM

4

LIFE SCIENCE

BUSINESSINCUBATOR

RO

THW

ELL

GYM

LambdaChi

Alpha

2

3 1

SANBORNFIELD

STANKOWSKIFIELD

MCALESTERPARK

(PEACE PARK)

BOND LIFESCIENCES CENTER

DOGWOOD

HAWTHORN

GALE

NA

PARKINGSTRUCTURE #7

MIS

SO

URI

PSYC

HIA

TRIC

CEN

TER

Aca

cia

FRANCISQUAD

ROLLINSBOTTOMS

ANIMALRESOURCE

CENTER

MELCARNAHAN

QUAD

KUHLMANCOURT

MEMORIALSTADIUM

TAYLORSTADIUM

MIZZOUATHLETICTRAININGCOMPLEX

SIMMONSFIELD

A. L. GUSTINGOLF

COURSE UNIVERSITYFIELD

USDA

HINKSONBOTTOMS

HINKSON FIELD

Gam

ma

Phi

Bet

a

Phi Delta Theta

Delta

Gamma

Kapp

a Alph

a

Order

ChiOmega

BetaSigma Psi

Pi KappaAlpha

Pi K

appa

Phi

Zeta

Tau

Alp

ha

Kappa KappaGamma

Sigma Chi

Zeta BetaTau

Alp

ha E

psilo

n Pi

Phi KappaTheta

Sigma Nu

AlphaGamma

Rho

DeltaTau Delta

DeltaUpsilon

AlphaDelta Pi

Pi BetaPhi

KappaDelta

Phi Mu

Alph

aPh

i

ORTHOPAEDICINSTITUTE

MU RESEARCHCOMMONS

LIDR

BTPAnnex

BetaTheta Pi

EPPLE FIELD

(HILLELBLDG)

CHILLER

PLANT

MISSOURITHEATRE

TUCKER

AG

RIC

ULT

UR

ESC

IEN

CE

BU

ILD

ING

Sig

ma

Sig

ma

Sig

ma

Alp

ha T

auO

meg

a

SHO

P

MAINBLDG

HITTSTREET

PARKINGSTRUCTURE

UNIVERSITY AVEPARKING

STRUCTURE

TIGER

PERFORMANCE

COMPLEX

VIRGINIAAVE

PARKINGSTRUCTURE

(CONLEY AVEPARKING

STRUCTURE)

MATHSCI

TURNER AVEPARKING

STRUCTURE

PATIENTCARE

TOWER

TIGER AVEPARKING

STRUCTURE

GATEWAY HALL

RES LIFESHOP

SURP

LUS

WAR

EHOU

SE

HINKSONBOTTOMS

HINKSON FIELD

EPPLE FIELDEPPLE FIELD

TAYLOR

SIMMONSFIELD

UNIVERSITY

A. L. GUSTINGOLF

COURSE

0 0.25 0.5 0.75 1

Miles

Detention

Cistern

Vegetated Swale

Bioretention

Green Roof

Permeable Pavement

Research

ConstructedWetland

Multiple Opportunity Area

Existing BMP

Habitat Restoration

Subwatershed Boundaries

MU Campus Boundary

100-Year Flood Zone

MU Storm Sewer

Streams

MU Buildings

Master Plan Build-Out

Roads/Sidewalks

Base Map Legend

Map LegendPotential Stormwater Improvement Areas

Stormwater Baseline MapMain Campus

UNIVERSITY AVENUE

ROLLINS STREET

HOSPITAL DRIVE

STADIUM BOULEVARD

CO

LL

EG

E A

VE

NU

E

PR

OV

IDE

NC

E R

OA

D

TIG

ER

AV

EN

UE

HINKSON BOTTOMS

Page 4: UNIVERSITY OF MISSOURImasterplan.missouri.edu/masterplan/sites/masterplan/...PHYSICS JESSE HALL HEARNES CENTER MIZZOU ARENA DEVINE PAVILION (NURSING) HOSPITAL & CLINICS (HOSPITAL PARKING

Hinkson Creek, which runs through the heart of Columbia, did not meet the standards for a warm water aquatic community, based on the numbers and diversity of invertebrates. Because no single pollutant was discovered for creating the problem, the concept of collaborative adaptive management (CAM) was adopted by the joint stakeholders of the University of Missouri, City of Columbia and Boone County.

CAM is a science-driven, stakeholder-based process for decision-making that allows for a wide range of actions to be investigated, including reducing peak stormwater run-o  and reducing the pollution in the run-o , which can contribute to better decision-making over time, thus improving the water quality and biological community.

One of the first steps MU’s Gary Ward, vice chancellor for operations and chief operations o¡cer, proposed was to meet with Jason Hubbart, associate professor of hydrology and water quality at Mizzou.

MU Campus Facilities helped to fund Hubbart’s research to investigate the impacts of land use/cover changes on hydroclimate, water quality,

biogeochemistry and physical-biological interactions in forested, agricultural, and urban ecosystems within the Hinkson Creek Watershed. Monitoring equipment was installed along two sites adjacent to Hinkson creek, one a remnant bottomland hardwood forest and the other a historical agriculture field. Groundwater samples were collected each month (June 2011-June 2013)to determine chemical composition along the floodplain.

The study, among the first to comprehensively characterize and compare shallow groundwater chemical composition at sites with contrasting land-use histories, showed that the bottomland forest had significantly higher concentrations of nutrients while the ag groundwater had significantly higher concentrations of trace elements. Comparing these samples with those of Hinkson Creek suggests potential (positive) impacts of surface vegetation alteration on soil chemistry and groundwater quality.

Ultimately, Hubbart’s research supports the use of floodplain and riparian forests for the conservation of groundwater and surface water resource quality.

Floodplain Research

Regional Context MapTotal acreage versus existing impervious area (shown in percentage of total acreage)

MU’s Financial Commitment to Stormwater Improvements

2014:

$201,196

2012:$11,030,167

2013:$466,381

2015:$357,654

Campus Floor Drain Investigation*Stormwater Masterplan & East Campus Water South Campus Storm Sewer South Campus Storm Sewer Interest on Bond Storm Sewer Mapping* Repair, Maintenace & Improvement of Storm & Sanitary Sewer Infrastructure*Storm & Sanitary Sewer Discharge Corrections* Storm Water Management*Street and Sidewalk Sweeping*Hospital Drive Storm Sewer

Gateway Hall Bio-Retention Wolpers and Johnston Permeable PaversFrancis Quadrangle Storm Inlets Campus Floor Drain Investigation Flow and Sediment Monitoring

••••••

••••

Traditions Plaza Permeable Pavement Habitat Assessment Memorial Union Floor Drain Re-routing to Sanitary Sewer

•••

Stewart and Providence Road Bioretention Patient Care Tower Green Roof Campus Long Term Water Quality Monitoring*Animal Resource Center Rain Gardens and Monitoring

••••

•••••

*Project began but maintenance continues annually.

Page 5: UNIVERSITY OF MISSOURImasterplan.missouri.edu/masterplan/sites/masterplan/...PHYSICS JESSE HALL HEARNES CENTER MIZZOU ARENA DEVINE PAVILION (NURSING) HOSPITAL & CLINICS (HOSPITAL PARKING

Student Research Helps with Mitigation

GREENHOUSE

ENVIRONMENTAL STATEMENTThe University of Missouri saved these valuable resources by using 80% recycled paper containing 60% post-consumer waste, processed chlorine free and manufactured with electricity that

SOLID TREES WATER ENERGY WASTE GASES 1 570 0.5 million 38 105 fully grown gallons BTU pounds pounds of CO2

Calculations based on research by Environmental Defense and other members of the Paper Task Force

Links and resources

1. MU Environmental Health and Safety ehs.missouri.edu/env/stormwater

2. Hinkson Creek CAM helpthehinkson.org

3. Missouri Department of Natural Resources dnr.mo.gov/env/wpp/stormwater

4. U.S. Environmental Protection Agency epa.gov/greeningepa/stormwater

5. Stormwater BMP Performance Database bmpdatabase.org

CONTINUED FROM PAGE 1

To address this problem, stormwater planners at Mizzou now aim to ensure that runo  is not increased and look for ways to improve water quality with each new construction project. Some standalone mitigation projects also have recently been implemented.

A new bioretention basin below the southeast parking lot at Stewart and Providence roads is one example. “Vehicles can leak transmission fluid, brake fluid or oil, and in that leakage there may be things that are harmful,” says Pete Millier, director, Campus Facilities – Landscape Services and Mizzou Botanic Garden. A depression in the ground sequesters pollutants, and a portion of the water is kept from washing to Flat Branch. “For us, a few thousand gallons here and there makes a big di erence,” Millier says. As a bonus, it demonstrates good stormwater practice to the community.

Both Millier and Sullivan say this is not so much innovative as common sense, and a way to further the university’s academic mission. A large-scale, collaborative e ort among Campus Facilities, the civil engineering department, MU Sustainability and researchers in the forestry department is shining new light on both stormwater monitoring and BMP performance in mid-Missouri. “We are looking at opportunities for stormwater improvement with every project,” Sullivan says.

Bioretention basin at Providence and Stewart Roads.

A group of Mizzou students gathered to plant pecan trees near Hinkson Creek on Arbor Day.