University of Colorado at Boulder Yicheng Wang, Phone: , (2) Prototype Model in the textbook The Wyndor Glass Co. produces high-quality glass products, including windows and glass doors. It has three plants. Plant 1 produces Aluminum frames Plant 2 produces wood frames Plant 3 produces the glass and assembles the products. The company has decided to produce two new products. Product 1: An 8-foot glass door with aluminum framing Product 2: A 4 x 6 foot double-hung wood framed window Each product will be produced in batches of 20. The production rate is defined as the number of batches produced per week. The company wants to know what the production rate should be in order to maximize their total profit, subject to the restriction imposed by the limited production capacities available in the 3 plants.