This document consists of 28 printed pages and 1 Insert. DC (NF/JG) 63097/7 © UCLES 2013 [Turn over UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education *6523019788* GEOGRAPHY 0460/11 Paper 1 May/June 2013 1 hour 45 minutes Candidates answer on the Question Paper. Additional Materials: Ruler Calculator READ THESE INSTRUCTIONS FIRST Write your Centre number, candidate number and name in the spaces provided. Write in dark blue or black pen. You may use a soft pencil for any diagrams, graphs or rough working. Do not use staples, paper clips, highlighters, glue or correction fluid. DO NOT WRITE ON ANY BARCODES. Write your answer to each question in the space provided. If additional space is required, you should use the lined page at the end of this booklet. The question number(s) must be clearly shown. Answer three questions. The Insert contains Photograph A for Question 4 and Photograph B for Question 6. The Insert is not required by the Examiner. Sketch maps and diagrams should be drawn whenever they serve to illustrate an answer. At the end of the examination, fasten all your work securely together. The number of marks is given in brackets [ ] at the end of each question or part question. For Examiner’s Use Q1 Q2 Q3 Q4 Q5 Q6 Total PMT

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

This document consists of 28 printed pages and 1 Insert.

DC (NF/JG) 63097/7© UCLES 2013 [Turn over

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONSInternational General Certificate of Secondary Education

*6523019788*

GEOGRAPHY 0460/11

Paper 1 May/June 2013

1 hour 45 minutes

Candidates answer on the Question Paper.

Additional Materials: Ruler Calculator

READ THESE INSTRUCTIONS FIRST

Write your Centre number, candidate number and name in the spaces provided.Write in dark blue or black pen.You may use a soft pencil for any diagrams, graphs or rough working.Do not use staples, paper clips, highlighters, glue or correction fluid.DO NOT WRITE ON ANY BARCODES.

Write your answer to each question in the space provided. If additional space is required, you should use the lined page at the end of this booklet. The question number(s) must be clearly shown.

Answer three questions.

The Insert contains Photograph A for Question 4 and Photograph B for Question 6.The Insert is not required by the Examiner.Sketch maps and diagrams should be drawn whenever they serve to illustrate an answer.

At the end of the examination, fasten all your work securely together.The number of marks is given in brackets [ ] at the end of each question or part question.

For Examiner’s Use

Q1

Q2

Q3

Q4

Q5

Q6

Total

PMT

Page 2: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

2

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

QUESTION 1

1 (a) Study Fig. 1, which shows the population pyramids of Mexico (LEDC) and the USA (MEDC).

male female

8 86 64 42 20 0

40-4445-4950-5455-5960-6465-6970-7475-7980+

35-3930-3425-2920-2415-1910-145-90-4

percentage of population

Mexico

male female

8 86 64 42 20 0

40-4445-4950-5455-5960-6465-6970-7475-7980+

35-3930-3425-2920-2415-1910-14

5-90-4

USAold

dependents

economicallyactive

youngdependents

Fig. 1

(i) What is meant by economically active?

..................................................................................................................................

............................................................................................................................. [1]

(ii) What evidence in the population pyramids shown in Fig. 1 suggests that:

A people in Mexico have a shorter life expectancy than people in the USA;

..................................................................................................................................

..................................................................................................................................

B the USA has a lower birth rate than Mexico?

..................................................................................................................................

............................................................................................................................. [2]

PMT

Page 3: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

3

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

(iii) Compare the percentage of young dependents in Mexico with that in the USA. Support your answer with figures.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [3]

(iv) Explain why, in LEDCs such as Mexico, young dependents make up a large percentage of the population.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [4]

PMT

Page 4: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

4

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(b) Study Fig. 2, which shows changes in the number of old dependents in the UK (MEDC).

0

1

2

3

4

5

6

7

8

2011 2021(expected)

2031(expected)

numberof people(millions)

peopleaged65to74

peopleaged75

andover

Key

year

Fig. 2

(i) Describe how the number of people aged 75 and over is expected to change in the UK between 2011 and 2031. Support your answer with figures.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [3]

PMT

Page 5: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

5

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

(ii) Explain why the governments of MEDCs, such as the UK, are concerned about the ageing population.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [5]

PMT

Page 6: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

6

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(c) For a named country, state a policy which has been used to influence rates of population growth. Describe the impacts of this policy.

Name of country ...................................................

Policy ...............................................................................................................................

Impacts ............................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..................................................................................................................................... [7]

[Total: 25 marks]

END OF QUESTION 1

PMT

Page 7: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

7

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

QUESTION 2

2 (a) Study Fig. 3, which shows cities which are expected to have a population greater than 5 million by 2015.

Equator

cities with expectedpopulation over5 million by 2015

Key

Fig. 3

(i) Name the continent which will have most cities with a population greater than 5 million by 2015.

........................................... [1]

(ii) State two other features of the distribution of the cities shown in Fig. 3.

1 ...............................................................................................................................

..................................................................................................................................

2 ...............................................................................................................................

............................................................................................................................. [2]

PMT

Page 8: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

8

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(iii) Explain how large cities in LEDCs can result from:

A natural population growth;

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [3]

B migration.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [4]

PMT

Page 9: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

9

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

(b) Study Fig. 4, which shows information about the urban population who lived in slums (poor quality housing) in 1990 and 2007 in a selection of LEDCs.

Key

Mexico

Colombia

Egypt

Indonesia

Brazil

South Africa

China

India

Pakistan

Iraq

Nigeria

Bangladesh

11.8

5.5

5.5

26.9

45.7

8.4

174.0

109.5

27.5

10.2

45.3

29.9

0 20 40 60 80 100

urban population living in slums (%)

urban slumpopulation,2007 (millions)

19902007

Fig. 4

(i) Identify the country where:

A the highest number of people lived in slums in 2007;

....................................................

B the highest percentage of the population lived in slums in both 1990 and 2007;

....................................................

C the percentage of people living in slums increased between 1990 and 2007.

.................................................... [3]

PMT

Page 10: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

10

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(ii) Explain why many people in cities in LEDCs live in slums.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [5]

(c) Name a city and describe what has been done to improve living conditions in the slums found there.

Name of city .........................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..................................................................................................................................... [7]

[Total: 25 marks]

END OF QUESTION 2

PMT

Page 11: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

11

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

QUESTION 3

3 (a) Study Figs 5A and 5B, which show a volcano before and after an eruption.

Keyski lifts

houses and farms

fruit trees and crops

roads

old lavaflows

rockyland

villagefertilesoil

old lavaflows

snow

rockyland

villagefertilesoil

Before eruption

Fig. 5A

fertilesoilfertilesoil

ash cloud

ash fallfrom volcano

cloud

After eruption

new lavaflows

village

Fig. 5B

PMT

Page 12: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

12

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(i) Identify a tourist facility shown on Fig. 5A, which was destroyed by the volcanic eruption.

.................................................................................................. [1]

(ii) Describe two likely problems for people who live in the area shown on Figs 5A and 5B as a result of the volcanic eruption.

1 ...............................................................................................................................

..................................................................................................................................

2 ...............................................................................................................................

............................................................................................................................. [2]

(iii) Explain why some volcanoes erupt on constructive (divergent) plate boundaries.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [3]

(iv) Describe the opportunities offered by volcanoes for people who live close to them.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [4]

PMT

Page 13: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

13

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

(b) Study Fig. 6, which shows the location of the Himalayas mountains and Mt. Everest.

CHINAAFG

AFG AFGHANISTAN

MYANMAR

BANGLADESH

BHUTAN NEPAL

ARABIANSEA

SRILANKA

BAY OFBENGAL

0 600

km

30 N

20 N

10 N

70 E

70 E

80 E

80 E 90 E

90 E

PAKISTAN

INDIA

MT. EVEREST

KeyDirection ofplate movement

N

Indo-Australianplate

Eurasian Plate

HIMALAYAS

Fig. 6

(i) Describe the location of Mt. Everest.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [3]

PMT

Page 14: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

14

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(ii) Explain how the Himalayas were formed as a result of plate movement.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [5]

(c) Name an area which you have studied where there has been an earthquake. Describe the effects of this earthquake.

Name of area .......................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..................................................................................................................................... [7]

[Total: 25 marks]

END OF QUESTION 3

PMT

Page 15: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

15

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

QUESTION 4

4 (a) Study Fig. 7, which shows an area of coastline.

N

20 m20 m

10 m10 m

10 m

Z

Key

Y

landform X

height above sea level

clay cliffs

sand and shingle

sand dunes

km

0 1

Fig. 7

(i) Identify the coastal landform labelled X on Fig. 7.

............................................................................................................................. [1]

(ii) Using evidence from Fig. 7 only, describe two features of the coastal landform labelled X.

1 ...............................................................................................................................

..................................................................................................................................

2 ...............................................................................................................................

............................................................................................................................. [2]

PMT

Page 16: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

16

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(iii) Explain how coastal processes formed landform X. You may include a labelled diagram.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

[3]

(iv) Explain how sand dunes are formed in areas of coastal lowland, such as area Z on Fig. 7.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [4]

PMT

Page 17: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

17

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

(b) Study Photograph A (Insert), which shows the cliffs labelled at Y on Fig. 7.

(i) Suggest why the cliffs shown in Photograph A are eroding rapidly.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [3]

(ii) Explain how erosion of cliffs, such as those shown in Photograph A, could cause problems for people.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [5]

PMT

Page 18: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

18

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(c) Most deltas are located on the coast. Describe the benefits and problems of living on a delta which you have studied.

Name of delta ................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..................................................................................................................................... [7]

[Total: 25 marks]

END OF QUESTION 4

PMT

Page 19: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

19

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

QUESTION 5

5 (a) Study Fig. 8, which shows information about domestic use of water in Norway (MEDC in Europe) and Sudan (LEDC in Africa).

0 10 20 30 40 50

0 10 20 30 40 50

60 70 80 90 100 110 120 130 140 150 160 170 180

washing

toiletcooking and drinkingwashing dishes and cleaningwashing clothes

other uses

Norway

Sudan

Key

litres per person per day

litres per person per day

Fig. 8

(i) What is meant by domestic use of water?

..................................................................................................................................

............................................................................................................................. [1]

(ii) Compare the total daily domestic use of water per person in Norway and Sudan. Use statistics from Fig. 8 in your answer.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [2]

PMT

Page 20: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

20

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(iii) Using evidence from Fig. 8 only, identify three other differences between the domestic use of water in Norway and Sudan.

1 ...............................................................................................................................

..................................................................................................................................

2 ...............................................................................................................................

..................................................................................................................................

3 ...............................................................................................................................

............................................................................................................................. [3]

(iv) Suggest reasons for differences in the domestic use of water in Norway and Sudan.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [4]

PMT

Page 21: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

21

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

(b) Study Fig. 9, a map of the Mangla Reservoir and Dam in Pakistan. The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the

height of the dam has been raised by over 9 metres.

Bagam Batli

Dudial

Palak

Khanabad

Chaksawri

Akalgarh(Islamgarh)

JariMangla

New Mirpur

Sultanpur

Pandori

Dina

JariDam

ManglaDam

ReservoirRiver Kanshi

To Kotli

N

50km

Bong Canal

River Jhelum

River

Poonc

h

Key

railways

main roads

canal

large towns

Fig. 9

(i) Describe the location of the Mangla Dam.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [3]

PMT

Page 22: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

22

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(ii) Suggest the benefits and problems of increasing the height of the Mangla Dam for people living in the area shown in Fig. 9.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [5]

(c) Name an example of a sea, lake or river which has been polluted by human activity. Describe the causes of pollution and its effects on the natural environment.

Name of sea, lake or river ........................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..................................................................................................................................... [7]

[Total: 25 marks]

END OF QUESTION 5

PMT

Page 23: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

23

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

QUESTION 6

6 (a) Study Fig. 10, which shows the environmental impacts of producing a brand of processed cheese, along with Photograph B (Insert) which shows this manufactured product.

producing raw materials

manufacturing

packaging

transport

Greenhousegas emissions (%)

Energyconsumption (%)

Waterconsumption (%)

Key

Fig. 10

(i) During which stage is there the greatest environmental impact? Underline the correct answer.

producing raw materials

manufacturing

packaging

transport [1]

(ii) Identify two ways in which the transport of the manufactured product may damage the natural environment.

1 ................................................................................................................................

..................................................................................................................................

2 ...............................................................................................................................

............................................................................................................................. [2]

PMT

Page 24: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

24

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(iii) Suggest three ways in which the environmental impacts of producing and transporting this manufactured product could be reduced.

1 ...............................................................................................................................

..................................................................................................................................

2 ...............................................................................................................................

..................................................................................................................................

3 ................................................................................................................................

............................................................................................................................. [3]

(iv) Explain how greenhouse gas emissions may cause an increase in global temperatures.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [4]

PMT

Page 25: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

25

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

(b) Study Fig. 11, information about making silicon chips which are a component used in the manufacture of computers.

waferproduction

energy

energy silicon forsolar panels

siliconmining

siliconchips

purifiedsilicon

waterchemicals

wastesilicon

waste

circuitetching

Fig. 11

(i) Identify an input, a process and an output in the manufacture of silicon chips.

Input ................................................

Process ................................................

Output ................................................ [3]

PMT

Page 26: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

26

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

(ii) Silicon is also a component of solar panels which are used to generate solar energy, an alternative to using fossil fuels.

Explain why in many countries only small amounts of alternative energy sources are used.

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

..................................................................................................................................

............................................................................................................................. [5]

PMT

Page 27: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

27

0460/11/M/J/13© UCLES 2013 [Turn over

ForExaminer’s

Use

(c) Name an area where manufacturing or processing industry is important and give an example of a type of industry (or factory) which you have studied in that area. Explain the reasons for its growth at that location.

Name of area ...................................................................................................................

Type of industry ...............................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..........................................................................................................................................

..................................................................................................................................... [7]

[Total: 25 marks]

END OF QUESTION 6

PMT

Page 28: UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS ... · The Mangla Dam is a multi-purpose project which was completed in 1967. Recently the height of the dam has been raised by

28

0460/11/M/J/13© UCLES 2013

ForExaminer’s

Use

Additional Page

If you use the following lined page to complete the answer(s) to any question(s), the question number(s) must be clearly shown.

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

.........................................................................................................................................................

Copyright Acknowledgements:

Question 2 Fig. 4 © adapted: Slums Graph; http://filipspagnoli.wordpress.com/stats-on-human-rights/statistics-on-poverty/statistics-on-poverty-urbanization-and-slums.

Question 4 Photograph A S Sibley © UCLES.Question 5 Fig. 9 © adapted: Wideworld Magazine; Philip Allan Publishers; April 1997.Question 6 Fig. 10 © adapted: http://www.groupe-bel.com/bebel/en/corporate-social-responsibility/sustainable-development-2-3/environment-and-

ecodesign.html.Question 6 Fig. 11 © adapted: http://cartanova.ca/green-business-blog/item/71-the-environmental-impact-of-the-internet.Question 6 Photograph B S Sibley © UCLES.

Permission to reproduce items where third-party owned material protected by copyright is included has been sought and cleared where possible. Every reasonable effort has been made by the publisher (UCLES) to trace copyright holders, but if any items requiring clearance have unwittingly been included, the publisher will be pleased to make amends at the earliest possible opportunity.

University of Cambridge International Examinations is part of the Cambridge Assessment Group. Cambridge Assessment is the brand name of University of Cambridge Local Examinations Syndicate (UCLES), which is itself a department of the University of Cambridge.