Universal Remodeling

Embed Size (px)

Citation preview

  • 7/31/2019 Universal Remodeling

    1/27

    EARTHQUAKEFACTS

    Are You Ready for

    THE BIG ONE!?

    Fires raged,fueled by natural gas leaks,

    ignited by fallen power lines.Can it happen again?

    Yes!! Experts predict we are due!!

  • 7/31/2019 Universal Remodeling

    2/27

    p p

    CALIFORNIAIf you are reading this,

    you probably live in a

    EARTHQUAKEHAZARD ZONE.

    .

  • 7/31/2019 Universal Remodeling

    3/27

    Did you know there are over

    200 Earthquake Faults in

    Southern California that are

    capable of a 6.0 magnitude orgreater earthquake?

    Most people in California livewithin 30 miles of these faults.

  • 7/31/2019 Universal Remodeling

    4/27

    EARTHQUAKES,

    Natural or Propane Gas Leaksand Electrical Sparks are aLETHAL COMBINATION

  • 7/31/2019 Universal Remodeling

    5/27

    Now you can help make our communitiesa safer place to live by being proactiveand encouraging the installation of an

    EARTHQUAKE ACTIVATEDGAS SHUT-OFF VALVE!

    Help save lives, property and

    mitigate damages caused bygas fires after a major earthquake.

  • 7/31/2019 Universal Remodeling

    6/27

    1994 Northridge EarthquakeFire caused by a gas leak in thewall due to a major earthquake.

    NO EARTHQUAKE ACTIVATED

    GAS SHUT-OFF INSTALLED.

  • 7/31/2019 Universal Remodeling

    7/27

    EQUIPPED WITH AN EARTHQUAKEACTIVATED GAS SHUT-OFF.

    NO GAS FIRE, EXPLOSION OR LOSS OF LIVES.

    PROPERTY, MEMORIES AND VALUABLES RETRIEVED.

  • 7/31/2019 Universal Remodeling

    8/27

    BE READY FOR THE

    NEXT BIG ONE!!Whether by mandate or peace of mind,

    Earthquake activated gas shut-off valve will

    automatically shut-off the gas to your home or

    business in the event of a major earthquake

    protecting your home, family and pets from a

    gas fire caused by earthquakes.

    Are you ready for the BIG ONE?

  • 7/31/2019 Universal Remodeling

    9/27

    Introducing The Next Generation Of Gas Safety Valves

  • 7/31/2019 Universal Remodeling

    10/27

    Safety and Convenience

    Automatically shuts off the gas, whether you arehome or not, in the event of a major earthquake.

    Helps prevent gas fueled fires caused by

    earthquakes.

    Protects your family, pets, home and keepsakes.

    No tools required to turn gas off or on in the event

    of any gas emergency such as fire, leak, for

    convenience or while on vacation.

  • 7/31/2019 Universal Remodeling

    11/27

    ASSI Safe-T-ValveProperly installed.Replaced existing

    elbow with no added

    material. Valve notrequired to beleveled or braced.Meter access cover

    not altered.Aesthetically

    appealing20 min. installation.

    Competitorsearthquake valve:Over 17 additionalfittings each. Valve

    must be leveled andbraced. Crawl spaceobstructed & covermust be modified.

    Eye sore.1 Hour & 30 min.

    installation each.

    ASSI

    Safe

    T

    Valve

    L.A. City

    Approved

    L.A. City approved installation

    Trigger separated from valve

    Increasing reliability & accessibility

    Valve separated

    from trigger,

    not leveled or

    brace. Replaced

    existing elbow

    Emergency

    Gas

    Shut-Off

  • 7/31/2019 Universal Remodeling

    12/27

    mpor an a e y ea ure

    Easily accessible Push Button Off to manually activate valve inthe event of a gas emergency, repair or convenience.

    Easy reset. No tools required. Turn trigger handlecounterclockwise to restore gas service.

  • 7/31/2019 Universal Remodeling

    13/27

    The proof is in the installationMultiple Unit Installation: 2 Tier Manifold

  • 7/31/2019 Universal Remodeling

    14/27

    Cabinet / Under SetVery tight installation. No room to install competitors

    valve without altering cabinet. Booked at 3 hrs to install

    EQV, not responsible for damage to cabinet or structure.

    Cabinet & meter set NOTaltered.

    Replaced existing elbow.

    Cabinet NOT Damaged.

  • 7/31/2019 Universal Remodeling

    15/27

    Field Set Post InstallationNotice that the post & ASSI Trigger are level.

    Valve is notlevel or braced. Replaced existing elbow only.Meter Set not altered, Gas Company can read through hole.

    S d d I ll i

  • 7/31/2019 Universal Remodeling

    16/27

    Standard InstallationMeter Set Not Altered.

    Replaced existing 90 degree elbow. No added material.

    Fi i h d i t ll ti

  • 7/31/2019 Universal Remodeling

    17/27

    Finished installation.The choice should be obvious, ASSI Gas Safe-T-Valve.

    The next generation in earthquake and gas safety valves.

    Affordable Safety Solutions IncYour circle of safety

    around the globe1-877-ASSI-USA

    EMERGENCYGAS

    SHUT-OFF

    ASSIFor emergency

    Call

    1-877-277-4872

  • 7/31/2019 Universal Remodeling

    18/27

    Demonstrate ValveTest Valve in Box: Cut the packaging straps on the valve

    base and meter cover. Remove gray trigger cover, leavetrigger mounted in box for testing.

    Trigger will come in the Off Position. Before resettingtrigger, take the valve base and pull cable till it is fully

    extended, to the point where the red knob slightly moves.This will stretch the cable and remove any kinks.

    Stand the trigger, still mounted inside the packaging boxstraight up on level surface, using built in level on trigger

    as a guide.

    Take valve base out of the box and check that there are nokinks or crucial bends in cable. You will find out the mostdifficult part of the installation will be the bends in the

    cable.

  • 7/31/2019 Universal Remodeling

    19/27

    Reset Red Lever/Knob to the vertical position, turn counter clock-wise until it locks in place. Valvebase should be open at this time.

    Move trigger as to modify a major earthquake. Thevalve base should trip and close, with significantmovement, stopping the flow of gas.

    Reset the trigger, opening valve - Trip valve usingemergency push off-button, black button located ontop of the trigger. This should close the valve.

    You are now ready for installation.

    Testing the valve and trigger, continued:

  • 7/31/2019 Universal Remodeling

    20/27

    Installation Tips Continued

    Disconnect valve T base from plunger for easier

    installation. (Disconnects at the bushing in 1 or larger

    valve base, leaving plunger in tact with the bushing.)

    Use the logic that the valve base has the same

    dimensions as a 90 degree elbow and does not have to

    be leveled or brace.

    Forget it is a valve for now. Take into consideration the

    clearance on the top of the plunger as to insure the bend

    coming out is not too sharp to reduce tension.

  • 7/31/2019 Universal Remodeling

    21/27

    About the Trigger, Cable and

    Valve Base Materials

    Our product has a 30 Year manufacturers Warranty.

    Trigger is made out of ABS Plastic, the strongest mostdurable plastic in the industry, (stronger and more

    durable than most metals).

    A ultra violet, (U.V.) protection is added to preventfading and is rated at 75 years.

  • 7/31/2019 Universal Remodeling

    22/27

    About the Trigger, Cable and

    Valve Base Materials continued:

    Cable is a solid nickel plated strand cable, with a

    resin protection, to insure slick movement, then

    wrapped with a metal protection for durability and

    coated with our U.V. Protection Plastic.

    If the cable cut intentionally or by accident the valve

    will shut-off letting you know the damage has

    occurred.

  • 7/31/2019 Universal Remodeling

    23/27

    About the Trigger, Cable and

    Valve Base Materials continued:Valve base is made out of brass for maximum durability and life

    span.

    Brass is approved for both gas and water. O rings are added

    to prevent against leakage.

    Sale the valve on the Technology and Emergency Push-Button

    off for any gas emergencies such as fires or repairs.

    No tools needed to turn gas off or on, making the Gas

    Company shut off a thing of the past.

    Cover snaps on and off for emergency access and is

    aesthetically appealing. Color blends with the gas meter.

  • 7/31/2019 Universal Remodeling

    24/27

    Ordinances Mandating

    Earthquake Valve Installations:

    Allstate Insurance currently mandates

    Earthquake Activated Gas Shut-Off Valves

    (EAGSV) in Earthquake Hazard Zones, such

    as, San Francisco, Mendocino, Lake, Napa,Sonoma, Humboldt, Marin, Santa Clara,

    Santa Cruz, Inyo, Mono, Contra Costa, Imperial,

    San Mateo, Alameda, Alpine, and Los Angeles cities.

    Additional counties that require the installation ofEAGSV are Orange, San Diego, San Bernardino,

    Solano, Ventura, and Kern.

  • 7/31/2019 Universal Remodeling

    25/27

    Ordinances Mandating

    Earthquake Valve Installations:

    The City of Los Angeles, West Hollywood, Marin,Alameda, and Contra Costa counties mandate

    EAGSV installation on all new buildings,

    when pulling a building permit, or prior tothe close of escrow, upon the transfer of

    ownership, or in any alteration of gas system.Yes, if you repair your roof, add on, remodel,

    change title to or sell property, you must have anEarthquake Activated Gas Shut-off Valve Installed.

  • 7/31/2019 Universal Remodeling

    26/27

    Ordinances Mandating

    Earthquake Valve Installations:

    The Countries of Japan, Iran and Turkey have more

    stringent mandates. Many other municipalities, states,

    and countries are considering similarmandates which will open up our market even more.

    In summary, this is a mandated product,

    with mandates growing. Our product isthe most reliable, user friendly and

    easiest to install in the industry today.

  • 7/31/2019 Universal Remodeling

    27/27

    Questions and Answers

    Making our communities a safer place to live.

    Thank you for your time.

    Universal Remodeling

    (888) 343 9111