75
UNITED STATES 0• NUCLEAR REGULATORY COMMISSION Z WASHINGTON, D.C. 20555-0001 Mr. Steven Brocoum, Assistant Manager for Licensing and Regulatory Compliance Yucca Mountain Site Characterization Office Office of Civilian Radioactive Waste Management U.S. Department of Energy P.O. Box 30307 North Las Vegas, NV 89036-0307 SUBJECT: MINUTES OF THE DECEMBER 20, 2000, MANAGEMENT MEETING Dear Mr. Brocoum: Enclosed are the minutes of the December 20, 2000, Management Meeting between the U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission to discuss the status of various management and programmatic issues concerning Yucca Mountain, Nevada. The meeting minutes consist of the meeting minutes summary, agenda, attendance list, and the presentation material noted as enclosures 1, 2, 3, and 4, respectively. The meeting was held at NRC Headquarters in Rockville, Maryland with participation by video conference at DOE facilities in Las Vegas, NV and Washington, DC, and the Center for Nuclear Waste Regulatory Analyses in San Antonio, TX. The meeting resulted in a good exchange of information and views between DOE and NRC. No response to this letter is required. If you have any questions regarding the enclosed meeting minutes, please contact Ken Chang of my staff. He can be reached on (301) 415-6612. Sincerely, C. William Reamer, Chief High-Level Waste Branch Division of Waste Management Office of Nuclear Material Safety And Safeguards Enclosures: Summary Highlights Agenda Attendance List Briefing Materials cc: See attached list

UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

UNITED STATES 0• NUCLEAR REGULATORY COMMISSION Z WASHINGTON, D.C. 20555-0001

Mr. Steven Brocoum, Assistant Manager for Licensing and Regulatory Compliance

Yucca Mountain Site Characterization Office Office of Civilian Radioactive Waste Management U.S. Department of Energy P.O. Box 30307 North Las Vegas, NV 89036-0307

SUBJECT: MINUTES OF THE DECEMBER 20, 2000, MANAGEMENT MEETING

Dear Mr. Brocoum:

Enclosed are the minutes of the December 20, 2000, Management Meeting between the U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission to discuss the status of various management and programmatic issues concerning Yucca Mountain, Nevada. The meeting minutes consist of the meeting minutes summary, agenda, attendance list, and the presentation material noted as enclosures 1, 2, 3, and 4, respectively.

The meeting was held at NRC Headquarters in Rockville, Maryland with participation by video conference at DOE facilities in Las Vegas, NV and Washington, DC, and the Center for Nuclear Waste Regulatory Analyses in San Antonio, TX.

The meeting resulted in a good exchange of information and views between DOE and NRC. No response to this letter is required. If you have any questions regarding the enclosed meeting minutes, please contact Ken Chang of my staff. He can be reached on (301) 415-6612.

Sincerely,

C. William Reamer, Chief High-Level Waste Branch Division of Waste Management Office of Nuclear Material Safety And Safeguards

Enclosures: Summary Highlights Agenda Attendance List Briefing Materials

cc: See attached list

Page 2: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Letter to S. Brocoum from C. William Reamer dated:

cc:

R. Loux, State of Nevada

S. Frishman, State of Nevada

L. Barrett, DOE/Washington, DC

A. Brownstein, DOE/Washington, DC

S. Hanauer, DOE/Washington, DC

C. Einberg, DOE/Washington, DC

J. Carlson, DOE/Washington, DC

N. Slater, DOE/Washington, DC

A. Gil, YMPO

R. Dyer, YMPO

S. Brocoum, YMPO

R. Clark, YMPO

S. Mellington, YMPO

C. Hanlon, YMPO

T. Gunter, YMPO

G. Dials, M&O

J. Bailey, M&O

D. Wilkins, M&O

M. Voegele, M&O

S. Echols, Winston & Strawn

B. Price, Nevada Legislative Committee

J. Meder, Nevada Legislative Counsel Bureau

D. Bechtel, Clark County, NV

E. von Tiesenhausen, Clark County, NV

A. Kalt, Churchill County, NV

G. McCorkell, Esmeralda County, NV

L. Fiorenzi, Eureka County, NV

A. Johnson, Eureka County, NV

A. Remus, Inyo County, CA

B. Duke, Lander County, NV

R. Massey, Lander County, NV

J. Pitts, Lincoln County, NV

M. Baughman, Lincoln County, NV

J. Wallis, Mineral County, NV

J. Shankle, Mineral County, NV

L. Bradshaw, Nye County, NV

M. Murphy, Nye County, NV

J. McKnight, Nye County, NV

D. Weigel, GAO

W. Barnard, NWTRB

R. Holden, NCAI

A. Collins, NIEC

R. Arnold, Pahrump County, NV

J. Larson, White Pine County

R. Clark, EPA

F. Marcinowski, EPA

R. Anderson, NEI

R. McCullum, NEI

S. Kraft, NEI

J. Kessler, EPRI

D. Duncan, USGS

R. Craig, USGS

W. Booth, Engineering Svcs, LTD

J. Curtiss, Winston & Strawn

S. Besser, NV Congressional Delegation

N. Rice, NV Congressional Delegation

T. Story, NV Congressional Delegation

J. Reynoldson, NV Congressional Delegation

J. Pegues, City of Las Vegas, NV

Page 3: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

ENCLOSURE 1

Page 4: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

NRC/DOE Management Meeting Summary DOE Las Vegas, NV; NRC Headquarters, Rockville, MD; CNWRA, San Antonio, TX

December 20, 2000, 2:00 PM to 4:30 PM, EST

The U.S. Nuclear Regulatory Commission (NRC) and the U.S. Department of Energy (DOE) met on December 20, 2000, to discuss the status of various management and programmatic issues. This meeting summary includes a brief description of the discussions, the meeting agenda (attachment 1), the attendance list (attachment 2), a copy of handouts used (attachment 3), and the list of action items being tracked with their status (attachment 4).

Introductory Comments

There were no introductory comments by the NRC, DOE, Affected Units of Local Government (AULG), or other Interested Parties.

NRC Program Update

Mr. John Greeves (NRC) provided a summary of the DOE/NRC Quarterly Quality Assurance (QA) Meeting held December 19, 2000. He indicated that, based on the information presented at the QA meeting, DOE appeared to be meeting its goals for data and software qualification, and requested that the QA meeting continue to be held in advance of the Management Meeting.

Mr. Bill Reamer (NRC) provided updates on the status of 10 CFR Part 63, the Yucca Mountain Review Plan (YMRP), NRC's concurrence on 10 CFR Part 963, and NRC's sufficiency review. The status of these activities remains unchanged since the previous Management Meeting. He indicated that prelicensing consultations with DOE may need to be revisited depending on the differences between the final and proposed rules. He indicated that NRC expected DOE to submit a license application consistent with the guidance provided in YMRP for format and content. Mr. Reamer stated that no further action would be taken on the NRC's strategy and guidance for its sufficiency review until the final 10 CFR Part 63 is issued and the YMRP is revised to be consistent with the final rule. Regarding the Licensing Support Network (LSN) rulemaking, Mr. Reamer stated that the staff expected to complete its review of comments and provide its recommendations to the Commission early in 2001. He indicated that the timing of DOE's certification of LSN availability was one of the principal issues raised in the comments.

Ms. Judy Treichel (Nevada Nuclear Waste Task Force) asked if the final 10 CFR Part 63 would be issued before the YMRP so that it would be possible to see how comments on the rule were treated before reviewing the YMRP. Mr. Reamer stated that the final 10 CFR Part 63 would be issued and then changes would be made in the YMRP to make it consistent with the final rule.

DOE Program Update

Mr. Don Horton (DOE) indicated that milestones for licensing may change as a result of work currently being planned to address issues raised by the Nuclear Waste Technical Review Board (NWTRB). He stated that DOE would keep NRC informed of such changes. Mr. Horton briefly discussed the announcement by Secretary Richardson of an investigation by the DOE Inspector

1

Page 5: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

General of allegations made regarding contractor bias. He stated that the Site Recommendation Consideration Report (SRCR) would not be issued until this investigation is complete. Mr. Horton also stated DOE's belief that the scientific and technical work conducted by the Program and reflected in its technical documents is unbiased and of high quality and provides the basis for the issue resolution process currently underway. Mr. Reamer said that the issue resolution process should proceed independently of the SRCR schedule. NRC staff would be amenable to an adjustment in the schedule for issue resolution due to a lack of people or resources, he added, but not to a shortening of its current 6-month schedule for sufficiency review of the SRCR.

Mr. Horton introduced Mr. Ken Hess, General Manager of the Bechtel SAIC Company, LLC. Mr. Dick Spence (DOE) provided a detailed discussion of the contractor transition process, its status and schedule for completion, including the turnover of ongoing work. Mr. Spence provided a complete list of the transition issues identified. Mr. Greeves also expressed interest in how the employee concerns program is being handled in the transition and indicated that he will follow-up with Mr. Horton. Mr. Greeves stated that NRC was interested in follow-up discussions on QA and other regulatory issues with DOE and its new M&O contractor after the transition period ends.

Key Technical Issues (KTI) Status

Ms. Carol Hanlon (DOE) reviewed the status of KTI resolution. Ms. Hanlon proposed a basis for closure of two KTIs (Structural Deformation and Seismicity, and Igneous Activity) for consideration by the NRC. Mr. Reamer stated that NRC would respond to this proposal as well as to proposed date changes for future KTI resolution meetings. Ms. Sandy Wastler (NRC) indicated that NRC was concerned by the potential delay in availability of the Features, Events, and Processes (FEPs) database for NRC review prior to a meeting on the Total System Performance Assessment and Integration (TSPAI) KTI. Ms. Hanlon indicated that DOE would keep NRC informed of the status of the FEPs database. Mr. Reamer (NRC) stated that the Chairman of the Commission had received a letter from Ms. Treichel regarding the issue resolution process and would be responding shortly.

Action Items

Mr. Tim Gunter (DOE) presented the status of action items from previous Management Meetings. He also presented a proposal for capturing action items in a list that would be updated after every meeting, included as part of the meeting summary, and discussed at the subsequent meeting. Actions identified as complete would be archived and deleted from the list for the next meeting.

New action items identified at this meeting (included on list of Action Items, attachment 4):

1. NRC will follow-up with DOE on Employee Concerns Program as part of transition. 2. DOE will provide NRC with clarification regarding which transition issues are related to

regulatory and QA matters. 3. A KTI breakout session will be held prior to the next Management Meeting.

2

Page 6: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

4. DOE will provide an update on the status of FEPs database availability to NRC prior to the Technical Exchange on TSPAI KTI.

Closing Remarks

Mr. Horton emphasized that QA will continue to be important to DOE and that DOE will monitor implementation by the new M&O contractor.

Mr. Greeves stated that NRC will monitor DOE's implementation of its QA program and that he wants an opportunity to meet with the new contractor to share NRC perspectives on past history.

No closing remarks were made by the AULG or other Interested Parties.

o hang Division of Waste Manag ent Office of Nuclear Material

Safety and Safeguards U.S. Nuclear Regulatory Commission

Nancy H. Slater-ThomI~on Regulatory Coordination Division Office of Civilian Radioactive

Waste Management U.S. Department of Energy

3

Page 7: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

ENCLOSURE 2

Page 8: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

TENTATIVE AGENDA NRC/DOE Quarterly Management Meeting

December 20, 2000 2:00 PM to 4:00 PM EST 11:00 AM to 1:00 PM PST

NRC White Flint (Room T2B5) Rockville, MD V-Tel to SW Research Center (Room A103) San Antonio, TX

V-Tel to DOE Headquarters (Room 7F-091) Washington, D.C. V-Tel to DOE-Hillshire (Room 516) Las Vegas, NV

Introductory Comments NRC/DOE

NRC Program Update NRC

DOE Program Update DOE

Key Technical Issues Status DOE

Action Items NRC/DOE

Closing Remarks ALL

Page 9: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

ENCLOSURE 3

Page 10: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

ATTENDANCE LIST

NRC/DOE Management Meeting

December 20, 2000

Rockville, MD

Name Organization Phone E-Mail

/A ,C({-.6e( CG'wX 01TS113 4t4 ~ gq~ fk-~/''#4c / 0 PK - ed '7 ¼rs4 - -S -7

Ala A j/1�4 � ,,�Ahjz_______________________ I_ .' - I.~- - I(I lL 11- 1_~l] IL L( ýL~ U' yi- L. " ,i

$Z/~If 37- LOC5EWV p.A

mX,1 L C4 Q.%. ca e ______M_0)_q/5__85_ _m_3en

ZA(J- yg 0PJ PqC-42 Ow~ ~ 7 M 3o 1-1cgj'

I 4 4

I 4 4

A I _____________________

Page 11: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

ATTENDANCE LIST NRC/DOE Management Meeting

December 20, 2000 Rockville, MD

Name Organization Phone E-Mail

I A*c -M ZlkcrL)c' M i.

fl~e~b' CýLl ______ 7__ L/ 2

-Kvi~i- i, ___________ 7-7~ tu 2 4k

11z~~ ________ x C' b z~~C ro

Page 12: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

DEC-20-00 17:21 FROM: CTR NUC WASTE REG ANA

List of Attendees December 20, 2000

DOE/NRC Management Met.e n

Location: ,,(/ (city, state / organization - Guilding)

Organization Phone

, C • ,• ,, t-' ['-,A ,/ - A- J

4-...-

+

4. 1

1- 1

1-

I ±

±

Name

, °

i f

- I i i

PAGE 2IID: 2105225155

Page 13: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

('Xjiy inq-uopoziuv8io1a)ms'd;jq) ntZ ýe) ýPýfltf'r-7-7(// -, Sk2pll IV-7 'uO'IvOO7

Relpaw 10111103viluN DUN/ao(l OOOZ OZ.t.lqtu.m.,tiQ saapuauv JO ISIl

N'd Z00*0N TS:Z TSiSS6ZZOý:GI 3JHS ýHiNNNOKAN3 MK

Page 14: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

ENCLOSURE 4

Page 15: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

U.S. Department of Energy Office of Civilian Radioactive Waste Management

OCRWM M&O Contract Transition

Presented to: NRC/DOE Management Meeting

Presented by: Richard E. Spence OCRWM Transition Management Team D6eartment of Energy Yuccarmptain Site Characterization Project Y ucca ,, R. .

"-Y CCAMOUNTAIN

PROJECTDece•rnb

Page 16: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Overview

"* Transition Objectives

"• Timeline

"* Transition Teams and Organization

"* Transition Process

"* Capturing all the Work

"* Summary of Pre-Award Planning

"* Transition Briefing Hierarchy

"* Summary of BSC Accomplishments

"* Phase-in Period

Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMSpence - 12 /0p00. pt

Page 17: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

OCRWM M&O Contract Transition Objectives

"* Conduct Orderly Transition of Workscope

"* Maintain Continuity of M&O Work

- Retain traceability and defensibility

"* Minimize Impact to Employees

- Expedite personnel interviews and employee retention

- Lab and USGS Principal Investigators retained per RFP

"• Minimize Impact on On-going Work Activities and Milestones

"* Minimize Total Cost of Transition

YM P Yucca Mountain ProjectlPreliminary Predecisional Draft Materials M&O Graphics PresentationsYMSpencel12/20/00.ppt

Page 18: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

M&O Contract Transition Timeline

End of Transition

Period

End of Phase-in Period

OCRWM M&O Contract Award Announcement

Nov. 14, 2000

POST-AWARD TRANSITION PERIOD

1�

1-

PHASE-IN PERIOD

December Holidays

Dec. 25 - Jan. 1

Dec. 5, 2000 Feb. 11, 2001 March 31, 2001

Yucca Mountain Project/Preliminary Predecisional Draft Matenals M&O Graphics PresentationsYMSpencej 2120100.ppt 4

December Holidays

Dec.

25 - Jan. 1

M&O Graphics PresentationsYMSpence_12/20/00.ppt 4YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials

Page 19: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Transition Teams and Organization

Nevada Operations OfficeOCRWM Transition

Management Team (OTMT)I DOE Legal Counsel

Susan Rives

SBSC Transition Team ... t-•TESS Transition Team]

I I TRA1NSITION FUNCTIONAL TEAMS (Organized by Functional Transition WBS)

' ' ' DOE Functional Team Leaders ,, I I IIII

I I I I

M&O GrphcsPrsetaios.Y pnc 1.. . .. ptYM P Yucca Mountain Project/Preliminary Predecisional Draft Materials

Dr. Ivan Itkin

Ronald Milner James Carlson

Richard Minning Russell Dyer

UM&O Graphics PresentationsYMSpence_12/20/00.ppt

Page 20: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Transition Process

Assign DOE Functional Team

Leaders & TESS FRs

Generate Orientation Briefings

Generate Preliminary Turnover and

Closeout Packages

Pre-Contract Award Period (OCRWM / TESS M&O)

.ward iod

) Contractor)

Hold Turnover Package Mtgs to brief work details

'1Ensure that Bechtel SAIC understands work and Sign Tri-Party Agreements F

Post-Contract / Transition Pe

(OCRWM / TESS M&O I BSC M&(

, =Hold Orientation Mtgs

to brief on-going work

IYucca Mountain ProjectIPreIiminar�� Predecisional Draft Materials M&O Graphics PresentationsYMSpence9 2/20100.ppt 6

Develop Transition Management Plan,

Procedure and Transition Planning Database

Phase-in Period

(OCRWM I BSC)

Oversee Phase-in

Identify and Document Transition-Related

Issues & Resolution Plans

I V I

YM P Yucca Mountain Project/Preliminary Predecisional Draft MaterialsM&O Graphics PresentationsYMSpence_ 12/20/00.ppt 6

Page 21: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issues to Capture/Turnover the Work

An issue is any M&O work-related item which if not addressed could negatively impact the continuation of that work by the new contractor

YM P Yucca Mountain Project/Preliminary Predecisional Draft MaterialsU

M&O Graphics PresentationsYMSpence_12/20/OO.ppt 7

Page 22: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Summary of Transition-Related Issues (TRI)

30(Regulatory) 10 (Management)

53 (Business Processes)

h, 30 (Human Resources)

(Technical

37 (Services)

82 (Infrastructure)

Total Number of Transition-Related Issues = 293

YM p Yucoa Mountain PmjedtPreliminjary Predecisional Draft MaterialsM&O Graphics Presentations YMSpence 12/20/O0.ppt 8

L-1

Page 23: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Transition-Related Issue (TRI) Examples

"• Provide status of License Application

- History, background, basis for decisions

"• Provide status of cross-cutting technical issues

"* Provide regulatory interface protocol on KTIs

"* Provide status of documents and systems associated with the License Application

- Technical Guidance Document

- License Application Management Plan

- Key Technical Issue Documents

- Licensing Support Network

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMSpence_12/20/00.ppt 9

Page 24: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Impact Category Definitions

"* Impact CategoryA

- Any issue which, if not addressed and mitigated early in the transition period, will have a measurable, unrecoverable, negative impact to major milestones or deliverables

"* Impact Category B

- Any issue which, if not addressed and mitigated early in the transition period, may have a measurable, unrecoverable, negative impact to major milestones or deliverables

"* Impact Category C

- Any item necessary to complete the transition but with no potential for negative impacts on major milestones or deliverables

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMSpence_12/20/00.ppt 10

Page 25: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Impact Category Distribution

Impact Category A 10%

15%

Impact Category C 75%

Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMSpence 1 2120100.ppt Ii

Impact Category B

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials

M&O Graphics PresentationsYMSpence_ 12/20/00.ppt 11

Page 26: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Hierarchy of Transition Briefings

Dec. 5 through Dec. 19, 2000

\ ,4- Award thru Feb. 11,2001

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials

09696amu -fluM&O Graphics PresentationsYMSpence_12/20/00.ppt 12

Page 27: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Summary of BSC Accomplishments "* Established fully functional Bechtel SAIC transition office

"* Held four employee "all-hands" meetings in LV

"* Held two employee "all-hands" meetings in DC

• Initiated job interviews with incumbent contractor personnel

* Established and maintained 24-hour telephone hotline

* Developed a communication website (BSCupdate.com)

* Submitted an updated transition plan including revised cost and schedule baselines

* Completed functional mapping to realign the current divisional organization into a project organization

* Maintaining critical skills through contingent offers to key incumbent personnel

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMSpence_12/20/00.ppt 13

Page 28: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Phase-in Period Activities

* Complete any residual Turnover Packages

* Perform check of BSC Project Control System to ensure that all work packages have been captured or accounted for

* Continue monitoring transition-related activities that are incomplete

* Address all remaining issues to ensure a successful M&O contract transition

* Transition Team function is officially complete by April 1, 2001. Thereafter, any residual issues will be handled by line management

J j P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMSpence_12/20/OO.ppt 14

Page 29: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Summary

"• Transition process was developed and approved

"* Transition planning was thorough

- Transition-related issues identified and prioritized

- Orientation Briefings prepared

- Turnover Package preparations ongoing

"* Transition plan is being implemented

"* Transition status reported to management on a regular basis

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMSpence_12/20/00.ppt 15

Page 30: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TB01 -001 (B) Business Processes - Procurement & Sub-Contracts

Description

Identify and prepare for assignment all open purchase orders and service contracts that will be the responsibility of the new contractor.

Business Processes - Procurement & Sub-Contracts

Business Processes - Memorandum Purchase Orders (MPO's)

TB02E-001 (A) Budget Briefing

TB02W-001 (C) Technical Direction Letters (TDL)

TB03-001 (C) Business Processes - Auditing

TB04-001 (C) Business Processes - Procurement & Sub-Contracts

TB04-006 (C) Taxes

TB04-008 (C) Business Processes

TB04-010 (C)

TB04-011 (B)

TB04-012 (B)

TB04-013 (C)

Business Processes - Accounting & Financial Services.

Business Processes - Accounting & Financial Services

Business Processes - Accounting & Financial Services

Business Processes - Accounting & Financial Services

TB04-014 (B) Letter of Credit

TB04-015 (C) Insurance

TB05-001 (C) Business Processes

TB05-002 (C) Business Processes - Contracts

TB05-003 (C) Business Process - Contracts

TB09E-001 (C) Technical Direction Letters

TB09E-003 (C) Cost Schedule Control System

TB09E-004 (C) Director's Program Briefing

TB09E-005 (B) Monthly Program Financial Summary

TBOI-003 (B)

TBOI-007 (B)

Identify the costs associated with any subcontracts, that will expire on (date) to assure that funds will be made available to the new contractor for payment of these costs.

National Laboratory's prime transition issue is continuity in contractual obligation and attendant funding and our ability to bill. The technical work will continue and we trust we will be notified as to organization and reporting relationships.

Brief incoming personnel on assistance and support in preparation of Budget Presentation Packages, Office of Management and Budget (OMB) Passback, Budget Rollout, and Appropriations Staff briefing.

Transition pending TDLs - Office of Civilian Radioactive Waste Management

(OCRWM) West

Disposition of Internal Audit Reports findings.

Imprest Funds Turnover

Taxes that M&O Contractors pay & the required registration forms will be

completed and submitted to the proper recipients by the required due dates.

Credit Cards

Fiscal Accounting Close-out. Book accruals against funding source.

Establishment of a program Payroll System

Continuity of accounts payable, travel procedures, and cost reimbursement to travelers.

Identify all uncosted obligations, including building leases, to assure that all funding has been planned for withholding the cost ceiling limits and that all uncosted obligations are identified as either encumbrances, workscopes, or unencumbered items.

Letter of Credit

All Property & Casualty Insurance for TRW will be closed out

Identify all current memo of understanding describing the relationship between the M&O, United States Geologic Survey (USGS), and Department Of Energy (DOE).

Final fee determination for TRW

Complete routine reports during/after transition.

Transition pending Technical Direction Letters (TDL) - Office of Civilian Radioactive Waste Management (OCRWM) East

Transfer knowledge and records on the Cost Schedule Control System, including data and sensitivity analysis capability

Brief incoming personnel on the scheduling, developing, and coordinating the Program Status and Issues meetings for the Program, Office of Acceptance, Transportation and Integration (OATI), and Program Management & Administration (PM&A) held approximately every 2-3 months.

Brief incoming personnel on support and drafting of the Monthly Summary of Program Financial and Budget Information. Transfer work, records and internet connections.

Page 31: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TB09E-006 (C) Preparation of Annual Work Plan

TBO9E-007 (C) Quarterly Financial Reports

TB09E-008 (C) Monthly Financial Reports

TB09W-003 (C)Business Processes - Project Planning & Control (PP&C)

TB09W-004 (C)Business Processes - Project Planning & Control (PP&C)

TB09W-005 (C)Business Processes - Project Planning & Control (PP&C)

TB09W-006 (C)Business Processes - Project Planning & Control (PP&C)

TB09W-007 (C) Business Process - Project Planning

& Control (PP&C)

TBI2E-001 (B) Building Leases - East

TBI2E-002 (B) Offices in the east - new contractor

TB12E-003 (C) Real Property Managment- East

TB12E-004 (B) Real Property Management -East

TB12E-005 (B) Equipment Removal/Disposal

TB12E-006 (B) Real Property Management - East

TB12W-O01 (C)Business Processes - Contracts

TB12W-002 (C)Bonding requirements - utilities

TB13-001 (C) Trans & Mgmt Motor Pool

TB14-001 (C)

TB14-002 (C)

TB15-001 (C)

Business Processes - Materials Management

Services / Inventory Control

Property Inventory

TBI5-003 (C) Excess Property

TB15-011 (C) Rental Property

TB15-014 (C) Property Control

Description

Brief incoming personnel on support to preparation of Annual Work Plan. Transfer work for 9/00 document preparation support. After award, revise RW40/50 FY01 work plans to reflect transition.

Brief incoming personnel on preparation of quarterly financial reports covering funds and performance status of program for Office of Civilian Radioactive Waste Management (OCRWM) report to Department Of Energy (DOE)

Brief incoming personnel on preparation of monthly financial and performance reports for Office of Acceptance, Transportation and Integration and Office Program Management & Administration (OPM&A).

Brief incoming personnel on preparation of Annual Work Plan. Transfer information regarding Fiscal Year 2001 planning effort.

Brief incoming personnel on Baseline Management processes, procedures, and documentation.

Brief incoming personnel on monthly reporting processes including customer reports and briefings generated by PP&C.

Transfer knowledge and records on the Cost Schedule Control System.

Inventory and Turnover Historical PP&C Data

Determine M&O East building leases to be transfered to the new M&O Conduct space planning for successor contractor team when they initally

arrive after contract award.

Remove TRW Logo from TESI Building

Establish New Contracts with Outside Vendors to replace corporate TRW Facilities, Health & Safety, & Security Services Support

Removal of Government- Furnished Equipment (GFE), Heating Ventilation Air-conditioning (HVAC) and Electrical Equipment for Sale/Disposal

Service/Maintenance Contracts for Washington, DC area.

TRW to assign Summerlin leases to new contractor.

Establish bonding requirement for utilities for all M&O facilities to assure no interruption of service.

Transfer lease agreements for General Services Administration (GSA) Vehicles to new contract.

Brief successor on Depratment Of Energy's (DOE) expectations regarding Material Management System.

Transfer all accountable materials/parts.

Conduct joint inventory and reconciliation and transfer of accountable government property.

Transition responsibility for disposal of excess property and establish cutoff date for TRW transactions.

Ensure Rental Property from Commercial Sources is returned or purchase order and property are assigned to new contract.

Transition responsibilities for identification, records, tracking and reporting of government property associated with the contract and the Department Of Energy/Yucca Mountain Site Characterization Office.

Page 32: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title DescriptionProperty at the National Laboratories

TB15-020 (C) Radiological History

TB15-021 (C) Tunnel Boring Machines (TBM)

TB15-025 (C) Capital Acquisitions

TB15-026 (C) Property Files

TB15-028 (C) Vienna Furniture Sublease - East

TB15-029 (C)

TB15-030 (C)

Property Computer Based Training (CBT)

Nevada Test Site/Bechtel Nevada Rentals

TH01 -001 (C) Worker Compensation

THOI-003 (C) Equal Employment Opportunity (EEO) Audits

THOI-004 (C) Performance Management Process

TH01 -006 (C) Personnel Files

TH01-007 (C) AFS Forms-HR

THO1-010 (C) Human Resources (FIR) Web Pages

TH02-001 (C) Health/Dental Plans

TH02-002 (C) Retirement/Pension Plan

TH02-003 (C) Investment Savings Plan

TH02-004 (C) Long Term Disability Plan

TH02-005 (C) Sick Leave Plan

TH02-006 (C) Vacation/Annual Leave

TB15-016 (C) Brief successor with Department Of Energy on Yucca Mountain Project property tracked by the National Laboratories

Ensure continuing availability of radiological history and clearance records to support future disposition of government property.

Transfer information regarding General Services Administration (GSA) sale and Equipment Held for Future Projects (EHFFP) status of Tunnel Boring Machines (TBM)

Coordinate processing of capital acquisitions from point of requisition through financial transfer during the entire transition period.

Identify property files that need to be transitioned in hard copy or electronic formats to the new contract.

Evaluate alternatives for disposition of furniture associated with Vienna 8th floor Sublease.

Brief successor on Yucca Mountain Project/M&O Managing Government Property Computer Based Training (CBT).

Ensure return or transition of Nevada Test Site/Bechtel Nevada Rental Equipment to new contract.

Determine responsibility for handling open Nevada contested worker compensation claims at time of contract expiration.

Status of open EEO audits/appraisals at time of contract expiration.

Brief incoming Human Resources on the Performance Management

Proces/Form. Close out 2000 performance year.

Prepare for the disposition of personnel files and confidential employee data.

Transfer ownership or delete HR forms on the Automated Form System.

Transfer ownership or delete pages on M&O HR web site used by M&O employees. Delete TRW-specific links.

Health/dental Plans: including Internal Revenue Sservice Section 125 Health & Dependent Care Accounts: COBRA, adequacy of reserves; vendor contracts; employee new year enrollments, employee communication. The method for closeout and transition of this item needs to be resolved with the successor contractor.

Retirement/Pension Plan: Adequacy of trust funding, employee communication. The method for closeout and transition of this item needs to be resolved with the successor.

Investment Savings Plan: employee communication of change. The method for closeout and transition of this item needs to be resolved with the successor.

Long Term Disability Plan: liability of existing claims; employee communication. The method for closeout and transition of this item needs to be resolved with the successor contractor.

Sick Leave/Salary Continuation Plan: existing employees have accrued benefit, communication to employees. Need to address carry over provisions (if any) to new contractor. The method for closeout and transition of this item needs to be resolved with the successor.

Annual Leave - identify amounts for payout or carryover of accrued benefit at the end of this contract or carry-over provisions. The method for closeout and transition of this item needs to be resolved with the successor contractor.

Issue (impact) Title Description

Page 33: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title DescriptionTH02-008 (C) Educational Reimbursement

TH02-009 (C) Retiree Supplemental Compensation

TH03-001 (C) Summer Intern Program

TH03-002 (C) Organization Charts

TH03-003 (C) Status of Workforce

TH03-004 (B)

TH03-005 (C)

TH03-006 (C)

TH03-007 (A)

Outplacement/Career Center

Educational Reimbursement: determine close out or transfer of costs for employees currently enrolled in an approved class.

Identify participants in health/dental plan continuation for retirees.

Brief successor contractor on summer intern program.

Brief successor contractor on Organization Chart/Organization Profiler process. Provide for continual updates to org. charts and method of viewing the new organization (if needed).

Report Status of workforce assigned to other locations/sites (TDY, permanent, telecommuters)and employees on Leave of Absence

Summarize Reduction in Force (RIF)/de-staffmg process for TRW and Teammates during/after Transition. Include plan for Outplacement/Career Center. Coordinate with successor contractor.

Relocation Costs Relocation: identify TRW and Teammate employees costs for return relocation agreements.

Employee Separation Costs

Interviewing/Hiring/Transfer Process

TH03-008 (C) Human Resources (HR) Databases

TH03-009 (A) Critical Skill Retention During Transition

TH04-001 (C) Formal Training

TH04-003 (C) Training Records & Software Systems

TH04-005 (C) Training Deliverables

TH04-006 (C) DOE Cross-Cutting Training Forum

TH04-007 (C) Training Section for License Application

TH05-002 (C) Workers Compensation Insurance

TH06-0O1 (C)

TIOI-002 (C)

Human Resources (HR) - Labor Relations

U.S. Department of Transportation (DOT) Hazmat Shipping/Handling

TIOI-004 (C) Borehole Security

T101-006 (C) Site Facilities & Systems Status

Identify costs of employee separation, if any.

Coordinate interviewing, hiring and transfer process with the successor contractor.

Brief successor contractor on all non-TRW proprietary M&O/HR databases and arrange for transfer of data. i.e., Task Achievement Program (TAP), Automated Offer System, etc.

Identify staff working on critical work.

Transfer all existing training policies, programs, plans, procedures, manuals, training needs assessments, and curse materials including Computer Based Training (CBT's), videotapes, etc. Transition all training responsibility, including responsibility for CBT, web-based training, and classroom training provided both locally and off-site.

Transfer all existing training records, Training Server database (training record data including training completions, training requirements, and course descriptions) Crystal Reports software.

Transition the following deliverables including the format and data processing mechanism required for preparation: (1) Training Cost Information Annual Update, (2) Annual Training Plan, (3) Annual Training Needs Assessment, (3) Annual Training Needs Assessment, (4) Environmental, Safety and Health Training and Qualification Program.

Transfer the responsibility for supporting the DOE Cross-Cutting Training Forum (CCTF).

Transfer all work completed to date on the Training Section of the License Application

Ensure uninterrupted workers compensation insurance.

Transfer of union contracts.

Orient new contractor with DOT standards regarding handling and shipping of

hazardous materials.

Transfer knowledge and responsibility for borehole security.

Transfer knowledge and status of each site facility or system. Include reference to as-builts, Operations and Maintenance (O&M) drawings, etc. Include the Operations Center.

Issue (impact) Title Description

Page 34: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

T101-007 (C) Ranch

Description

Transfer knowledge associated with the operation of Ranch Control.Control

TIOI-008 (C) Ground Support Monitoring

TIOI-009 (C) Site Technical Library

TIOI-010 (C)

Transfer knowledge associated with the Exploratory Studies Facility (ESF) Ground Support Monitoring program.

Transfer knowledge associated with the Site Technical Library.

Tour Support Transfer knowledge of Site tour support provided by Site Construction & Operations

T101-011 (C) Nye County Drilling

TIOI-012 (C) Nevada Test Site (NTS) Interface

Outstanding Deficiencies

TIOI-014 (C) Central Support Area

T101-015 (C)

T101-017 (C)

T101-018 (C)

T101-022 (C)

T102-001 (C)

T103-001 (C)

TI04W-001 (C)

TI04W-002 (C)

Site Construction & Ops/Repository Design interface

Qualified Software used by Site Construction & Ops

SC&O FY01 Plan

Site Development Plan

MAXIMO Software

Unfinished Construction

Standards/Requirements Identification Documents (S/RID) Database

External Integrated Safety Management System (ISMS) verification Deficiencies

TIO4W-003 (C) Requirements Management

Describe the interface with the ongoing NYE County drilling and testing programs.

The Project interfaces with the NTS for certain services through an Memorandum Purchase Order (MPO) between TESS & NTS contractor (Bechtel). This information must be transferred to the new contractor. Services include Buses, Electricity, Water from Wells J-12 & J-13, Medics, Security, Fire Protection, & Communications. Also, the offsite Medical head tax paid based on employee distribution between NTS and LV.

Identify any outstanding deficiencies associated with Site operations. These would include Deficiency Reports/Corrective Action Reports, Non-conformance Reports, Occupational Safety Compliance Reports, ECSRs, IAPs from Independent Assessments, Exploratory Studies Facility Design Requirements, Surface-based Testing Facility Requirements Document, open Technical Direction Letters, and any other open deficiencies.

The Project currently utilizes several facilities in the Central Support Area of Nevada Test Site Area 25. The new contractor will need to be briefed on the what facilites are used, what functions occur in these facilities, what permits exist with the NTS, and the issue related to the State waste water permit for this area.

Transfer knowledge related to the interface between the Site Construction & Operations organization and the Repository Design organizations.

Identify all Qualified Software and software requiring qualification that is used by Site Construction & Operations.

Transfer knowledge of the FY01 Site Construction & Operations portion of the Annual Plan. Include overall workscope, budget, schedule and report of status against the plan (variances).

Transfer knowledge associated with the development and revision of the Site Development Plan

Transfer knowledge and license for the MAXIMO maintenance management software tool. Include information concerning all preventive maintenance activities included in the system.

Identify and transfer knowledge related to any unfinished Exploratory Studies Facility construction work. This would include Title III Evaluation Report (TERs) recommedations, 3.0 IX areas (ground support), etc.

Transfer of the S/RID data for the Environmental Safety & Health requirements derived from DOE directives with implementing mechanisms and documented evidence to the new contractor

Brief the incoming team on remaining deficiencies and issues from the ISMS external verification that are not completed/closed

Implementation of the Requirement Management Integration Group (RMIG) will be in mid-program including possibly changing the RTN platform to a new system. The new contractor will need to be briefed on the status and selected path forward towards a complete Requirements traceability management system

T101-013 (C)

Page 35: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TI06E-O01 (C)

Description

Brief incoming contractor on HQ ES&H - related activities, policies and procedures, including ISM, I-1 (Industrial Hygiene), and NEPA actitivies.

Program briefing

TI06W-001 (C) ES&H Environmental Compliance

TI06W-002 (C) ES&H Environmental Surveillance

TI06W-003 (C) ES&H Data Collection Program

TI06W-004 (C)

TI06W-005 (C)

TI06W-006 (C)

TI06W-007 (C)

TI06W-008 (C)

ES&H Regulated Materials Management

ES&H Radiological Environmental Monitoring Program

ES&H Radiation Monitoring Program

ES&H Radiation Source Accountability

ES&H Radiological Surveys of Equipment

TI06W-009 (C) ES&H Radiation Protection Program

TI06W-010 (C) ES&H Socioeconomics

TI06W-011 (C) ES&H Payments Equal to Taxes

TI06W-012 (C) ES&H Safety and Health Program

TI06W-013 (C) ES&H Silica Program

TI06W-014 (C) ES&H Mine Rescue

TI06W-015 (C) ES&H Assessment Program

ES&H National Environmental Policy Act

Transition Firewall from M&O to RSIS

Install/provide network access for new contractor

Brief the new contractor on the status of all environmental permits, agreements, land withdrawls and rights-of-way, and compliance requirements, including actions required by the contractor to comply with permit conditions, collected permit related data, and prepare compliance reports.

Brief incoming contractor on the status of the Environmental Compliance (ECS) Surveillance Program, including records, open ECS Reports (ECSRs) and proposed corrective action status.

Brief incoming contractor on environmental data requirements, monitoring requirements, data sets, databases, subcontract/consultant agreements, records and controlled documents.

Brief incoming contractor on the status of the regulated materials management program, including current Request For Approvals in process, hazardous waste stored at the Satellite Accumulation Areas, YMP Project Accumulation Area, hazardous waste disposal contractors, waste handling agreements with DOE/NV, and the status of regulated materials and hazardous waste records.

Brief the incoming contractor on radiological studies, data collected and radiological records.

Brief incoming contractor on the Airborne Radiation Protection Program from Naturally Occurring Radon.

Transfer of custodianship and accountability of radioactive sources and radioactive materials/radiologically controlled areas.

Brief incoming contractor on the radiological survey program for free release of equipment and material.

Transfer the Radiation Protection Program and NV/YMP Radiological Control Manual.

Brief incoming contractor on socioeconomic data requirements, monitoring requirements, data sets, databases, subcontract/consultant agreements, records and controlled documents.

Brief incoming contractor on Payments-Equal-to-Taxes (PEIT) program, including data requirements for all new organizations, close-out of departing organizations, attention to overlap during transition, records of government property transfers, etc

Brief incoming contractor on Safety and Health program, including plans, procedures, records, deficiencies and status of proposed corrective actions.

Brief incoming contractor on the silica and erionite protection programs.

Brief the incoming contractor on information associated with the Mine Rescue Team.

Brief incoming contractor on the status of the Environmental Safety and Health Assessment program, including identifying deficiencies, any potential environmental, health, or safety violations or open assessment findings, and proposed corrective actions.

Brief incoming contractor on the status of compliance with the National Environmental Policy Act (NEPA).

Transition management and administration of YMP Firewall from M&O West to RS Information Systems West.

Network Operations will provide equipment and support necessary to ensure the new contractor has the ability to access the YMP network. It will include the creation of local and or remote accounts as required. This is an immediate priority issue for which we must have requirements from the new contractor upon contract award.

TI06W-016 (C)

TI07W-002 (C)

TI07W-003 (A)

Page 36: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title DescriptionInformation Technology Systems Transfer

Computer Hardware and Software Identification

Information Management Staffing retention

TI08E-005 (C) Cyber Security

TIO8E-006 (C)

TIO8E-007 (C)

TIO8E-008 (C)

TIO8E-009 (C)

TIOSE-011 (C)

InterNet connection to Current Contractor

Information Technology - east Operations Contracts and Licenses Continuity

Migration of IT -East Computer Infrastructure to new location.

Information Technology (IT) to "clean" excess computer equipment.

Turnover of Automated Forms System Database.

TI08W-001 (B) Information Systems Continuity and Transition

TI08W-002 (B) Software Baseline Maintenance

TIOBW-003 (B) Computer Hardware and Software Identification

TI08W-004 (C) Non-IT Managed Information Systems Continuity

TIO8E-O01 (B)

TIO8E-003 (C)

TIO8E-004 (B)

Information systems and databases that are used under the current contract may need to be transitioned to the successor contractor. Identify systems and databases that will transition and those that will no longer be required based on successor contractor requirements to facilitate implementation of successor systems. For systems and databases transitioning to new contract, identify current systems/database administrator.

The CRWMS M&O Bar Code property numbers on computer systems are used by Information Technology (IT) to track problem calls to the Help Desk, software installations, and hardware/software configuration. Modification of this tag number under the successor contractor could result in the loss of valuable data. Brief successor contractor on CRWMS M&O Bar-Code Property Numbers and their uses by the IT organization.

Augment personnel with contract services if/when personnel of non-selected contractors leave the program.

Provide for transition of Cyber-Security Program and brief successor contractor personnel in on-going cyber-security efforts and issues.

The CRWMS M&O maintains internet connections to TRW and these connections will need to be terminated at the end of contract.

Identify all hardware/software maintenance contracts and software licensing agreements currently in use in Vienna. Provide for uninterrupted maintenance coverage of hardware and software systems during the transition period. Provide successor contractor with list and points of contact to negotiate new agreements with vendors.

Identify all Information Technology (IT) infrastructure that needs to be migrated to alternative location. Vienna a facility may not be available and space at Capital Gallery (MD). Ave) may not have sufficient space to accommodate the IT Requirements.

Information Technology to delete OCRWM program records and software from excess computer equipment to facilitate disposal (e.g.; Gift, Sale).

Turnover of Automated Forms System Database.

Information management systems and databases, including mission-critical and mission-important systems, that are used under the current contract will need to be transitioned to the successor contractor. Those that will no longer be required, based on successor contractor requirements to facilitate implementation of successor systems, will be closed out. Provide a list of information management systems used in support of the OCRWM Program to the successor contractor. Prioritize the list of active systems. Identify current systems administrator and owner of each system, and required support to facilitate transition. Identify and list software that is currently in development or in process. Quality-affecting software will need to be transitioned to the successor contractor. Provide a list of computers by bar-code numbers that are currently used to run "Q"-affecting software, also listing the quality-affecting software that is loaded on the computers in order to ensure that baseline integrity is maintained in compliance with AP-S 1.1 Q.

The CRWMS M&O Bar Code property numbers on computer systems are used by Information Technology (IT) to track problem calls to the Help Desk, software installations, and hardware/software configuration. Modification of this tag number under the successor contractor could result in the loss of valuable data. Brief successor contractor on CRWMS M&O Bar-Code Property Numbers and their uses by the IT organization.

Information systems are being developed and operated by personnel who work for companies that are not part of any proposal. Identify and prepare a list of the non-Information Technology managed information management systems. Identify who has responsibility for ensuring a successful transition of such systems. Brief successor contractor to ensure continuity.

Issue (impact) Title Description

Page 37: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title DescriptionTeammate Software

Information Technology Work Package Transition

TIOBW-009 (C) Cyber Security

TIOBW-010 (B)

TI08W-011 (C)

TI08W-012 (C)

TI08W-013 (C)

TI08W-014 (A)

Server Operations Contracts and Licenses Continuity

IT Computer Equipment Property Management

Non-M&O IT Computer Equipment Processing and Disposal

Configuration Management Information System (CMIS) Enhancements

Provide new contractor with computers

TI09W-002 (C)

TI09W-003 (C)

TI09W-004 (B)

Controlled Document Inventory and Custodianship

Controlled Document Plan and Procedure Changes

Document Input Reference System (DIRS) Operational Issues

TI09W-005 (C) DIRS Database Authorization

TIO8W-005 (C)

TIOBW-006 (C)

Teammates have their own software installed on their computers for business-related purposes. Identify and remove teammate software from computer desktops by the end of the transition period. This includes time card collection software for each of the current teammates.

This issue serves as a place holder for Information Technology work that requires turnover to the new contractor but that is not covered in another issue.

Provide for transition of Cyber-Security Program and brief successor contractor personnel in on-going cyber-security efforts and issues.

Identify all hardware/software maintenance contracts and software licensing agreements currently in use on the YMP. Provide for uninterrupted maintenance coverage of hardware and software systems during the transition period. Provide successor contractor with list and points of contact to negotiate new agreements with vendors.

Provide Information Technology support to identify and assist in inventory and transfer of computer equipment and associated property records to the contract successor.

Provide Information Technology technical support to process, sanitization and dispose of equipment that is non-M&O property such as national labs or other contractors computer equipment that has been replaced or is being excessed and is cost-ineffective to return for processing.

Provide an orientation briefing and turnover package for CMIS software systems.

Ensure 200 computers are configured and sufficient software licenses exist to support the new contractor.

Transfer knowledge and records for operation and maintenance of the Correspondence Tracking System and associated Correspondence Control and Records Unit and interface with YM and the Executive Secretariat of DOE.

Transition mail room services for OCRWM at Forrestal

Document holders and owners may change as a result of reorganization and employee departures during end of contract transition. Ensure Document Holders and Owners Report is maintained current based on contract transition, reorganization, and employee turnover. Transition Document Holders and Owners Report to successor contractor.

Provide a controlled document turnover to the successor contractor with a complete and accurate inventory of the Document Control Master Hard Copy, Electronic Media, and Document Control Database Management Systems.

New business practices and methodologies during transition may require a large number of the current OCRWM/YMP/M&O procedures and plans to change. This will impact Document Control's ability to process deliverables and other controlled documents. Develop plan for potential influx of high volume of document changes.

Currently DIRS tracks unresolved reference numbers (URNs) and to be verified/determined (TBx) information that is assigned to individuals in accordance with AP-3.15Q. Ensure responsibilities to track and close URNs and TBx information is reassigned if individuals leave the project or transfer to different organizations. Provide URN and TBx status report to successor contractor.

Document Input Reference System (DIRS) has several levels of authorization access. The transition to a successor contractor introduces changes to all of these levels. Because DIRS is a "Q" database, these levels are essential and controlled access is Quality Assurance Requirements Document mandated. Ensure authorzation is maintained current during transition and provide list of database access authorization levels to successor contractor.

TI09E-001 (C) Correspondence Tracking

TI09E-002 (C) Mail Services

TI09W-O01 (C) Controlled Document Tracking

Issue (impact) Title Description

Page 38: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TI09W-006 (C) Copyright Clearance

TI09W-007 (B) Turnover of M&O and Teammate Records

TIO9W-007 (B) Turnover of M&O and Teammate Records

TI09W-008 (B) Turnover of Departing Employee Records

TI09W-009 (C) Maintenance of Records Signature Lists

TI09W-010 (C) Technical Information Center Continuity

TI09W-01 1 (C) Technical Information Center Electronic Reference Databases

TI09W-012 (C) TechLib Cataloging Database

TI09W-013 (C)

TI09W-014 (C)

Turnover of Forms hard copy inventory and distribution process.

Turnover of DOE Scanned Mail process.

TI1OW-001 (C) Cellular Telephone Service

TI10W-002 (C) Transfer Telecommunication Information

Description

Copyright permissions for technical products will need to be evaluated and those that are assigned to TRW will need to be reassigned to the new contractor or directly to the DOE. The DOE will need to provide guidance to the successor contractor on how to proceed with copyright acquisition under the new contract. Provide briefing on copyright clearance status.

Provide for the identification, oversight, turnover and submittal of all M&O and Teammate records to ensure that continuity of operation is maintained during the transition. Include records located at the national laboratories, USGS, and any other subcontractor locations. Ensure in-process records and completed records not yet submitted to the Records Processing Center are accounted for prior to personnel departure. Prepare and implement a plan to ensure all federal records are located, identified, boxed and shipped to the RPC in Las Vegas.

Provide for the identification, oversight, turnover and submittal of all M&O and Teammate records to ensure that continuity of operation is maintained during the transition. Include records located at the national laboratories, USGS, and any other subcontractor locations. Ensure in-process records and completed records not yet submitted to the Records Processing Center are accounted for prior to personnel departure. Prepare and implement a plan to ensure all federal records are located, identified, boxed and shipped to the RPC in Las Vegas.

Develop plan for the potential influx (high volume) of Federal Records turned over to the Records Processing Center from current employees leaving the YMP and/or closing out records prior to contract closure.

Update AP-17. IQ required signature lists for successor contractor. Ensure that departing employees are on their latest signature list before departure.

The Technical Information Center (TIC) will need to transition to the successor contractor. Provide a complete and accurate inventory of the TIC to the successor contractor. Establish controls for the orderly return of library materials as personnel leave the Project. Define a process for the recovery of lost or misplaced materials. Address how lost or missing material will be handled by the departing contractor and how acceptance will be handled by the new contractor. Provide a briefing to the new contractor on current acquisition process and turnover of library materials.

The Technical Information Center (TIC) maintains access to several electronic reference databases that are used by project engineers and scientists for search and retrieval of information. Identify contracts and/or licenses for these databases. Provide for uninterruped coverage during transition period. Provide successor contractor with list and points of contact to negotiate agreements with vendors for continuance of services. Provide information including financial obligations, access authorization, and database choices.

The Technical Information Center maintains the TechLib Cataloging Database. Maintain database current during transition period. Transition database to successor contractor. Provide information regarding database access, licensing, design, and maintenance.

Turnover of Forms hard copy inventory and distribution process.

Turnover of DOE Scanned Mail process.

Brief incoming personnel on the administrative and billing process for cellular telephone service provided by the DOE/NV M&O contractor, Bechtel Nevada

Transfer all telecommunication related design prints, specifications, technical information, circuit numbers, truth tables, routing paths, etc. to incoming contractor.

Page 39: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title DescriptionTill-001 (C)

Tlll-002 (C)

Copier/Printer Equipment Lease Agreements and Contracts

Government Printing Office Agreement

TM01-003 (C) Management - Legal

TM03E-001 (B) Transition Work Packages

TM03E-002 (A) Home Office Transitions

TM03E-003 (C) Orientation Briefing - Program Support - East (PME)

TM03E-004 (C) Orientation Briefing - General Management - East (GME)

TM03E-005 (C) Orientation Briefing - Waste Acceptance (WA)

TM03E-006 (C) Orientation Briefing - Systems Analysis /Integration - East (SAIE)

TM03E-007 (C) Orientation Briefing - Program Management Support - HQ (PMSH)

TM03E-008 (C) Orientation Briefing - Information Technology - East (ITE)

TM03E-009 (C) Orientation Briefing - Records Management - East (RME)

TM03E-010 (C) Orientation Briefing - Regulatory Support - East (RSE)

TM03E-01 I (C) Orientation Briefing - National Transportation (NT)

TM03E-012 (C) Orientation Briefing - Infrastructure Support - East (ISE)

TM03E-013 (C) External Audits (EA)

Lease agreements for copier/printer equipment and maintenance contracts are currently TRW agreements that are scheduled to expire before the new contract begins. The successor contractor will need to negotiate new agreements. Current contracts will need to be closed out. Successor contractor will need to provide continuity of operation and availability of equipment and respective maintenance agreements.

The current arrangement for printing through the Government Printing Office (GPO) will need to be changed from TRW to the successor contractor. The change must be made through the DOE. Coordinate with DOE and the successor contractor to ensure change occurs.

The post-transition responsibility for open and/or potential litigation and claims must be resolved. Determination of which ones will be transferred to the responsibility of the successor contractor and which ones will require further action and continued involvement after 2/11/01. Contract close-out must be established.

Transition FY01 work plans for work authorized by RW-40/50 and RW-1/2

Close out and turn over work, equipment and documents in teammate home offices in the east.

Orientation Briefing - Program Support. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TR09E, TS07E, TT03E(001), TR08E. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - General Management. This briefing will cover Transition Work Breakdown Structure (TWBS) Element TM03E. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Waste Acceptance. This briefing will cover Transition Work Breakdown Structure (TWBS) Element TR06. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Systems Analysis /Integration. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TR08E(002-005), TR09E, TT03E(002), TT04E, TT04E, and TT12E(001). Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Program Management Support. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TB02E and TB09E. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Information Technology. This briefing will cover Transition Work Breakdown Structure (TWBS) Element TI08E. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Records Management. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TI09E. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Regulatory Support. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TI06E, TRO0E, TRU2E, TR03E, TR04E, and TR05E. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - National Transportation. This briefing will cover Transition Work Breakdown Structure (TWBS) ElementTR07. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Infrastructure Support. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TB12E and TS04E. Requirement for this issue was established by the DOE OTMT.

Brief the incoming contractor on the status of ongoing external audits (e.g. KPMG Peat Marwick, General Accounting Office and DOE Inspector General) and turn over related tasks and documents.

Issue (impact) Title Description

Page 40: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

TitleIssue (impact)

TM03W-001 (A)

TM03W-002

(C)

TM03W-003 (A)

TM03W-004 (B)

TM03W-005 (C)

TM03W-007 (C)

TM03W-007 (C)

TM03W-008 (C)

TM03W-009 (C)

TM03W-010 (C)

TMO3W-01 I Orientation Briefing - Prime (C) Contract (PCON)

TM03W-012 (C)

TM03W-.013 (C)

TM03W-014 (c)

TM03W-015 (C)

TM03W-016 (c)

Orientation Briefing Telecommunications/Fleet Services West (TEL)

Orientation Briefing - Subcontracts and Purchasing (SUBK)

Orientation Briefing - Human Resources (HR)

Orientation Briefing - Training (TRNG)

Orientation Briefing Communications/Institution/Outreac (IEA)

Assure Complete Transition of Work

Transition Team Integration

Home Office Work

Departing Personnel

MOA Between DOE NVO and DOE YMSCO

Overview Orientation Briefing M&O (OVB)

Overview Orientation Briefing M&O (OVB)

Orientation Briefing - Finance (FIN)

Orientation Briefing - Property Management (PROP)

Orientation Briefing - Program Planning & Control (PPC)

Description

Consistent approach needs to be developed and utilized in transitioning work to the new contractor. Work turn over packages must cover all work currently planned for the balance of FY00 and all of FY01.

Brief new contractor transition team on related transition activities. Ensure full integration with the OCRWM Transition Management Team and the TRW Environmental Safety Systems Transition Team.

Work ongoing in home offices will be closed out/turned over.

Departing personnel critical to the transition efforts may necessitate acceleration of orientation briefings, turnover packages, or closeout packages for work scope pertaining to their affected areas. Flexibility in the transition plans to accommodate these scenarios should be considered during their development.

Brief incoming personnel on the interface role with DOE/NV for support services provided under DE-GM08-98NV13553 Memorandum of Agreement between DOE Nevada Operations Office and the DOE Yucca Mountain Site Characterization Office

Orientation Briefing - M&O. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TMO1, TM02, TM03W, and TSO0. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - M&O. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TMO 1, TM02, TM03W, and TSO 1. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Finance / Facilities. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TB03, TB04, TB13, and TBM03E -013. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Property Management. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TB14, and TB15. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Program Planning & Control. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TB02W, TB09W and TR08W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Prime Contract. This briefing will cover Transition Work Breakdown Structure (TWBS) Element TB05. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Telecommunications West. This briefing will cover Transition Work Breakdown Structure (TWBS) Element TI10W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Subcontracts and Purchasing. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TBO1, TB07, and TB12W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Human Resources. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements THO1, TH02, TH03 , TH05, TH06, and TS08. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Training. This briefing will cover Transition Work Breakdown Structure (TWBS) Element TH04. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Communications/Institution/Outreach. This briefing will cover Transition Work Breakdown Structure (TWBS) Element TS07W. Requirement for this issue was established by the DOE OTMT.

Page 41: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TMO3W-017 Orient (C) Desigi

ation Briefing - Surface n(SDD)

Description

Orientation Briefing - Surface Design. This briefing will cover Transition Work Breakdown Structure (TWBS) Element TT09. Requirement for this issue was established by the DOE OTMT.

TM03W-018 Orientation Briefing - Subsurface (C) Design (SSFD)

TM03W-019 Orientation Briefing - Waste (C) Package Design (WPD)

Orientation Briefing - Waste Management (WMD)

TM03W-021 Orientation Briefing - Product (C) Assurance (PAD)

Orientation Briefing - Systems Engineering (SED)

Orientation Briefing - Testing (TEST)

Orientation Briefing - Data Verification and Qualification (DSVQ)

Orientation Briefing - Modeling (MDL)

Orientation Briefing - Site Recommendation (SR)

Orientation Briefing - License Application (LA)

Orientation Briefing - Performance Assessment (PA)

Orientation Briefing - Environment Impact Statement (EIS)

Orientation Briefing -External Interfaces (El)

TM03W-031 Orientation Briefing - Regulatory (C) Safety Strategy/Commitments

(RSSC)

Orientation Briefing - Site Construction & Operations (SCO)

TM03W-020 (C)

Orientation Briefing - Subsurface Design. This briefing will cover Transition Work Breakdown Structure (TWBS) Element TT10. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Waste Package Design. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TTf11. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Waste Management. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TT 15. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Product Asurance. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TT04W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing -Systems Engineering. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TT02 (004), TT07 (002), TT08, TT12W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Testing. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TT101, TT02(001- 003). Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Data Verification and Qualification. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TT02, TT14. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Modeling. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TT'05. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Site Recommendation. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TR03W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - License Application. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TR04W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Performance Assessment. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements T706. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Environment Impact Statement. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TR02W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - External Interfaces. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TR01W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Regulatory Safety Strategy/Commitments. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TT07, TT13, TR08W, TR09W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Site Construction & Operations. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TIO1, T102, T103. Requirement for this issue was established by the DOE OTMT.

TM03W-022 (C)

TM03W-023 (C)

TM03W-024 (C)

TM03W-025 (C)

TM03W-026 (C)

TM03W-027 (C)

TM03W-028 (c)

TM03W-029 (C)

TM03W-030 (C)

TM03W-032 (C)

Page 42: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

Orientation Briefing - Internal Assessments (IA)

Orientation Briefing - Security (SS)

TM03W-035 Orientation Briefing - Information (C) Technology - West (1TW)

TM03W-036 Orientation Briefing - Information (C) Systems Integration - West (ISI)

TM03W-037 Orientation Briefing (C) Documents/Data/Records (DDR)

Orientation Briefing - Environmental (ENV)

TM03W-039 Orientation Briefing - Safety & (C) Health (SH)

TM03W-040 Orientation Briefing - Integrated (C) Safety Management (ISM)

Orientation Briefing - Quality Assurance (QA)

TM03W-042 () Program History (PH)

TR01 E-002 (C) Regulatory - External Interfaces

TR01 E-003 (C) Regulatory - External Interfaces

TR01 E-004 (B) Regulatory - External Interfaces

TROI E-005 (B) Regulatory - External Interfaces

TR01W-002 (C) Regulatory Interactions

TROIW-003 (C)Non-regulatory interfaces

TR02E-O01 (C) EIS Briefing

Description

Orientation Briefing - Internal Assessments. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TR05W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Security. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TS04W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Information Technology - West. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TI07W, T108W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Information Systems Integration - West. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements T108W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Documents/Data/Records. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements T109W, T11 lE, T1111W, TT14. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Environmental. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TO06W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Safety & Health. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements T106, TS03, TS05, TS06. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Integrated Safety Management. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements T104W. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Quality Assurance. This briefing will cover Transition Work Breakdown Structure (TWBS) Elements TS02. Requirement for this issue was established by the DOE OTMT.

Orientation Briefing - Program history outlining the pertinent regulatory milestones in the U.S. Repository Program

Briif incoming personnel on support for maintenance and update of Briefinig Materials Notebook for DOE/NRC Management Meetings. Transfer records and materials.

Brief incoming personnel on support and preparation for semi-annual briefing to the Nuclear Regulatory Commissioners.

Transfer knowledge and records for support to monitor interactions between NRC and Advisory Committee on Nuclear Waste.

Transfer knowledge and records for support of reviews of regulatory and licensing documents, e.g. Site Recommendation, regulations, and rule makings.

Describe ongoing regulatory interactions (e.g., Nuclear Waste Technical Review Board, Advisory Committee on Nuclear Waste), including pertinent historical issues; address meeting minutes, open issues, and decision-making processes as necessary. Identify associated databases for turnover.

Describe non-regulatory external (e.g., Peer Review, Consulting Board, Quality Assurance Management Assessment, etc.) interfaces. Document history and ongoing issues, reference documents, databases, etc.

Brief incoming contractor on Environmental Impact Statement schedule, policy, and procedures.

TM03W-033 (C)

TM03W-034 (c)

TM03W-038 (C)

TM03W-041 (C)

Page 43: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TR02W-001 (B)EIS Transition

TRO3W-001 (A)Site Recommendation

TR04E-001 (C) Cross cutting issues

TR04E-002 (C) Regulatory - External Interfaces

TR04W-001 (B)License Application

TR04W-002 (B) Cross-cutting regulatory/technical issues

TR04W-003 (A)Key Technical Issue (KTI) Resolution Protocol

TR04W-004 (B)Associated Deliverables/Products

TR05E-001 (C) Commitments tracking

TR05W-001 (C)CIRS (LOE)

TR06E-O01 (A) Regulatory - Waste Acceptance

TR06E-002 (C) Waste Stream Assumptions and Databases

TR06E-003 (A) Utility Litigation Information

TR06E-004 (C) Standard Contract

TR06E-005 (B) Requirements and Technical Baseline Documents

TR07-001 (B) National Transportation

TR08E-002 (A) TSLCC analyses and documentation.

Description

The background and history of the Environmental Impact Statement must be documented, including ongoing open status and issues.

Transition background and history of the Site Recommendation Consideration Report/Site Recommendation.

Provide a history of key ongoing policy issues (e.g., hot vs. cold repository, stainless steel canister credit for high-level waste, Licensing Support Network, regulation changes). Include detailed delineation of the issue's history, bases for decisions made, interface with DOE and NRC, and impact on existing repository design. Reference other documents as necessary

Brief incoming personnel on support for development of the NRC compliant Safeguards and Security policy and licensing strategy for a mined geologic repository and transportation.

Transition background and history of the activities associated with the planning for and development of the license applications must be documented, including the bases for the document; status of the document and associated planning activities; history and basis for key technical regulatory decisions associated with the document; positions taken by DOE and NRC; established future plans and their bases; established budget and associated constraints; associated regulatory commitments; etc.

Provide a history of key ongoing technical issues (e.g., hot vs. cold repository, stainless steel canister credit for high-level waste, Licensing Support Network, regulatory protocol and regulatory and licensing process, regulation changes). Include detailed delineation of the issue's history, bases for decisions made, interface with DOE and NRC, and impact on existing repository design. Reference other documents as necessary.

Document and transfer detailed protocol related to regulatory interface on KTIs.

Describe and provide status of license application associated deliverables (e.g., technical guidance documents, Licensing Application Management Plan, commitments, key technical issues, Licensing Support Network, etc.). Identify, provide sufficient history, and reference associated documents/references and applicable databases.

Brief incoming personnel on support for development of a Commitments Tracking Data Base, and any material already developed and in-place.

Transfer the activities associated with CIRS (Condition/Issue Identification and Reporting/Resolution System) to the new contractor.

Support to Waste Acceptance Team, including ongoing and future work, records for completed work; and support to litigation and settlement activities.

Brief incoming personnel on Waste Stream Assumptions and Databases. Transfer Databases, background and documentation.

Transition litigation sensitive information files and storage equipment and assure new personnel are appropriately covered under secrecy agreements.

Briefing on Standard Contract support activities, including modifications under consideration; transition documents and files.

Briefing on status of Waste Acceptance System Requirements Document and Interface Control Document Volumes l&2 status; transition files and documentation.

Transition documentation and knowledge about national transportation including negotiations with the railroads

Support and document preparation for Total System Life Cycle Cost document; transfer supporting databases and TSLCC Model, including code and documentation. Transfer knowledge and records on sensitivity runs of TSLCC cost analysis and Fee Adequacy with legislation and budget options. Brief incoming support personnel. Also assist incoming personnel as they participate as observers in the ICE review.

Page 44: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TR08E-003 (A) Fee Adequacy

TR08E-004 (C) Cost Estimating Guide

TR08E-005 (C) Business Process - Project Control

TR08W-001 (C)TSLCC Continuity

TR09E-001 (C) International

TR09E-002 (C) International

TS01-001 (B)

TS01-002 (A)

Infrastructure / Policies and Procedures

Transition Process Control Procedures (PVAR Set)

TS01-004 (C) ISM Related Procedures

TS01-005 (C) Miscellaneous Procedures

TS02-001 (B) Services - Quality Assurance

TS02-002 (C) Services / Quality assurance

TS02-003 (C) Services - Quality Assurance

TS02-004 (B) Services - Quality Assurance

TS03-001 (C) Services - Medical

Description

Support and document preparation for Fee Adequacy document, including code and documentation; transfer supporting databases and Fee Adequacy Model. Brief incoming support personnel.

Transfer the Civilian Radioactive Waste Management System Management and Operating Contractor Cost Estimating Guide, dated April 25, 1996, along with all cost estimating guidance from the client, to the incoming contractor for review, update and use as necessary.

Transfer knowledge and records for rapid response for budget increment/decrement comparisons, as well as impacts to Total System Life-Cycle Cost and Fee Adequacy

Develop approach for dealing with transition of TSLCC estimates. The TSLCC is affected by all change requests with cost impacts. The TSLCC is to be controlled and updated as required. Large volume of TSLCC backup information, both in M&O Las Vegas offices and in teammate home offices, needs to be adequately controlled for transition to the new contractor. Note both MGR as well as ATI and Programmatic TSLCC elements need to be included. Additionally, some of the supporting databases use contractor owned and/or proprietary software for development or as a basis for the estimates.

Brief incoming support personnel on International Data Base which is in process of being built, and transition international documents and knowledge. Train incoming personnel on use and manitenace of database.

Brief incoming personnel and transition preparation for the international meeting, i.e., Nuclear Energy Agency (NEA) Radioactive Waste Management Committee meeting.

Transfer knowledge and responsibility for all procedures associated with Site Construction and Operations.

Transition knowledge and responsibility for the M&O to complete Site Recommendation and License Application. Basically this will include the Process Validation and Re-engineering set of procedures and their supporting lower tier procedures.

Transfer knowledge and responsiblity for M&O procedures related to the Integrated Safety Management Initiative.

Transfer knowledge and responsibility for non-core M&O procedures to the new contractor. These will address procedures not included in Issues TS0 1 001(Site Construction and Operations Procedures), TSO1 002 (Core Procedures), and TS01 004 (ISM Inititative Procedures).

Assure that all outstanding issues identified via the Quality Assurance Corrective Action Report (CAR) process, the Deficiency Report (DR) process and recommendations made from the Office of Quality Assurance verification process are assigned to and understood by appropriate management within the new M&O to assure timely resolution of corrective action and that these corrective actions are tracked through closure

Transfer knowledge of all QATSS quality control site issues including record packages.

Transfer of all Quality Assurance Vendor/Procurement related issues and activities.

Transfer of all Quality Assurance Engineering issues and activities

Brief incoming contractor on YMP medical program support provided by DOE/NTS contractor (Bechtel), status of medical records, and any medical program issues.

Page 45: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TS04E-001 (C) Building Security

TS04E-002 (C) TRW Security Systems

TS04E-003 (C) Security

TS04E-004 (C) DOE Badges for New Contractor in the East

TS04W-001 (C)Badging

TS04W-003 (C) Security

TS05-001 (C) Services - Fire Protection

TS06-001 (C) Emergency Management

TS06-002 (C) Occurance Reporting and Processing System

TS06-003 (C) Emergency Management Drill

TS07E-001 (C) OCRWM Home Page

TS07E-002 (C) OCRWM external information documentation

TS07E-003 (C) OCRWM offsites

TS07W-001 (C) Lessons Learned

TS07W-002 (C) Staff Responsibilities

TS07W-003 (B) YMP Home Page

TS07W-005 (C) Science Centers

TS07W-006 (C) Stakeholders and Affected Units of Govt.

TS07W-007 (C) SRCR and NEPA Hearings

TS07W-008 (C) News Clip Services TS07W-009 (C) Nuclear Culture Communication

Tools

TS07W-010 (C) OCRWM Toll-Free Information Line

Description

Transition building security systems in the east

Remove Corporate TRW Security Systems and Hardware

Coordinate with new contractor and DOE HQ all personnel security clearance forms in order to obtain DOE HQ approvals

Las Vegas Security, with the assistance of the DC office, will photograph the new M&O employess in Vienna/DC and DOE NVOO will process the badges. Termination statements, DOE F 5631.29 will be prepared for all East employees with security authorizations "L" or "Q". Transition badging of personnel east and west

Coordinate with the new contractor and DOE NV all Foreign Ownership Control or Influence (FOCI), Facility Data and Approval Record (FDAR), Contract Security Classification Specification (CSCS), and personnel security clearance forms in order to obtain DOE NV and DOE HQ approvals.

Brief incoming contractor on YMP fire protection program, support provided by DOE/NTS Contractor (Bechtel) status of records and any fire protection issues.

Brief incoming contractor on YMP emergency management program, support provided by DOEINTS Contractor (Bechtel), status of records and any emergency management issues. Brief incoming contractor on Occurrence Reporting and Processing System (ORPS), including open ORPS reports.

Brief contractor on requirements for an emergency management drill.

Brief incoming personnel on suport and maintenance of OCRWM Home Page. Transfer all documentation.

Brief incoming personnel on support in preparation of HQ external information documentation. Transfer all documentation.

Brief incoming personnel on logistical support to OCRWM off sites. Transfer documentation, if any.

Brief successor contractor on status of Lessons Learned activites for Institutional/Communications.

Brief successor contractor on responsibilities and locations of Communications Department staff.

Brief incoming personnel on suport and maintenance of YMP Home Page. Transfer all documentation.

Brief successor contractor on operation and transfer leases for the Science Centers in Las Vegas, Beatty and Pahrump.

Stakeholders and Affected Units of Government need to be advised of transition; impacts and changes. Coordinate with successor contractor.

Brief successor contractor on Site Recommendation Consideration Report (SRCR) Hearing and National Environmental Protection Agency (NEPA) Hearings including contracts, logistics.

Transition news clip services and advise on copyright issues.

Nuclear Culture communication tools - brief successor contractor on tools used to communicate nuclear culture to the M&O

Brief successor contractor on the uses and responsibilities of the OCRWM National Inquiry Response Program and associated toll-free information line.

Page 46: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TS07W-01 I (C) Yucca Mountain Tour Program

TS07W-012 (C) Yucca Mountain Exibit Program

TS07W-013 (C) Yucca Mountain Speakers' Bureau

TS07W-014 (C) Yucca Mountain Site Characterization Correspondence

TSO8-001 (C) OCRWM Concerns

[Replication or

Save Conflict]

TS08-002 (C) Exit Identification Process

TT02-001 (C) Site Investigations

TT02-002 (C) Internal Applied Research and Testing (ART) Commitments

TT02-004 (C) Transition of Test & Evaluation Plan (T&EP)

TT03E-001 (B) Technical - Technical Rqrmts.

TT03E-002 (C) CRD Maintenance

TT03W-001 (A) Maintenance of SDDs

TT03W-003 (B) Maintenance of PDD

TT03W-004 (C) Integrate Technical Requirements

TT03W-005 (B) Code of Record

TT04E-O01 (C) Baseline Management

TT04W-001 (B) Level 3 Change Control and Baseline Process

TT04W-002 (C) Level 3 Technical Baseline Validation and Verification (V&V)

TT04W-003 (A) Configuration Management Information System Data

Description

Brief successor contractor on the conduct of tour operations and the status of scheduled tours.

Brief successor contractor on the responsibilities of the YMP exhibit program, status of scheduled exhibit events, and staffing requirements.

Brief successor contractor on the responsibilities of the YMP speakers' bureau, status of scheduled speaker presentations, and presentation requirements.

Brief successor contract on the responsibility of responding to public inquiries. Briefing will include correspondence format, resources, retrieval methods, and concurrence process. Also, procedures on handling requests from the Internet, mail, and other methods of communications.

Coordinate the transfer of any open OCRWM Concerns as aplicable.

Coordinate the exit interview process with the OCRWM Concerns office.

Transition Test Coordination Office (TCO) field support

Transition ART committments

Transition T&EP

Transfer knowledge and records on rapid response support for technical issues and questions. Ensure the network for rapid response stays in place during transition, and ensure RW-1 and RW-2 access to senior management and special expertise from the M&O and Labs during the transition.

Brief incoming personnel on Program Systems Requirement documentation support and the necessary QA needed. Transfer knowledge on rapid response to CRD changes and revisions. Insure the network for rapid changes and revisions stays in place during transition.

Transfer knowledge on development of System Description Documents (SDDs) and rapid SDD changes and revisions. Ensure the network for SDD development and rapid changes and revisions stays in place during transition.

Transfer knowledge on rapid Project Description Document (PDD) changes and revisions. Insure the network for rapid changes and revisions stays in place during transition.

Transfer knowledge on rapid integration of technical requirements over all three levels of requirements control. Insure the network for rapid requirements integration stays in place during transition.

A Code of Record is required as part of the License Application. This Code of Record can not be developed without a gradation methodology. A methodology needs to be developed to establish the appropriate gradation of codes and standards included in requirements documents.

Brief incoming personnel on Baseline Management processes, procedures and documentation

Provide a turnover package for the Level 3 Change Control and Baseline process.

Provide an orientation briefing and turnover package on the level 3 technical baseline V&V.

New contractor briefing and turnover package for the Configuration Management Information System data and baseline documentation.

Page 47: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title DescriptionTT04W-004 (C) Product Checking Group PCG) Key

Functions

TT04W-005 (A) Technical Input Management Document Input Reference System (DIRS)

Analysis and Modeling of Natural Systems

Total System Performance Assessment (TSPA)

Provide an orientation briefing and turnover package for key PCG functions; including maintenance of product checklists for AP-3.1 OQ, the Technical Process Guidance Manual (TPGM), and the PCG Log

Provide an orientation briefing and turnover package to DIRS

Transition Analysis and Modeling Reports (AMRs) and Process Model

Reports (PMRs) for Natural Systems

Transition Total System Performance Assessment (TSPA)

TT07-001 (B) Repository Safety Strategy (RSS) Transition RSS

Preclosure safety assessment activities

Transition of Performance Confirmation Program

Surface Facilities design work packages and deliverables

Water permit

TT07-002 (C)

TT08-001 (C)

TT09-001 (A)

TT09-002 (C)

TTIO-001 (A)

TTIO-002 (A)

TT10-003 (A)

TT10-004 (A)

TTII-001 (B)

TT11-002 (C)

TTIl-003 (C)

TTI1-004 (C)

TT11-005 (C)

Transition of preclosure safety analyses, hazard's analysis, classification analyses and QA grading of systems, structures, and components. Ensure analyses necessary to support license application are adequately communicated.

Develop an approach for the successful transition of the performance confirmation program plan and implementation. Ensure planned level 4 and 3 milestones are met and license application needs are adequately supported.

Orderly transfer of responsibility for Surface Facilities design and accumulated knowledge of associated issues from current M&O Team members and personnel to new M&O contractor and personnel.

The water permit carries a Professional Engineer (PE) stamp. APE in the new organization will need to be identified as the cognizant PE for this permit. This will need to be communicated to the State of Nevada.

Work packages related to subsurface repository facilities design need to be transitioned to the new contractor. Many tasks cross the contract transition date of2/11/01. One of these tasks will result in a deliverable due 4/20/01.

Work packages related to subsurface repository performance testing need to be transitioned to the new contractor. The work includes field testing and testing at the Atlas test Facility. Most of the work packages will cross the contract transition date of 2/11/01. One of these work packages will result in a deliverable due 3/31/01.

Work packages related to subsurface repository performance modeling needs to be transitioned to the new contractor. The result of one work package will be the Engineered Barrier System (EBS) Process and Model Report (PMR) which is due as a deliverable on 12/17/00. Final acceptance by the DOE is expected to cross the contract transition date of 2/11/01. This deliverable is critical to meeting the SR schedule. All of the tasks in the other work package will cross the contract transition date.

Work packages related to the Exploratory Studies Facility design need to be transitioned to the new contractor. The design includes Title III services.

Transition closure weld development program

Transfer long lead procurements for waste package.

Transfer of Waste Package Fabrication Information

Transition for experimental programs at Argonne National Laboratory supporting bum-up credit (radiochemical assays and Nuclear Radiation Assessment Division tests)

Transition of suport/review of the NERI sponsored SNL bum-up credit experiments.

TT05-001 (A)

TT06-001 (A)

Transition of Subsurface Design Work Packages

Transition of Subsurface Performance Testing Work Packages

Transition of Subsurface Performance Modeling Work Packages

Transition of Test Facilities Design

Work Packages

Closure Weld Development

Long Lead Material Transfer

Waste Package Fabrication Information

Radiochemnical Assays and NRAD Tests

National Energy Research Institute (NERI) sponsored Sandia National Lab (SNL) bum-up

Issue (impact) Title Description

Page 48: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TTI 1-008 (C) Contract with Argonne National Labs (ANL)

TTI 1-009 (C) Pacific Northwest National Lab (PNNL) contracts

TTI1-010 (C) Commercial contracts

TT11-011 (C) University of Virginia (UVA) contract

Description

Transition contract with ANL.

Transition PNNL contract related to materials testing.

Current commercial contracts with companies, such as GE, for materials testing need to be transitioned

Transition of UVA contract.

Support Effort with the OECD and IAEA

Waste Package design work packages and deliverables

TT12E-003 (C) Transfer technical databases - east

TTI2W-001 (B) DIEs, TFMs, and SPPAs

TT1 2W-003 (C) Systems Engineering support and commitments to integrated safety management

TT1 2W-004 (C) LA Products List

TTI 2W-005 (C) Engineering support and commitments to the NWTRB

TT12W-006 (C) Systems Engineering support and commitments to integrated technical issue resolution.

TTI 2W-007 (C) Technical analysis of Repository Design Alternatives

TT13-001 (C) Self-Assessments

TT13-002 (C) Lessons Learned

TT13-003 (C) Root Cause

TT13-004 (C) Performance Indicators

TT14-001 (A) Technical Data Management System Continuity

TT11-012 (C)

TT11-013 (A)

Transition of support efforts with the Organization of Economic Cooperation and Development and the International Atomic Energy Agency on burn-up credit

Orderly transfer of responsibility for Waste Package design and accumulated knowledge of associated issues from current M&O Team members and personnel to new M&O contractor and personnel.

Brief incoming personnel on systems documentation support and databases. Transfer systems databases, e.g. CALVIN. Train incoming personnel on the use of CALVIN. Provide code and code documentation. Transition Characteristics Database.

Transition of DIEs (Determination of Importance Evaluations), TFMs (Tracers, Fluids, and Materials evaluations), and SPPAs (Site Performance Protection Analyses. Ensure analyses necessary to support license application are adequately communicated.

Transition of the engineering support and commitments to integrated safety management activities.

Transition of the License Application Products List. Ensure planned level 4 and 3 milestones are met and license application needs are adequately supported.

Transition of the engineering support and comnuitments to the Nuclear Waste Technical Review Board

Transition of the engineering support and commitments to integrated technical issue resolution.

Transition of Systems Engineering support and commitments to the technical analysis of Repository Design Alternatives. Ensure planned level 4 and 3 milestones are met and license application needs are adequately supported.

Transfer the performance of the responsibilities for the Self-Assessment Coordinator (per AP-2.20Q) to the new contractor.

Transfer the performance of the responsibilities of the Lessons Learned Coordinator (per AP-REG-001) to the new contractor.

Transfer the performance of root cause analysis and assisting line management in the performance of root cause analysis using TapRoot (per AP-16.4Q) to the new contractor.

Transfer the collection, review, and reporting of monthly performance indicators to the new contractor.

Transition Technical Data Management System and maintain current and available through transition. Inventory and prepare lists of hardware maintenance and software licenses. Continue to accept new data and prepare/provide deliverables and status reports through transition. Prepare and provide briefing to successor contractor on work scope, procedural responsibilities, QA interface, functional points of contact, and on-going deliverables and status reports.

Page 49: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Issue (impact) Title

TT14-002 (A) Data/Software Verification/Qualification

TT15E-002 (C) Technical - Waste Stream Assumptions

TTI5W-001 (C) DOE Waste Agreements and Responsibilities

Description

The verification/qualification of data and software will be transitioned.

Brief incoming personnel on Waste Stream assumptions and databases. Transfer databases, background and documentation.

Transition DOE Waste Agreements and Responsibilities

Page 50: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

U.S. Department of Energy Office of Civilian Radioactive Waste Management

Key Technical Issues Progress and Status Overview

Presented to: NRC/DOE Management Meeting

Page 51: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Background * Nuclear Waste Policy Act requirements for sufficiency comments §114(a)(1)(E):

"Preliminary comments of the Commission concerning the extent to which atdepth site characterization analysis and waste form proposal for such site seem to be sufficient for inclusion in any application to be submitted by the Secretary for licensing such site as a repository."

• Letter of November 24, 1999: Stephan Brocoum to John Greeves suggested an approach for providing technical basis reports to the NRC including Process Models Reports, Analysis Model Reports, Total System Performance AssessmentSR, etc., and for conducting a series of interactions to provide technical information

"* Technical Exchange of April 25-26: Discussed approach to developing sufficiency comments; and discussed current status of Key Technical Issues as understood by both the DOE and NRC Staff

- Defined closed, closed pending, and open in regard to Key Technical Issue status

"* Technical Exchange held June 6 - 7: Discussed status of TSPA-I Key Technical Issue, exchanged extensive information, closed no issues, defined process for future meetings

"* June NRC/DOE Management Meeting: Redefined approach for future technical exchange meetings, including specific focus on individual Key Technical Issues rather than the Process Model Reports and associated Analysis Model Reports

"* Since June: Seven technical exchanges conducted, addressing five Key Technical Issues

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanlon_12120100.ppt 2

Page 52: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Completed NRC/DOE Technical Exchanges on Key Technical Issues

"* Key Technical Issues Status (April 25 - 26, Las Vegas)

"* TSPA (June 6 - 7, San Antonio)

"= UZ Flow Under Isothermal Conditions (8116 - 17, Berkeley)

"* Igneous Activity (8/30 - 31, Las Vegas)

"° Container Life and Source Term (9/12 - 13, Las Vegas)

"* Structural Deformation and Seismicity (10/11 - 13, Las Vegas)

* In-package Criticality (10/23 - 24, Las Vegas)

° Saturated Zone Flow (10/31, 11/1 - 2, Albuquerque)

* Radionuclide Transport (12/5 - 7, Berkeley)

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics Presentations_YMHanlon_12/20/OO.ppt

Page 53: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Upcoming NRC/DOE Technical Exchanges on Key Technical Issues

* Thermal Effects on Flow and Evolution of the NearField Environment (1/8 - 12, Pleasanton)

* Repository Design and Thermal-Mechanical Effects (2/6 - 8, Las Vegas)

* Total System Performance Assessment and Integration (Mid-March 2001, San Antonio)

Total System Performance Assessment - Site Recommendation results briefing (1/24, Las Vegas/videoconference, tentative)

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanlon_12/20/00.ppt 4

Page 54: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

KTI Summary Status from Completed Technical Exchanges

KTI No. Subissues Subissues Subissuses Subissues Closed Closed- open

pending

Unsaturated 6 2 4 0 & Saturated Flow Igenous 2 0 1 1 Activity Container 6 0 6 0 Life & Source Term Structural 4 1 3 0 Deformation & Seismicity Radionuclide 4 0 4 0 Transport

TOTAL 22 3 18 1

Yuca MuntinProect~rlimnar Pedeisina Drft atrias MO rapicsPrsenatinsYM~n~oj220/O1ptAM&O Graphics PresentationsY MHanlon- 1 2/2U/00. pptYM P Yucca Mountain Project/Preliminary Predecisional Draft Materials

5

Page 55: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Status By Individual Key Technical Issue

* Unsaturated and Saturated Flow: Six Subissues

- Subissue 1: Climate Changes (closed)

- Subissue 2: Hydrologic Effects of Climate Change (closed)

- Subissue 3: Present-Day Shallow Infiltration (closed pending) -4 NRClDOE agreements

- Subissue 4: Deep Percolation (closed pending) - 5 NRClDOE agreements

- Subissue 5: Saturated Zone Ambient Flow Conditions and Dilution Processes (closed pending) - 14 NRClDOE agreements

- Subissue 6: Matrix Diffusion (closed pending) -4 NRC/DOE agreements

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanlon_12120/00.ppt

Page 56: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Status By Individual Key Technical Issue (Continued)

e Igneous Activity: Two Subissues

- Subissue 1: Probability of igneous activity at or near the proposed repository site (closed pending) - 2 NRC/DOE agreements

- Subissue 2: Consequences of igneous activity within the repository setting (open) - 10 NRCIDOE agreements.

)TJIJ)J Yucca Mountain ProjectlPreliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanlonA 2120100.ppt 7M&O Graphics PresentationsYM Hanlon-_12/20/00.ppt 7

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials

Page 57: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Status By Individual Key Technical Issue (Continued)

* Container Life and Source Term: Six Subissues

- Subissue 1: Effects of corrosion processes on the lifetime (closed pending) - 17 NRCIDOE agreements

- Subissue 2: Effects of phase instability and initial defects (closed pending) - 9 NRC/DOE agreements

- Subissue 3: Rate at which radionuclides in spent nuclear fuel are released (closed pending) - 10 NRCIDOE agreements

- Subissue 4: Rate at which radionuclides in high-level waste glass are released (closed pending) - 1 NRC/DOE agreements

- Subissue 5: Effects of in-package criticality (closed pending) - 7 NRCIDOE agreements

- Subissue 6: Effects of alternated engineered barrier subsystem design features (closed pending) -4 NRC/DOE agreements

YM j Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics Presentations_YMHanlon_12/20/00.ppt 8

Page 58: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Status By Individual Key Technical Issue (Continued)

* Structural Deformation and Seismicity: Four Subissues

Subissue 1: Faulting (closed pending) - 2 NRClDOE agreements

- Subissue 2: Seismicity (closed pending) -4 NRC/DOE agreements Subissue 3: Fracturing (closed pending)- 4 NRC/DOE agreements

- Subissue 4: Tectonic Framework (closed)

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYM Hanlon-_12/20/00.ppt 9

Page 59: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Status By Individual Key Technical Issue (Continued)

Radionuclide Transport: Four Subissues

- Subissue 1: Radionuclide transport through porous rock (closed pending) - 5 NRC/DOE agreements

- Subissue 2 : Radionuclide transport through alluvium (closed pending) - 11 NRC/DOE agreements

- Subissue 3 : Radionuclide transport through fractured rock (closed pending) - 10 NRC/DOE agreements

- Subissue 4: Nuclear criticality in the far field (closed pending) - 3 NRC/DOE agreements

i YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanlon_12/20/00.ppt 10

Page 60: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Summary Status of Agreements

• Status of activities that support agreement items for First and Second Quarter FY 2001

- Agreements Met

* 5 activities have been completed satisfying several agreement items for several key technical issues

- Agreements Facing Delay

* 2 activities may be later than agreement date

- Agreements Upcoming

* 27 activities are near completion and will be available in the upcoming months

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanlon_12/20100.ppt

Page 61: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Agreement Items Met

* Unsaturated Zone - Infiltration Plan revised (11/2/00 presented to the NRC)

* Unsaturated Zone - Testing Plan for Alcove 8 (11/2/00 closed by the NRC)

* Igneous Activity - Examine USGS Open File Report for new aeromagnetic data (12/9/00)

* Container Life and Source Term - Vibratory effects on radionuclide release. (10/11/00 discussed in Structural Deformation & Seismicity meeting)

* Container Life and Source Term - Criticality Probability Calculation (11101/00 sent to NRC)

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanlon_12/20/00.ppt 12

Page 62: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Agreement Items Facing Delay

* TSPA-SR Revision 0

- Activity supports several Key Technical Issues

- Revision 0 accepted with conditions

- Revision 0 ICN 1, removing conditions, completed

- Anticipated to be available in January 01

* FEP's Database

- Activity supports several Key Technical Issues

- Anticipated to be available in January 01

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanlon_12/20/00.ppt 13

Page 63: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Tracking of NRC/DOE Agreements from Technical Exchanges

"* NRC/DOE agreements from Technical Exchanges are itemized status lists updated biweekly

"* List clearly shows:

- Link to a particular subissue

- Activity to be performed

- Status of the activity

- Planned/funded status

"* All agreements are entered into Condition/Issue Identification and Reporting/Resolution System (CIRS) for formal tracking to completion, including through transition

YM P ucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYM Hanlon_12/20/00.ppt 14

Page 64: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Candidates for Complete Issue Closure

Two Key Technical Issues to potentially close

- Structural Deformation and Seismicity

* Work to satisfy most agreements to be complete in FY 01 except Seismic Topical Report #3

* NRC agree that completion of Seismic Topical Report #3 is closed pending in Repository Design and Thermal-Mechanical Effects Key Technical Issue only (preclosure)

* DOE agree to ensure adequate information will be available to close postclosure issues in Structural Deformation and Seismicity Key Technical Issue before Site Recommendation

- Igneous Activity

"* Information to satisfy agreements to be documented in the TSPA-SR Revision 1 (June 2001)

" Information will be carried into TSPA-LA

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics Presentations_YMHanlon_12/20/00.ppt 15

Page 65: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Challenges- KTI Technical Exchanges

* Evolving Issue Resolution Status Reports

- Revisions issued during the KTI resolution process

* Yucca Mountain Standard Review Plan not Available

-�'�

M&O Graphics PresentationsYMHanlon- 12/20/00.pptiYM P Yucca Mountain Project/Preliminary Predecisional Draft Materials 16

Page 66: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Conclusion

"* Technical Exchanges have been productive

- Only I subissue remains open

- If trend continues, about 95% of the KTI subissues will be statused as either closed or closed pending upon completing all the meetings

"* Effective in establishing pathforward agreements for a docketable License Application

"* DOE and NRC teams working effectively

"* Management participation has been a definite asset

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanIon_12/20/00.ppt 17

Page 67: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Backup

I Yl l Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYM Hanlon-1I2120100.ppt 18

Page 68: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Agreement Items Upcoming

* Saturated Zone - SD-6 and WT data (available in TDMS 02/01)

* Saturated Zone - Saturated Zone FEP's AMR (available 02/01)

* Igneous Activity - Igneous Consequences Modeling for TSPASR AMR (available 01/01)

• Igneous Activity - Comparison of ASHPLUME Model Results to Representative Tephra Fall Deposits" (Available 01/01)

• Igneous Activity - Input Values for External & Inhalation Radiation Exposure AMR (available 01/01)

* Igneous Activity - Dike Propagation Near Drifts AMR (available 01/01)

* Igneous Activity - Characterize Framework for Igneous Activity at Yucca Mountain, Nevada AMR (available 01/01)

* Igneous Activity - Number of Waste Packages Hit by Igneous Intrusion AMR (available 01/01)

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics Presentations_YMHanlon-12/20/00.ppt 19

Page 69: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Agreement Items Upcoming (Continued)

* Container Life & Source Term - Waste Package Operations Fabrication Process Report (available 01/01)

* Container Life & Source Term - Waste Package Operations Closure Weld Technical Guidelines Document (available 01/01)

* Container Life & Source Term - Initial Failures inclusion in TSPA (Discuss in TSPA meeting 03/01)

* Container Life & Source Term - Summary of In-package Chemistry for Waste Forms AMR (available 01/01)

* Container Life & Source Term - Cladding Degradation Summary Abstraction AMR (available 01101)

* Container Life & Source Term - Clad Degradation - Local Corrosion of Zirconium and its Alloys under Repository Conditions AMR (available 01/01)

* Container Life & Source Term - TSPA Model AMR (available

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics Presentations- YMHanlon- 2/20/00.ppt 20

Page 70: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Agreement Items Upcoming (Continued)

"* Container Life & Source Term - Multiscale Thermohydrologic Model AMR (available 01101)

"* Container Life & Source Term - Defense High Level Waste Glass Degradation AMR (available 01/01)

"* Container Life & Source Term - Disposal Criticality Analysis Methodology Topical Report (available 01/01)

* Container Life & Source Term - Review Expected Behavior of Alpha Titanium Alloys Under Yucca Mountain Conditions Report (available 01/01)

* Structural Deformation & Seismicity - Disruptive Events FEP's AMR (available 01/01)

* Structural Deformation & Seismicity - Documentation on the Expert Elicitation Feedback Process (available 12/00)

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics Presentations-YMHanlon_1 2/20/00.ppt 21

Page 71: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Agreement Items Upcoming (Continued)

* Structural Deformation & Seismicity - Pre-test predication

for Niche 3 Letter Report (available 01/01)

* Radionuclide Transport - Laboratory Testing Plan for RT studies (available 01/01)

* Radionuclide Transport - Inventory Abstraction AMR (available 01/01)

* Radionuclide Transport - Waste Form Colloid-Associated Concentration Limits: Abstraction and Summary AMR (available 01/01)

* Radionuclide Transport - Features, Events, and Processes in UZ Flow and Transport AMR (available 01/01)

* Radionuclide Transport - Features, Events, and Processes in UZ Flow and Transport AMR (available 01/01)

YM P Yucca Mountain Project/Preliminary Predecisional Draft Materials M&O Graphics PresentationsYMHanlon_12/20/00.ppt 22

Page 72: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

DOE/NRC Management Meeting Action Items Num Action Item Status Remarks___..._....._....._.............

00/09-01 DOE will provide, in writing to NRC, the In Progress Status provided to ORs and at Management or QA status of Data Qualification and Verification Meetings. Formal written transmittal was to be provided in and Software Qualification in March of 2001. March 2001. (Note that this item was originally scheduled

contingent upon a December 2000 SRCR submittal.) Based on changes to program schedule, this item may be delayed. However, with the SRCR, DOE will provide NRC with an analysi.s of any impact and significance of unqualified data

00/09-02 DOE will evaluate the 24 SDDs (reference Complete The 24 SDDs were transmitted in two groups to the NRC slide 3 in SR Status presentation) completed by letters dated September 19, 2000 and December 13, for SRCR to determine if they should be 2000. provided to the NRC for their sufficiency lreview.

00/09-03 NRC and DOE will schedule a KTI Status Complete The KTI status is an agenda item for the December 20, meeting prior to the next Management 2000 Management Meeting. meeting. The Status meeting will focus on the progress made toward the agreed upon actions in the individual KTI meetings. The meeting will include a discussion on the tracking system used and the process to include the actions into work planning process.

00/09-04 DOE will provide NRC an update on the Complete Revision 4, ICN 1 to the Repository Safety Strategy was planned release date for Revision 4 of the completed. Copies of the document will also be available at Repository Safety Strategy the December 20, 2000 Management Meeting. 00/09-05 DOE will provide NRC with a copy of the Complete The Preclosure Safety Assessment was transmitted by letter

_Preliminary Preclosure Safety Assessment from Brocoum to Reamer on September 28, 2000.

Final 12-15 mm action items (larger font).xls, 01/26/2001Page 1 of 3

Page 73: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

DOE/NRC Management Meeting Action Items Action Item Status Remarks

00/06-01 DOE will evaluate the possibility of Complete CD-ROMs containing the PMR and associated AMRs have electronically distributing AMRs/PMRs to been produced and distributed for the Unsaturated Zone NRC and stakeholders PMR, Disruptive Events PMR, Engineered Barrier System

PMR. A CD-ROM was produced and distributed for the Waste Form Degradation PMR - Many of the AMRs have Ag__o been made availahle on the Internet

00/06-02 DOE and NRC will focus the technical Complete exchange meetings to resolve technical issues.

00/06-03 The next NRC/DOE Quality Assurance Complete meeting will be September 26, 2000, and the next NRC/DOE Management meeting will be September 27, 2000. Both meetings will be held in Las Vegas- Nevada

00/04-01 DOE will release copies of preliminary AMRs Complete Final AMR for this action item provided to the NRC on as soon as possible to the NRC, with copies to 12/13/2000. Future revisions will also be provided to the State, Counties, and interested parties as support revisions to PMRs being used for SRCR support. reauested.

00/04-02 DOE will continue to interact with the OR's on Complete This item has been discussed in the Bi-weekly OR meetings Procurement issues and a "Procurement Notice Supplier Quality Alert" was

provided to all suppliers on the Quality Suppliers list. The OR has closed this issue.

00/04-03 DOE will provide copies of the TRB slides to Complete These copies were provided via the OR office on May 22, NRC (Greeves) 2000.

00/04-04 DOE will provide a list of the 27 categories of Complete This information was provided via the OR office. _EIS comments to NRC (Greeves) II

Final 12-15 mm action items (larger font).xls, 01/26/2001 Page 2 of 3

Page 74: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

DOE/NRC Management Meeting Action Items Num Action Item Status Remarks

00/04-05 DOE and NRC agreed to establish a In Progress There was a demonstration of CIRS database and consolidated list of commitments and open commitment management system on 11/21/00 to items and develop a process to track which demonstrate DOE open item management. Also, KTI status open items are closed, closed pending is being discussed at the December 20, 2000 Management confirmation, or open. The status of this effort Meeting (see action item 00/09-04). will be reported at future management me.ptino,-,

00/04-06 NRC will continue to work with the DOE to In Progress DOE has signed a licensing agreement with Golder, a make the "Goldsim" code available licensing agreement has been sent to and commented upon

by the NRC. Golder responded to comments and is awaiting NRC signature of the licensing agreement. Upon signature, Golder will provide the NRC with access to download the software. The project is preparing the model !qnd filf-" fcr the. NRC' tn ivue. with the. -wiftixnre.

00/04-07 DOE and NRC will continue the dialogue on Complete This process has begun, and will continue. QA issues with quarterly meetings I

Final 12-15 mm action items (larger font).xls, 01/26/2001 Page 3 of 3

Page 75: UNITED STATES 0• NUCLEAR REGULATORY COMMISSION · T. Story, NV Congressional Delegation J. Reynoldson, NV Congressional Delegation ... Mr. Reamer stated that the staff expected

Mr. Steven Brocoum, Assistant Manager for Licensing and Regulatory Compliance

Yucca Mountain Site Characterization Office Office of Civilian Radioactive Waste Management U.S. Department of Energy P.O. Box 30307 North Las Vegas, NV 89036-0307

SUBJECT: MINUTES OF THE DECEMBER 20, 2000, MANAGEMENT MEETING

Dear Mr. Brocoum:

Enclosed are the minutes of the December 20, 2000, Management Meeting between the U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission to discuss the status of various management and programmatic issues concerning Yucca Mountain, Nevada. The meeting minutes consist of the meeting minutes summary, agenda, attendance list, and the presentation material noted as enclosures 1, 2, 3, and 4, respectively.

The meeting was held at NRC Headquarters in Rockville, Maryland with participation by video conference at DOE facilities in Las Vegas, NV and Washington, DC, and the Center for Nuclear Waste Regulatory Analyses in San Antonio, TX.

The meeting resulted in a good exchange of information and views between DOE and NRC. No response to this letter is required. If you have any questions regarding the enclosed meeting minutes, please contact Ken Chang of my staff. He can be reached on (301) 415-6612.

Sincerely,

C. William Reamer, Chief High-Level Waste Branch Division of Waste Management Office of Nuclear Material Safety

And Safeguards

Enclosures: Summary Highlights Agenda Attendance List Briefing Materials

cc: See attached list DISTRIBUTION: JGreeves JHolonich WReamer DWM r/f HLWB r/f ACNW On-Site Reps TEssig DBrooks SWastler LSS PUBLIC CNWRA WPatrick,CNWRA ADAMS ACCESSION NUMBER: ADAMS DOCUMENT TITLE: x Publicly Available El Non-Publicly Available El Sensitive x Non-Sensitive S:/DWM/HLWB/gdh1122000MgmtMtgMinutes

OFFICE HLWB1 HLWB HLWB H HLWB NAME DHiggs KChang NKStablein CWReamer DATE 01/ /01 01/ /01 01/ /01 01/ /01

OFFICIAL RECORD COPY