8
GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE N 6,650 3,000 1,000 1,200 9.80 9.60 9.40 9.20 9.00 8.80 8.75 8.70 9.80 9.80 9.80 9.60 9.40 9.00 8.80 9.20 boundary 23.40m. boundary 23.40m. boundary 21.20m. boundary 21.20m. OUTLINE OF PROPOSED HOUSE F.F.L. 10 00 proposed deck landscaped landscaped landscaped landscaped sealed driveway entry crossing grass berm footpath path paved service court council w.w drain and manhole connection council sw. drain and manhole connection Site Plan 1:100 UNITEC SAMPLE

UNITEC SAMPLE - Weeblycons6401.weebly.com/uploads/4/2/6/3/42631959/house_example.pdf · UNITEC SAMPLE. GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE 2,860 2,600 260

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UNITEC SAMPLE - Weeblycons6401.weebly.com/uploads/4/2/6/3/42631959/house_example.pdf · UNITEC SAMPLE. GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE 2,860 2,600 260

GSEducationalVersion

2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE

N

6,65

0

3,000

1,00

01,

200

9.80

9.60

9.40

9.20

9.00

8.80

8.758.70

9.80 9.80

9.80

9.60

9.40

9.00

8.80

9.20

boundary 23.40m.

boundary 23.40m.

boun

dary

21.

20m

.

boun

dary

21.

20m

.

OUTLINE OF PROPOSED HOUSE

F.F.L. 10 00

proposed deck

landscaped

landscaped

landscapedlandscaped

sealeddriveway

entry

crossing

grass berm

footpath

path

paved service court

council w.w drainand manholeconnection

council sw. drainand manholeconnection

Site Plan 1:100

UNITEC SAMPLE

Page 2: UNITEC SAMPLE - Weeblycons6401.weebly.com/uploads/4/2/6/3/42631959/house_example.pdf · UNITEC SAMPLE. GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE 2,860 2,600 260

GSEducationalVersion

2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE

2,86

0

2,60

026

02,

455

2,00

02,

200

300

30° 30°

+10,0001 Ground Floor

+10,0001 Ground Floor

+12,8602 First Floor

+12,8602 First Floor

2,86

0

2,60

026

0

2,20

020

00

300 300

135135

15°15°

+10,0001 Ground Floor

+10,0001 Ground Floor

+12,8602 First Floor

+12,8602 First Floor

Section AA 1:100

Section BB 1:100

UNITEC SAMPLE

Page 3: UNITEC SAMPLE - Weeblycons6401.weebly.com/uploads/4/2/6/3/42631959/house_example.pdf · UNITEC SAMPLE. GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE 2,860 2,600 260

GSEducationalVersion

Drawn by:

Student ID:

Stream 3

Scale:

Major Project House 2014Doc1

Layout:

L14

EAST/WEST SECTION

General Notes- No dimensions are to be scaled from this

drawing- Any discrepancies found in this drawing or any

related document must be reported to architectprior to construction

- Contractor must verify all dimensions andlevels on site before construction

- Drawing to be read in conjunction with all othersheets in set

- SED - Specific Engineering Design, refer toengineers drawings

- All construction to comply with NZS3604:2011,all relevant clauses of NZBC and requirementsof local planning authority

D-03A01

D-02A01

135

300

2,10

0

3,42

1

2,55

0

2,86

5

2,45

5

2,10

0

3,98

5

EXTERNAL WALLS: 90x45mm H1.2 wall framing @600crs(H3.1 for wet areas) w/ 180x16mm Jenkin a-lign® bevelback weatherboards on 20x45mm H3.1ventilated cavity battens @ 600crs on ThermakraftCovertek® building wrap and 10mm standard GIBinternal lining w/ R2.2 Pink Batts® wall insulation

TRUSS ROOF AND EAVES: Colorsteel Endura® 0.55mm longrun corrugated steelroofing on Thermakraft Covertek 405 roof underlay on 70x45mm H1.2 purlins @900crs. max spacing on prefabricated Pryda® roof trusses @ 900crs. max. spacingw/ Marley Typhoon uPVC 6100mm2 spouting system and 80mmØ downpipes into T-spreader system on Jenkin Tru-Pine 190x18mm barge board and 190x18mm fasciaw/ Glidevale ventilators in flat eaves w/ James Hardie Silkline soffit lining

MIDFLOOR FRAMING: 20mm particle board (plywoodfor wet areas) on 290x45mm H1.2 floor joists @450crs max spacing with solid blocking at centre line

HIP ROOF: Colorsteel Endura® 0.55mm longruncorrugated steel roofing on Thermakraft Coverup® roofunderlay on 70x45mm H1.2 purlins @ 900crs maxspacing on 2/140x45mm rafters @ 900 crs. notchedback at eaves overhang to 90x45mm fixed to140x45mm stringer with joist hanger and 2 stainlesssteel straps to top plate w/ R2.2 Pink Batts roofinsulation on 70x45mm purlins on the flat @ 900 crs.on 10mm GIB internal lining

INTERNAL WALLS: 90x45mm studs w/ 90x45mmmottomplates, nogs and topplates and 140x35mmstrapping plates w/ nogs @ max 1350mm crs. w/90mm Pink Batts Silencer insulation where indicated

EJ16 EJ17

EJ06 EJ01 EJ04 EJ02

IJ21 IJ16

SED SED

BEDROOM 2 BEDROOM 3LANDING

MASTER BEDROOM KITCHEN DINING LIVING WORKSHOPAND

SINGLE GARAGE

WR WR

Floo

r to

floor

Floo

r to

top

of s

trapp

ing

plat

e

Floo

r to

win

dow

/doo

r/bul

khea

d

Floo

r to

top

of s

trapp

ing

plat

e

Floo

r to

win

dow

/doo

r hea

d

Floo

r to

unde

rsid

e of

stri

nger

Floo

r to

ridge

+10,0001 Ground Floor

+12,8602 First Floor

+15,3153 Roof

D-04A01

D-06A02

CONCRETE SLAB FLOOR: 100mm conc. slab w/ 500E mesh onexport H-grade 40mm thick R1.1 insulation on 250 micron DPM on25mm sand blinding on 150mm compacted hardfill layer with Firth20-series® solid filled block foundation wall with D10 starters @600crs bent over D12 horizontal trim bar 350mm into slab conc.strip footing with 4/D12 bars horizontal with R10 ties @ 600 crs.

CEILING SYSTEM: 10mm GIB Ultraline Plus® ceilinglining on 70x35mm H1.2 battens @ 400crs with R2.2Pink Batts® ceiling insulation

TIMBER SUBFLOOR: 21mm Forte Prefinished woodflooring Ultra on140x45mm H1.2 floor joists @ 450 crs. w/ continues boundary joist forlateral support w/ 90mm R1.4 Pink Batts® insulation and 50mmpolystyrene (fixed w/ 45x35 battens on flat) on 2/190x45mm H3.2 bearerson 125x125mm H5 Senton piles @ 1650 crs. max spacing set inØ540x450mm deep concrete footings (900mm min. depth for anchor piles)

S-02 Long Section East / West 1L03, L04

1:50

Notes

- All timber Radiata Pine SG8 H1.2unless a perimeter joist - H3.2 or asspecified

- All measurements in mm, unlessspecified

Key

EJ - External Joinery IJ - Internal Joinery WR - Wardrobe

UNITEC SAMPLE

Page 4: UNITEC SAMPLE - Weeblycons6401.weebly.com/uploads/4/2/6/3/42631959/house_example.pdf · UNITEC SAMPLE. GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE 2,860 2,600 260

GSEducationalVersion

Drawn by:

Student ID:

Stream 3

Scale:

Major Project House 2014Doc1

Layout:

L13

NORTH/SOUTHSECTION

General Notes- No dimensions are to be scaled from this

drawing- Any discrepancies found in this drawing or any

related document must be reported to architectprior to construction

- Contractor must verify all dimensions andlevels on site before construction

- Drawing to be read in conjunction with all othersheets in set

- SED - Specific Engineering Design, refer toengineers drawings

- All construction to comply with NZS3604:2011,all relevant clauses of NZBC and requirementsof local planning authority

Roof Pitch 30°Roof Pitch 30°

D-11A03

+9,900+9,950

300

2,10

0

2,86

0

2,10

02,45

52,

550

3,98

5

2,30

0

1,556

EXTERNAL WALLS: 90x45mm H1.2 wall framing @600crs(H3.1 for wet areas) w/ 180x16mm Jenkin a-lign®bevelback weatherboards on 20x45mm H3.1 ventilatedcavity battens @ 600crs on Thermakraft Covertek®building wrap and 10mm standard GIB internal lining w/R2.2 Pink Batts® wall insulation

CONCRETE SLAB FLOOR: 100mm conc. slab w/ 500E mesh onexport H-grade 40mm thick R1.1 insulation on 250 micron DPM on25mm sand blinding on 150mm compacted hardfill layer with Firth20-series® solid filled block foundation wall with D10 starters @600crs bent over D12 horizontal trim bar 350mm into slab conc.strip footing with 4/D12 bars horizontal with R10 ties @ 600 crs.

STAIR SYSTEM: Prefabricated timber stairs w/179mm riser and 280mm going

TRUSS ROOF AND EAVES: Colorsteel Endura® 0.55mm longruncorrugated steel roofing on Thermakraft Covertek 405 roof underlay on70x45mm H1.2 purlins @ 900crs. max spacing on prefabricated Pryda®roof trusses @ 900crs. max. spacing w/ Marley Typhoon uPVC 6100mm2

spouting system and 80mmØ downpipes into T spreader system on JenkinTru-Pine 190x18mm barge board and 190x18mm fascia w/ Glidevaleventilators in flat eaves w/ James Hardie Silkline soffit lining CEILING SYSTEM: 10mm GIB Ultraline Plus® ceiling

lining on 70x35mm H1.2 battens @ 400crs with R2.2Pink Batts® ceiling insulation

MIDFLOOR FRAMING: 20mm particle board (plywoodfor wet areas) on 290x45mm H1.2 floor joists @450crs max spacing with solid blocking at centre line

MONO PITCH SKILLION ROOF: Colorsteel Endura®0.55mm longrun corrugated steel roofing onThermakraft Coverup® roof underlay on 70x45mmH1.2 purlins @ 900crs max spacing on 90x45mm H1.2rafters on 290x90mm H1.2 underpurlins

TIMBER SUBFLOOR: 21mm Forte Prefinished woodflooring Ultra on140x45mm H1.2 floor joists @ 450 crs. w/ continues boundary joist forlateral support w/ 90mm R1.4 Pink Batts® insulation and 50mmpolystyrene (fixed w/ 45x35 battens on flat) on 2/190x45mm H3.2 bearerson 125x125mm H5 Senton piles @ 1650 crs. max spacing set inØ540x450mm deep concrete footings (900mm min. depth for anchor piles)

TIMBER DECK AND STAIRS: 130x32mm deckingtimber on 140x45 H3.2 deck joists @ 600crs. on2/140x45mm H3.2 bearers/stringer on 125x125 H5Senton piles @ 1650 crs. max spacing set inØ290x450mm deep concr. footings (460Ø underextended roof posts)w/H3.2 Timber stairs w/180mm rise - 280mm going

ENTRY COLUMN CLADDING: 350x350mm Murosbrick panel

ENTRY SLAB: 100mm thick 17.5 MPa concr. edge tobe thickened 200wx450d w/ D12 starters into mainslab @ 600crs (100mm into main slab, 400mm intoentry slab) and extra reinforcement under columns w/1/D12 horizontal bottom rod and 2/D12 vertical starters

INTERNAL WALLS: 90x45mm studs w/ 90x45mmmottomplates, nogs and topplates and 140x35mmstrapping plates w/ nogs @ max 1350mm crs. w/90mm Pink Batts Silencer insulation where indicated

KITCHEN / DINING / LIVING

BATHROOM LANDING

ENTRYSTAIRS

ST.

LOBBYIJ17 IJ15

Floo

r to

floor

Floo

r to

top

of s

trapp

ing

plat

e

Floo

r to

win

dow

/doo

r/bul

khea

d

Floo

r to

top

of s

trapp

ing

plat

e

Floo

r to

win

dow

/doo

r hea

d

Floo

r to

ridge

Ent

ry c

olum

n cl

addi

ng h

eigh

t

+10,0001 Ground Floor

+12,8602 First Floor

+15,3153 Roof

D-05A01

D-10A03

S-01 Cross Section North / SouthL03, L04

1:50

Notes

- All timber Radiata Pine SG8 H1.2unless a perimeter joist - H3.2 or asspecified

- All measurements in mm, unlessspecified

Key

EJ - External Joinery IJ - Internal Joinery

UNITEC SAMPLE

Page 5: UNITEC SAMPLE - Weeblycons6401.weebly.com/uploads/4/2/6/3/42631959/house_example.pdf · UNITEC SAMPLE. GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE 2,860 2,600 260

GSEducationalVersion

Drawn by:

Student ID:

Stream 3

Scale:

Major Project House 2014Doc1

Layout:

L12

SOUTH & WESTELEVATION

General Notes- No dimensions are to be scaled from this

drawing- Any discrepancies found in this drawing or any

related document must be reported to architectprior to construction

- Contractor must verify all dimensions andlevels on site before construction

- Drawing to be read in conjunction with all othersheets in set

- SED - Specific Engineering Design, refer toengineers drawings

- All construction to comply with NZS3604:2011,all relevant clauses of NZBC and requirementsof local planning authority

EJ22

EJ09

30° 30°

15°

55°

55°

Muros Brick panel350x350mm, light brick

Polished concrete Entry slab@ F.F.L. 9.90 and ServiceCourt slab @ F.F.L. 9.85

EJ03

cri�cal height +9.800

cri�cal height +8.713

maximum height 8m

2m

2m+10,000Ground Floor

+12,860First Floor

+15,315Roof

Jenkin A-line bevel backweatherboards 135x18mm

H3.2 Timber stairs w/180mm rise - 280mm going

Polyester powder coated, thermally brokenaluminium window joinery w/ double glazing

130x32mm H3.2 decking groove side up w/ 130x32mmH3.2 baseboard surround w/ 5mm gap between boards

H3.2 timber pergola fixed to wall w/ 290x90mmH3.2 stringer w/ 2/M12 coach screws @ 600crs

Colorsteel Endura® 0.55 gauge longrun corrugatedsteel roofing w/ flashing over Jenkin Tru-Pine

190x18mm barge board and 190x18mm fasciaw/ Glidevale ventilators at eaves

Marley Typhoon® uPVC spoutingsystem w/ 6100mm² capacity w/ 80mmØ

round downpipe. First floor roof downpipereduced into T spreaders onto lower roof

EJ14EJ13

EJ07EJ08

EJ20 EJ21

15° 15°

45°45°EJ05

EJ12

cri�cal height +9.361cri�cal height +9.186

2m

2m

maximum height 8m

+10,000Ground Floor

+12,860First Floor

+15,315Roof

Jenkin A-line bevel backweatherboards 135x18mm

100mm thick 17.5 MPasealed concr. entry slab

Polyester powder coated, thermallybroken aluminium window joinery w/

double glazing

100mm thick 17.5 MPasealed concr. entry slab

Colorsteel Endura® 0.55 gauge longrun corrugatedsteel roofing w/ flashing over Jenkin Tru-Pine

190x18mm barge board and 190x18mm fasciaw/ Glidevale ventilators at eaves

Marley Typhoon® uPVC spoutingsystem w/ 6100mm² capacity w/ 80mmØround downpipe. First floor roof downpipereduced into T spreaders onto lower roof

Velux® skylight w/ Velux® flashing system

350x350mm Muros brick panel 2600x2200mm Ashton TermaTech insulated sectionaloverhead automatic garage door w/ remote control

2 West ElevationL03, L04

1 South ElevationL03, L04

RISK MATRIX SUMMARY

The proposed house is has the following attributes:- Located in a medium wind zone- Two storeys- Two lower roofs intersecting the first floor walls

on the south,east and west sides- Envelope complexity is a simple shape except for

north side pergola- Timber slat decks are at ground level only- The eaves width on ground floor roof is 300mm

(sloping)/barges width 135mm, eaves width onfirst floor roof is 300mm (flat)/barges width135mm with 50mm ridge barge width forextended garage roof

- Single cladding type - horizontal bevel backweatherboards over 20mm drained cavity

1:100

UNITEC SAMPLE

Page 6: UNITEC SAMPLE - Weeblycons6401.weebly.com/uploads/4/2/6/3/42631959/house_example.pdf · UNITEC SAMPLE. GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE 2,860 2,600 260

GSEducationalVersion

Drawn by:

Student ID:

Stream 3

Scale:

Major Project House 2014Doc1

Layout:

L11

NORTH & EASTELEVATION

General Notes- No dimensions are to be scaled from this

drawing- Any discrepancies found in this drawing or any

related document must be reported to architectprior to construction

- Contractor must verify all dimensions andlevels on site before construction

- Drawing to be read in conjunction with all othersheets in set

- SED - Specific Engineering Design, refer toengineers drawings

- All construction to comply with NZS3604:2011,all relevant clauses of NZBC and requirementsof local planning authority

EJ23

EJ11 EJ10

30° 30°

15°

55°

55°

Muros Brick panel350x350mm, light brick

Polished concrete slab

critical height +9.800

critical height +8.737

maximum height 8m

2m

2m

+10,000Ground Floor

+12,860First Floor

+15,315Roof

Jenkin A-line bevel backweatherboards 135x18mm

H3.2 Timber stairs w/180mm rise - 280mm going

H3.2 timber roof framing under extended rooffixed to wall w/ 290x90mm H3.2 stringer w/2/M12 coach screws @ 600crs

Colorsteel Endura® 0.55 gauge longrun corrugatedsteel roofing w/ flashing over Jenkin Tru-Pine190x18mm barge board and 190x18mm fasciaw/ Glidevale ventilators at eaves

Marley Typhoon® uPVC spoutingsystem w/ 6100mm² capacity w/ 80mmØround downpipe. First floor roof downpipereduced into T spreaders onto lower roof

45°45°

EJ19

15° 15°

D-07A02

critical height +9.186critical height +9.361

maximum height 8m

2m 2m

+10,000Ground Floor

+12,860First Floor

+15,315Roof

Jenkin A-line bevel backweatherboards 135x18mm

H3.2 Timber stairs w/180mm rise - 280mm going

Polyester powder coated, thermallybroken aluminium window joinery w/double glazing

130x32mm H3.2 decking groove side upw/ 130x32mm H3.2 baseboard surround

w/ 5mm gap between boards

H3.2 timber pergolafixed to wall w/ 290x90mmH3.2 stringer w/ 2/M12 coachscrews @ 600crs

Colorsteel Endura® 0.55 gauge longrun corrugatedsteel roofing w/ flashing over Jenkin Tru-Pine

190x18mm barge board and 190x18mm fasciaw/ Glidevale ventilators at eaves

Marley Typhoon® uPVC spoutingsystem w/ 6100mm² capacity w/ 80mmØ

round downpipe. First floor roof downpipereduced into T spreaders onto lower roof

EJ16EJ17 EJ18

EJ01EJ02 EJ04 EJ06

E-02 East ElevationL03, L04

E-01 North ElevationL03, L04

1:100

RISK MATRIX SUMMARY

The proposed house is has the following attributes:- Located in a medium wind zone- Two storeys- Two lower roofs intersecting the first floor walls

on the south,east and west sides- Envelope complexity is a simple shape except for

north side pergola- Timber slat decks are at ground level only- The eaves width on ground floor roof is 300mm

(sloping)/barges width 135mm, eaves width onfirst floor roof is 300mm (flat)/barges width135mm with 50mm ridge barge width forextended garage roof

- Single cladding type - horizontal bevel backweatherboards over 20mm drained cavityUNITEC

SAMPLE

Page 7: UNITEC SAMPLE - Weeblycons6401.weebly.com/uploads/4/2/6/3/42631959/house_example.pdf · UNITEC SAMPLE. GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE 2,860 2,600 260

GSEducationalVersion

Drawn by:

Student ID:

Stream 3

Scale:

Major Project House 2014Doc1

Layout:

L04

FIRST FLOOR PLAN

General Notes- No dimensions are to be scaled from this

drawing- Any discrepancies found in this drawing or any

related document must be reported to architectprior to construction

- Contractor must verify all dimensions andlevels on site before construction

- Drawing to be read in conjunction with all othersheets in set

- SED - Specific Engineering Design, refer toengineers drawings

- All construction to comply with NZS3604:2011,all relevant clauses of NZBC and requirementsof local planning authority

EJ16 EJ17EJ18 EJ19

EJ23

EJ21EJ20

EJ22

IJ14 IJ15IJ19 IJ18

IJ22 IJ20

IJ21

IJ17IJ16

S-03L15

S-03L15

E-01L11

E-02L11

E-03L12

E-04L12

3,780 3,440 3,780

4,64

0

8,20

0

3,56

0

903,

470

904,

460

90

350

9096

090

2,97

0

901,

400

9031

090

905

1,66

5

2,00

072

8

4,64

0

2,00

072

8

901,

570

350

9096

090

2,97

090

90

90 3,690 3,440 3,690 90

1,550 90 90 1,550900 90 900 1,370

357 1,000 1,000 357

11,000

90 3,000 90 600 90 2,210 90 960 90 600 90 3,000 90

590 2,000 2,000 590105 2,000 600 180

BEDROOM 2carpet

BEDROOM 3carpet

BATHROOMWC

Storage

LANDINGcarpet

stair down

lintel 2/190x45

TIMBER STAIRS

VOID

outline of lower roof outline of lower roof

deck below dotted

Storage Storage

outline of roof above dashed

perg

ola

outli

ne

tiles

tiles

lintel 2/190x45 lintel 2/90x45 lintel 2/190x45

lintel 2/90x45

head tr. 90x45

lintel 2/90x45

head tr. 90x45

War

drob

e

War

drob

e

head tr. 90x45

head tr. 90x45

head

tr. 9

0x45

head

tr. 9

0x45

head

tr. 9

0x45

head

tr. 9

0x45

head

tr. 9

0x45

head

tr. 9

0x45

head

tr. 9

0x45

900m

m h

igh

wal

lfro

m s

tair

pitc

hlin

e u

sed

as h

andr

ail

900mm high wall fromf.f.l. (shaded)

Total FloorArea 51.04 m2

toile

t

basi

n

bath

basi

n

shower

riser 179going 280

ds

ds

ds

ds

underpurlins indicatedoverhead dashed

F.F.L. 12.86

ds ds

lintel/underpurlin 290x90

L13

S-0

1L1

3S

-01

S-02L14

S-02L14

N

Notes

- All timber radiata pine SG8 H1.2 unlessspecified

- All measurements in mm, unlessspecified

- HWC - Hot water cylinder located inspace under the stairs

Key

head tr. - head trimmer F.F.L. - finished floor level ds - double studs

1:50

UNITEC SAMPLE

Page 8: UNITEC SAMPLE - Weeblycons6401.weebly.com/uploads/4/2/6/3/42631959/house_example.pdf · UNITEC SAMPLE. GSEducationalVersion 2014 DOCUMENTATION 1 MAJOR PROJECT HOUSE 2,860 2,600 260

GSEducationalVersion

Drawn by:

Student ID:

Stream 3

Scale:

Major Project House 2014Doc1

Layout:

L03

GROUND FLOORPLAN

General Notes- No dimensions are to be scaled from this

drawing- Any discrepancies found in this drawing or any

related document must be reported to architectprior to construction

- Contractor must verify all dimensions andlevels on site before construction

- Drawing to be read in conjunction with all othersheets in set

- SED - Specific Engineering Design, refer toengineers drawings

- All construction to comply with NZS3604:2011,all relevant clauses of NZBC and requirementsof local planning authority

16

x 17

9 =

2,86

0

1

2

3

4

5

EJ07EJ08EJ13 EJ12 EJ14 EJ05 EJ15

EJ10

EJ11

EJ01 EJ02EJ04

EJ06

EJ03

EJ09

IJ01

IJ03 IJ02 IJ05

IJ13

IJ10

IJ04

IJ12

IJ08 IJ09 IJ11IJ06 IJ07

D-08A02

D-09A02

D-12A03

D-14A04

17,400

90 3,020 90 90 10,820 90 90 3,020 90

445 2,400 295

8,20

0

9027

090

6,82

034

549

590

270

1,03

0

1,66

0

1,06

92,

000

1,03

12,

000

1,15

5

903,

110

903,

620

90

902,

060

9096

090

350

902,

191

989

90

3,11

090

690

2,00

0

8,20

0

17,400

5,245 270 2,900 270

4,270 910 65 6252,600 350

910 270 845 2,000600 235 210 1,600

825 2,000 90 3,600 90 3,600 795

660 1,900 201 900 119 1,890 90 1,070 1,355 1,280 1,355

90 1,600 90 2,000 90 2,000 90 1,020 90 900 90 900 90 1,280 90 3,690 90 3,110 90

900 1,690 520 580 2,240 960 2,080 1,050 100 1,175 1,505 1,175 45

2,57

0

1,51

0

2,00

097

2

S-03L15

S-03L15

E-01L11

E-02L11

E-03L12

E-04L12

3 pergola posts

3 roof posts

MASTER BEDROOMcarpet

ENSUITE

KITCHENexposed

wooden floor

DININGexposed

wooden floor

LIVINGexposed

wooden floor

DECK

WORKSHOP

SINGLE GARAGEexposed and sealed concrete

HALLcarpet

HALLpolished concrete

St. St.

STUDYcarpet

LOBBYpolishedconcrete

ENTRYexposed and

sealed concrete

stair up

WC

PANTRY

LAUNDRYW.I.Wcarpet

SERVICE COURTexposed and sealed concrete

STAIRS UP

head

tr. 2

/140

x45

lintel 2/240x45

head tr. 90x45

FFL 10.00

FFL 10.00

FFL 9.85FFL 9.90

FFL 9.95

DECK UNDER EXTENDEDROOF

DECK WITH PERGOLA

riser 179going 280

lintel 2/190x45 lintel 2/140x45lintel 2/90x45

TIMBER STAIRS

900m

m h

igh

wal

l fro

m s

tair

pitc

hlin

e be

low

use

d as

han

drai

l

900m

m h

igh

wal

l fro

m s

tair

pitc

hlin

ebe

low

use

d as

han

drai

l

HWC

lintel 2/140x45 over dashed

bulkhead dotted

lintel 2/290x45 over dashed lintel 2/190x45lintel 2/140x45 over dashedlintel 2/140x45over dashed

lintel SED lintel SED

head tr. 90x45 head tr. 90x45 head tr. 90x45 head tr. 90x45

head tr. 90x45 head tr. 90x45

head

tr. 9

0x45

head

tr. 9

0x45

head

tr. 9

0x45

head tr. 90x45head tr. 90x45

head

tr. 2

/140

x45

head

tr. 2

/140

x45

head

tr. 2

/140

x45

lintel 2/140x45 lintel 2/190x45

tiles

tiles tiles

timber decking timber decking

timber decking

sink

stovetop

fridge

dishwasher

toilet

toile

t

washingmachine

dryer

tubbuilt

in w

ardr

obe

built

in w

ardr

obe

basi

n

basi

n

bath

roof outline (dashed)

roof

out

line

(das

hed)

roof

out

line

(das

hed)

roof outline (dashed)

roof outline (dashed)

timber

270x270mmcolumn

270x270mmcolumn

Total Floor Area132.44 m2

L13

S-0

1L1

3S

-01

S-02L14

S-02L14

N

1:50

Notes

- All timber radiata pine SG8 H1.2 unlessspecified

- All measurements in mm, unlessspecified

- HWC - Hot water cylinder located inspace under the stairs

Key

head tr. - head trimmer F.F.L. - finished floor level ds - double studs

UNITEC SAMPLE