    1

    Ramagundam

    BOILER MAINTENANCE PRESSURE PARTS

    STAGE III OVERHAULS 2010Sl.

    No.

    DESCRIPTION UNIT -VII REMARKS

    01 Duration of Overhaul 01/08/2010 to 24/08/2010

    02 Boiler Cleaning 1. Internal cleaning with low pressure water Done in Pass-1&22. Cleaning with HP jet -Done3. Scrapping Done over Water Wall Panel

    03 Approach 1. Sky climbers 2 nos. erected

    2. Quick erect scaffolding up to roof- Done3. Platform below Z panel Done4. Platen Reheater coils-4 Tier platform erected at front & rear coils5. SHDP coils -5 Tier platform erected6. Platen Super heater coils-4 Tier platform erected7. SH / RH/ Rear RH coils spacer tube approach platform erected.8. Platform for inspection of Eco inlet bends hangers at Eco hopper.9. 3-tier Platform for LTSH Terminal Tube Inspection Erected.10.For Steam Cooled wall front header stub DP platform erected.

    04 Thickness survey Area No. of Spots Taken

    Z-Panel 4385

    Wall Blower 6732

    RH Bends 303

    Gooseneck 981

    Burners 287

    SHDP 1303

    Economiser 16560

    LTSH 12524

    Screen Tube 1216

    Terminal Tubes 1488

    Lifted Coils 2423

    Total

    48202

  • 8/10/2019 unit-7 2010.pdf

    2/12

    2

    Ramagundam

    05 HP Tube Replacement Location Joints welded Radiography

    PASS 1 Wall Blower 525 525

    Corner Panel 47 47

    Z-Panel 42 42

    Reheater 15 15

    TOTAL 629 629

    PASS 2

    Economiser 144 144

    LTSH 111 111

    Eco Inlet old Joints 195 195

    Bifurcation 2 2

    TOTAL 452 452

    06 LTSH and Eco coils Lifted / Lowered Adjacent coil Top Bank

    inspected

    LTSH 1 / 2 & 123/124 3/4,121/122

    ECO 1/2 & 183/184 3/4 & 181/182

    07 Planned jobs as per

    Action plan.

    1. Old joints radiography 583 nos in eco inlet connection tubes.2. Platen SH I/L header all stubs DP Done in all 25 Coils.3. Steam Cooled Wall Front header stub joints DP carried out.4. In all 124 LTSH coils T1,T2&T3 was locked with Clamps at

    Hanger No. 1.

    5. All the orifices are removed in bottom ring header and afterhydraulic test and flushing of the headers orifices were put back in

    place.

    6. CRH power cycle piping Hangers replacement done as per plan.

    92 joints found defected.

    OK

    OK

    To restrict Misalignment.

    8 nos. Support Hangers were replaced.

    08 Non destructive testing (a)RH start up vent stub, drain stub DP.

    (b)DP on fin welding.

    All NDT tests completed

  • 8/10/2019 unit-7 2010.pdf

    3/12

    3

    Ramagundam

    (c)DP on cleats welding.(d)DP on wind box attachments.

    (e)DP of steam cooled wall front header stub joint.(f) DP of platen SH inlet header stub joints.(g)Oxide Layer Thickness measurement carried out in Final RH,Platen SH

    &Divisional Panel inside furnace as well as in Penthouse as per plan.

    (h)30nos. DMWin FRH & 40 nos. of FRH&PSH bottom bendsRadiography done.

    09 Penthouse and dead

    chamber inspection andrectification.

    (a)Penthouse

    (b)Windbox(c)Dead chamber top(d)Dead chamber bottom.

    (a)Penthouse was found clean during

    initial inspection.(b)In 55 mtr dead chamber no significantash accumulation observed..

    (c)10 mtr. Dead chamber seal boxes cutand replaced with new ones at all the

    four corners refractory filling for

    sealing.

    10 Hanger inspection 1. Penthouse support inspected and loose hangers were loaded. Power cycle piping hangers inspected.

    Hot & Cold Readings were taken.11 Burners (a)Coal compartments replaced.:- All were replaced with reconditioned

    coal compartments.

    (b)Coal compartments insitu reconditioned: - No insitu replacement.(c)Other components replaced:-Nil(d)SADC checking:- All SADCs were de linked and checked for freeness.

    They were linked and checked for full opening and full closing

    pneumatically.(e)Burner readings at 0,+30,-30. Carried out.(f) Oil burner alignment. Carried out.

    12 Ducts (a)Cleaning.(b)Details of works carried out(c)Bracing replacement, shielding of bracing and patch welding.(d)NMEJ replacement done in Hot primary air Duct.

    Enclosed:Annexure I

    13 Safety Valves Drum Safety valve SV3,SV4&SV6 Servicing Done.

    MS Safety Valve SV8 Servicing Done.

  • 8/10/2019 unit-7 2010.pdf

    4/12

    4

    Ramagundam

    All Drum & MS Safety Valve Trivi Setting Done.

    All Serviced Safety valve actual floating done. Details attached:Annexure -II

    14 ERV SV-9,10,12,13,22.All pilot v/v serviced15 RH attemperation valves SD 47,51&45 Servicing Done

    16 SB line control valve SB 55&56 Servicing Done

    17 Any other major valve CBD 72,73 & CRH NRV. Servicing Done

    18 Other conventional

    valves

    ERV B65&66 Servicing Done

    19 Valves replaced Feed water sample line v/v replaced.

    20 SH attemperation valve SD-35,36,39&43 Servicing Done

    21 Soot Blower Lance Tube Replaced in LRSB No. 107,108,109&110

    Wall Blower at C&D elevation servicing done.

  • 8/10/2019 unit-7 2010.pdf

    5/12

    5

    Ramagundam

    ANNEXURE I

    DUCT WORK DETAILS:

    DESCRIPTION OF WORK UM QTY

    Replacement of ducts bracing Nos. 318

    Removal & Rewelding of Protection plate .on duct expansion joints P/Mtr. 241

    Patching of duct deflector plates Sq.Mtr 225

    Replacement of eroded gusset plates Nos. 159

    Removal & Rewelding of shields on duct bracings Nos. 79

    Replacement of NMEJ Nos. 04

    ANNEXURE-II

    SAFETY VALVES ACTUAL FLOATING DETAILS:

    Sl

    No.

    Safety Valve Design Lift

    Pressure

    kg/cm2

    Lifting

    Pressure

    kg/cm2

    Resetting

    Pressure

    kg/cm2

    Blow Down in

    %

    01 Drum Safety Valve SV 3 211.1 214 192 6.13

    02 Drum Safety Valve SV 4 211.1 211 199 5.69

    03 Drum Safety Valve SV 6 213.2 214 204 4.67

    04 MS Safety Valve SV 8 188.5 188 182 3.19

  • 8/10/2019 unit-7 2010.pdf

    6/12

    6

    Ramagundam

    ANNEXURE-III

    MATERIAL CONSUMPTION DETAILS:

    Pass

    1

    OH

    Works

    :

    Material

    Code MaterialDescription Unit Qty Amount

    M0521990532 SPRLWOND

    METLC

    GASKET

    SS316

    GRAPHITE

    FI

    NO

    10 4602.00

    M1661210209 HOSEWATER:IS:444:1.0MPa:20MM M 120 8040.00

    M1661210227 HOSEWATER:STD&GRIS:444:21MPaPR:25MM M 76 5335.96

    M2450321524 TIGFILLERROD:MODEL/:2.40TGSM KG 10 5805.20

    M2450321524 TIGFILLERROD:MODEL/:2.40TGSM KG 15 8707.80

    M2450321551 WELDINGACCESSORIESTIGSIZE 2.4MM KG 10 7543.60

    M2450341753 WELDINGACCESTIGFILLERWIRE2.4MM KG 5 4123.35

    M4706020557 WALLBLWRBEND 51X56MMSA210RIFLED NO 18 65757.96

    M4706020575 WWBEND51X5.6MMSA210RIFLED. NO 20 95818.40

    M4706040768 FINBAR6X12.7BMC20FORWWTUBES KG 400 44160.00

    M4706130012 WWRINGHDRMANHOLESBOMO2SMA1H430 SET 1 799.21

    M4716020246 U7RHBENDTUBED63.5X4MMR200,60DEG NO 1 6666.40

    M4716020255 U7RHBENDTUBED63.5X4MMR200,120DEG NO 1 6666.40

    M4772100089 WATERWALL

    SMOOTH

    TUBE

    51X5.6

    SA210

    GR

    C

    M

    250 241467.50M4772100353 RIFLETUBE51X5.6MMSA210GR.C M 100 302648.00

    M4772100353 RIFLETUBE51X5.6MMSA210GR.C M 200 605296.00

    M4772290078 ST.TUBE54.0X4.0MMSA213T22 M 0 0.00

    M4772450076 ST.TUBE63.5X4.0MMSA213TP347H M 20 121841.40

    M4741010090 CARNSEALRNGSBOMO2SMA3U1780OILGUN SET 5 2628.20

    M4741010133 PINFOROILBURNRTILTSBOMO2SMA3U4180 NO 10 464.97

    M0540153057 PKGG:IS:4687/1

    DRY

    AS:SQ:3MM

    NO

    35 13297.90

  • 8/10/2019 unit-7 2010.pdf

    7/12

    7

    Ramagundam

    M0590113001 ASBESTOSCLOTHSTRIP 3MM(T)X65MM KG 51 10546.09

    M4741010160 FLEXSEALTUBEASSYSBOMO2SMA3U0240 NO 8 9886.00

    M4745010010 GKTFOR

    COUPLG

    24

    FOR

    COAL

    BURNER

    NO

    24 9792.00

    M4745020107 SQHDPIVOTPINSMA3U0730FORCOALBUN NO 10 1731.08

    M4745020116 REACDENDSBOMO2SMA3U1320FORCOALBUNR NO 10 439.01

    Total

    1584064.43

    Pass2OHWorks:MaterialCode MaterialDescription Unit Qty Amount

    M0171110249

    RODSS

    CIR

    AISI:304

    6MM

    KG

    50 10390.50

    M0141200259 SHEETSSAISI:3042.5MM MT 1.344 308827.87

    M0141200259 SHEETSSAISI:3042.5MM MT 0.96 220591.33

    M0521990532 SPRLWONDMETLCGASKETSS316GRAPHITEFI NO 3 1380.60

    M1661210209 HOSEWATER:IS:444:1.0MPa:20MM M 122 8174.00

    M2415022552 ELECTRODESSRESISTING 308163/3.15MM NO 483 4801.02

    M2415032029 WELDINGELECTRODEE309L16; 2.5X350MM NO 960 24278.40

    M2415032029

    WELDINGELECTRODE

    E309L

    16;

    2.5X350

    MM

    NO

    768 19422.72

    M2415082024 WELDINGELECTRODEE8018B2 2.5MM*350MM NO 625 3193.75

    M2450321524 TIGFILLERROD:MODEL/:2.40TGSM KG 10 5805.20

    M2450321524 TIGFILLERROD:MODEL/:2.40TGSM KG 10 5805.20

    M2450321551 WELDINGACCESSORIESTIGSIZE 2.4MM KG 5 3771.80

    M4704020047 FIXGBLTFORDRUMMANHOLEDOOR SET 2 1442.00

    M4711070060 SHSCFRONT6X100MMBMC20FORSH KG 200 16920.00

    M4711080111 ALIGNTCLAMPLTSHCOILS500MW.BLRSTII NO 100 85197.00

    M4711080111 ALIGNTCLAMPLTSHCOILS500MW.BLRSTII NO 100 85197.00

    M4711990105 STRAIGHTTUBE51.0X10.0MMSA210GRC M 20 17689.60

    M4772100131 TUBE44.5X7.1MMGRADE:SA230T11. M 20 15424.40

    M4772100168 ST.TUBE47.63X6.6MMSA213T11 M 50 222862.00

    M4772100210 ECONOMISERSTTUBESA210GRA1FORU7 M 150 83935.50

    Total

    1145109.893

  • 8/10/2019 unit-7 2010.pdf

    8/12

  • 8/10/2019 unit-7 2010.pdf

    9/12

    9

    Ramagundam

    M1149200885 HSDVehicle L 3 115.21

    M1149200885 HSDVehicle L 10 401.76

    M1149200885

    HSDVehicle

    L

    10 399.67

    M1149200885 HSDVehicle L 5 203.95

    M2730250029 MARKEENCLOTHWIDTH90CM3640GMS/SQ.MTR M 10 0

    M2801990039 WHITECOTTONYARNWASTE(TEASED) KG 3 89.79

    M2801990039 WHITECOTTONYARNWASTE(TEASED) KG 10 299.29

    M2801990039 WHITECOTTONYARNWASTE(TEASED) KG 5 149.65

    M4725010003 DISCFORDRUMSAFTYV/V1740OF500MW NO 1 8,567.39

    M4725010003 DISCFORDRUMSAFTYV/V1740OF500MW NO 2 17,134.78

    M4725070007 CSEALRNGFORERVISOLGV/VBHEL NO 1 30,092.01

    M4725070007 CSEALRNGFORERVISOLGV/VBHEL NO 3 90,276.04

    M4725070089 SEATBUSHGGKTFORERV1538VX NO 3 10,221.83

    M4725070195 PILOTV/VDISCFORRHOUTLT6ERV NO 1 3,878.80

    M4725070308 DISCFORMAINVALVEOFERV1538VX10W NO 1 24,078.00

    M4725330188

    GASKETSET

    SH.ATP.CONT

    V/V.SNO2815854

    SET

    2 20,309.87

    M4725330507 GLANDPKGFORU7SHSCVSD4043 NO 2 2,307.50

    M4725340137 GASKETSET RH.ATPCONTV/VSNO.2815939 SET 2 7,960.19

    M4725340199 COUPGFORRHCVSBOMO5SMA3H0120 NO 6 1,716.00

    M4725340205 GLNDPKGFORU7RHSPRAYCVSD4952 NO 2 2,307.50

    M4725350078 GLANDPKGSETFOR40%SB.CONTV/V. SET 1 16,318.39

    M4725350081 GLANDPKGFORSB.CONTV/V.S.NO.2817468 SET 1 16,318.40

    M4725420025

    gasketset

    of

    SH

    Atep

    blk

    V/VS.NO2815836

    SET

    1 13,100.21

    M4725430026 GASKETSETRHATTEPBLKV/VSNO2815820 SET 2 7,960.19

    M4725430081 GLNDPKGFORRHSBVSD4548 NO 2 3,907.00

    M4725430106 VALVETRIMFORRHBRANCHBLCKV/V SET 1 47,341.75

    M4725430106 VALVETRIMFORRHBRANCHBLCKV/V SET 1 47,341.75

    M5101126060 PRESSURESEALGASKETFORCRHNRV NO 1 35,782.50

    M5105020014 STEM&DISCASSEMBLY25NB,F22,2500CL NO 1 3,813.33

    Total

    5,32,427.64

  • 8/10/2019 unit-7 2010.pdf

    10/12

    10

    Ramagundam

    DuctsOHWorks:

    MaterialCode MaterialDescription Unit Qty Amount

    M0105160128 ANGLEEQIS:2062E250AFE410W75X6MM MT 2.93 1,06,062.10

    M0135102525 PLATEMSIS:2062E250AFE410W5MM MT 8.02 3,30,244.59

    M0135105029 PLATEMSIS:2062E250AFE410W10MM MT 2.3 95,883.32

    M1613342370 PMSB2:IS:1239PT1H:80X88.9:4.50 M 61.45 21,836.26

    M1613348527 PMSB2:IS:1239PT1H:100X114.3:7.10 M 330.22 1,94,225.50

    M1613355439

    PIPEMS

    BL

    PII:1239

    PT1H:125X146:5.40MM

    M

    99.2 64,080.22

    M1514145821 SCREWHEXHT:IS:1364:COARSEMC:24X65MM NO 200 9,180.00

    M1515142560 8.8HTFTHREADHEXHD.BOLT/NUTM10X100 NO 200 2,142.00

    M1515146429 BOLTH.HD:IS:13648.8:24X100 NO 100 6,517.80

    M1525244012 STUDFERROUSIS1862P.C.8.8M16X100 NO 300 6,089.40

    M1528342960 STUDFERROUSTHREDED:IS:1862 H.T12X80 NO 300 2,417.40

    M1515142870 BLTHEXHT:IS:1364:MC:12X60MM NO 1,500 13,045.38

    Total

    8,51,723.97

    ReplacementofNMEJ

    MaterialCode MaterialDescription Unit Qty Amount

    M4748130032 NONMETLCEXPNJNTFABCKEB2005IN M 35 2,41,073.12

    M4748130023

    NONMETLC

    EXPN

    JNT

    FABC

    KEB

    2005IN

    M

    35 4,39,954.04

    Total 6,81,027.16

  • 8/10/2019 unit-7 2010.pdf

    11/12

    11

    Ramagundam

    Insulation

    &

    Refractory:

    MaterialCode MaterialDescription Unit Qty Amount

    M0362454501 SLABBONM:IS:8183:BULK150:50MM M2 1,334.17 2,04,313.92

    M0440310509 REF/INSUCAST:MONOLFIR:Al2O3&Fe2O3 MT 2 28,469.92

    Total 2,32,783.84

    Hangers

    Replacement

    in

    CRH

    Line:

    MaterialCode MaterialDescription Unit Qty Amount

    M4715016014 H&SITEM:HANGERASSY. NO 8 16,52,000.00

    Total

    16,52,000.00

  • 8/10/2019 unit-7 2010.pdf

    12/12

    12

    Ramagundam

    UNIT 7 OVERHAUL 2010 EXPENDITURE:

    Sl.

    No.WorkDescription P.O.No. Agency Works Material Total

    1

    HP tube replacement Pass1 &

    Burner repair 4000048461 M/s Fab Erectors 3475070.50 1584064.43 5059134.93

    2 HP tube replacement Pass2 4000049014M/s Brothers Engg & ErectorsLtd.

    2455525.43 1145109.89 3600635.32

    3 Tube thickness survey 4000039090 M/s Sans Inpection 227022.26 0.00 227022.26

    4 HP Jet cleaning 4000039076 M/s Nutech Jetting 148844.34 0.00 148844.34

    5 Erection of quick erect scaffolding 4000044132 M/s Prabhat Engineering Works 663815.20 0.00 663815.20

    6 Pressure setting of safety valves 4000038103 M/s Nicco Engineering Services 61768.00 0.00 61768.00

    7 Servicing of HP valves 4000041949 M/s Hydraulic Valves 204619.45 532427.64 737047.09

    8 Refractory & Insulation works 4000042283 M/s ABC Engineering Works 1046693.21 232783.84 1279477.05

    9Maint. Of LRSBs, Burners & Misc.works

    4000030401 M/s Noorie Engineering Works 967622.38 851723.97 1819346.35

    10 Ex BHEL Services 4000039630 M/s ABC Supevisory Services 241936.43 0.00 241936.43

    11 Repl. Of Hangers in unit 7 4000047790 M/s Noorie Engineering Works 385608.80 1652000.00 2037608.80

    12 Repl of NMEJ in Unit7 4000050384M/s KE Burgmann FlexiblesIndia pvt Ltd.

    49635.00 681027.16 730662.16

    9928161.00 6679136.94 16607297.94