Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Telephone: + 44 (0) 151 524 2434Fax (Sales): + 44 (0) 151 524 2430Email: [email protected]
George Roberts (NW) LimitedUnit D WakefieldRoadNetherton LiverpoolL30 6TZ UK Issue1:2016
George RobertsTotal Reliability of Supply
George RobertsTotal Reliability of Supply
• Tubes • Scaffold • Staircases • Beams • Formwork • Fencing • Tubes • Scaffold • Staircases • Beams • Formwork • Fencing
George RobertsTotal Reliability of Supply
Uniscaff
UniscaffUserGuide
www.scaffoldingsales.co.uk
Registered in Cardiff. 2728193GEORGE ROBERTS (NORTHWEST) LTD Vat No. 618 5719 17
K-Lok User GuideK-Lok User GuideK-Lok User Guide
2
Contents
Introduction 3
General Notes 4
Detailed Component List 5
KeyFeaturesofUniscaff 8
StepbyStepErectionGuide 9
UniscaffGeorge RobertsTotal Reliability of Supply
over 500 milesof scaffolding
K-Lok User GuideK-Lok User GuideK-Lok User Guide
22 3
UniscaffTowerAssemblyInstructionsIntroduction
TheUniscaffStairTowerismadefrompre-fabricatedcomponentsandbuiltusingstandards,ledgerbeams,stairflights,landings,handrailsandguardrails.Thestairtowercanbebuiltasanindependentconstructionorintegratedintootherscaffoldingorstaging.
AllcomponentsaremadeofgalvanisedsteelandconformtothestructuralrequirementsofBSEN12811ndBSEN12810withregardstothecomponenttestingandcalculationrequirements.Allcomponentshaveouridentificationmarkswithmonthandyearofmanufacture.
UniscaffUniscaff
UniscaffAccessTowerMaximumPeopleTable
TowerHeight
MaximumNo. Personnel
2 m
4 m
6 m
8m 31
10 m 37
12 m 44
14 m 50
16m 58
18m 64
20 m 71
22 m 77
24m 84
26 m 91
TowerHeight
MaximumNo. Personnel
28m 98
30 m 99
32 m 94
34 m 94
36 m 90
38m 89
40m 85
42m 85
44m 81
46m 80
48m 76
50 m 75
K-Lok User GuideK-Lok User GuideK-Lok User Guide
4 21
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
Base Jacks
TheBaseJacksareadjustableinheighttoensurethetowerisbothlevelandstableonunevenground.
Note:Alwaysuseminimumadjustmentheighttoachievefinalplatformheight.
Standards
Standardsare1m,2mand3minlengthandareusedaccordingtotheheightoftowerbeingbuilt.
Beams
TheUniscaffstairtowerisbuiltusing1.6mand3.0mledgerbeamswith2.0m,1.5mand1.0mbetweentheplatformlevels.
Anchorage
TheUniscaffstairtowermustbeanchoredtoastructureateachplatformlevelonbothsidesoftheinnerandouterstandardsusingscaffoldtubeandcouplers.
LoadsonFlightsandLandings
Stairflightsandlandingshaveasafeworkingloadof1.5kN/sq.m
Loads on Standards
Thestairtowerwhenusing2.0mplatformheightshasapermissibleloadingof20kNperstandard.
Handrails
Allstairflightsandlandingsareequippedwithaminimumofdoublehandrails.Anadditional3.0msinglehandrailisaddedtotheexternalareaona2.0mstairflight.
ConstructionHeights
Themaximumconstructionheightforastairtowerwithplatformlevelsandstairflightseverytwometresis30.0m.Thestairflightsmusthavehandrailsontheinsideofeverystairflight.Thelandingsmusthaveguardrailsat1.0mand0.5mheights.
IMPORTANTNOTICEForstairtowerconstructionsnotcoveredbythiserectionguidepleasecontactthetechnicalsalesteamattheaddressonthereverseofthisguide.
Long FaceParallel to Building
MaximumTowerHeight(m)
In Country InTown
SValuetobeascertainedsubjecttosite
20 30 30
24 30 30
28 30 30
32 14 14
36 4 8
40 - 4
DerivedfromOutofServiceCondition-Criticalupto30m
ShortFaceParallel to Building
MaximumTowerHeight(m)
In Country InTown
SValuetobeascertainedsubjecttosite
DerivedfromOutofServiceCondition-Criticalupto30m
20 30 30
24 30 30
28 30 30
32 30 30
36 30 30
40 20 20
UniscaffAccessTowerSafeHeightTables
K-Lok User GuideK-Lok User GuideK-Lok User Guide
20 5
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffCOMPONENT LIST
Standard Size 1.0m Code 1601005 Wt(Kg) 6.00
Size 2.0m Code 1601003 Wt(Kg) 11.70
Size 3.0m Code 1601002 Wt(Kg) 17.28
Base Jack Code 1601001 Wt(Kg) 4.10
Clip-on Post Code 1601055 Wt(Kg) 5.3
ErectionPlatform Code 1601035 Wt(Kg) 13.0
Ledger Beam Size 1.6m Code 1601011 Wt(Kg) 9.6
Size 3.0m Code 1601010 Wt(Kg) 18.17
UniscaffAccessTowerUserGuideAddendumNotes
●Where structure is not available atthe lift heights then a scaffold bracingsystemshouldbeusedtoprovideatietotheliftbacktoapositionofeffectiverestraint or theGeorgeRoberts (NorthWest)LtdTechnicalServicesDepartmentcontactedforadvice.
SafeWorkingHeightTablesNotes
Tablesarebasedonamaximumheightof30m,heightsabovethisarepossiblebuttheseshouldbereferredtoGeorgeRoberts (NW) Ltd Technical ServicesDepartmentoracompetenttemporaryworksengineer.
The User Guide utilises wind loadingin the preparation of its safe workingheighttablesforthestairtowers.Thesetables are limited to “S” values above20 and below 40. Where localisedconditions result in “S” values outsideof these parameters the wind velocitypressures may either be lower thanor exceed those utilised within thecalculations fromwhich the tables arederived. Stair towers located on sitesat the edges of cliffs or escarpments,incoastal locationsortotallstructuressurrounded by other tall structureswhich may cause funnelling of thewind pressure are all susceptible tosignificant increases in wind pressuredue to local effects. In these instancesit is recommended that advice issought from the George Roberts (NW)Ltd Technical Service Department or acompetenttemporaryworksengineer.
Ifthesiteis;atleast2Kminsideatownterrain, is shielded by buildings within100m and the average height of thesurrounding buildings are 5m or morethenitisclassifiedasa“Town”site.Allother locations are considered to be“Country”.
The safe height tables and sectioncapacities contained within the UserGuidearebaseduponliveloadingfromtheintendeduseonly.Additionalloadingmay accrue on the working platformsor components as a consequence ofatmospheric precipitations such asice, snow, sand or dust. The workingprocesses may also cause debris suchas sand, grit or demolition debris toaccumulate on the working platformof components which will increasethe live loading above that allowedfor within the live loading.Where thisis seen to occur or is know will occurfurtherguidanceshouldbesoughtfromtheGeorgeRoberts (NW)LtdTechnicalServices Department or a competent temporary works designer which mayresult in a down grading of the LoadClassforthescaffold.
GeneralNotes
PriortoerectionallUniscaffstairtowercomponents should be inspected fordamage by the erectors. DO NOT usedamaged components within theerectedtower.
The system utilises fully galvanisedcomponents which will be suitablefor storage in exposed areas andgenerally the components should bemaintenance free. Should there be aloss of the galvanising layer such thatcorrosiondepositsstarttooccurorthecomponentsaredamagedduringuseorstoragethenthecomponentshouldbereturnedtoGeorgeRoberts(NW)Ltdforreplacement.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
6 19
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
Uniscaff
TopEndGuardFrame
Guardrail
Guardrail Frame
Folding Guard Frame
Handrail Post
Size 1.6m Code 1601022 Wt(Kg) 3.30
Size 2.16m Code 1601021 Wt(Kg) 5.20
Size 3.0m Code 1601020 Wt(Kg) 9.75
Size 1.6m Code 1601016 Wt(Kg) 10.09
Size 3.0m Code 1601015 Wt(Kg) 14.49
Code 1601055 Wt(Kg) 5.30
Code 1601070 Wt(Kg) 8.10
Code 1601014 Wt(Kg) 4.90
● Towermustbeerectedonastablebasewhichwillpreventexcessivesettlement.Spreader plates should be used asnecessary. The foundations should beadequate to carry and disperse theload imposed both locally at eachstandard and, in general, to carry thewhole weight of the stair tower. Theresponsibility for the adequacy of thefoundations should be establishedand approved prior to erection. Theclient for the stair tower and / or thecontractor may need to be consulted.Thefoundationforastairtowershouldbemaintainedinanadequateconditionduring the life of the tower. Regularinspectionproceduresmustbeprovidedandusesuspended if there is found tobeanylossofsupport.
● Towermustbeerectedagainstasoundandinherentlystableexistingstructure,upon which it relies for stability. Alltowers will impose forces upon thestructure they are fixed to throughtheir ties. An assessment should beinitially made regarding the ability ofthestructuretosustaintheloadseitherglobally, due to its own instability,or locally as a result of defectivefinishes.Loadingsfromthetiesintothesupporting structure are dependantupon the live loading to the stairtower, itsheightand inthemajorityofcases the wind loading imposed uponthe tower and its cladding status. Forguidance with regards to the designof ties into building facades wewouldreferyoutoSection5ofTG20:08ortotheGeorgeRoberts (NW)LtdTechnicalServices Department or a competent temporaryworksdesigner
● InaccordancewiththerequirementsofBSEN12811theDesignloadis1kN/
m2,or1.5kNpositioned inworstcaseposition for element of tower underinspection.
● Towershouldbetiedtoexistingstructureat each lift (i.e. 2m vertical centres)using horizontal ties at each side thatsecurely fix to the existing structureand to the inner and outer standard.Additional components outside thesystems standard component set mayberequiredtoenableuseinaccordancewith this User Guide. These willnormallyconstituteloosetubestoEN39andfittingstoEN74.
● Wheretowerhastheshortfaceparallelto the existing structure, additionalties should be provided at each liftfromtheouterstandardsat45degreesback to the existing structure. Theseadditional ties are to be securely fixedto the existing structure and the fixingis assumed to be capable of resistinghorizontal forces both parallel andperpendiculartotheplaneofthewall.
● Thetowerisassumedtobeuncladandfree from netting and sheeting, suchthattheonlyareapresentedtothewindisthatofthecomponentsofthetower.
● Thepersonnelcapacity table is limitedto amaximum area load of 3 kN/m2forpracticalreasons.
● For the personnel capacity table, oneperson is assumed to weigh 100 Kg,exertingaforceofapproximately1kN.
● Throughout the calculations themaximum design load on any standardhasbeentakenas35.6kNwherethe3mface isparallel to the structureand41.6kNwheretheshortfaceisparalleltothestructure.
UniscaffAccessTowerUserGuideAddendumNotes
COMPONENT LIST
K-Lok User GuideK-Lok User GuideK-Lok User Guide
18 7
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffUniscaff
StairFlight
Stair Handrail
Landing
Entrance Step
Size 1.0m Code 1601032 Wt(Kg) 28.27
Size 1.5m Code 1601041 Wt(Kg) 27.20
Size 2.0m Code 1601049 Wt(Kg) 33.00
Size 1.0m Code 1601042 Wt(Kg) 8.80
Size 1.5m Code 1601041 Wt(Kg) 9.39
Size 2.0m Code 1601040 Wt(Kg) 10.40
Code 1601043 Wt(Kg) 25.10
Code 1601060 Wt(Kg) 14.60
IMPORTANTNOTICEFor stair tower constructions not covered by thiserection guide please contact the technical salesteamattheaddressonthereverseofthisguide.
COMPONENT LIST
K-Lok User GuideK-Lok User GuideK-Lok User Guide
8 17
UniscaffTowerAssemblyInstructions
Uniscaff
UniscaffKeyFeatures
Guardrail Frame
Top End Guard Frame
Guard Rail
Ledger Beam
Hand Rail
Base Jack
Folding Guard Frame
Clip On Post
Wall Tie
Standard
Stair Flight
Landing
Entrance step
25.Entrance/exitattopoftower.Erector1issafelystandingonlandingandhookedontocentreof1.6mledgerbeam.Hefits3mguardrailframewitherector2safelystandingonerectingplatformatoppositeendoftower,hookedonto1.6mledgerbeam.Erector1thenfitstopguardframeintohandrailpostandlandingasabove.
26.SIDE EXITErector1issafelystandingonlandingandfitsclip-onposttoinsideledgerbeam.Erector2standingonerectingplatformatoppositeendoftowerhookedonto1.6mledgerbeam.Bothoperatorsthenfit2.16mguardrailsintoclip-onpostandstandard,ensuringlockingcatchesareengaged.Theexitisthencomplete.
27.END EXITErector1issafelystandinqonlanding.Erector2isstandingonerectingplatformatoppositeendoftowerclippedonto1.6mledgerbeam.Bothoperatorsthenfit3mguardrailframeateachsideoftower.Remove1.6mguardfromlandingposition.Theexitisthencomplete.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
16 9
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffUniscaff
1.Startbysettingoutthesolepadsandthebaseplatesandpositionthestandards,ledgerbeamsandtransombeams.Placebasejacksontosolepadsandthenadjusttoapproximatelyfinalheight.
2.Placestandardsontobasejacks,makingsurethepocketsfaceintherightdirection.
3.Connect3metreledgerbeamtothehigherlevelpockets.Connectthe1.6mledgerbeamstolowerlevelpockets.
22.Fitguardrailframestofaceandendoftower.Fitledgerbeamstonextliftrequired(at1m,1.5or2m).Re-hooktoupperledger,closetostandards
23.Atthispoint,makesureyoutieinbeforeerectingnextlift.
24.ForfurtherIiftsrepeatprocedures8,9and12-17untilyoureachfinalexitoramidexitpoint.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
10 15
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffUniscaff
4.Engagealllockingcatchesasyouproceed.
5.Usingatapemeasure,checkdistancefromstructure
6.Levelfirstliftbyadjustingbasejacksasnecessary.Dothisinaclockwisedirection.
19.Re-positionerectingplatformontonextliftdirectlyabovelowerlanding.
20.Erector1climbsstairflightandfitstemporaryclip-onposttoledgerbeamclosetoerectingplatform.Hethenhooksontoledgerbeamand,usingclip-onpostforsupport,climbsontoerectingplatform.NB: Post only used to aid climbing onto exposed landing
21.Seconderectornowclimbsstairflighttolanding,hooksontoledgerbeamclosetostandard.Standardsarenowaddedtoallfourlegs.(Youcan now move the clip-on post to a safe place until it is needed again)
K-Lok User GuideK-Lok User GuideK-Lok User Guide
14 11
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
Uniscaff
7.Checkbaseliftissquareusingatapemeasure
8.Placefirstlanding(A)onledgerbeams.Thenplacetheerectingplatform(B)attheoppositeendofthebay.Nowbotherectorsshouldinstallthesecondlevelofledgerbeams.At this point check the drawings for 1m, 1.5m or 2m lift heights.
9.Nowinstallthesecondlanding-initiallyabouthalfametrefromtheendofthebay.
16.FitGuardrailFramesandGuardrailstotheoutsidefaceofthestairflight.
17.Theleaderectorclipsontomidpointofledgerbeam.Botherectorsfitstairhandrailpostintotopandlowerlandings.Then,stairhandrailislocatedintothehandrailpostandlockingcatchesengaged.
Usepigtailtoensurepostcannotmove.
18.Fitfoldingguardframeintohandrailpostandstandardatentrancetostair.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
12 13
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffUniscaff
10.Fit the entrance step to the stairtower.
11.Thetowermustbeanchoredtothestructureoneachplatformlevelusingscaffoldtubeandcouplersconnectedtoboththeinnerandouterstandards.
12.Thestairflightisinstalledbyfirstpositioningverticallyandlocatingthebaseintothepocketsonthelowerlanding....
13.Theflightisthenloweredontothelandingabove
14.Thelandingisthenpushedalonguntil......
15....thetopofthestairflightisfullylocatedintothepocketsoftheupperlanding.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
12 13
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffUniscaff
10.Fit the entrance step to the stairtower.
11.Thetowermustbeanchoredtothestructureoneachplatformlevelusingscaffoldtubeandcouplersconnectedtoboththeinnerandouterstandards.
12.Thestairflightisinstalledbyfirstpositioningverticallyandlocatingthebaseintothepocketsonthelowerlanding....
13.Theflightisthenloweredontothelandingabove
14.Thelandingisthenpushedalonguntil......
15....thetopofthestairflightisfullylocatedintothepocketsoftheupperlanding.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
14 11
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
Uniscaff
7.Checkbaseliftissquareusingatapemeasure
8.Placefirstlanding(A)onledgerbeams.Thenplacetheerectingplatform(B)attheoppositeendofthebay.Nowbotherectorsshouldinstallthesecondlevelofledgerbeams.At this point check the drawings for 1m, 1.5m or 2m lift heights.
9.Nowinstallthesecondlanding-initiallyabouthalfametrefromtheendofthebay.
16.FitGuardrailFramesandGuardrailstotheoutsidefaceofthestairflight.
17.Theleaderectorclipsontomidpointofledgerbeam.Botherectorsfitstairhandrailpostintotopandlowerlandings.Then,stairhandrailislocatedintothehandrailpostandlockingcatchesengaged.
Usepigtailtoensurepostcannotmove.
18.Fitfoldingguardframeintohandrailpostandstandardatentrancetostair.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
10 15
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffUniscaff
4.Engagealllockingcatchesasyouproceed.
5.Usingatapemeasure,checkdistancefromstructure
6.Levelfirstliftbyadjustingbasejacksasnecessary.Dothisinaclockwisedirection.
19.Re-positionerectingplatformontonextliftdirectlyabovelowerlanding.
20.Erector1climbsstairflightandfitstemporaryclip-onposttoledgerbeamclosetoerectingplatform.Hethenhooksontoledgerbeamand,usingclip-onpostforsupport,climbsontoerectingplatform.NB: Post only used to aid climbing onto exposed landing
21.Seconderectornowclimbsstairflighttolanding,hooksontoledgerbeamclosetostandard.Standardsarenowaddedtoallfourlegs.(Youcan now move the clip-on post to a safe place until it is needed again)
K-Lok User GuideK-Lok User GuideK-Lok User Guide
16 9
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffUniscaff
1.Startbysettingoutthesolepadsandthebaseplatesandpositionthestandards,ledgerbeamsandtransombeams.Placebasejacksontosolepadsandthenadjusttoapproximatelyfinalheight.
2.Placestandardsontobasejacks,makingsurethepocketsfaceintherightdirection.
3.Connect3metreledgerbeamtothehigherlevelpockets.Connectthe1.6mledgerbeamstolowerlevelpockets.
22.Fitguardrailframestofaceandendoftower.Fitledgerbeamstonextliftrequired(at1m,1.5or2m).Re-hooktoupperledger,closetostandards
23.Atthispoint,makesureyoutieinbeforeerectingnextlift.
24.ForfurtherIiftsrepeatprocedures8,9and12-17untilyoureachfinalexitoramidexitpoint.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
8 17
UniscaffTowerAssemblyInstructions
Uniscaff
UniscaffKeyFeatures
Guardrail Frame
Top End Guard Frame
Guard Rail
Ledger Beam
Hand Rail
Base Jack
Folding Guard Frame
Clip On Post
Wall Tie
Standard
Stair Flight
Landing
Entrance step
25.Entrance/exitattopoftower.Erector1issafelystandingonlandingandhookedontocentreof1.6mledgerbeam.Hefits3mguardrailframewitherector2safelystandingonerectingplatformatoppositeendoftower,hookedonto1.6mledgerbeam.Erector1thenfitstopguardframeintohandrailpostandlandingasabove.
26.SIDE EXITErector1issafelystandingonlandingandfitsclip-onposttoinsideledgerbeam.Erector2standingonerectingplatformatoppositeendoftowerhookedonto1.6mledgerbeam.Bothoperatorsthenfit2.16mguardrailsintoclip-onpostandstandard,ensuringlockingcatchesareengaged.Theexitisthencomplete.
27.END EXITErector1issafelystandinqonlanding.Erector2isstandingonerectingplatformatoppositeendoftowerclippedonto1.6mledgerbeam.Bothoperatorsthenfit3mguardrailframeateachsideoftower.Remove1.6mguardfromlandingposition.Theexitisthencomplete.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
18 7
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffUniscaff
StairFlight
Stair Handrail
Landing
Entrance Step
Size 1.0m Code 1601032 Wt(Kg) 28.27
Size 1.5m Code 1601041 Wt(Kg) 27.20
Size 2.0m Code 1601049 Wt(Kg) 33.00
Size 1.0m Code 1601042 Wt(Kg) 8.80
Size 1.5m Code 1601041 Wt(Kg) 9.39
Size 2.0m Code 1601040 Wt(Kg) 10.40
Code 1601043 Wt(Kg) 25.10
Code 1601060 Wt(Kg) 14.60
IMPORTANTNOTICEFor stair tower constructions not covered by thiserection guide please contact the technical salesteamattheaddressonthereverseofthisguide.
COMPONENT LIST
K-Lok User GuideK-Lok User GuideK-Lok User Guide
6 19
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
Uniscaff
TopEndGuardFrame
Guardrail
Guardrail Frame
Folding Guard Frame
Handrail Post
Size 1.6m Code 1601022 Wt(Kg) 3.30
Size 2.16m Code 1601021 Wt(Kg) 5.20
Size 3.0m Code 1601020 Wt(Kg) 9.75
Size 1.6m Code 1601016 Wt(Kg) 10.09
Size 3.0m Code 1601015 Wt(Kg) 14.49
Code 1601055 Wt(Kg) 5.30
Code 1601070 Wt(Kg) 8.10
Code 1601014 Wt(Kg) 4.90
● Towermustbeerectedonastablebasewhichwillpreventexcessivesettlement.Spreader plates should be used asnecessary. The foundations should beadequate to carry and disperse theload imposed both locally at eachstandard and, in general, to carry thewhole weight of the stair tower. Theresponsibility for the adequacy of thefoundations should be establishedand approved prior to erection. Theclient for the stair tower and / or thecontractor may need to be consulted.Thefoundationforastairtowershouldbemaintainedinanadequateconditionduring the life of the tower. Regularinspectionproceduresmustbeprovidedandusesuspended if there is found tobeanylossofsupport.
● Towermustbeerectedagainstasoundandinherentlystableexistingstructure,upon which it relies for stability. Alltowers will impose forces upon thestructure they are fixed to throughtheir ties. An assessment should beinitially made regarding the ability ofthestructuretosustaintheloadseitherglobally, due to its own instability,or locally as a result of defectivefinishes.Loadingsfromthetiesintothesupporting structure are dependantupon the live loading to the stairtower, itsheightand inthemajorityofcases the wind loading imposed uponthe tower and its cladding status. Forguidance with regards to the designof ties into building facades wewouldreferyoutoSection5ofTG20:08ortotheGeorgeRoberts (NW)LtdTechnicalServices Department or a competent temporaryworksdesigner
● InaccordancewiththerequirementsofBSEN12811theDesignloadis1kN/
m2,or1.5kNpositioned inworstcaseposition for element of tower underinspection.
● Towershouldbetiedtoexistingstructureat each lift (i.e. 2m vertical centres)using horizontal ties at each side thatsecurely fix to the existing structureand to the inner and outer standard.Additional components outside thesystems standard component set mayberequiredtoenableuseinaccordancewith this User Guide. These willnormallyconstituteloosetubestoEN39andfittingstoEN74.
● Wheretowerhastheshortfaceparallelto the existing structure, additionalties should be provided at each liftfromtheouterstandardsat45degreesback to the existing structure. Theseadditional ties are to be securely fixedto the existing structure and the fixingis assumed to be capable of resistinghorizontal forces both parallel andperpendiculartotheplaneofthewall.
● Thetowerisassumedtobeuncladandfree from netting and sheeting, suchthattheonlyareapresentedtothewindisthatofthecomponentsofthetower.
● Thepersonnelcapacity table is limitedto amaximum area load of 3 kN/m2forpracticalreasons.
● For the personnel capacity table, oneperson is assumed to weigh 100 Kg,exertingaforceofapproximately1kN.
● Throughout the calculations themaximum design load on any standardhasbeentakenas35.6kNwherethe3mface isparallel to the structureand41.6kNwheretheshortfaceisparalleltothestructure.
UniscaffAccessTowerUserGuideAddendumNotes
COMPONENT LIST
K-Lok User GuideK-Lok User GuideK-Lok User Guide
20 5
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
UniscaffCOMPONENT LIST
Standard Size 1.0m Code 1601005 Wt(Kg) 6.00
Size 2.0m Code 1601003 Wt(Kg) 11.70
Size 3.0m Code 1601002 Wt(Kg) 17.28
Base Jack Code 1601001 Wt(Kg) 4.10
Clip-on Post Code 1601055 Wt(Kg) 5.3
ErectionPlatform Code 1601035 Wt(Kg) 13.0
Ledger Beam Size 1.6m Code 1601011 Wt(Kg) 9.6
Size 3.0m Code 1601010 Wt(Kg) 18.17
UniscaffAccessTowerUserGuideAddendumNotes
●Where structure is not available atthe lift heights then a scaffold bracingsystemshouldbeusedtoprovideatietotheliftbacktoapositionofeffectiverestraint or theGeorgeRoberts (NorthWest)LtdTechnicalServicesDepartmentcontactedforadvice.
SafeWorkingHeightTablesNotes
Tablesarebasedonamaximumheightof30m,heightsabovethisarepossiblebuttheseshouldbereferredtoGeorgeRoberts (NW) Ltd Technical ServicesDepartmentoracompetenttemporaryworksengineer.
The User Guide utilises wind loadingin the preparation of its safe workingheighttablesforthestairtowers.Thesetables are limited to “S” values above20 and below 40. Where localisedconditions result in “S” values outsideof these parameters the wind velocitypressures may either be lower thanor exceed those utilised within thecalculations fromwhich the tables arederived. Stair towers located on sitesat the edges of cliffs or escarpments,incoastal locationsortotallstructuressurrounded by other tall structureswhich may cause funnelling of thewind pressure are all susceptible tosignificant increases in wind pressuredue to local effects. In these instancesit is recommended that advice issought from the George Roberts (NW)Ltd Technical Service Department or acompetenttemporaryworksengineer.
Ifthesiteis;atleast2Kminsideatownterrain, is shielded by buildings within100m and the average height of thesurrounding buildings are 5m or morethenitisclassifiedasa“Town”site.Allother locations are considered to be“Country”.
The safe height tables and sectioncapacities contained within the UserGuidearebaseduponliveloadingfromtheintendeduseonly.Additionalloadingmay accrue on the working platformsor components as a consequence ofatmospheric precipitations such asice, snow, sand or dust. The workingprocesses may also cause debris suchas sand, grit or demolition debris toaccumulate on the working platformof components which will increasethe live loading above that allowedfor within the live loading.Where thisis seen to occur or is know will occurfurtherguidanceshouldbesoughtfromtheGeorgeRoberts (NW)LtdTechnicalServices Department or a competent temporary works designer which mayresult in a down grading of the LoadClassforthescaffold.
GeneralNotes
PriortoerectionallUniscaffstairtowercomponents should be inspected fordamage by the erectors. DO NOT usedamaged components within theerectedtower.
The system utilises fully galvanisedcomponents which will be suitablefor storage in exposed areas andgenerally the components should bemaintenance free. Should there be aloss of the galvanising layer such thatcorrosiondepositsstarttooccurorthecomponentsaredamagedduringuseorstoragethenthecomponentshouldbereturnedtoGeorgeRoberts(NW)Ltdforreplacement.
K-Lok User GuideK-Lok User GuideK-Lok User Guide
4 21
UniscaffTowerAssemblyInstructionsUniscaffTowerAssemblyInstructions
Base Jacks
TheBaseJacksareadjustableinheighttoensurethetowerisbothlevelandstableonunevenground.
Note:Alwaysuseminimumadjustmentheighttoachievefinalplatformheight.
Standards
Standardsare1m,2mand3minlengthandareusedaccordingtotheheightoftowerbeingbuilt.
Beams
TheUniscaffstairtowerisbuiltusing1.6mand3.0mledgerbeamswith2.0m,1.5mand1.0mbetweentheplatformlevels.
Anchorage
TheUniscaffstairtowermustbeanchoredtoastructureateachplatformlevelonbothsidesoftheinnerandouterstandardsusingscaffoldtubeandcouplers.
LoadsonFlightsandLandings
Stairflightsandlandingshaveasafeworkingloadof1.5kN/sq.m
Loads on Standards
Thestairtowerwhenusing2.0mplatformheightshasapermissibleloadingof20kNperstandard.
Handrails
Allstairflightsandlandingsareequippedwithaminimumofdoublehandrails.Anadditional3.0msinglehandrailisaddedtotheexternalareaona2.0mstairflight.
ConstructionHeights
Themaximumconstructionheightforastairtowerwithplatformlevelsandstairflightseverytwometresis30.0m.Thestairflightsmusthavehandrailsontheinsideofeverystairflight.Thelandingsmusthaveguardrailsat1.0mand0.5mheights.
IMPORTANTNOTICEForstairtowerconstructionsnotcoveredbythiserectionguidepleasecontactthetechnicalsalesteamattheaddressonthereverseofthisguide.
Long FaceParallel to Building
MaximumTowerHeight(m)
In Country InTown
SValuetobeascertainedsubjecttosite
20 30 30
24 30 30
28 30 30
32 14 14
36 4 8
40 - 4
DerivedfromOutofServiceCondition-Criticalupto30m
ShortFaceParallel to Building
MaximumTowerHeight(m)
In Country InTown
SValuetobeascertainedsubjecttosite
DerivedfromOutofServiceCondition-Criticalupto30m
20 30 30
24 30 30
28 30 30
32 30 30
36 30 30
40 20 20
UniscaffAccessTowerSafeHeightTables
K-Lok User GuideK-Lok User GuideK-Lok User Guide
22 3
UniscaffTowerAssemblyInstructionsIntroduction
TheUniscaffStairTowerismadefrompre-fabricatedcomponentsandbuiltusingstandards,ledgerbeams,stairflights,landings,handrailsandguardrails.Thestairtowercanbebuiltasanindependentconstructionorintegratedintootherscaffoldingorstaging.
AllcomponentsaremadeofgalvanisedsteelandconformtothestructuralrequirementsofBSEN12811ndBSEN12810withregardstothecomponenttestingandcalculationrequirements.Allcomponentshaveouridentificationmarkswithmonthandyearofmanufacture.
UniscaffUniscaff
UniscaffAccessTowerMaximumPeopleTable
TowerHeight
MaximumNo. Personnel
2 m
4 m
6 m
8m 31
10 m 37
12 m 44
14 m 50
16m 58
18m 64
20 m 71
22 m 77
24m 84
26 m 91
TowerHeight
MaximumNo. Personnel
28m 98
30 m 99
32 m 94
34 m 94
36 m 90
38m 89
40m 85
42m 85
44m 81
46m 80
48m 76
50 m 75
K-Lok User GuideK-Lok User GuideK-Lok User Guide
2
Contents
Introduction 3
General Notes 4
Detailed Component List 5
KeyFeaturesofUniscaff 8
StepbyStepErectionGuide 9
UniscaffGeorge RobertsTotal Reliability of Supply
over 500 milesof scaffolding
Telephone: + 44 (0) 151 524 2434Fax (Sales): + 44 (0) 151 524 2430Email: [email protected]
George Roberts (NW) LimitedUnit D WakefieldRoadNetherton LiverpoolL30 6TZ UK Issue1:2016
George RobertsTotal Reliability of Supply
George RobertsTotal Reliability of Supply
• Tubes • Scaffold • Staircases • Beams • Formwork • Fencing • Tubes • Scaffold • Staircases • Beams • Formwork • Fencing
George RobertsTotal Reliability of Supply
Uniscaff
UniscaffUserGuide
www.scaffoldingsales.co.uk
Registered in Cardiff. 2728193GEORGE ROBERTS (NORTHWEST) LTD Vat No. 618 5719 17