Unique Challenges and Benefits

for

BIM

in Airport Construction and Management

Deniz Ziya Pehlivan

BIM Manager

TAV Construction

Page 2: Unique Challenges and Benefits for BIM in Airport

TAV

CO

NS

TR

UC

TIO

NEstablished in 2003 from TAV Airports which was

founded in 1997.

Total value of projects under contract 21.6 billion

USD.

Total construction projects contracted over 6,000,000

Listed in ENR’s 2021 Top 250 International

Contractors

Projects in Turkey, Georgia, Holland, France, Tunisia, Macedonia, Egypt, Libya,

Qatar, KSA, Oman, UAE and Kazakhstan.

Corporate headquarters located in Istanbul with branch offices in Dubai,

Doha, Cairo, Tripoli, Bahrain and Tunisia.

Page 3: Unique Challenges and Benefits for BIM in Airport

FACILITY MANAGEMENT & OPERATİONS

• Navigation

• Asset management

• OEM documentation access

• Building management/automation system (BMS/BAS) integration

• Facility management system integration (i.e. CMMS)

• Energy performance validation

• Operation analytics and prediction

• Staff training

OPERATION READINESS & TRANSFER (ORAT)

• Digital data delivery

• Familiarization:

o Visualization

o Staff training

• Virtual commercial planning

• Virtual walk through and stakeholder engagement

• Laser scanning and validation

• Immersive Virtual Reality

• Increased post-opening activities

DESIGN & CONSTRUCTION

• 3D model:

o Coordination

o BOQ extraction

o Shop drawings

o Visualization

o Rendering

• 4D scheduling/logistics:

o Trade coordination

o Site coordination

o Resource allocation

• 5D cost control:

o Cost planning

o Estimation

o Variation tracking

o VE / Energy modeling

TAVINTEGRATED SOLUTIONS

Formalize and utilize the combined design, construction, and operation know-how of TAV Construction, TAV Airports and partners based on available tools and technologies created for the built environment industry: More than 6,500,000 m2 of built environment with BIM…

Page 4: Unique Challenges and Benefits for BIM in Airport

We are NOT sufficiently consuming the information we producebecause we are not digitizing, standardizing, bounding the data and data groups in the

maximum productive way!

Actual Life Cycle of a Typical Physical Information:Cumbersome process, nonproductive activities and loss of valuable information

Page 5: Unique Challenges and Benefits for BIM in Airport

We have a long way to go!

Page 6: Unique Challenges and Benefits for BIM in Airport

CHALLENGE

Projects are mostly similar in the way they face problems, but the amount and the magnitude of the problems are drastically increased with the increasing size and complexity of the projects we are undertaking.

That means more data, better interrelation and information reports thereof are required for the best decision.

Page 7: Unique Challenges and Benefits for BIM in Airport

Design Benefits• CDE for multi-national and cross-country/continent

stakeholdersBoth HAMAD and MTB airport projects were having over 1000 white collar personnel at its peak! Who were creating, modifying, communicating, discussing to build a digital project.

• Single Source of Truth: Federated & combined models

Thousands of model files combined during both projects and all the coordination reviews and decisions thereof are made possible with highest accuracy.

• EDMS for RACI implementation, official documentation, records and latest information

100s and 1000s of data process and document submission made during the construction, ORAT and operation execution.

• As Built with laser scanning for maximized verification and as built records

Especially ID related “shall and core” areas such as kiosks, commercial zones, etc. benefits from it in maximum possible way.

Page 8: Unique Challenges and Benefits for BIM in Airport

Planning, Execution & ORAT

• Seamless Shop Drawing Production from Models

Highest accuracy of site execution with maximized match between models and drawings.

• Site Inputs

Data collection, efficient data management, effective data sharing, and data transfer.

• Logistics and 4D

Extra productive especially for the renovation, capacity increase and expansion projects.

• ERP Integration

Highest level of material procurement management, warehouse management, material tracking and material order procedure.

• RFID

Material tracking systems helping to manage millions of dollars worth material. Integration with ERP system will provide the best output.

• COBie

Data collection, efficient data management and data sharing.

Page 9: Unique Challenges and Benefits for BIM in Airport

Change Management

• TimesheetsProperly defined and clustered, cumulatively reviewed and standardized, linked to model structure, baseline program and BIM status report with easy identification

• BIM Status(Progress) reports Officially recorded and submitted, recorded on the weekly basis based on BIM Execution Plan.

• Model ChecklistsA detailed version of tracker lists, recording details of the individual model content on weekly basis as minimum.

• KPI analysisLinked to timesheets, monitored and analyzed on weekly basis highlighting project crucial notes in order to identify key events and their impacts.

Page 10: Unique Challenges and Benefits for BIM in Airport

Operations

Tibah Airports Prince Mohammed Bin Abdulaziz International Airport

BIM-FM Integration with BIMCaVe

2.5 million+ elements with more than 100,000 maintainable assets

Asset and Work Order Integration / Management

Any Digital Tool does not mean Solution:

There are plenty of software on the market which are not

satisfactory for the job. Look out for new products all the time!