UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle need: East-West transportation. The Union Street Gondola will connect the waterfront with the Convention Center and a mid-station between First and Third Avenues. East-West Link o Union Street is a busy downtown corridor but lacks transportation of any kind to the waterfront, because the land west of First Avenue is a steep bluff, served only by a steep staircase in a very pedestrian-hostile environment. This project will provide the missing link. Ties to New Waterfront Park o The Union Street Gondola will connect the new waterfront park with the city core. o It will enhance both public access to the park and the visitor experience itself. o The project supports three key goals of the Waterfront Strategic Plan: increasing waterfront visitors, improving a vital east-west connection, and attracting private investment. o As a private investment, the project will allow the city and taxpayers to reallocate resources, potentially completing the build-out of the new waterfront park more quickly. Connects to Public Transportation o The Union Street Gondola will be able to move 1,800 people an hour along a major east-west corridor presently lacking public transportation. o It will connect the Convention Center, the Downtown Transit Tunnel, Pike Place Market, the Art Museum, and the new waterfront park. o The project is especially suited to serving families with young children, the elderly, and the disabled – those physically unable to climb the bluff or otherwise walk long distances. o In addition, the service will benefit commuters who use transit to reach downtown, and out-of-town visitors. o The project will enhance existing public transit service. The mid-station will be within a block of a Downtown Transit Tunnel station and major north-south transit services, making existing transit more attractive. Leverages Existing Parking o Construction and redevelopment in the waterfront area will reduce currently existing parking, even as demand to use the waterfront is expected to double. The project helps address this major problem by enabling use of more distant existing parking facilities in the downtown, helping to offset the more localized losses. FACT SHEET Key Statistics o ½ mile (2,800 feet) long o Five-minute trip (one way) o Three stations o Eight support columns o 1,800 people can be moved per hour o Eight-passenger cars depart every 16 seconds o Funded solely by private investment For Additional Information Kyle Griffith (206) 396-8134 [email protected]

UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

  • Upload
    lyminh

  • View
    219

  • Download
    5

Embed Size (px)

Citation preview

Page 1: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

UNION STREET GONDOLA the urban aerial people mover

Meeting a key Seattle need East-West transportation The Union Street Gondola will connect the waterfront with the Convention Center and a mid-station between First and Third Avenues East-West Link

o Union Street is a busy downtown corridor but lacks transportation of any kind to the waterfront because the land west of First Avenue is a steep bluff served only by a steep staircase in a very pedestrian-hostile environment This project will provide the missing link

Ties to New Waterfront Park

o The Union Street Gondola will connect the new waterfront park with the city core

o It will enhance both public access to the park and the visitor experience itself

o The project supports three key goals of the Waterfront Strategic Plan increasing waterfront visitors improving a vital east-west connection and attracting private investment

o As a private investment the project will allow the city and taxpayers to reallocate resources potentially completing the build-out of the new waterfront park more quickly

Connects to Public Transportation

o The Union Street Gondola will be able to move 1800 people an hour along a major east-west corridor presently lacking public transportation

o It will connect the Convention Center the Downtown Transit Tunnel Pike Place Market the Art Museum and the new waterfront park

o The project is especially suited to serving families with young children the elderly and the disabled ndash those physically unable to climb the bluff or otherwise walk long distances

o In addition the service will benefit commuters who use transit to reach downtown and out-of-town visitors

o The project will enhance existing public transit service The mid-station will be within a block of a Downtown Transit Tunnel station and major north-south transit services making existing transit more attractive

Leverages Existing Parking

o Construction and redevelopment in the waterfront area will reduce currently existing parking even as demand to use the waterfront is expected to double The project helps address this major problem by enabling use of more distant existing parking facilities in the downtown helping to offset the more localized losses

FACT SHEET

Key Statistics

o frac12 mile (2800 feet) long o Five-minute trip (one way) o Three stations o Eight support columns o 1800 people can be

moved per hour o Eight-passenger cars depart

every 16 seconds o Funded solely by private

investment

For Additional Information

Kyle Griffith (206) 396-8134 Kgkg15gmailcom

Timing o If built promptly at the beginning of the tearing down of the Viaduct in 2016 it can also

provide a temporary benefit to waterfront businesses that will have been suffering from continuous constructions impacts during the 2012-2016 period and which will be worsened by the viaduct teardown

o In order to be timed with the initial phase of taking down the viaduct in 2016 the permitting needs to occur in 2013 so that engineering and purchasing can occur in rsquo14 and rsquo15

Green

o It is quiet fast and powered by electricity

Meeting a Critical Need

Union Street is a vital downtown street serving many important Seattle destinations including the Convention Center Benaroya Hall Seattle Art Museum and the Pike Place Market Union Street crosses 85 north-south bus routes and the regional light rail system The Union Street right-of-way also reaches the current Waterfront Park slated to be the jewel of the new central waterfront but because the land west of First Avenue is a steep bluff in reality there is no connection The Union Street Gondola will provide service to 1800 people an hour to all these destinations By linking the uptown to the waterfront the Gondola will not only encourage downtown guests to use public transportation it will also encourage better use of existing parking which will be essential in meeting the projected doubling of waterfront visitors from the current 3 million a year Since it will do this using private investment the Gondola project would allow the City and taxpayers to reallocate resources to other needs potentially completing the build-out of the new Waterfront more quickly Gondolas are becoming common solutions to unique urban transportation problems with more than 44 urban gondola systems worldwide The Portland (Oregon) Aerial Tram connecting two campuses of the Oregon Health Sciences University has carried more than one million passengers per year since opening in 2007 The Union Street Gondola will have twice the capacity of the Portland system Spacious enclosed cars will each carry 8 people and depart every 16 seconds You Can Help The Union Street Gondola has begun permitting with the City of Seattle In order to have the project ready to build as soon as the Viaduct comes down it is important the City move promptly

UNION STREET GONDOLA the urban aerial people mover

Why isnrsquot this being developed by the City or Metro Seattlersquos Waterfront is separated from the rest of the City by more than just the viaduct The topography between the Waterfront Pike Place Market and Convention Center neighborhoods is a steep cliff making bus taxi light rail or subway service impossible Currently there is no bus route serving this connection and access is limited The privately funded operated and maintained Union St Gondola will cost the city and taxpayers nothing but will provide tremendous benefits such as

1) Help to keep the waterfront accessible during the decade of heavy construction disruption

2) Provide a new EastWest connection which will connect Seattlersquos Downtown HotelRetail and Convention Center core to its Waterfront and Pike Place Market neighborhoods

3) Utilize an electric and green technology cutting down on carbon emissions from vehicle traffic and activating underutilized parking garages too far away and with too steep of hill to walk from the Waterfront

4) Bring more people into downtown and increase pedestriancycle and business activity throughout the city

Whatrsquos the timing and substance of the Cityrsquos review We are currently in an intensive permitting and review process with the City We have hired the best local professionals who are helping us complete this process Our goal is to open the Gondola in conjunction with the demolition of the viaduct How do we know the public will have adequate input on this project The permit process includes several opportunities for public involvement We have been meeting with Seattle residents business owners and downtown destinations for the past 2 years to include their feedback We value the publics input and have already made significant improvements to our concept based on this feedback How can a private company use the Cityrsquos right of way The gondola will run above the center line of Union St and operate entirely on City right of way We are working with the City to acquire long term access for this right of way similar to a sky bridge We will never own the City property only have an agreement to operate on it

Frequently Asked Questions

For Additional Information

Kyle Griffith (206) 396-8134 Kgkg15gmailcom

How will the project get financing Private and company capital combined with bank financing will fund this project Our bank is very supportive and enthusiastic about the gondola project If the project doesnrsquot get enough riders are you going to ask for taxpayers to support you No we will never require or ask for one cent of taxpayer dollars How many passengers will it take to make sure this is financially self-sustaining It is too soon to know at this point because we dont know all the costs involved We want the project to break even but are prepared to subsidize the gondola out of our existing operations if necessary How much will tickets cost The ticket price is yet to be determined but we recognize to achieve the goal of high ridership the ticket price needs to be as low as possible When our cost picture is more clear wersquoll be able to estimate necessary ticket prices We are thinking of structuring the ticket to be good for rides on the gondola all day This will allow maximum flexibility for the riders allowing them to travel on their own schedule and encourage them to spend more time downtown Whorsquos going to profit from ticket sales The gondola will be operated like any small business but because of the extremely high start up costs it is unlikely to be profitable for many years from now if at all The motivation for the gondola is not to profit from ticket sales but to increase visitors and pedestrians to the waterfront and subsequently downtown as well What will the citydo the taxpayers receive financially for allowing a private entity to profit from use of public assets We are working with the City on an agreement to use their right of way We both recognize the importance of keeping costs low to enable an affordable ticket to encourage high ridership If the city delays the project (for example if the tunnel is delayed) will the taxpayers be liable for cost overruns No the Gondola project will never require or ask for any taxpayer money There are condominiums on Union Street Are there any privacy issues to be concerned about We have been working with residents to understand their concerns and solve them together There is great excitement from the downtown residents for a new EastWest connection We are confident there are solutions to any privacy issues

Gondola on Union

An Urban Aerial People

Mover for Seattle

Kick Off Presentation

March 4 2014

Aerial Gondola

Premise bull Connect downtown to our

new waterfront with an aerial people mover

bull Promote a sustainable means of pedestrian mobility

bull Private Investment = Public Benefit

bull Continue Seattlersquos legacy as an innovative exuberant and forward looking city

Mid-Station Pike Place Market

Retail Core Benaroya Hall Transit Tunnel

Financial District New Streetcar

Convention

Center First Hill Pike Pine Denny

Triangle 150000 Jobs 10000 Hotel Rooms 30000 Residents

Waterfront Aquarium Waterfront Businesses The Wheel Ferry Terminal New World Class Pedestrian and Bike

Network

Union Street

Aerial Gondola Project

Connecting Assets

Connecting Parking Resources

Accessing amp Enhancing The New Waterfront

How are we getting 1700000 annual visitors to the waterfront

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 2: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Timing o If built promptly at the beginning of the tearing down of the Viaduct in 2016 it can also

provide a temporary benefit to waterfront businesses that will have been suffering from continuous constructions impacts during the 2012-2016 period and which will be worsened by the viaduct teardown

o In order to be timed with the initial phase of taking down the viaduct in 2016 the permitting needs to occur in 2013 so that engineering and purchasing can occur in rsquo14 and rsquo15

Green

o It is quiet fast and powered by electricity

Meeting a Critical Need

Union Street is a vital downtown street serving many important Seattle destinations including the Convention Center Benaroya Hall Seattle Art Museum and the Pike Place Market Union Street crosses 85 north-south bus routes and the regional light rail system The Union Street right-of-way also reaches the current Waterfront Park slated to be the jewel of the new central waterfront but because the land west of First Avenue is a steep bluff in reality there is no connection The Union Street Gondola will provide service to 1800 people an hour to all these destinations By linking the uptown to the waterfront the Gondola will not only encourage downtown guests to use public transportation it will also encourage better use of existing parking which will be essential in meeting the projected doubling of waterfront visitors from the current 3 million a year Since it will do this using private investment the Gondola project would allow the City and taxpayers to reallocate resources to other needs potentially completing the build-out of the new Waterfront more quickly Gondolas are becoming common solutions to unique urban transportation problems with more than 44 urban gondola systems worldwide The Portland (Oregon) Aerial Tram connecting two campuses of the Oregon Health Sciences University has carried more than one million passengers per year since opening in 2007 The Union Street Gondola will have twice the capacity of the Portland system Spacious enclosed cars will each carry 8 people and depart every 16 seconds You Can Help The Union Street Gondola has begun permitting with the City of Seattle In order to have the project ready to build as soon as the Viaduct comes down it is important the City move promptly

UNION STREET GONDOLA the urban aerial people mover

Why isnrsquot this being developed by the City or Metro Seattlersquos Waterfront is separated from the rest of the City by more than just the viaduct The topography between the Waterfront Pike Place Market and Convention Center neighborhoods is a steep cliff making bus taxi light rail or subway service impossible Currently there is no bus route serving this connection and access is limited The privately funded operated and maintained Union St Gondola will cost the city and taxpayers nothing but will provide tremendous benefits such as

1) Help to keep the waterfront accessible during the decade of heavy construction disruption

2) Provide a new EastWest connection which will connect Seattlersquos Downtown HotelRetail and Convention Center core to its Waterfront and Pike Place Market neighborhoods

3) Utilize an electric and green technology cutting down on carbon emissions from vehicle traffic and activating underutilized parking garages too far away and with too steep of hill to walk from the Waterfront

4) Bring more people into downtown and increase pedestriancycle and business activity throughout the city

Whatrsquos the timing and substance of the Cityrsquos review We are currently in an intensive permitting and review process with the City We have hired the best local professionals who are helping us complete this process Our goal is to open the Gondola in conjunction with the demolition of the viaduct How do we know the public will have adequate input on this project The permit process includes several opportunities for public involvement We have been meeting with Seattle residents business owners and downtown destinations for the past 2 years to include their feedback We value the publics input and have already made significant improvements to our concept based on this feedback How can a private company use the Cityrsquos right of way The gondola will run above the center line of Union St and operate entirely on City right of way We are working with the City to acquire long term access for this right of way similar to a sky bridge We will never own the City property only have an agreement to operate on it

Frequently Asked Questions

For Additional Information

Kyle Griffith (206) 396-8134 Kgkg15gmailcom

How will the project get financing Private and company capital combined with bank financing will fund this project Our bank is very supportive and enthusiastic about the gondola project If the project doesnrsquot get enough riders are you going to ask for taxpayers to support you No we will never require or ask for one cent of taxpayer dollars How many passengers will it take to make sure this is financially self-sustaining It is too soon to know at this point because we dont know all the costs involved We want the project to break even but are prepared to subsidize the gondola out of our existing operations if necessary How much will tickets cost The ticket price is yet to be determined but we recognize to achieve the goal of high ridership the ticket price needs to be as low as possible When our cost picture is more clear wersquoll be able to estimate necessary ticket prices We are thinking of structuring the ticket to be good for rides on the gondola all day This will allow maximum flexibility for the riders allowing them to travel on their own schedule and encourage them to spend more time downtown Whorsquos going to profit from ticket sales The gondola will be operated like any small business but because of the extremely high start up costs it is unlikely to be profitable for many years from now if at all The motivation for the gondola is not to profit from ticket sales but to increase visitors and pedestrians to the waterfront and subsequently downtown as well What will the citydo the taxpayers receive financially for allowing a private entity to profit from use of public assets We are working with the City on an agreement to use their right of way We both recognize the importance of keeping costs low to enable an affordable ticket to encourage high ridership If the city delays the project (for example if the tunnel is delayed) will the taxpayers be liable for cost overruns No the Gondola project will never require or ask for any taxpayer money There are condominiums on Union Street Are there any privacy issues to be concerned about We have been working with residents to understand their concerns and solve them together There is great excitement from the downtown residents for a new EastWest connection We are confident there are solutions to any privacy issues

Gondola on Union

An Urban Aerial People

Mover for Seattle

Kick Off Presentation

March 4 2014

Aerial Gondola

Premise bull Connect downtown to our

new waterfront with an aerial people mover

bull Promote a sustainable means of pedestrian mobility

bull Private Investment = Public Benefit

bull Continue Seattlersquos legacy as an innovative exuberant and forward looking city

Mid-Station Pike Place Market

Retail Core Benaroya Hall Transit Tunnel

Financial District New Streetcar

Convention

Center First Hill Pike Pine Denny

Triangle 150000 Jobs 10000 Hotel Rooms 30000 Residents

Waterfront Aquarium Waterfront Businesses The Wheel Ferry Terminal New World Class Pedestrian and Bike

Network

Union Street

Aerial Gondola Project

Connecting Assets

Connecting Parking Resources

Accessing amp Enhancing The New Waterfront

How are we getting 1700000 annual visitors to the waterfront

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 3: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

UNION STREET GONDOLA the urban aerial people mover

Why isnrsquot this being developed by the City or Metro Seattlersquos Waterfront is separated from the rest of the City by more than just the viaduct The topography between the Waterfront Pike Place Market and Convention Center neighborhoods is a steep cliff making bus taxi light rail or subway service impossible Currently there is no bus route serving this connection and access is limited The privately funded operated and maintained Union St Gondola will cost the city and taxpayers nothing but will provide tremendous benefits such as

1) Help to keep the waterfront accessible during the decade of heavy construction disruption

2) Provide a new EastWest connection which will connect Seattlersquos Downtown HotelRetail and Convention Center core to its Waterfront and Pike Place Market neighborhoods

3) Utilize an electric and green technology cutting down on carbon emissions from vehicle traffic and activating underutilized parking garages too far away and with too steep of hill to walk from the Waterfront

4) Bring more people into downtown and increase pedestriancycle and business activity throughout the city

Whatrsquos the timing and substance of the Cityrsquos review We are currently in an intensive permitting and review process with the City We have hired the best local professionals who are helping us complete this process Our goal is to open the Gondola in conjunction with the demolition of the viaduct How do we know the public will have adequate input on this project The permit process includes several opportunities for public involvement We have been meeting with Seattle residents business owners and downtown destinations for the past 2 years to include their feedback We value the publics input and have already made significant improvements to our concept based on this feedback How can a private company use the Cityrsquos right of way The gondola will run above the center line of Union St and operate entirely on City right of way We are working with the City to acquire long term access for this right of way similar to a sky bridge We will never own the City property only have an agreement to operate on it

Frequently Asked Questions

For Additional Information

Kyle Griffith (206) 396-8134 Kgkg15gmailcom

How will the project get financing Private and company capital combined with bank financing will fund this project Our bank is very supportive and enthusiastic about the gondola project If the project doesnrsquot get enough riders are you going to ask for taxpayers to support you No we will never require or ask for one cent of taxpayer dollars How many passengers will it take to make sure this is financially self-sustaining It is too soon to know at this point because we dont know all the costs involved We want the project to break even but are prepared to subsidize the gondola out of our existing operations if necessary How much will tickets cost The ticket price is yet to be determined but we recognize to achieve the goal of high ridership the ticket price needs to be as low as possible When our cost picture is more clear wersquoll be able to estimate necessary ticket prices We are thinking of structuring the ticket to be good for rides on the gondola all day This will allow maximum flexibility for the riders allowing them to travel on their own schedule and encourage them to spend more time downtown Whorsquos going to profit from ticket sales The gondola will be operated like any small business but because of the extremely high start up costs it is unlikely to be profitable for many years from now if at all The motivation for the gondola is not to profit from ticket sales but to increase visitors and pedestrians to the waterfront and subsequently downtown as well What will the citydo the taxpayers receive financially for allowing a private entity to profit from use of public assets We are working with the City on an agreement to use their right of way We both recognize the importance of keeping costs low to enable an affordable ticket to encourage high ridership If the city delays the project (for example if the tunnel is delayed) will the taxpayers be liable for cost overruns No the Gondola project will never require or ask for any taxpayer money There are condominiums on Union Street Are there any privacy issues to be concerned about We have been working with residents to understand their concerns and solve them together There is great excitement from the downtown residents for a new EastWest connection We are confident there are solutions to any privacy issues

Gondola on Union

An Urban Aerial People

Mover for Seattle

Kick Off Presentation

March 4 2014

Aerial Gondola

Premise bull Connect downtown to our

new waterfront with an aerial people mover

bull Promote a sustainable means of pedestrian mobility

bull Private Investment = Public Benefit

bull Continue Seattlersquos legacy as an innovative exuberant and forward looking city

Mid-Station Pike Place Market

Retail Core Benaroya Hall Transit Tunnel

Financial District New Streetcar

Convention

Center First Hill Pike Pine Denny

Triangle 150000 Jobs 10000 Hotel Rooms 30000 Residents

Waterfront Aquarium Waterfront Businesses The Wheel Ferry Terminal New World Class Pedestrian and Bike

Network

Union Street

Aerial Gondola Project

Connecting Assets

Connecting Parking Resources

Accessing amp Enhancing The New Waterfront

How are we getting 1700000 annual visitors to the waterfront

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 4: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

How will the project get financing Private and company capital combined with bank financing will fund this project Our bank is very supportive and enthusiastic about the gondola project If the project doesnrsquot get enough riders are you going to ask for taxpayers to support you No we will never require or ask for one cent of taxpayer dollars How many passengers will it take to make sure this is financially self-sustaining It is too soon to know at this point because we dont know all the costs involved We want the project to break even but are prepared to subsidize the gondola out of our existing operations if necessary How much will tickets cost The ticket price is yet to be determined but we recognize to achieve the goal of high ridership the ticket price needs to be as low as possible When our cost picture is more clear wersquoll be able to estimate necessary ticket prices We are thinking of structuring the ticket to be good for rides on the gondola all day This will allow maximum flexibility for the riders allowing them to travel on their own schedule and encourage them to spend more time downtown Whorsquos going to profit from ticket sales The gondola will be operated like any small business but because of the extremely high start up costs it is unlikely to be profitable for many years from now if at all The motivation for the gondola is not to profit from ticket sales but to increase visitors and pedestrians to the waterfront and subsequently downtown as well What will the citydo the taxpayers receive financially for allowing a private entity to profit from use of public assets We are working with the City on an agreement to use their right of way We both recognize the importance of keeping costs low to enable an affordable ticket to encourage high ridership If the city delays the project (for example if the tunnel is delayed) will the taxpayers be liable for cost overruns No the Gondola project will never require or ask for any taxpayer money There are condominiums on Union Street Are there any privacy issues to be concerned about We have been working with residents to understand their concerns and solve them together There is great excitement from the downtown residents for a new EastWest connection We are confident there are solutions to any privacy issues

Gondola on Union

An Urban Aerial People

Mover for Seattle

Kick Off Presentation

March 4 2014

Aerial Gondola

Premise bull Connect downtown to our

new waterfront with an aerial people mover

bull Promote a sustainable means of pedestrian mobility

bull Private Investment = Public Benefit

bull Continue Seattlersquos legacy as an innovative exuberant and forward looking city

Mid-Station Pike Place Market

Retail Core Benaroya Hall Transit Tunnel

Financial District New Streetcar

Convention

Center First Hill Pike Pine Denny

Triangle 150000 Jobs 10000 Hotel Rooms 30000 Residents

Waterfront Aquarium Waterfront Businesses The Wheel Ferry Terminal New World Class Pedestrian and Bike

Network

Union Street

Aerial Gondola Project

Connecting Assets

Connecting Parking Resources

Accessing amp Enhancing The New Waterfront

How are we getting 1700000 annual visitors to the waterfront

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 5: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Gondola on Union

An Urban Aerial People

Mover for Seattle

Kick Off Presentation

March 4 2014

Aerial Gondola

Premise bull Connect downtown to our

new waterfront with an aerial people mover

bull Promote a sustainable means of pedestrian mobility

bull Private Investment = Public Benefit

bull Continue Seattlersquos legacy as an innovative exuberant and forward looking city

Mid-Station Pike Place Market

Retail Core Benaroya Hall Transit Tunnel

Financial District New Streetcar

Convention

Center First Hill Pike Pine Denny

Triangle 150000 Jobs 10000 Hotel Rooms 30000 Residents

Waterfront Aquarium Waterfront Businesses The Wheel Ferry Terminal New World Class Pedestrian and Bike

Network

Union Street

Aerial Gondola Project

Connecting Assets

Connecting Parking Resources

Accessing amp Enhancing The New Waterfront

How are we getting 1700000 annual visitors to the waterfront

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 6: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Aerial Gondola

Premise bull Connect downtown to our

new waterfront with an aerial people mover

bull Promote a sustainable means of pedestrian mobility

bull Private Investment = Public Benefit

bull Continue Seattlersquos legacy as an innovative exuberant and forward looking city

Mid-Station Pike Place Market

Retail Core Benaroya Hall Transit Tunnel

Financial District New Streetcar

Convention

Center First Hill Pike Pine Denny

Triangle 150000 Jobs 10000 Hotel Rooms 30000 Residents

Waterfront Aquarium Waterfront Businesses The Wheel Ferry Terminal New World Class Pedestrian and Bike

Network

Union Street

Aerial Gondola Project

Connecting Assets

Connecting Parking Resources

Accessing amp Enhancing The New Waterfront

How are we getting 1700000 annual visitors to the waterfront

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 7: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Mid-Station Pike Place Market

Retail Core Benaroya Hall Transit Tunnel

Financial District New Streetcar

Convention

Center First Hill Pike Pine Denny

Triangle 150000 Jobs 10000 Hotel Rooms 30000 Residents

Waterfront Aquarium Waterfront Businesses The Wheel Ferry Terminal New World Class Pedestrian and Bike

Network

Union Street

Aerial Gondola Project

Connecting Assets

Connecting Parking Resources

Accessing amp Enhancing The New Waterfront

How are we getting 1700000 annual visitors to the waterfront

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 8: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Connecting Parking Resources

Accessing amp Enhancing The New Waterfront

How are we getting 1700000 annual visitors to the waterfront

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 9: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Accessing amp Enhancing The New Waterfront

How are we getting 1700000 annual visitors to the waterfront

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 10: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Qualified Team Assembled

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 11: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

bull 16 Urban Gondolas in operation bull 30+ being planned

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 12: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Urban Gondolas Caracas

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 13: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Singapore

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 14: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Portland

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 15: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Benefits - Universal Access For All

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 16: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Cable Propelled Transit

Dopplymayr Aerial System bull Monocable Detachable Gondola bull Level walk-in access for all

CWA Cabins bull 8 passenger cabins bull 1800 people per hour capacity each way bull 20000+ passengers possible daily capacity

(ridership utilization currently being studied)

bull Cabins arrive at 16 seconds intervals bull 6 meters per second maximum speed bull Diesel powered emergency backup retrieves

cabins to stations

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 17: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

An Aerial Gondola

Can Help Reduce

Traffic amp Parking

bull Waterfront visitors can

use 1200 underutilized

stalls of parking at the

Convention Center

bull Reduced amount of

traffic coming to the

waterfront searching for

parking

bull Integrates with other

forms of transit ndash Future

Streetcar The University

Station Tunnel Buses and Ferries

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 18: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Benefits ndash Clean Green and Safe

bull Highly efficient

electrically powered

cable drive can

move 1800

passengers per hour

each way

bull No fossil fuel

emissions

bull Promotes downtown

living

bull Quiet

bull Sails above energy

eating stop and go

traffic

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 19: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Benefits ndash Clean Green and Safe

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 20: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Transportation Connections New Street Car Ferry Terminal 3rd Ave Buses and Univ Station Light Rail Tunnel

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 21: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Overall Scale Axonometric View Buildings North of Union Removed

Mid-Station

Convention Center

Waterfront

8 Supportive Columns

Typical Block Rainier Square

Page 22: UNION STREET GONDOLA the urban aerial people …media.cmgdigital.com/shared/news/documents/2014/03/04/Gondola...UNION STREET GONDOLA the urban aerial people mover Meeting a key Seattle

Typical Block Rainier Square