3
Student Accommodation Modular Options Joss Constructions/Ecotec - NSW Australia 10/03/2010

Uni Modular Construction (Green Precast)greenprecastsystems.com/media/Modular_Construction-Green...Box 2655 ABU DHABI - UAE PHONE: +971 2 666 6332 FAX: +971 2 666 2292 GREEN PRECAST

  • Upload
    others

  • View
    26

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Uni Modular Construction (Green Precast)greenprecastsystems.com/media/Modular_Construction-Green...Box 2655 ABU DHABI - UAE PHONE: +971 2 666 6332 FAX: +971 2 666 2292 GREEN PRECAST

Student AccommodationModular Options

Joss Constructions/Ecotec - NSW Australia

10/03/2010

Page 2: Uni Modular Construction (Green Precast)greenprecastsystems.com/media/Modular_Construction-Green...Box 2655 ABU DHABI - UAE PHONE: +971 2 666 6332 FAX: +971 2 666 2292 GREEN PRECAST

Student AccommodationModular Options

Joss Constructions/Ecotec - NSW Australia

10/03/2010

Individual 4-sided bedroommodules manufactured o!-site

Modules are monolithicallycast - no construction jointsbetween walls

Excellent acousticproperties betweenadjacent rooms

Greatly compressedconstruction timeframe

as the majority of structuremanufactured concurrently

to site preparation etc.

Replication: modulesmanufactured

precisely tospeci"cation each pour

Page 3: Uni Modular Construction (Green Precast)greenprecastsystems.com/media/Modular_Construction-Green...Box 2655 ABU DHABI - UAE PHONE: +971 2 666 6332 FAX: +971 2 666 2292 GREEN PRECAST

Student AccommodationModular Options

Joss Constructions/Ecotec - NSW Australia

10/03/2010

Industry standardlifting gear installed

in each module

Cast-in steeldoorframes

All power, co-ax, ethernetetc. can be cast-in

even plumbing and hydronicheating in slabs

Timber framingcast-in to modulesto assist in !xingwindows etc.

Light !ttingscast-in