Understanding Gas Protection Measure Selection within

Waterproofing Systems

John Naylor – Technical Director

Page 2: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

The Main Hazardous Gases

CH4

CO2

H2S

RnN2

CO

VOCs

H2

Page 3: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Sources of UK ground-gas

• Natural– Bedrock and sediments containing Uranium

– Calcareous rock (limestone)

– Coal bearing strata

– Organic sediments (peat, alluvium)

• Anthropogenic– Landfill

– Made ground

– Mining

– Past contaminative activity

Page 4: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

P British Coalfields

Risks from:

• Methane

• Carbon Dioxide

• Carbon Monoxide

• Hydrogen Sulphide

• Oxygen deficiency

Page 5: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Abbeystead Valve House Disaster, 1984 16 people killed

28 people injured

Page 6: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

June 2014

Carbon dioxide discovered in Gorebridge homes

Page 7: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

2017 Update

64 homes demolished

Page 8: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

23,000 former landfills in England & Wales

Page 9: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Loscoe Explosion, 19863 people injured

Page 10: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Radon Gas

Sou

rce

: H

PA-R

PD

-03

3 I

nd

icat

ive

Atl

as o

f R

ado

n in

En

glan

d a

nd

Wal

es 2

00

7

INDICATIVE

“Radon is the second highest cause of lung cancer in the UK, after smoking”Average Annual Radiation Dose

Page 11: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Published June 2015

• Increased scope (site investigation and risk assessment)

• Updated to latest good practice

• Includes changes to building types

• Expanded and modified scoring tables

• Verification

BS 8485:2015

Page 12: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Ground-Gas Risk Assessments Tier 1 - Is there a pollutant linkage?

- Initial Conceptual Site Model

Tier 2 - Generic risk assessment

- What is the empirical level of risk?

- Need sufficient monitoring data to determine a GSV

and a Characteristic Situation

Tier 3 - Site specific risk assessment

- What is the quantitative risk?

- Use numerical models to calculate gas

accumulation beneath & within buildings

- Detailed qualitative risk assessment

Tier 4 - Receptor monitoring

- Monitoring directly at or near to the receptor

Which ever tier – use multiple-lines of evidence

Page 13: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Conceptual Site Model Development

Using site investigation data and monitoring data to identify plausible pollution linkages that require further management

Page 14: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

0

10

20

30

40

50

60

08 Jul 10 Jul 12 Jul 14 Jul 16 Jul 18 Jul 20 Jul 22 Jul 24 Jul 26 Jul 28 Jul 30 Jul

Weekly monitoring on these dates shows almost no methane

Weekly monitoring on these dates shows falling methane

Weekly monitoring on these dates shows rising methane

Methane

Ground Gas VariabilityC

oncentr

atio

n (

%v/v

)

Page 15: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

BS8485:2015 Characteristic Situations

CS1 Very Low Risk No Special precautions required

CS2 Low Risk Passive Gas Protection (<30m span)

CS3 Moderate RiskHighest level of passive protection and limit for private unmanaged residential dwellings

CS4 Moderate to High RiskLower active systems for commercial and industrial. Managed residential possible with care.

CS5 High RiskLarge industrial sheds with large open areas. Really think about it.

CS6 Very High RiskYes even here you can develop, but should you be building on it?

Page 16: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

BS8485:2015 - Building Types & Sensitivity

Source: Table 3 from BS8485:2015

• Requires Professional Judgement

• Can have different types in the same building

Page 17: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

BS8485:2015 - Scoring

Determine your minimum score requirements using a “combination of two or more” of the following elements:

• Ventilation measures

• Structural barrier or basement

• Gas-resistant membrane

You can’t use the same element twice!

Page 18: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

• There are several additional notes to this table• You may consider different parts of the building

requiring different scores

BS8485:2015 - Gas Protection Score, Table 4

Page 19: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

BS8485:2015 - Table 5 Structural Barrier

• Not all concrete is the same!

• Any breaches in slabs need sealing

• Annex A provides further detail

Page 20: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

BS8

10

2:2

00

9

Page 21: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Type or Grade?

Grade is the end use

1 – Car parking

2 – Plant rooms and workshops

3 – Ventilated residential and commercial areas

Type is the protection system

A - Barrier

B – Structurally integral

C – Drained

Page 22: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

BS8485:2015 - Ventilation

• Much more detail in

this version

• Need to design it

• Prove your

ventilation works

• No active for

Type A Building

Element Score

Pressure relief 0.5

Passive sub floor ventilation

Very Good 2.5Good 1.5

Active dispersal layer 1.5 to 2.5

Active positive pressurisation

1.5 to 2.5

Ventilated car park(to approved Doc F)

4

Page 23: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Gas resistant membranes meeting ALL of the above

requirements – HERO or ZERO

BS8485:2015 - Table 7

Page 24: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Detail in Design, Detailing in Installation

Page 25: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

CIRIA C735 - Verification

• All installations should have some form of verification

• Verification should be proportionate to:

• A) the risks from the site,

• B) the experience of the installation operatives

• Verification should be conducted by suitably qualified and Independent practitioners.

“The process of demonstrating that the risk has been reduced to meet remediation criteria and objectives based on a quantitative assessment of remediation performance”

Page 26: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

C735 Decision Structure

CIRIA C735 Figure 3.1

Page 27: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Verification Plan

Verification Plan’s should include:

• Site summary

• Design / specification compliance

• Acceptable installation methods

• Installer / verifier competencies

• Inspection / testing regime

• Non-conformance resolution

• Define Contents of Final Verification

Report

Page 28: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Integrity Testing

a) In line with methodologies in Annex 2, 3 and 4 of CIRIA 735 (Leak Detection)

• Smoke Testing

• Tracer Gas Testing

• Dielectric Testing

b) In line with methodologies in ASTM D4437 (Seam Testing)

• Pick/Probe Test

• Air Lancing

• Pressure Testing

There are also others

Page 29: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Verification Monitoring

Pre and Post Remediation Monitoring Evidence

Page 30: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Summary

1

Site Investigation

• desk study

• trail pits

• monitoring

• laboratory analysis

Weeks to Months

2Risk Assessment

• Conceptual Site Model

• Consideration of gases and vapours

• Generic GSV

• Detailed assessment

• Assigning Characteristic Situation

3

Design & Specification• Proportionate to the risks posed

• BS8485 Points Scoring System

• Ventilation

• Structure

• Membrane

BS8102 Considerations

4

Installation• NVQ Level 2 Qualification

• Protection from Follow on Trades

5

Verification• C735

• Verification Plan

• Independent

• Integrity testing

Page 31: Understanding Gas Protection Measure Selection within ... · Understanding Gas Protection Measure Selection within ... ventilation works • No active . ... Pressure relief 0.5 Passive

Thank you !