43
Ta il in g Ta il in g O r e O r e O r e O r e O r e W a s t e W a s t e

underground mining system

Embed Size (px)

DESCRIPTION

mining pertambangan

Citation preview

Page 1: underground mining system

Tailing

Tailing

Ore

Ore

Ore

Ore

Ore

W a s t e

W a s t e

Page 2: underground mining system

SISTEM PENAMBANGANSISTEM PENAMBANGAN

• TAMBANG TERBUKA TAMBANG TERBUKA – OPEN PITOPEN PIT– QUARRYQUARRY– STRIP MINESTRIP MINE– ALLUVIAL MINE/HYDRAULIC MINE ALLUVIAL MINE/HYDRAULIC MINE

• TAMBANG BAWAH TANAHTAMBANG BAWAH TANAH

• TAMBANG BAWAH AIRTAMBANG BAWAH AIR

Page 3: underground mining system

SISTEM TAMBANG BAWAH SISTEM TAMBANG BAWAH TANAHTANAH(BIJIH)(BIJIH)

• OPEN STOPE METHODOPEN STOPE METHOD– GLORY HOLEGLORY HOLE – GOPHERINGGOPHERING– SUBLEVEL STOPING SUBLEVEL STOPING – OVERHAND STOPINGOVERHAND STOPING- UNDERHAND STOPINGUNDERHAND STOPING- BREAST STOPINGBREAST STOPING

- STOPE AND PILLAR- STOPE AND PILLAR

• SUPPORTED METHODSUPPORTED METHOD

• CAVING METHODCAVING METHOD

Page 4: underground mining system

• SUPPORTED METHODSUPPORTED METHOD– CUT AND FILLCUT AND FILL– STULL STOPINGSTULL STOPING– STOPE AND PILLARSTOPE AND PILLAR– SQUARE SET STOPINGSQUARE SET STOPING– SHRINKAGE STOPINGSHRINKAGE STOPING

• CAVING METHODCAVING METHOD– BLOCK CAVINGBLOCK CAVING– SUBLEVEL CAVINGSUBLEVEL CAVING– TOP SLICINGTOP SLICING

Page 5: underground mining system

TAMBANG BAWAH TANAHTAMBANG BAWAH TANAH(BATUBARA)(BATUBARA)

• LONG WALL MININGLONG WALL MINING– ADVANCED SYSTEMADVANCED SYSTEM– RETREATING SYSTEMRETREATING SYSTEM

• ROOM AND PILLARROOM AND PILLAR

Page 6: underground mining system

PERALATAN PENAMBANGANPERALATAN PENAMBANGAN• ALAT BONGKAR TBTALAT BONGKAR TBT

– LUNAK : EXCAVATOR, Drum shearerLUNAK : EXCAVATOR, Drum shearer– KERAS : Pemboran & peledakanKERAS : Pemboran & peledakan

• ALAT MUAT : LHD, ROCKER SHOVEL, ALAT MUAT : LHD, ROCKER SHOVEL, CONTINUEOS LOADERCONTINUEOS LOADER

• ALAT ANGKUT: TRUK, BELT ALAT ANGKUT: TRUK, BELT CONVEYOR, LOKOMOTIF, HAULAGE, CONVEYOR, LOKOMOTIF, HAULAGE, WINDING SYSTEM.WINDING SYSTEM.

Page 7: underground mining system

TAMBANG TAMBANG BAWAH TANAHBAWAH TANAHLAY OUT BUKAANLAY OUT BUKAAN

Page 8: underground mining system

TAMBANG TAMBANG BAWAH BAWAH TANAHTANAH

Glory HoleGlory Hole

Page 9: underground mining system

TAMBANG BAWAH TANAHTAMBANG BAWAH TANAHGopheringGophering

Page 10: underground mining system

TAMBANG TAMBANG BAWAH BAWAH TANAHTANAHSublevel Sublevel StoppingStopping

Page 11: underground mining system
Page 12: underground mining system

TAMBANG BAWAH TANAHTAMBANG BAWAH TANAHSublevel StoppingSublevel Stopping

Page 13: underground mining system

TAMBANG BAWAH TANAHTAMBANG BAWAH TANAHOverhand StopingOverhand Stoping

Page 14: underground mining system

TAMBANG TAMBANG BAWAH BAWAH TANAHTANAH

Underhand Underhand StopingStoping

Page 15: underground mining system

TAMBANG TAMBANG BAWAH BAWAH TANAHTANAH

Stope and Stope and PillarPillar

Page 16: underground mining system

TAMBANG TAMBANG BAWAH TANAHBAWAH TANAH

Stope and PillarStope and Pillar

Page 17: underground mining system

SUPPORTED METHODSUPPORTED METHODCut and FillCut and Fill

Page 18: underground mining system

SUPPORTED METHODSUPPORTED METHODCut and FillCut and Fill

Page 19: underground mining system

SUPPORTED SUPPORTED METHODMETHOD

Stull StoppingStull Stopping

Page 20: underground mining system

SUPPORTED SUPPORTED METHODMETHOD

Square-set Square-set StopingStoping

Page 21: underground mining system

SUPPORTED SUPPORTED METHODMETHOD

Shrinkage Shrinkage StoppingStopping

Page 22: underground mining system

CAVING METHODCAVING METHODBlock CavingBlock Caving

Page 23: underground mining system

CAVING METHODCAVING METHODSublevel CavingSublevel Caving

Page 24: underground mining system

CAVING METHODCAVING METHODTop SlicingTop Slicing

Page 25: underground mining system

TAMBANG BAWAH TANAH BATUBARATAMBANG BAWAH TANAH BATUBARARoom and PillarRoom and Pillar

Page 26: underground mining system

ALAT ANGKUTALAT ANGKUT

Page 27: underground mining system
Page 28: underground mining system
Page 29: underground mining system

1. Pemboran

2. Peledakan 3. PenarikanTailing Tailing

TailingTailing

Ore Ore

Ore Ore

Ore

WasteWaste

Page 30: underground mining system

4. Rongga Stope

Tailing

Ore

Waste

Waste

Ore

Barikade Waste

Barikade Waste

Tailing

Tailing

Tailing

X - Cut

X - Cut

5. Back Filling

6. Stope siap produksi

Rongga setelah produksi

Rongga awal

OreOre

Waste

Waste

Page 31: underground mining system

SIKLUS Cut&FillSIKLUS Cut&Fill DrillDrill

Type : Button Bit

Diameter : 45 mm

Rod length : 2.4 m

Drill depth : 2,3 m

Drill space : 60 cm

No of Holes : ± 50-60 holes

Page 32: underground mining system

BlastBlast Explosives

Danfo (25kg/bag) : 0,49 kg/ton

Dinamit (25 & 30 mmx 20 cm @ 0,18-0,2 gr) : 0,07 kg/ton

El. Detonator:0,03 pcs/ton

Nonel Det : 0,2 pcs/ton

Page 33: underground mining system

SupportSupport Diamond Pattern:

Split set:

L : 2,4 m

D : 49 mm

Weld Mesh (2,2x4,5 m):

O : 10 x 10 cm

D : 5.6 mm

Wire mesh (2x15 m):

O : 40 x 40 mm

D : 4 mm

Flat strap :

L : 3 m

W: 15 cm

T : 3 mm

a

b

c

Page 34: underground mining system

Jumbo Axera D07 S-260, (Tamrock)

Mark up & Drilling Face

Diameter Hole : 45mmDiameter Reamer : 102mmLength of hole : 3.0m

University of Pembangunan Nasional “Veteran” YogyakartaDepartment of Mining EngineeringJuly 21, 2007

Smooth Blasting within weak rock, Smooth Blasting within weak rock, undergroundunderground Kencana MineKencana Mine

Page 35: underground mining system

Drill Pattern

University of Pembangunan Nasional “Veteran” YogyakartaDepartment of Mining EngineeringJuly 21, 2007

Smooth Blasting within weak rock, Smooth Blasting within weak rock, undergroundunderground Kencana MineKencana Mine

Page 36: underground mining system

Reamer Hole 102mmFree Face

Cut Hole 45mm

Burncut

University of Pembangunan Nasional “Veteran” YogyakartaDepartment of Mining EngineeringJuly 21, 2007

Smooth Blasting within weak rock, Smooth Blasting within weak rock, undergroundunderground Kencana MineKencana Mine

Page 37: underground mining system

Mass Hole

Perimetric Hole

Knee HoleLifter Hole

Smooth Blasting within weak rock, Smooth Blasting within weak rock, undergroundunderground Kencana MineKencana Mine

University of Pembangunan Nasional “Veteran” YogyakartaDepartment of Mining EngineeringJuly 21, 2007

Page 38: underground mining system
Page 39: underground mining system
Page 40: underground mining system
Page 41: underground mining system

Raise Climber: MERK : ARKBRO

MODEL : ABI-SE/EE

CAPACITY : 150 m (9 m2)

Motor : Compressed air driven

Air Consumption @ 6 Bar: 165 – 230 l/s

(10-143/min)

TAHUN OPERASI : 1996

Page 42: underground mining system

• shearer shearer rev.mpgrev.mpg

Page 43: underground mining system