Upload
eustacia-norman
View
227
Download
1
Tags:
Embed Size (px)
Citation preview
UNCLASSIFIED
Squadron PESTO Pillar Course
30 September 2015
Personnel Equipment Training
UNCLASSIFIED2
Introduction
This presentation covers the following topics:
UNCLASSIFIED
Introduction - Objectives
3
Note: The DRRS-N graphics used in this presentation contain notional data and are for illustration purposes only
At the end of this presentation, you will have a basic understanding of:
• The aviation squadron PESTO metrics and their authoritative data sources
• The aviation squadron PESTO data flow to DRRS-N
• The aviation squadron PESTO drill downs available in DRRS-N
UNCLASSIFIED
Overview - Authoritative Data Sources
DRRS-N compiles unit resource values (called FOMs or Figures of Merit), using authoritative data sources. These values and associated data are available to the Commander as a guide for making unit assessments.
4
UNCLASSIFIED
Overview - Authoritative Data Sources
5
In the following slides, we will introduce the three PESTO pillars which are calculated within DRRS-N for all Aviation Squadrons.
Each section will discuss a specific pillar using the following format:
• An overview of the pillar
• The metrics, which drive the calculations of that pillar
• The inputs (authoritative data source) and data flow to DRRS-N
• The drill down analysis provided within DRRS-N
UNCLASSIFIED6
The personnel (P) pillar represents a detailed capture of individual skills that affect the ability of a unit to perform its mission. The personnel metrics in DRRS-N tie the BUPERS process to Fleet readiness.
PESTO Pillars - Personnel - Overview
UNCLASSIFIED
PESTO Pillars - Personnel - Metrics
7
• Active (AC) and reserve (RC) component officer and enlisted rating Fit
• AC and RC enlisted NEC Fit• Government civilian Fit –generally not applicable
to fleet units (no civilian billets on AMD)• T&E school requirements (currently VP only)
PFOM – Calculated for each NMET. The unit’s overall “P number” is anaverage of all individual NMETs.
PFOM is the compilation of [requirements - gaps / requirements]in the following areas:
UNCLASSIFIED
PESTO Pillars - Personnel - Metrics
8
View a sample (No-Weight) PFOM Calculation on the next page.
UNCLASSIFIED
PESTO Pillars - Personnel - Metrics
Sample (No-Weight) PFOM Calculation:
Skill OFF CIV T&E NEC Total PFOM
Rs 16 0 74 145 235
66Gs 6 0 40 34 80
PFOM = (Rs – Gs) = (235 – 80) = Rs 235
66
UNCLASSIFIED
PESTO Pillars - Personnel - Inputs/Data Flow
10
View Explanation of Terms on the next page.
UNCLASSIFIED
PESTO Pillars - Personnel - Inputs/Data Flow
Explanation of Terms:
AQD Additional Qualification Designator
BA Billets Authorized
BIN Billet Identification Number
COB Currently On Board
DESIG Designator
FIT Billet to qualification match based on DESIG/NEC,
Rank/Pay band, and Subspecialty (AQD)
FLTMPS Fleet Training Management and Planning System
NEC Navy Enlisted Classification. A critical NEC manned less than
50% will automatically make a NMET red.
NOBC Navy Occupational Billet Code
RCN Rating Control Number
TFMMS Total Force Manpower Management System
UNCLASSIFIED
PESTO Pillars - Personnel - Drill Down
12
In DRRS-N , expand the Capability Areas to view individual METS. Click on the P-Pillar score in a given MET to see the PFOM drill down.
UNCLASSIFIED
PESTO Pillars - Personnel - Drill Down
9377
13
PFOM = (Rs – Gs) = (271– 62) = Rs 271
77
271 62
UNCLASSIFIED
PESTO Pillars - Equipment - Overview
• The equipment (E) pillar represents the equipment material condition for performing each assigned NMET and capability
• The E Pillar compares what equipment is authorized via the Current Readiness Standards to what is actually in the squadron
Authorized aircraft (flight line standard) Mission capable aircraft (RFT/RBA standard) Mission Systems (FLIR, Guns, PODS, etc)
• In DRRS-N, the E Pillar only considers the deployed standard for all equipment.
14
UNCLASSIFIED15
PESTO Pillars - Equipment - Standards
HSC CVN Current Readiness Standard
UNCLASSIFIED
PESTO Pillars - Equipment - Metrics
• Red, yellow and green bands have been established for equipment “assigned and “ready” using the deployment phase as the standard for an MCO
• Red, yellow and green bands have also been established for mission systems “assigned” and “ready”
Maintenance and Basic are red Intermediate and Sustainment are yellow Deployable is green
16
UNCLASSIFIED
PESTO Pillars - Equipment - Sample HS Metric
1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM.
2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships.
3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available.
16
UNCLASSIFIED
PESTO Pillars - Equipment - Sample HS Metric
1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM.
2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships.
3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available.
17
UNCLASSIFIED
PESTO Pillars - Equipment - Sample HS Metric
1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM.
2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships.
3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available.
18
(Partial mapping - for illustration only)
UNCLASSIFIED
PESTO Pillars - Equipment - Sample HS Metric
1. AMSRR supplies the data to the Aviation Data Warehouse (ADW) and AMFOM.
2. AMFOM uses the TMS-specific look up tables to determine aircraft and mission systems points-to-color relationships.
3. AMFOM also ties the equipment resources required to the capability (NTA). 4. DRRS-N displays the data in the E-pillar. Some drill down is available.
19
UNCLASSIFIED
PESTO Pillars - Equipment - Inputs/Data Flow
21
UNCLASSIFIED
PESTO Pillars - Equipment - Drill Down
22
In DRRS-N , expand the Capability Areas to view individual METS. Click on the E-Pillar score in a given MET to see the AMFOM drill down.
UNCLASSIFIED
PESTO Pillars - Equipment - Drill Down
23
Deployed Entitlement(Point tables)
Available (AMSRR Data)
Calculated Readiness
72
Unit T/M/S Standard
UNCLASSIFIED
PESTO Pillars - Training - Overview
• The training (T) pillar represents the performance and experience of the Squadron for performing each assigned NMET and capability
• NTIMS (the Navy Training Information Management System) calculates the values that are displayed in the T pillar of DRRS-N
24
UNCLASSIFIED
PESTO Pillars - Training - Metrics
• The Capabilities-based T&R Matrix supports DRRS-N by providing the mapping and Training Figure of Merit (TFOM) scores for the T-Pillar.
TFOM is a function of two factors;
Performance (Pf) and Experience (Ef)
TFOM metric is a measure that describes a unit’s training capability in a given NTA
• SHARP allows squadrons to collect flight and training data and feed that data to the TYCOM and the DRRS-N T pillar via a Current Readiness Assessment (CRA) report every 15 days.
25
View Performance (Pf) and Experience (Ef) Metrics on the next page.
UNCLASSIFIED
PESTO Pillars - Training - Metrics
If Ef <1 and Pf is held at .80.
Note:
COB = Crews on Board
SRS = Squadron Requirements Section
Pf =Number of Skilled Crews Complete
Number of Skilled Crews Required
Ef =Number of SRS Items Completed
Number of SRS Items Required
Note: When Ef is less than 100, Pf is capped at 80. This prevents a unit from showing green in the T-Pillar unless all squadron level requirements have been completed.
UNCLASSIFIED
PESTO Pillars - Training - Inputs/Data Flow
27
UNCLASSIFIED
PESTO Pillars - Training - Drill Down
28
100100
In DRRS-N , expand the Capability Areas to view individual METS. Click on the T-Pillar score in a given MET to see the TFOM drill down.
UNCLASSIFIED
PESTO Pillars - Training - Drill Down
Performance Factor Tab Experience Factor Tab
UNCLASSIFIED
Summary
30
This presentation covered:
UNCLASSIFIED
Summary
31