Acquisition Policy Changes:Acquisition Policy Changes:Systems Engineering FocusSystems Engineering Focus
Defense Acquisition Management System,Defense Acquisition Management System,DoD Instruction 5000.02DoD Instruction 5000.02
May 6, 2009
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
Dave FerrisChief Systems EngineerJoint Program Executive Office for
Chemical and Biological [email protected]
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
Systems Engineering (SE) Focus
• Agenda
– What is SE
– DoDI 5000.02 Revisions wrt SE
– SE Emphasis
– SE Technical Reviews
– Conclusion
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
What is Systems Engineering?
1. A Logical Sequence of Activities and Decisions Followed to Transform an Operational Need Into System Performance Parameters and a Preferred System Configuration
2. The Integration and Management of Engineering Specialties a. Design Engineeringb. Specialty Engineeringc. Test Engineeringd. Logistics Engineeringe. Production Engineering
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
Defense Acquisition Management System 2008
Full RateProd DR
JCDJoint Concepts FNAFAA
MS CMS B
OSD/JCS COCOM FCB
FSAStrategic Guidance
Incremental Development
MS A
User Needs
ICD TechDev CDD
Engineering & Manufacturing Development & Demonstration
CPDProduction & Deployment O&S
AoA
MDD
Materiel SolutionAnalysis
Technology Opportunities & Resources
Systems Engineering Is Throughout the Life-Cycle Systems Engineering Is Throughout the Life-Cycle
SYSTEMS ENGINEERING
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
Systems Engineering Related Regulatory Requirements Added/Revised For All Programs
Requirement Reference When Required CommentPreliminary Design
Review (PDR) Report DoDI 5000.02 Pre or Post MS B Assessment Conducted by MDA
Post Critical Design Review (CDR) Report DoDI 5000.02 Post-CDR
AssessmentAssessment
Conducted by MDA
Test & Evaluation Strategy DoDI 5000.02 MS A
Address Competitive
Prototype Testing
Technology Development Strategy DoDI 5000.02 MS A Describe Acquisition
Increments
Systems Engineering Plan (SEP) DoDI 5000.02 MS A, B, & C
MS A: Supports TDS
MSS B/C: Supports AS
IUID Implementation Plan DoDI 5000.02 MS B&C Summarized in SEP
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
IOCBA
Technology Opportunities & Resources
MaterielSolutionAnalysis
FRPDecisionReview
FOC
Materiel DevelopmentDecision
User Needs
Changes to Decision Points
Old (2003) New (2008) Change from 2003Concept Decision (CD)Materiel Development Decision
(MDD)MDD required prior to entering the process at any point
Design Readiness Review DRR
Post-CDR Assessment MDA’s assessment of PM’s CDR Report
PDR CDR
CDD CPD
ICD
AoA
Pre-Systems Acquisition Systems Acquisition Sustainment
Post CDRAssessment
PDR
Technology Developme
nt
Production & Deployment
Operations &
Support
Engineering and Manufacturing Development
Post-PDR Assessment MDA’s assessment of PM’s PDR Report (if PDR after MS B)
N/A
C
or
Post PDRAssessment
Defense Acquisition Management System 2008
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
PDR Before Milestone B•Planned for in Technology
Development Strategy•PDR Report provided to MDA at MS B
• Includes recommended requirements trades
B
Engineering & Manufacturing Development
C
TechnologyDevelopment
PDR CDR
CDD CPD
Post CDRAssessment
PDR
or
PDR After Milestone B•Planned for in Acquisition Strategy•PDR Report provided to MDA prior to
Post PDR Assessment•Reflects requirements trades•At Post PDR Assessment, MDA
considers PDR report; determines action(s) required to achieve APB objectives and issues ADM
Post PDRAssessment
Preliminary Design Review
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
Engineering & Manufacturing Development Two Major Efforts
B C
PDR CDR
CDD CPD
Post CDRAssessment
PDR
or
Integrated SystemDesign
System Capability &Manufacturing Process
Demonstration
Old (2003) New (2008) Change from 2003
System Design Integrated System Design Establishment of Product Baseline for all Configuration Items
System Demonstration
System Capability & Manufacturing Process Demonstration
Manufacturing processes effectively demonstrated; production-representative article(s) demonstrated in intended environment; T&E assesses improvements to mission capability and operational support based on user needs.
Post PDRAssessment
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
Systems Engineering: Renewed Emphasis
• Systems Engineering Plan (SEP) Required at Each Milestone
• MDA is Approval Authority for the SEP
• PEOs Must Have Lead Systems Engineer – Oversees SE Across PEOs Portfolio; Reviews SEPs; Assesses Performance of Subordinate Systems Engineers with PEO and PM
• Event-driven Technical Reviews Required – with SMEs Independent of Program, Unless Waived by MDA
• Requires Configuration Management to Establish and Control Product Attributes and the Technical Baseline
• Spectrum Supportability Determination Required, Where Applicable
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
Systems Engineering (Cont’d)
• ESOH Risk Management Required to be Integrated with Overall SE Process
• PESHE (Programmatic ESOH Evaluation) Required of all Programs Regardless of ACAT
• Requires PMs to Employ Modular Open Systems Approach to Designs
• Addresses PM Support of Mishap Accident Investigations
• Data Management Strategy Required to Assess Long-term Technical Data Needs of the System – Included in Acquisition Strategy (ACAT I & II Programs)
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
• Initial Technical Review (ITR)• Alternative Systems Review (ASR)• Systems Requirements Review
(SRR)• System Functional Review (SFR)• Preliminary Design Review (PDR)• Critical Design Review (CDR)• Post-PDR Assessment (Post-PDRA)
• Post-CDR Assessment (PCDRA)• Test Readiness Review (TRR)• System Verification Review (SVR)• Functional Configuration Audit
(FCA)• Production Readiness Review (PDR)• Operational Test Readiness Review
(OTRR)• Physical Configuration Audit (PCA)
• Technology Readiness Assessment (TRA)
• In-Service Review (ISR)
IOC
Technology Development
Engineering and Manufacturing Development
Production & Deployment
Operations &
SupportFRP DecisionReview
FOC
Post-CDR A
MaterielSolutionAnalysisMateriel Development Decision
BA CProgramInitiation
ITR ASR
TRA
SRR SFR PDR CDR
TRA
TRR SVR (FCA)/PRR
PCAISR
PostPDR A
PDR
or
Systems Engineering Technical Reviews
UNCLASSIFIED
Joint Program Executive Office for Chemical and Biological Defense
Near-Term Actions
Systems Engineering: Increased Rigor & Leadership-level Attention
Systems Engineering: Increased Rigor & Leadership-level Attention
• Detailed Checklist→Define the Systems Engineering Policy Difference→Old vs. New DoD 5000
• Team of Independent Engineers/Acquisition Analysts→Apply Checklist to Every Program by June 5, 2009→Define all DoD 5000 Systems Engineering “Compliance Gaps”
• Results →Provide Results to Joint Project Managers→Position JPMs to Engage in “What Makes Sense” Discussion with
JPEO→Close Compliance Gaps Where Prudent