26
UNCLASSIFIED LI 0526 - H-46 Series UNCLASSIFIED Navy Page 1 of 26 P-1 Line #34 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification Of Aircraft P-1 Line Item Nomenclature: 0526 - H-46 Series ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements: MDAP/MAIS Code(s): Resource Summary Prior Years FY 2012 FY 2013 # FY 2014 Base FY 2014 OCO ## FY 2014 Total FY 2015 FY 2016 FY 2017 FY 2018 To Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) 697.329 21.584 2.343 2.127 - 2.127 1.629 1.284 0.070 0.035 - 726.401 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P1) ($ in Millions) 697.329 21.584 2.343 2.127 - 2.127 1.629 1.284 0.070 0.035 - 726.401 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) 697.329 21.584 2.343 2.127 - 2.127 1.629 1.284 0.070 0.035 - 726.401 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost (Units in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost (Units in Dollars) - - - - - - - - - - - - # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The FY 2014 OCO Request will be submitted at a later date Description: This line item funds modifications to the H-46 aircraft. The H-46 is a twin-turbine powered dual-piloted tandem-rotor helicopter. The cabin contains provisions for accommodating 25 troops and crew members. The cabin also contains an integral cargo and rescue system. The overall goal of the modification budget in FY 2014 is to keep the H-46 a viable platform until a replacement aircraft can be fielded. H-46 helicopters are used by the Marine Corps for troop transport and search and rescue missions. United States Marine Corps inventory: total (83) aircrafts: (66) CH-46E active + (4) HH-46E active + (13) CH-46E reserve aircrafts. Average age of aircraft (as of December 2011) is currently 43 years (or 10,980 hours). Original design service life was 10,000 hours. It was subsequently extended to 12,500 hours on 18 December 1992 and to 15,000 hours on 16 February 1996. Aircraft can continue to be flown past 15,000 flight hours on an average age exploration program. Item Schedule Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 Total Item Nomenclature* Exhibits ID CD Unit Cost ($) Qty (Each) Total Cost ($ M ) Unit Cost ($) Qty (Each) Total Cost ($ M ) Unit Cost ($) Qty (Each) Total Cost ($ M ) Unit Cost ($) Qty (Each) Total Cost ($ M ) Unit Cost ($) Qty (Each) Total Cost ($ M ) Unit Cost ($) Qty (Each) Total Cost ($ M ) 1 - H-46 SAFETY (025-97) P3A 81.286 0.896 0.050 - - - 2 - H-46 GASSP (018-07) P3A 163.307 20.440 2.293 2.127 - 2.127 3 - H-46 AVIONICS UPGRADE (017-08) P3A 66.993 0.248 - - - - 4 - INACTIVE OSIPS P3A 385.743 - - - - - Total Gross/Weapon System Cost 697.329 21.584 2.343 2.127 - 2.127 Volume 2 - 251

UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

  • Upload
    others

  • View
    6

  • Download
    1

Embed Size (px)

Citation preview

Page 1: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 1 of 26 P-1 Line #34

Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1:Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements:MDAP/MAIS Code(s):

Resource SummaryPriorYears FY 2012 FY 2013#

FY 2014Base

FY 2014OCO##

FY 2014Total FY 2015 FY 2016 FY 2017 FY 2018

ToComplete Total

Procurement Quantity (Units in Each)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Cost ($ in Millions) 697.329 21.584 2.343 2.127   -     2.127 1.629 1.284 0.070 0.035   -     726.401Less PY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Net Procurement (P1) ($ in Millions) 697.329 21.584 2.343 2.127   -     2.127 1.629 1.284 0.070 0.035   -     726.401Plus CY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Total Obligation Authority ($ in Millions) 697.329 21.584 2.343 2.127 - 2.127 1.629 1.284 0.070 0.035 - 726.401

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Flyaway Unit Cost (Units in Dollars)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Unit Cost(Units in Dollars)

  -       -       -       -       -       -       -       -       -       -       -       -    

# FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012## The FY 2014 OCO Request will be submitted at a later dateDescription:This line item funds modifications to the H-46 aircraft. The H-46 is a twin-turbine powered dual-piloted tandem-rotor helicopter. The cabin contains provisions for accommodating 25 troops and crew members.The cabin also contains an integral cargo and rescue system. The overall goal of the modification budget in FY 2014 is to keep the H-46 a viable platform until a replacement aircraft can be fielded. H-46helicopters are used by the Marine Corps for troop transport and search and rescue missions. United States Marine Corps inventory: total (83) aircrafts: (66) CH-46E active + (4) HH-46E active + (13) CH-46Ereserve aircrafts. Average age of aircraft (as of December 2011) is currently 43 years (or 10,980 hours). Original design service life was 10,000 hours. It was subsequently extended to 12,500 hours on 18December 1992 and to 15,000 hours on 16 February 1996. Aircraft can continue to be flown past 15,000 flight hours on an average age exploration program.

Item Schedule Prior Years FY 2012 FY 2013 FY 2014 Base FY 2014 OCO FY 2014 Total

Item Nomenclature* ExhibitsIDCD

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

1 - H-46 SAFETY (025-97) P3A 81.286 0.896 0.050   -       -       -    

2 - H-46 GASSP (018-07) P3A 163.307 20.440 2.293 2.127   -     2.127

3 - H-46 AVIONICSUPGRADE (017-08)

P3A 66.993 0.248   -       -       -       -    

4 - INACTIVE OSIPS P3A 385.743   -       -       -       -       -    

Total Gross/WeaponSystem Cost

697.329 21.584 2.343 2.127 - 2.127

Volume 2 - 251

Page 2: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 2 of 26 P-1 Line #34

Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1:Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements:MDAP/MAIS Code(s):

Item Schedule FY 2015 FY 2016 FY 2017 FY 2018 To Complete Total

Item Nomenclature* ExhibitsIDCD

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

Unit Cost($)

Qty(Each)

Total Cost($ M )

1 - H-46 SAFETY (025-97) P3A   -       -       -       -       -     82.232

2 - H-46 GASSP (018-07) P3A 1.629 1.284 0.070 0.035   -     191.185

3 - H-46 AVIONICSUPGRADE (017-08)

P3A   -       -       -       -       -     67.241

4 - INACTIVE OSIPS P3A   -       -       -       -       -     385.743

Total Gross/WeaponSystem Cost

1.629 1.284 0.070 0.035 - 726.401

*Item Nomenclature represents Item Number, DODIC, and Item Name for the P40A and P5; Name for the P18 and P23; Modification Number and Modification Title for the P3A; Item Number and Item Name for the P10.Note: Totals in this Exhibit P-40 set may not be exact or add due to rounding.

Justification:

Volume 2 - 252

Page 3: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 3 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):1 - H-46 SAFETY (025-97)

Models of Systems Affected: H-46 SERIES H-46SERIES

Type Modification: SAFETY IMPROVEMENT( OSIP025-97 )

Related RDT&E PEs:

Resource SummaryPriorYears FY 2012 FY 2013#

FY 2014Base

FY 2014OCO##

FY 2014Total FY 2015 FY 2016 FY 2017 FY 2018

ToComplete Total

Procurement Quantity (Units in Each)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Cost ($ in Millions) 81.286 0.896 0.050   -       -       -       -       -       -       -       -     82.232Less PY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Net Procurement (P1) ($ in Millions) 81.286 0.896 0.050   -       -       -       -       -       -       -       -     82.232Plus CY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Total Obligation Authority ($ in Millions) 81.286 0.896 0.050 - - - - - - - - 82.232

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Unit Cost(Units in Dollars)

  -       -       -       -       -       -       -       -       -       -       -       -    

# FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012## The FY 2014 OCO Request will be submitted at a later date

Description:The Safety Improvement Program was directed by Chief of Naval Operations letter 7100 serial N880F/7U660758 dated 10 January 97, and approved as an Abbreviated Acquisition Program by the ProgramExecutive Officer on24 October 97. This program contains the following Engineering Change Proposals (ECP):

Current Active Modifications:1. HH-46E SEARCH AND RESCUE (SAR) CONVERSION: All Navy H-46Ds have been retired leaving the Marine Corp as the sole operator of the H-46D Type-Model-Series (TMS). The high flight hours onthe HH-46D airframes, poor engine reliability and obsolescence issues make this aircraft difficult and expensive to operate and maintain. This ECP will convert 4 CH-46E helicopters to the HH-46E configurationto perform the SAR mission, and will permit retirement of the H-46D TMS.

2. Blue Force Tracker (BFT): Identifies location of friendly forces of all services both ground and air, also provides a limited long range communication capability. BFT displays this information on a moving mapdisplay in the cockpit. Installs provisions on 154 aircraft and buys 61 mission kits for deploying aircraft. [Install Equipment - BFT Ship Integration] BFT is a stand-alone Situational Awareness (SA) transceiversystem employed on United States Marine Corps (USMC) aircraft and vehicles, and in their associated command posts. This system provides the Marine Expeditionary Unit and H-46 Squadron Commanders atactical/operational picture, and enhanced SA in their command post. When their command post is afloat, BFT installed aboard ship provides the Commander and Staff the ability to command and control (C2)forces from ship to objective movement. The BFT improves USMC aircrew and passengers survivability against hostile threats by upgrading the threat detection ability, reducing vulnerability by communicatingaircraft position to deconflict with friendly forces in the Area of Operations. This capability is currently being integrated aboard (11) Navy amphibious assault ships (9 - Landing Helicopter Docks, 1 - LandingPlatform Dock and 1 - Landing Ship Dock). These installs are non-permanent changes or temporary installs that will remain in place until replaced by BFT 2.

DEVELOPMENT STATUS / MAJOR DEVELOPMENT MILESTONES:Current Active Modifications:1. HH-46E SEARCH AND RESCUE (SAR) CONVERSION: This upgrade is complete.

Volume 2 - 253

Page 4: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 4 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):1 - H-46 SAFETY (025-97)

Models of Systems Affected: H-46 SERIES H-46SERIES

Type Modification: SAFETY IMPROVEMENT( OSIP025-97 )

Related RDT&E PEs:

2. BLUE FORCE TRACKER: Completing nonrecurring installations on ships. Integrating capability on aircraft continuing firmware/software upgrades.

ARCHIVE Modifications:1. UTILITY HYDRAULIC SYSTEM REDESIGN: This upgrade is complete.2. LOWER DUAL BOOST ACTUATOR: This upgrade is complete.3. NVG COMPATIBLE COCKPIT DOME LIGHT: This upgrade is complete.4. T58-16/402 RUNNING ENGINE WASH: This upgrade is complete.5. SLIDING RESCUE HATCH (HELL HOLE DOOR): This upgrade is complete.6. ALQ-157 INFRARED COUNTERMEASURES (IRCM): This upgrade is complete.7. AN/ALE-47 COUNTERMEASURES DISPENSING SYSTEM (CMDS): This ECP was approved 26 Feb 2004. This upgrade is complete.8. AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete.9. ALE-47 Expendable PODs: This upgrade is complete.10. CDNU: The CDNU update was cancelled when it was discovered that integration would have taken an extended period of time due to the complexity of the hardware and software design. Based on thetotal number of helicopters available for the installation and Five Year Rule considerations, it was decided that this program was no longer cost effective.

Volume 2 - 254

Page 5: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 5 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):1 - H-46 SAFETY (025-97)

Models of Systems Affected: H-46 SERIES H-46SERIES

Type Modification: SAFETY IMPROVEMENT( OSIP025-97 )

Related RDT&E PEs:

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

ProcurementH-46 SAFETY (025-97)

A KitsRecurring

1.1.1) A Kits Blue Force Tracker - Organic 154 / 2.170   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     154 / 2.170

1.1.2) HH-46E Search and Rescue (SAR) - NonOrganic 7 / 0.635   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     7 / 0.635

1.1.3) Mission Kits Blue Force Tracker - Organic 271 / 3.263   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     271 / 3.263

1.1.4) Tactical Operating Center Kits - Organic 130 / 0.449   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     130 / 0.449

1.1.5) Tactical Operating Center Kits (OCO) - Organic 10 / 0.382   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     10 / 0.382

1.1.6) Archived ECPs Non-Organic - Organic 3,247 / 38.141   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     3,247 / 38.141

1.1.7) Prior Year Installation Cost - Organic 1,676 / 14.960   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     1,676 / 14.960

Subtotal Recurring 5,495 / 60.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5,495 / 60.000

Non-Recurring1.2.1) Installation Kits N/R - Organic   -     / 3.760   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 3.760

Subtotal Non-Recurring - / 3.760 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 3.760

B KitsRecurring

2.1.1) Install Equipment - BFT Ship Integration -NonOrganic (1)

4 / 0.052 7 / 0.207   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     11 / 0.259

Subtotal Recurring 4 / 0.052 7 / 0.207 - / - - / - - / - - / - - / - - / - - / - - / - - / - 11 / 0.259

Non-Recurring2.2.1) ECO MOD/ALQ-157 - Organic   -     / 0.709   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.709

2.2.2) ECO NRE/NAVICP/ALQ-157 - Organic   -     / 0.815   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.815

Subtotal Non-Recurring - / 1.524 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.524

Total, H-46 SAFETY (025-97) 5,499 / 65.336 7 / 0.207 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5,506 / 65.543

Total Procurement, All Modifications 5,499 / 65.336 7 / 0.207 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5,506 / 65.543

Support3.1) Engineering Change Orders   -     / 0.000   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

3.2) Data   -     / 0.886   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.886

3.3) Training Equipment 10 / 0.141   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     10 / 0.141

3.4) Support Equipment   -     / 0.405   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.405

Volume 2 - 255

Page 6: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 6 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):1 - H-46 SAFETY (025-97)

Models of Systems Affected: H-46 SERIES H-46SERIES

Type Modification: SAFETY IMPROVEMENT( OSIP025-97 )

Related RDT&E PEs:

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

3.5) ILS   -     / 1.172   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 1.172

3.6) Other Support (2)   -     / 12.840   -     / 0.388   -     / 0.050   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 13.278

3.7) Other Support OCO   -     / 0.080   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.080

3.8) Interim Contractor Support   -     / 0.000   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total Support, All Modifications 15.524 0.388 0.050 - - - - - - - - 15.962

Total Procurement and Support 80.860 0.595 0.050 - - - - - - - - 81.505

H-46 SAFETY (025-97) Installation Cost   -     / 0.426   -     / 0.301   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.727

Total Installation Cost - / 0.426 - / 0.301 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.727

Total Cost (Procurement + Support + Installation) 81.286 0.896 0.050 - - - - - - - - 82.232

Volume 2 - 256

Page 7: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 7 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):1 - H-46 SAFETY (025-97)

Models of Systems Affected: H-46 SERIES H-46SERIES

Type Modification: SAFETY IMPROVEMENT( OSIP025-97 )

Related RDT&E PEs:

Manufacturer Information: H-46 SAFETY (025-97)Manufacturer Name: Various Manufacturer Location: VariousAdministrative Leadtime (in Months): 0 Production Leadtime (in Months): 0

Dates FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018Contract DatesDelivery Dates

 Installation: H-46 SAFETY (025-97) Method of Implementation: Depot Installation Name: HH-46E Search and Rescue (SAR)

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

All Prior Years 6 / 0.309 1 / 0.011   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     7 / 0.320

FY 2012   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2013   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2014   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2015   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2016   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2017   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2018   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

To Complete   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total 6 / 0.309 1 / 0.011   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     7 / 0.320

Installation ScheduleFY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TotIn 6 1   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     7Out 6   -     1   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     7

Volume 2 - 257

Page 8: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 8 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):1 - H-46 SAFETY (025-97)

Models of Systems Affected: H-46 SERIES H-46SERIES

Type Modification: SAFETY IMPROVEMENT( OSIP025-97 )

Related RDT&E PEs:

 Installation: H-46 SAFETY (025-97) Method of Implementation: NORFOLK NAVAL SHIPYARD Installation Name: Install Equipment - BFT Ship Integration

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

All Prior Years 2 / 0.117 2 / 0.040   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     4 / 0.157

FY 2012   -     /   -     1 / 0.250 6 /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     7 / 0.250

FY 2013   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2014   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2015   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2016   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2017   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2018   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

To Complete   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total 2 / 0.117 3 / 0.290 6 /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     11 / 0.407

Installation ScheduleFY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TotIn 2 1   -     1 1 1 1 2 2   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     11Out 2 1   -     1 1 1 1 2 2   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     11

 Installation: H-46 SAFETY (025-97) Method of Implementation: Organic - A Kits Blue Force Tracker Installation Quantity: 154

 

Installation: H-46 SAFETY (025-97)Method of Implementation: Not Installed - Mission Kits Blue ForceTracker Installation Quantity: 271

 

Installation: H-46 SAFETY (025-97)Method of Implementation: Not Installed - Tactical Operating CenterKits Installation Quantity: 130

 

Installation: H-46 SAFETY (025-97)Method of Implementation: Not Installed - Tactical Operating CenterKits (OCO) Installation Quantity: 10

 

Volume 2 - 258

Page 9: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 9 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):1 - H-46 SAFETY (025-97)

Models of Systems Affected: H-46 SERIES H-46SERIES

Type Modification: SAFETY IMPROVEMENT( OSIP025-97 )

Related RDT&E PEs:

Installation: H-46 SAFETY (025-97)Method of Implementation: Not Installed - Archived ECPs Non-Organic Installation Quantity: 3247

 

Installation: H-46 SAFETY (025-97)Method of Implementation: Not Installed - Prior Year InstallationCost Installation Quantity: 1676

 Installation: H-46 SAFETY (025-97) Method of Implementation: Not Installed - Training Equipment Installation Quantity: 10

Footnotes:(1) BFT Ship Integration Install Schedule: Quantity of (11) kits procured: (4 kits with prior year funds and 7 kits with FY12 funds). Installation: 11 Kits: 2-FY11, 3-FY12, 6-FY13.(2) Other Support cost in FY13 are required for BFT Ship Integration

Volume 2 - 259

Page 10: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 10 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):2 - H-46 GASSP (018-07)

Models of Systems Affected: H-46 Series Type Modification: SAFETY (HONA Category A) Related RDT&E PEs:

Resource SummaryPriorYears FY 2012 FY 2013#

FY 2014Base

FY 2014OCO##

FY 2014Total FY 2015 FY 2016 FY 2017 FY 2018

ToComplete Total

Procurement Quantity (Units in Each)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Cost ($ in Millions) 163.307 20.440 2.293 2.127   -     2.127 1.629 1.284 0.070 0.035   -     191.185Less PY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Net Procurement (P1) ($ in Millions) 163.307 20.440 2.293 2.127   -     2.127 1.629 1.284 0.070 0.035   -     191.185Plus CY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Total Obligation Authority ($ in Millions) 163.307 20.440 2.293 2.127 - 2.127 1.629 1.284 0.070 0.035 - 191.185

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Unit Cost(Units in Dollars)

  -       -       -       -       -       -       -       -       -       -       -       -    

# FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012## The FY 2014 OCO Request will be submitted at a later date

Description:Provides targeted initiatives to remedy the top age-related safety and reliability issues engineered to address the heavy wear-and-tear effects of high-tempo Overseas Contingency Operations (400% of plannedutilization rate) on CH-46 airframes and subsystems in order to ensure safe, reliable and effective aircraft operation throughout the United States Marine Corps Medium Lift transition period.

This Operational, Safety and Improvement Program will execute multiple Engineering Change Packages (ECPs), grouped in three sequential Block upgrades (A, B, and C). Elements within each Block upgradehave been grouped by similar complexities and lead times.Specific ECPs:1. Redesign and modernize wiring harnesses in airframe areas subject to high levels of heat, sand contamination and/or vibration.2. Redesign and modernize hydraulics subsystems using common or Commercial Off The Shelf (COTS) components.3. Redesign and improve portions of airframe structure subject to high levels of fatigue, corrosion and other stress.4. Improve and modernize critical avionics, Aircraft Survival Equipment and other aircraft systems to resolve obsolescence, reliability or safety issues using common, previously qualified or COTS solutions.5. Improve rotorhead bearing and seal liners in order to eliminate chrome plating in the overhaul process.

DEVELOPMENT STATUS / MAJOR DEVELOPMENT MILESTONES:Block A: This upgrade is complete.Block B and C: Installation of Block B & C (concurrent) is on going. Estimated completion date for all installations is FY13.

Volume 2 - 260

Page 11: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 11 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):2 - H-46 GASSP (018-07)

Models of Systems Affected: H-46 Series Type Modification: SAFETY (HONA Category A) Related RDT&E PEs:

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

ProcurementH-46 GASSP (018-07)

A KitsRecurring

1.1.1) GASSP Block A (A-Kit) - NonOrganic (3) 371 / 13.356   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     371 / 13.356

1.1.2) GASSP Block B (A-Kit) - NonOrganic (4) 146 / 4.645   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     146 / 4.645

1.1.3) GASSP Block C (A-Kit) - NonOrganic (5) 259 / 24.556 9 / 0.897   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     268 / 25.453

1.1.4) GASSP Kits (IMP Mod) - NonOrganic (6) 190 / 5.492   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     190 / 5.492

Subtotal Recurring 966 / 48.049 9 / 0.897 - / - - / - - / - - / - - / - - / - - / - - / - - / - 975 / 48.946

Non-Recurring1.2.1) NRE - Organic   -     / 6.582   -     /   -       -     / 0.710   -     / 0.250   -     /   -       -     / 0.250   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 7.542

Subtotal Non-Recurring - / 6.582 - / - - / 0.710 - / 0.250 - / - - / 0.250 - / - - / - - / - - / - - / - - / 7.542

B KitsRecurring

2.1.1) Installation Equipment - Organic (7) 6,169 / 46.010 2,696 / 7.599 1,100 / 0.750 1,290 / 0.900   -     /   -     1,290 / 0.900 1,240 / 0.800 860 / 0.600   -     /   -       -     /   -       -     /   -     13,355 / 56.659

Subtotal Recurring 6,169 / 46.010 2,696 / 7.599 1,100 / 0.750 1,290 / 0.900 - / - 1,290 / 0.900 1,240 / 0.800 860 / 0.600 - / - - / - - / - 13,355 / 56.659

Non-Recurring2.2.1) Installation Equipment N/R - Organic 1 / 10.952   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     1 / 10.952

Subtotal Non-Recurring 1 / 10.952 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 10.952

Total, H-46 GASSP (018-07) 7,136 / 111.593 2,705 / 8.496 1,100 / 1.460 1,290 / 1.150 - / - 1,290 / 1.150 1,240 / 0.800 860 / 0.600 - / - - / - - / - 14,331 /124.099

Total Procurement, All Modifications 7,136 / 111.593 2,705 / 8.496 1,100 / 1.460 1,290 / 1.150 - / - 1,290 / 1.150 1,240 / 0.800 860 / 0.600 - / - - / - - / - 14,331 /124.099

Support3.1) Engineering Change Orders   -     / 0.000   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

3.2) Data   -     / 1.319   -     / 0.396   -     / 0.183   -     / 0.182   -     /   -       -     / 0.182   -     / 0.282   -     / 0.150   -     /   -       -     /   -       -     /   -       -     / 2.512

3.3) Training Equipment (8) 8 / 0.492   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     8 / 0.492

3.4) Support Equipment   -     / 7.766   -     / 1.329   -     / 0.350   -     / 0.250   -     /   -       -     / 0.250   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 9.695

3.5) ILS   -     / 2.104   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 2.104

3.6) Other Support (9)   -     / 27.160   -     / 6.810   -     / 0.300   -     / 0.545   -     /   -       -     / 0.545   -     / 0.547   -     / 0.534   -     / 0.070   -     / 0.035   -     /   -       -     / 36.001

3.7) Interim Contractor Support   -     / 0.000   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Volume 2 - 261

Page 12: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 12 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):2 - H-46 GASSP (018-07)

Models of Systems Affected: H-46 Series Type Modification: SAFETY (HONA Category A) Related RDT&E PEs:

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

Total Support, All Modifications 38.841 8.535 0.833 0.977 - 0.977 0.829 0.684 0.070 0.035 - 50.804

Total Procurement and Support 150.434 17.031 2.293 2.127 - 2.127 1.629 1.284 0.070 0.035 - 174.903

H-46 GASSP (018-07) Installation Cost   -     / 12.873   -     / 3.409   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 16.282

Total Installation Cost - / 12.873 - / 3.409 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 16.282

Total Cost (Procurement + Support + Installation) 163.307 20.440 2.293 2.127 - 2.127 1.629 1.284 0.070 0.035 - 191.185

Volume 2 - 262

Page 13: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 13 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):2 - H-46 GASSP (018-07)

Models of Systems Affected: H-46 Series Type Modification: SAFETY (HONA Category A) Related RDT&E PEs:Manufacturer Information: H-46 GASSP (018-07)Manufacturer Name: Block C Mfg - PIF Manufacturer Location: Huntsville, AlabamaAdministrative Leadtime (in Months): 5 Production Leadtime (in Months): 1

Dates FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018Contract Dates Feb 2012Delivery Dates Mar 2012

 

Installation: H-46 GASSP (018-07)Method of Implementation: Contractor FMT & Concurrent withDepot Level Maintenance Installation Name: GASSP Block A (A-Kit)

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

All Prior Years 362 / 5.044 12 / 0.337   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     374 / 5.381

FY 2012   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2013   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2014   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2015   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2016   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2017   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2018   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

To Complete   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total 362 / 5.044 12 / 0.337   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     374 / 5.381

Installation ScheduleFY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TotIn 362 4 4 4   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     374Out 362   -     4 4 4   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     374

Volume 2 - 263

Page 14: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 14 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):2 - H-46 GASSP (018-07)

Models of Systems Affected: H-46 Series Type Modification: SAFETY (HONA Category A) Related RDT&E PEs: 

Installation: H-46 GASSP (018-07)Method of Implementation: Contractor FMT& Concurrent with DepotLevel Maintenance Installation Name: GASSP Block B (A-Kit)

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

All Prior Years 129 / 1.355 18 / 0.088   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     147 / 1.443

FY 2012   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2013   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2014   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2015   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2016   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2017   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2018   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

To Complete   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total 129 / 1.355 18 / 0.088   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     147 / 1.443

Installation ScheduleFY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TotIn 129 5 6 7   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     147Out 94 35 5 6 7   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     147

 

Installation: H-46 GASSP (018-07)Method of Implementation: Contractor FMT& Concurrent with DepotLevel Maintenance Installation Name: GASSP Block C (A-Kit)

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

All Prior Years 137 / 4.703 118 / 1.605 8 / 0.000   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     263 / 6.308

FY 2012   -     /   -     9 / 0.585   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     9 / 0.585

FY 2013   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2014   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2015   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2016   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2017   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Volume 2 - 264

Page 15: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 15 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):2 - H-46 GASSP (018-07)

Models of Systems Affected: H-46 Series Type Modification: SAFETY (HONA Category A) Related RDT&E PEs: 

Installation: H-46 GASSP (018-07)Method of Implementation: Contractor FMT& Concurrent with DepotLevel Maintenance Installation Name: GASSP Block C (A-Kit)

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

FY 2018   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

To Complete   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total 137 / 4.703 127 / 2.190 8 /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     272 / 6.893

Installation ScheduleFY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TotIn 137 31 32 32 32 8   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     272Out 86 51 31 32 32 32 8   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     272

 

Installation: H-46 GASSP (018-07)Method of Implementation: Contractor FMT& Concurrent with DepotLevel Maintenance Installation Name: GASSP Kits (IMP Mod)

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

All Prior Years 120 / 1.771 14 / 0.794   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     134 / 2.565

FY 2012   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2013   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2014   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2015   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2016   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2017   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2018   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

To Complete   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total 120 / 1.771 14 / 0.794   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     134 / 2.565

Volume 2 - 265

Page 16: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 16 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):2 - H-46 GASSP (018-07)

Models of Systems Affected: H-46 Series Type Modification: SAFETY (HONA Category A) Related RDT&E PEs: 

Installation: H-46 GASSP (018-07)Method of Implementation: Contractor FMT& Concurrent with DepotLevel Maintenance Installation Name: GASSP Kits (IMP Mod)

Installation ScheduleFY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TotIn 120 3 4 3 4   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     134Out 117 3 3 4 3 4   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     134

 Installation: H-46 GASSP (018-07) Method of Implementation: Organic - Installation Equipment Installation Quantity: 13355

 Installation: H-46 GASSP (018-07) Method of Implementation: Organic - Installation Equipment N/R Installation Quantity: 1

 Installation: H-46 GASSP (018-07) Method of Implementation: Not Installed - Training Equipment Installation Quantity: 8

Footnotes:(3) Block A Install Schedule: Qty of 374 GASSP Bloack A Installs = 119 each shipset + 1 trainer for Wire Strike Protection System (WSPS), 126 each shipset + 1 trainer for Electrical Hydraulic Pump (EHP) and126 each shipset + 1 trainer for Electrical Block Upgrade. The 3 trainer kits were bought under Training Equipment.(4) BLock B Install Schedule: Qty of 79 GASSP Block B Installs for AIMS enhancements with HTA + Qty of 68 Block B FY 2011 GASSP installs funded with FY 2009 OCO supplemental funding = 146 eachshipset + 1 trainer (prior year, procured under Training Equipment)(5) Block C Install Schedule: Qty of 272 GASSP Block C Installs = 58 each shipset for MDP & OH (+ 1 trainer), 93 each shipset for VOR/ILS (+1 trainer), 59 each shipset for ICS (+1 trainer), and 58 each shipset(+1 trainer) for PTU. Qty of 34 Block C FY 2011 GASSP installs funded with FY 2009 OCO supplemental funding. The 4 trainer kits were procured under Training Equipment.(6) IMP Install Schedule: Qty of (190) kits bought with Supplemental funds in Prior Years. Qty of 134 Install Equipment = 71 each shipset + 1 trainer for Sync Shaft Fairings, 62 each shipset for APU DeckUpgrades. Remaining kits no longer required and will be taken apart and moved to supply.(7) It has been determined that Depot level processing of Rotorheads (plating process) has caused cracks in stainless steel components. FY13 submission included NRE funding to qualify new rotorheadbearings and liners which will eliminate the need for plating of susceptible rotorhead components. FY14 baseline funding includes the procurement of new design liners and bearings. Installations will beaccomplished concurrent with rotorhead Depot level overhaul/repair.(8) 8 trainers consist of (3) for Block A; (1) for Block B and (4) for Block C Block A - (1) WSPS; (1) EHP and (1) Electrical Block Upgrade Block B - (1) AIMS Enhancement with HTA Block C - (1) MDP & OH; (1)VOR/ILS; (1) ICS and (1) PTU(9) It has been determined that Depot level processing of Rotorheads (plating process) has caused cracks in stainless steel components. The additional FY14 other support baseline funding is needed tosupport Rotorhead requirement.

Volume 2 - 266

Page 17: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 17 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):3 - H-46 AVIONICS UPGRADE (017-08)

Models of Systems Affected: H-46 SERIES Type Modification: CH-46 AVIONICS UPGRADEPROGRAM (OSIP 017-08)

Related RDT&E PEs:

Resource SummaryPriorYears FY 2012 FY 2013#

FY 2014Base

FY 2014OCO##

FY 2014Total FY 2015 FY 2016 FY 2017 FY 2018

ToComplete Total

Procurement Quantity (Units in Each)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Cost ($ in Millions) 66.993 0.248   -       -       -       -       -       -       -       -       -     67.241Less PY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Net Procurement (P1) ($ in Millions) 66.993 0.248   -       -       -       -       -       -       -       -       -     67.241Plus CY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Total Obligation Authority ($ in Millions) 66.993 0.248 - - - - - - - - - 67.241

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Unit Cost(Units in Dollars)

  -       -       -       -       -       -       -       -       -       -       -       -    

# FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012## The FY 2014 OCO Request will be submitted at a later date

Description:DESCRIPTION / JUSTIFICATION: The CH-46E has multiple avionics systems that are in need of upgrade. These systems include the cockpit information displays, the onboard navigation and communicationsystems and their perspective controls, the instrument flight required situational awareness systems and their associated displays and the survivability systems controls and displays.

LONG RANGE COMM: CH-46E aircraft perform missions over a wide area where they are outside of Line-Of-Sight (LOS) communication range. Mission changes, threat changes, and emergencies requirethat the crew have ability to communicate over long distances. Long Range Communication Integration provides over the horizon communication capability and mission flexibility. Funds for 50 mission kitsof Advanced Long Range Communication System for installation in deployed CH-46E helicopters operating in support of GWOT from land bases and Marine Expeditionary Units amphibious shipping. Oneoperational trainer will receive a partial install.

LAIRCM: Large Aircraft Infrared Counter Measure program (LAIRCM) meets an urgent requirement to improve the survivability of the CH-46E helicopter against infrared guided surface-to-air missiles. LAIRCMis a high-power directional infrared (IR) jammer. It is designed to defeat a wide range of infrared heat seeking missiles. Missile detection and tracking data is provided to the Signal processor by multi-colorinfrared sensors. The system includes a transformer-rectifier, an embedded Global Positioning System (GPS) inertial navigation system, 5 infrared missile warning sensors and 2 laser jammers. The system isdependent on GPS reception for precise location information. The GPS signal is protected by an Advanced Digital Antenna Program (ADAP), a GPS anti jam protection system. The systems will be installed on31 aircraft and 1 trainer.

DEVELOPMENT STATUS / MAJOR DEVELOPMENT MILESTONES:

LONG RANGE COMM: Preliminary Engineering Design completed May 2010. Preliminary Design Review (PDR) and Critical Design Review (CDR) completed. The equipment contract awarded March 2010with Rockwell Collins for 3 Validation/Verification kits. Installs began July 2010 and will complete in April 2013.

Volume 2 - 267

Page 18: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 18 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):3 - H-46 AVIONICS UPGRADE (017-08)

Models of Systems Affected: H-46 SERIES Type Modification: CH-46 AVIONICS UPGRADEPROGRAM (OSIP 017-08)

Related RDT&E PEs:

LAIRCM: Validation installation complete. Verification installations complete. Recurring installation began July 2010. All 32 installations will be completed in mid FY 2013. All equipment deliveries completed.All aircraft production A-kits complete and delivered. Completion date for all installs is FY13.

Volume 2 - 268

Page 19: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 19 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):3 - H-46 AVIONICS UPGRADE (017-08)

Models of Systems Affected: H-46 SERIES Type Modification: CH-46 AVIONICS UPGRADEPROGRAM (OSIP 017-08)

Related RDT&E PEs:

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

ProcurementH-46 AVIONICS UPGRADE (017-08)

A KitsRecurring

1.1.1) ARC-220 - NonOrganic 50 / 1.097   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     50 / 1.097

1.1.2) LAIRCM ADAP - NonOrganic 31 / 0.360   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     31 / 0.360

1.1.3) LAIRCM ADAP AE - Organic 31 / 0.545   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     31 / 0.545

1.1.4) LAIRCM ADAP Antenna - Organic 31 / 0.131   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     31 / 0.131

1.1.5) LAIRCM - Organic 128 / 22.325   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     128 / 22.325

1.1.6) LAIRCM Prior Year Installs - Organic   -     / 5.217   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 5.217

Subtotal Recurring 271 / 29.675 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 271 / 29.675

Non-Recurring1.2.1) ARC-210 - Organic   -     / 0.320   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.320

1.2.2) ARC-220 - Organic   -     / 0.280   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.280

Subtotal Non-Recurring - / 0.600 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.600

B KitsRecurring

2.1.1) ARC-210 - Organic 3 / 0.713   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     3 / 0.713

2.1.2) ARC-220 - Organic 51 / 2.922 1 / 0.054   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     52 / 2.976

2.1.3) LAIRCM - Organic 31 / 0.036   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     31 / 0.036

2.1.4) Heads Up Display (HUD) - Organic 264 / 3.834   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     264 / 3.834

Subtotal Recurring 349 / 7.505 1 / 0.054 - / - - / - - / - - / - - / - - / - - / - - / - - / - 350 / 7.559

Non-Recurring2.2.2) LAIRCM - Organic   -     / 5.847   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 5.847

Subtotal Non-Recurring - / 5.847 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 5.847

Total, H-46 AVIONICS UPGRADE (017-08) 620 / 43.627 1 / 0.054 - / - - / - - / - - / - - / - - / - - / - - / - - / - 621 / 43.681

Total Procurement, All Modifications 620 / 43.627 1 / 0.054 - / - - / - - / - - / - - / - - / - - / - - / - - / - 621 / 43.681

Support3.1) Data   -     / 1.617   -     / 0.019   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 1.636

3.2) Training Equipment   -     / 0.842   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.842

3.3) Support Equipment   -     / 1.159   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 1.159

Volume 2 - 269

Page 20: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 20 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):3 - H-46 AVIONICS UPGRADE (017-08)

Models of Systems Affected: H-46 SERIES Type Modification: CH-46 AVIONICS UPGRADEPROGRAM (OSIP 017-08)

Related RDT&E PEs:

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

3.4) ILS   -     / 0.125   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 0.125

3.5) Other Support   -     / 18.415   -     / 0.025   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 18.440

3.6) Interim Contractor Support   -     / 0.000   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total Support, All Modifications 22.158 0.044 - - - - - - - - - 22.202

Total Procurement and Support 65.785 0.098 - - - - - - - - - 65.883

H-46 AVIONICS UPGRADE (017-08) Installation Cost   -     / 1.208   -     / 0.150   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 1.358

Total Installation Cost - / 1.208 - / 0.150 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.358

Total Cost (Procurement + Support + Installation) 66.993 0.248 - - - - - - - - - 67.241

Volume 2 - 270

Page 21: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 21 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):3 - H-46 AVIONICS UPGRADE (017-08)

Models of Systems Affected: H-46 SERIES Type Modification: CH-46 AVIONICS UPGRADEPROGRAM (OSIP 017-08)

Related RDT&E PEs:

Manufacturer Information: H-46 AVIONICS UPGRADE (017-08)Manufacturer Name: Manufacturer Name Not Provided. Manufacturer Location: Manufacturer Location Not Provided.Administrative Leadtime (in Months): Production Leadtime (in Months):

Dates FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018Contract DatesDelivery Dates

 Installation: H-46 AVIONICS UPGRADE (017-08) Method of Implementation: Depot Installation Name: ARC-220

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

All Prior Years 22 / 1.137 28 / 0.000   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     50 / 1.137

FY 2012   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2013   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2014   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2015   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2016   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2017   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2018   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

To Complete   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total 22 / 1.137 28 /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     50 / 1.137

Installation ScheduleFY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TotIn 22 7 7 7 7   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     50Out 17 5 7 7 7 7   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     50

Volume 2 - 271

Page 22: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 22 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):3 - H-46 AVIONICS UPGRADE (017-08)

Models of Systems Affected: H-46 SERIES Type Modification: CH-46 AVIONICS UPGRADEPROGRAM (OSIP 017-08)

Related RDT&E PEs:

 Installation: H-46 AVIONICS UPGRADE (017-08) Method of Implementation: Contractor/Depot Installation Name: LAIRCM ADAP

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Installation CostQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

All Prior Years 1 / 0.071 18 / 0.150 12 / 0.000   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     31 / 0.221

FY 2012   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2013   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2014   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2015   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2016   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2017   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

FY 2018   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

To Complete   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -    

Total 1 / 0.071 18 / 0.150 12 /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -     31 / 0.221

Installation ScheduleFY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

APY 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 TC TotIn 1 2 2 8 6 6 6   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     31Out 1   -     2 2 8 6 6 6   -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -       -     31

 Installation: H-46 AVIONICS UPGRADE (017-08) Method of Implementation: Not Installed - LAIRCM ADAP AE Installation Quantity: 31

 Installation: H-46 AVIONICS UPGRADE (017-08) Method of Implementation: Not Installed - LAIRCM ADAP Antenna Installation Quantity: 31

 Installation: H-46 AVIONICS UPGRADE (017-08) Method of Implementation: Not Installed - LAIRCM Installation Quantity: 128

 Installation: H-46 AVIONICS UPGRADE (017-08) Method of Implementation: Not Installed - ARC-210 Installation Quantity: 3

 Installation: H-46 AVIONICS UPGRADE (017-08) Method of Implementation: Not Installed - ARC-220 Installation Quantity: 52

 Installation: H-46 AVIONICS UPGRADE (017-08) Method of Implementation: Not Installed - LAIRCM Installation Quantity: 31

 

Volume 2 - 272

Page 23: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 23 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):3 - H-46 AVIONICS UPGRADE (017-08)

Models of Systems Affected: H-46 SERIES Type Modification: CH-46 AVIONICS UPGRADEPROGRAM (OSIP 017-08)

Related RDT&E PEs:

Installation: H-46 AVIONICS UPGRADE (017-08) Method of Implementation: Not Installed - Heads Up Display (HUD) Installation Quantity: 264

Volume 2 - 273

Page 24: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 24 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):4 - INACTIVE OSIPS

Models of Systems Affected: [No Model Specified] Type Modification: [No Modification Type Specified] Related RDT&E PEs:

Resource SummaryPriorYears FY 2012 FY 2013#

FY 2014Base

FY 2014OCO##

FY 2014Total FY 2015 FY 2016 FY 2017 FY 2018

ToComplete Total

Procurement Quantity (Units in Each)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Cost ($ in Millions) 385.743   -       -       -       -       -       -       -       -       -       -     385.743Less PY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Net Procurement (P1) ($ in Millions) 385.743   -       -       -       -       -       -       -       -       -       -     385.743Plus CY Advance Procurement ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Total Obligation Authority ($ in Millions) 385.743 - - - - - - - - - - 385.743

(The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.)

Initial Spares ($ in Millions)   -       -       -       -       -       -       -       -       -       -       -       -    Gross/Weapon System Unit Cost(Units in Dollars)

  -       -       -       -       -       -       -       -       -       -       -       -    

# FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012## The FY 2014 OCO Request will be submitted at a later date

Description:

Volume 2 - 274

Page 25: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 25 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):4 - INACTIVE OSIPS

Models of Systems Affected: [No Model Specified] Type Modification: [No Modification Type Specified] Related RDT&E PEs:

Prior Years FY 2012 FY 2013FY 2014

BaseFY 2014

OCOFY 2014

Total FY 2015 FY 2016 FY 2017 FY 2018To

Complete Total

Financial PlanQty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )Qty (Each) /

Total Cost ($ M )

ProcurementINACTIVE OSIPS

A KitsRecurring

1.1.1) Inactive OSIP Total - Organic   -     / 385.743   -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     /   -       -     / 385.743

Subtotal Recurring - / 385.743 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 385.743

Total, INACTIVE OSIPS - / 385.743 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 385.743

Total Procurement, All Modifications - / 385.743 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 385.743

Total Procurement and Support 385.743 - - - - - - - - - - 385.743

Total Installation Cost - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / -

Total Cost (Procurement + Support + Installation) 385.743 - - - - - - - - - - 385.743

Volume 2 - 275

Page 26: UNCLASSIFIED - AeroWeb...AN/AAR-47(V)2 MISSILE WARNING SET INSTALLATION: This ECP was approved 26 Feb 2004. This upgrade is complete. 9. ALE-47 Expendable PODs: This upgrade is complete

UNCLASSIFIED

LI 0526 - H-46 Series UNCLASSIFIEDNavy Page 26 of 26 P-1 Line #34

Exhibit P-3A, Individual Modification: PB 2014 Navy Date: April 2013Appropriation / Budget Activity / Budget Sub Activity:1506N: Aircraft Procurement, Navy / BA 05: Modification ofAircraft / BSA 1: Modification Of Aircraft

P-1 Line Item Nomenclature:0526 - H-46 Series

Modification Nomenclature(Modification Number - ModificationTitle):4 - INACTIVE OSIPS

Models of Systems Affected: [No Model Specified] Type Modification: [No Modification Type Specified] Related RDT&E PEs:Manufacturer Information: INACTIVE OSIPSManufacturer Name: Manufacturer Name Not Provided. Manufacturer Location: Manufacturer Location Not Provided.Administrative Leadtime (in Months): Production Leadtime (in Months):

Dates FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018Contract DatesDelivery Dates

 Installation: INACTIVE OSIPS Method of Implementation: No Quantities Associated with Install Installation Quantity: 0

Volume 2 - 276