CONTEXTCrisis in Darfur has displaced 2 m people
• More than 1,000 villages destroyed or tokuls fallen apart
• Environmental degradation due to continued deforestation
• Continued reports on new attacks and displacements
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
BACKGROUND• CPA for Darfur without local political support
• Joint Assessment the first follow-up• Suspension of D-JAM in December 2006• Focus on preparing for early recovery
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
SITUATION ASSESSMENT (1)• Traditional reconstruction requires 16 million trees
• Traditional huts and fencing built of wood• Need to stop cutting of trees and forest
• Need an alternative approach: “woodless technology”
• Formation of ENTEC
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
SITUATION ASSESSMENT (2)• Relief operations using wood in constructions
• Reconstruction of schools and clinics by humanitarian community
• Local relief economy boosting on wood based products
• Fired bricks for construction and charcoal as household fuel
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
STRATEGIC PROPOSAL• Use time of displacement to develop and adapt new
technology• Train IDPs and leaders in camps
• Build demonstration houses• Select 3 types of construction technologies:
• stabilized soil blocks, green bricks and stones
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
COLLABORATIVE APPROACH• ENTEC TF gather all stakeholders (NGOs and UN)
UNRCO:• Framework Coordination
UNEP:• Mainstreaming of environmental issues and resource
managementUN-HABITAT:
• Reconstruction technology, urban integration, land dispute resolution
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
RECONSTRUCTION PRINCIPLES• Focus on sustainable reconstruction and recovery
• Support to community based reconstruction• Gender sensitive planning and implementation
• Engagement of all stakeholders• Limit import of building materials
• Promote reconstruction with livelihood opportunities
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
PREPARATORY ACTIVITIES• 1. Woodless building technologies and standards
• 2. A critical mass of IDP to be trained• 3. Facilitating community-based reconstruction• 4. Land and property restitution and village re-
planning mechanisms
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
EXPECTED RESULTS (1)• Three prototypes of woodless buildings
• Buy-in among key stakeholders for woodless technologies
• Standards for earth technology approved
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
EXPECTED RESULTS (2)• Thousands of IDPs trained in alternative construction
technologies• IDPs have capacity to reconstruct and maintain
buildings• Groups of IDPs have formed small construction
enterprises• Constructions of 30 demonstration buildings
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
EXPECTED RESULTS (3)• Durable models for mechanical compression of soil
blocks• Plan for manufacturing and distribution of
compression tools• Economic profiles of 2 selected towns
• Reconstruction support process and structure defined
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
EXPECTED RESULTS (4)• Leaders have capacity to facilitate village re-
planning• Compendium on land policies, practices and
agreements• Collude local dispute management practices
• Better knowledge on land dispute needs and
mechanisms
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
REPLICABILITY • Need to be better prepared prior to return processes
• Comprehensive settlements reintegration and recovery approach
• Sustainable relief and reconstruction policy• Approach replicable in other regions
UN-HABITATUN-HABITATPreparatory Programme for the Darfur ReconstructionPreparatory Programme for the Darfur Reconstruction
Activities were started in March 2007