UKUR BAHAN : quantity surveying Artikel ilmu ukur bahan untuk semua. Bersama kita maju dunia akhirat. Quantity surveying articles for everybody. Together we hopefully succeed in this temporary world and in the everlasting hereafter. Thursday, October 23, 2008 History of Quantity Surveying The quantity surveyor emerged in England at the beginning of the nineteenth century, although the firm of Henry Cooper and Sons of Reading was established as early as 1785. Prior to the first recorded usage of the term "quantity surveyor" in 1859, the terms "measurer", "custom surveyor" or "surveyor" were used. In those early days the quantity surveyor acted for the master tradesmen, measuring the work after completion and frequently submitting partisan Final Accounts to the building owner. As a direct result of these activities it increasingly became the practice of building owners to have work executed under contract and to call for tenders before any work was undertaken. A procedure therefore developed whereby building owners would approach an architect to design a building. Drawings and specifications were distributed to selected master builders, who would then submit tenders for the total price rather than a collection of prices from master tradesmen. The task of arriving at an accurate estimate of cost or tender can be carried out in only one way - that of measuring the quantities of all materials and labour necessary to complete the work, i.e. preparing bills of quantities. As each builder had to prepare his own bills of quantities for each project, they realised that it would be more economical for them as a group to

UKUR BAHAN

Embed Size (px)

DESCRIPTION

dqwd

Citation preview

Page 1: UKUR BAHAN

UKUR BAHAN : quantity surveying Artikel ilmu ukur bahan untuk semua. Bersama kita maju dunia akhirat. Quantity surveying articles for everybody. Together we hopefully succeed in this temporary world and in the everlasting hereafter.

Thursday, October 23, 2008

History of Quantity Surveying

The quantity surveyor emerged in England at the beginning of the

nineteenth century, although the firm of Henry Cooper and Sons of Reading

was established as early as 1785. Prior to the first recorded usage of the

term "quantity surveyor" in 1859, the terms "measurer", "custom surveyor"

or "surveyor" were used.

In those early days the quantity surveyor acted for the master tradesmen,

measuring the work after completion and frequently submitting partisan

Final Accounts to the building owner. As a direct result of these activities it

increasingly became the practice of building owners to have work executed

under contract and to call for tenders before any work was undertaken. A

procedure therefore developed whereby building owners would approach an

architect to design a building. Drawings and specifications were distributed

to selected master builders, who would then submit tenders for the total

price rather than a collection of prices from master tradesmen.

The task of arriving at an accurate estimate of cost or tender can be carried

out in only one way - that of measuring the quantities of all materials and

labour necessary to complete the work, i.e. preparing bills of quantities. As

each builder had to prepare his own bills of quantities for each project, they

realised that it would be more economical for them as a group to employ one

surveyor to measure quantities for them all. They would thus share the cost

of the surveyor, obtain an identical Bill of Quantities which ensured that they

would all be tendering on the same basis.

The building owner subsequently realised that it would be to his personal

Page 2: UKUR BAHAN

advantage to appoint and pay the fees of the quantity surveyor.

Thus the independent professional quantity surveyor gained consultant

status.

Islamic Calendar http://www.asaqs.co.za/public/history.html

Posted by ukur bahan : quantity surveying at 2:23 AM

2 comments:

Eko Supriyadi's Blog said...

Good historical script, we have same subject and I’ll really happy of it. Could

we keep on share any information about Civil Engineer,Quantity Surveying,

etc?

Regards

Monday, January 5, 2009 9:14:00 PM PST

ukur bahan : quantity surveying said...

Why not? Di persilakan kerana ilmu untuk di kongsi bersama-sama.

Tuesday, January 6, 2009 11:34:00 PM PST

Post a Comment

Newer Post Older Post Home

Subscribe to: Post Comments (Atom)

RIGHT is MIGHT

Page 3: UKUR BAHAN

We know that right will win eventualy.

Illegitimate and harsh actions by Israel all this while...will only hasten its death. It is just a

matter of time...and PALESTINE will be FREE again. 

Bersama Kita Jayakan

Kepada SEMUA pernah menyusun/mengarang artikel dalam bidang UKUR BAHAN dan suka

di manfaatkan ramai, tolong hantarkan kepada kami di [email protected] untuk

penerbitan di sini. Terima kasih banyak-banyak.

To ALL: If you would prefer to let others benefit from your QUANTITY SURVEYING articles,

please post yours to [email protected] . Thanks a lot.

Selamat menjadi QS yang berwibawa

Oleh kerana hidup ini hanyalah sementara jadi perlu sangatlah kita mengamalkan agama

dan menjaga akhlak kita supaya negara yang indah ini menjadi aman sejahtera.

Selamat menjadi QS yang berwibawa yang membantu agama Allah.

Blog Archive

►  2011 (4)

o ►  April (1)

SPNB lambat bayar kontraktor

o ►  January (3)

Kementerian Kerja Raya perkenal NeTI proses bida t...

Page 4: UKUR BAHAN

Contract for 3rd Bosporus bridge to be awarded nex...

Quantity Surveyors - A Glance

►  2010 (127)

o ►  December (4)

Seminar Series by SUAZ Consultancy & Solutions

Sektor pembinaan dijangka rancak 2011

Cost Control Of A Project

Tugas Dan Peranan Juruukur Bahan

o ►  November (15)

Perubahan Kerja (Variations of Works)

Penyerahan Kerja

Lukisan seperti di bina (As Built Drawing)

Pendudukan separa

Kecacatan

P.D.A, A.T.D.A dan A.C.D.A

Bayaran Pendahaluan

Pengumpulan Data Kos

Kontraktor Tidak Menyiapkan Kerja

Bon Pelaksanaan, Insuran Kerja, Insuran Liability ...

DOKUMEN TENDER / KONTRAK

Cara Bayaran Terhadap Tender, Sebut Harga, Dan Lan...

Akaun Muktamad

Bayaran Interim

Sektor pembinaan dicemari rasuah

o ►  October (19)

3 projek utama gagal kerana kronisme

Measured Term Maintenance Contract

Cost Reimbursable or Prime Cost

Construction Management

Design, Manage and Construct

Target Cost Design and Build

Design and Build

Management Contracting

Page 5: UKUR BAHAN

Target Cost Contracts

Schedules of Work

Specification and Drawings

Bills of Approximate Quantities

Bills of Quantities

Construction Procurement Guide

Preparing for a Successful Mediation

FAQs about Negotiation, Mediation, Arbatration and...

Why you need a Quantity Surveyor?

HISTORY OF THE ROLES AND RESPONSIBILITIES OF QUANT...

CURRENT ROLES AND RESPONSIBILITIES OF QUANTITY SUR...

o ►  September (17)

Tips to develop alliances

Why You Need Allies at Work : Tips About How to De...

Cambodia's Construction Boom

Cambodia's Economic Growth - the New Construction

Cambodian Building Boom

Delay and cost overruns in Vietnam large construct...

Teknologi dan Kejuruteraan di Zaman Kegemilangan I...

KERTAS TAKING-OFF

o ►  August (4)

o ►  July (16)

o ►  April (22)

o ►  February (30)

►  2009 (19)

o ►  November (10)

o ►  July (2)

o ►  June (1)

o ►  April (1)

o ►  March (1)

o ►  January (4)

▼  2008 (24)

Page 6: UKUR BAHAN

o ►  December (2)

o ►  November (2)

o ▼  October (11)

History of Quantity Surveying

WHAT ARE COST ENGINEERING, QUANTITY SURVEYING, AN...

WHEN DOES A VARIATION IN CONSTRUCTION BECOME A SEP...

Outsourcing and Quality Performance: Malaysia’s Pu...

Cost Engineering

What Liability Does A Quantity Surveyor Have If A ...

Discover the Health of the Quantity Surveyors Mark...

Learning From Other QS 2

Working in Dubai - Etiquette

Learning From Other QS 1

Cost Overrun

o ►  August (1)

o ►  June (1)

o ►  May (4)

o ►  April (3)

►  2007 (36)

o ►  September (6)

o ►  August (19)

o ►  July (5)

o ►  June (6)

Stats

Traffic Live