3
15/02/12 PUocXUemenW NoWice 1/3 hWWpV://ZZZ.deYbXVineVV.com/main/pndeWail.cfm?ID=EBRD29-816%2F12 Main Menu Business Directory Search Databank User Guide Account Information Copyright© Contact Us PROCUREMENT NOTICE Country: Ukraine Project: PAN-EUROPEAN CORRIDORS PROJECT Financing: European Bank for Reconstruction and Development Abstract: CONSULTANCY SERVICES: SUPERVISION OF WORKS FOR M05 ROAD REHABILITATION Sector: Transport Loan/Credit Number: Project ID No. 41805 Contract/Bid Number: Invitation for Expression of Interest Deadline: 13 March 2012 State Road Agency of Ukraine UKRAVTODOR Supervision of Works for M05 Road Rehabilitation (Pan-European Corridors. Repair of the Section of M05 Kyiv ± Odessa Road Phase II. Component 4: Contract 1 (km 17+740 – km 36+500), Contract 2 (km 42+000 – km 58+000), Contract 3 (km 58+000 – km 87+000) This notice follows the General Procurement Notice (GPN) for this project published on the Bank's Website on 15 June 2011. The State Road Agency of Ukraine - Ukravtodor (the “Employer”) intends applying the proceeds of a loan from the European Bank for Reconstruction and Development and European Investment Bank (the “Bank”) toward the cost of repair of sections of the M05 Road Kiev – Odessa. The works to be carried out include the rehabilitation of three sections of M05 Road (18.8 km, 16 km and 29 km long) and include roads, bridges, drainage and ancillary works. The Works are situated to the south of Kiev and follow the line of the existing M05 road, between village Chabany and interchange at km 87+000 (Bila Tserkva), excluding section km 36+500 – km 42+000. The Employer invites expressions of interest from suitably qualified firms who are interested in providing the services and carrying out the duties of the Engineer´ in accordance with the contract for all of the above works which will be based upon FIDIC-MDB Harmonised Edition of the Conditions of Contract for Construction, March 2006. The assignment is expected to start in summer 2012 and last up to 18 months (plus 12

Ukraine - 13.03 - Supervision of Works for M05 Road Rehabilitation - Procurement Notice

Embed Size (px)

DESCRIPTION

notice

Citation preview

Page 1: Ukraine - 13.03 - Supervision of Works for M05 Road Rehabilitation - Procurement Notice

15/02/12 Procurement Notice

1/3https://www.devbusiness.com/main/pndetail.cfm?ID=EBRD29-816%2F12

Main Menu

BusinessDirectory

Search

Databank

User Guide

AccountInformation

Copyright©

Contact Us

PROCUREMENT NOTICE

Country: Ukraine

Project: PAN-EUROPEAN CORRIDORS PROJECT

Financing: European Bank for Reconstruction and Development

Abstract: CONSULTANCY SERVICES: SUPERVISION OF

WORKS FOR M05 ROAD REHABILITATION

Sector: Transport

Loan/Credit Number: Project ID No. 41805

Contract/Bid Number: Invitation for Expression of Interest

Deadline: 13 March 2012

State Road Agency of Ukraine

UKRAVTODOR

Supervision of Works for M05 Road Rehabilitation

(Pan-European Corridors. Repair of the Section of M05 Kyiv – Odessa Road

Phase II. Component 4: Contract 1 (km 17+740 – km 36+500), Contract 2 (km

42+000 – km 58+000), Contract 3 (km 58+000 – km 87+000)

This notice follows the General Procurement Notice (GPN) for this project published on

the Bank's Website on 15 June 2011.

The State Road Agency of Ukraine - Ukravtodor (the “Employer”) intends applying theproceeds of a loan from the European Bank for Reconstruction and Development and

European Investment Bank (the “Bank”) toward the cost of repair of sections of the M05

Road Kiev – Odessa.

The works to be carried out include the rehabilitation of three sections of M05 Road

(18.8 km, 16 km and 29 km long) and include roads, bridges, drainage and ancillary

works.

The Works are situated to the south of Kiev and follow the line of the existing M05 road,

between village Chabany and interchange at km 87+000 (Bila Tserkva), excluding

section km 36+500 – km 42+000.

The Employer invites expressions of interest from suitably qualified firms who are

interested in providing the services and carrying out the duties of the Engineer´ in

accordance with the contract for all of the above works which will be based upon

FIDIC-MDB Harmonised Edition of the Conditions of Contract for Construction, March

2006.

The assignment is expected to start in summer 2012 and last up to 18 months (plus 12

Page 2: Ukraine - 13.03 - Supervision of Works for M05 Road Rehabilitation - Procurement Notice

15/02/12 Procurement Notice

2/3https://www.devbusiness.com/main/pndetail.cfm?ID=EBRD29-816%2F12

months Defect Liability Period).

The consultancy contract is expected to be financed from the proceeds of the loan and

consulting firms from any country are eligible for short listing and selection. The proceeds

of the Bank´s Loan will not be used for the purpose of any payment to person or entities,

or for any import of goods, if such payment is prohibited by a decision of the United

Nations Security Council taken under Chapter VII of the Charter of the United Nations

Short-listed qualified firms will be formally invited to submit proposals following this

invitation.

In order to determine the capability and experience of consulting firms seeking to beshort-listed, the information submitted shall include the following:

Company profile, organisation and staffing;

Details of experience or similar assignments undertaken in the previous five years,including their locations (the information submitted shall include for each project, as aminimum, the following: project title; contractual role of the firm; the presence of any

affiliate or parent companies and their respective roles; location; start and completiondates; value; name of the Client; funding source; objectives and brief narrative description

of the project, functions and tasks carried out, including applicable national and/orinternational codes and standards, and certification); and

CVs of staff available to work on the assignment If consulting firm has been found by a judicial process or other official enquiry to have

engaged in corrupt or fraudulent practices, details of the basis for the outcome of suchprocess or enquiry shall be provided with the expression of interest.

The Employer reserves the right not to shortlist consulting firms that have been found tohave engaged in corrupt or fraudulent practices regardless of the results of technical

evaluation of the expressions of interest

If a firm considers it does not possess all the required expertise for the assignment, it mayconsider forming a joint venture partnership with other firms. In such cases the

Expression of Interest should provide the aforementioned details for each partner and anindication which firm is the lead partner.

The above information should not exceed 40 pages.

Three (3) copies of the above information in Russian and one (1) copy in English shouldbe submitted to the address below in a sealed envelope marked Expression of Interest

for the Pan-European Corridors. Repair of the Section of M05 Kyiv – OdessaRoad Phase II. Component 4 (Contract 1 (km 17+740 – km 36+500), Contract 2

(km 42+000 – km 58+000), Contract 3 (km 58+000 – km 87+000) – SupervisionConsultant, for delivery not later than 14:00 Kiev time on 13 March 2012.

Further information may be obtained from:

Page 3: Ukraine - 13.03 - Supervision of Works for M05 Road Rehabilitation - Procurement Notice

15/02/12 Procurement Notice

3/3https://www.devbusiness.com/main/pndetail.cfm?ID=EBRD29-816%2F12

Contact: Mr. Igor Halashchuk, Head of PIU. Projects Implementation Unit.

51 Antonovicha (Gor`kogo) Str., office 708. Kiev 03150.

Ukraine. Tel/Fax: +38 044 287 70 60.

E-mail: [email protected] Number: EBRD29-816/12

UNDB Print Edition: Issue No. 816, 16 February 2012

Posted Online: 10 February 2012

View other procurement notices associated with this loan or credit

Copyright © 2012 United Nations