UK Tier 1 Centre. Glenn Patrick LHCb Software Week, 28 April 2006. UK Tier 1. Rutherford Appleton Laboratory. Diamond. Particle Physics. ISIS. 2005. 2004. LHCb. ATLAS. LHCb. ATLAS. BaBar. BaBar. UK Tier 1 Exploitation. Largest GridPP users by VO for 2005. BaBar. ATLAS. BIOMED. - PowerPoint PPT Presentation

Citation preview

Page 1: UK Tier 1 Centre

UK Tier 1 Centre

Glenn PatrickLHCb Software Week, 28 April 2006

Page 2: UK Tier 1 Centre

ISIS

UKTier 1

Diamond

ParticlePhysics

Rutherford Appleton Laboratory

Page 3: UK Tier 1 Centre

3Glenn Patrick LHCb Software Week – 28 April 2006

UK Tier 1 Exploitation

BaBar

LHCb

ATLAS

2004

2005

ATLAS

LHCb

BaBar

Page 4: UK Tier 1 Centre

Largest GridPP users by VO for

2005

NB: Excludes data from Cambridge – for Condor support in APEL see Dave Kant’s talk

ATLASBaBar

LHCb

ZEUSCMS

BIOMED

DZERO

LHCb Tier 1 = 505,921 KSI2K hoursLHCb Tier 2 = 983,050 KSI2K hours

Now 23 approved VOs

Page 5: UK Tier 1 Centre

5Glenn Patrick LHCb Software Week – 28 April 2006

UK Tier 1 CPU

Current capacity 830 KSI2K.Some units now 4 years old.

Extra 266 KSI2K delivered 10 March and should be available at start of May after 4 week load test.

Twin dual-core Opteron 270s:• 1GB RAM/core• 250 GB HDD

Total CPU Capacity = 1,096 KSI2K

Page 6: UK Tier 1 Centre

6Glenn Patrick LHCb Software Week – 28 April 2006

UK Tier 1 Disk

Current capacity 177TB.

Extra 168TB and 21 servers deliveredon 10 March.

Some teething problems. Fix has been generated and tested.

Hopefully, resume installation this week with target for end May.

Total Disk Storage ~308TB(after retirements).

Page 7: UK Tier 1 Centre

7Glenn Patrick LHCb Software Week – 28 April 2006

New SL8500 tape robot

New STK SL8500 tape robot.

•Replaces STK Powderhorn 99310 robot (single arm, 9940 drives)

•Funded by CCLRC. Entered service 28th March 2006.

•6,000 slots. Upgrade to 10,000 slots later in the year giving a capacity of 5 PBytes.

•8 mini robots mounting tapes – faster, more resilient.

•T10000 tape drives (Castor and not ADS at moment).

318TB(Feb) 336TB 446TB (extra T10K media)

Page 8: UK Tier 1 Centre

8Glenn Patrick LHCb Software Week – 28 April 2006

New SL8500 tape robot

Page 9: UK Tier 1 Centre

9Glenn Patrick LHCb Software Week – 28 April 2006

CASTOR2 Deployment

Mar-Apr Testing: functionality, interoperability and database stressing

May-Sep Spec and deploy hardware for production database

May Internal throughput testing with Tier 1 disk servers

Jun CERN Service Challenge throughput testing

Jul-Sep Create full production infrastructure;full deployment on Tier1

Sep-Nov Spec and deploy second phase production hardware to provide full required capacity

Apr 07 Startup of LHC using CASTOR at RAL

dCache available

until early

2007

Page 10: UK Tier 1 Centre

10Glenn Patrick LHCb Software Week – 28 April 2006

Tier 1 ServicesLHCb VO Box available since January 2006: lcgvo0339.gridpp.rl.ac.uk Configuration/service certificate by Raja

et al.

LHCbVO Box

DC06-02 requires database servicesupporting COOL and 3D in October.New hardware ordered: 4 servers – Dual AMD Opteron 250

(ATLAS and LHCb) 3.5TB storage array for both.Ref. Database workshop, RAL, 23 March

node03

node04

LHCbATLAS

node02

node01

Rutherford Appleton Laboratory

Page 11: UK Tier 1 Centre

11Glenn Patrick LHCb Software Week – 28 April 2006

UK CPU Allocations

LHCb(UK) Tier 2 CPU (KSI2K) – 20062006 Q2 2006 Q3 2006 Q4

1500 1500 700

LHCb(UK) Tier 1 CPU (KSI2K) – 2006

Apr May Jun Jul Aug Sep Oct Nov Dec

150 150 150 175 175 175 120 120 120

Overallocated – scale by 0.81

Underallocated

Page 12: UK Tier 1 Centre

12Glenn Patrick LHCb Software Week – 28 April 2006

T1 Experiment Shares

ATLASBaBar

LHCbCMS

LHCbKSI2K 1256

KSI2K 15011.95%

Page 13: UK Tier 1 Centre

13Glenn Patrick LHCb Software Week – 28 April 2006

UK Disk Allocations

LHCb(UK) Tier 1 Disk (TB) – 2006

Apr May Jun Jul Aug Sep Oct Nov Dec

10 10 40 40 40 40 45 45 45

? ? ? ? ? ? ?

Deployment of new disk?

If this fails, encouraged by GRIDPP to use Tier 2 disk!

32.2TB= 2.2TB stripped DST(DC06) + 30TB additional signal production

Page 14: UK Tier 1 Centre

14Glenn Patrick LHCb Software Week – 28 April 2006

UK Tape Allocations

LHCb(UK) Tier 1 Tape (TB) – 2006

Apr May Jun Jul Aug Sep Oct Nov Dec

20 20 20 40 40 60 60 60 60

? ? ? ? ? ? ? ? ?

Sum(all experiments)

372TB

Sum(all experiments)623TB

Page 15: UK Tier 1 Centre

15Glenn Patrick LHCb Software Week – 28 April 2006

UK Tier 1 Status

Total Available (April 2006)

CPU = 830 KSI2K (500 dual cpu)Disk = 177 TB (60 servers)Tape = 318 TB

Total Available (Later in 2006)

CPU = 1,096 KSI2K Disk = 308 TBTape = 446 TB

LHCb Tier 1 2006 (1/6 share)

CPU = 222 KSI2K Disk = 122 TBTape = 103 TB

LHCb(UK) Tier 1 (April 2006)

CPU = 150 KSI2K Disk = 10 TBTape = 20 TB

Page 16: UK Tier 1 Centre

16Glenn Patrick LHCb Software Week – 28 April 2006

The Future!GRIDPP1 Prototype Grid

£17M, complete.September 2001 – August 2004

GRIDPP2 Production Grid£16M, ongoing.

September 2004 – August 2007

GridPP3?

GRIDPP3 “Exploitation” Grid?PPARC have just issued the

call for a bid to cover the period2007 -2011. To be submitted

by 13 July. LHCb input required now.2007 – 2011