29
UIC CLASS I QUARTERLY REPORT for the LOST CREEK ISR PROJECT 2nd Quarter 2018 Lost Creek ISR, LLC Sweetwater County, WY UIC PERMIT 13-409 Prepared by Ur-Energy for Wyoming Department of Environmental Quality - Water Quality Division – Underground Injection Control July 27, 2018

UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

UIC CLASS I

QUARTERLY REPORT for the

LOST CREEK ISR PROJECT

2nd Quarter 2018

Lost Creek ISR, LLC Sweetwater County, WY

UIC PERMIT 13-409

Prepared by Ur-Energy for Wyoming Department of Environmental Quality -

Water Quality Division – Underground Injection Control

July 27, 2018

Page 2: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Lost Creek ISR Project UIC Class I Quarterly Report

2nd Quarter 2018

i

Contents 1.0 Introduction ................................................................................................................... 1

2.0 Summary Data ............................................................................................................. 2

3.0 Analytical Results ......................................................................................................... 5

4.0 Permit Exceedances..................................................................................................... 5

5.0 Alarms, Shut-Downs, and Corrective Actions ............................................................... 6

6.0 Summary of Well Tests or Workovers .......................................................................... 6

Tables Table 1A: Operational Data Summary for DDW1 Table 1B: Operational Data Summary for DDW3 Table 1C: Operational Data Summary for DDW4 Table 2: Cumulative Injection Volumes to Date Table 3: Analytical Results Summary Table 4: Summary of Exceedances Table 5: Summary of Automatic Pressure Shutoff Testing Figures Figure 1: Well Locations

Appendices Appendix 1: Daily Injection Pressures Appendix 2: Lab Report

Page 3: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Lost Creek ISR Project UIC Class I Quarterly Report

2nd Quarter 2018

1

1.0 Introduction

The period covered by this report is the second calendar quarter of 2018 from April 1 to June 30, 2018.

Three Class I disposal wells were operational during the reporting period: LC DW No. 1 (“DDW1”), LC DW No. 3 (“DDW3”), and LC DW No. 4 (“DDW4”). Well locations (labeled) are shown below in relation to the Permit to Mine boundary (green line):

FIGURE 1: Well Locations

All three wells were operated intermittently during the quarter. Operational data was monitored and recorded electronically and also recorded manually by operator each shift.

A revised UIC Permit 16-145 was issued on June 28, 2018 and was received by LCI just after the end of the quarter. The new stipulations of the Permit were implemented during the next quarter.

As per UIC Permit 13-409 requirements, the following elements from Section K(6) of have been included in this report:

Approx. location of Plant

Page 4: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Lost Creek ISR Project UIC Class I Quarterly Report

2nd Quarter 2018

2

a. Minimum, volume-weighted average, and maximum instantaneous injection rates for each well for each month

b. Minimum, average, and maximum daily injection pressures for each well for each month c. Total injection volume in barrels (bbl) for each well for each month, total for the quarter, and

cumulative volume of waste injected to date. d. Maximum and minimum annulus pressures for each month with alarm/kill pressure value e. Quarterly analytical results f. Permit exceedances during the quarter g. Any alarms or shutdowns and corrective actions h. Summary of well tests or workovers

2.0 Summary Data

Tables 1A, 1B, 1C, and 2 below provide a data summary for above items a, c, and d above. Data for item b above is provided in Appendix 1 including tables and charts of the daily injection pressure values.

TABLE 1A: Operational Data Summary for DDW1

PARAMETER UNITS

LC DW No. 1

April 2018 May 2018 June 2018 Quarterly Total/Min/ Max/Avg

Operation Time min 33,527 13,710 11,210 58,447 % Run Time % 78% 31% 26% 45% Injection Rate Minimum Instantaneous gpm 0 0 0 0 Injection Rate Average (TWA) gpm 1 2 2 1 Injection Rate Maximum Instantaneous gpm 2 2 2 2 Injection Rate Maximum Permit Limit gpm 50 50 Injection Pressure Daily Minimum psig 470 456 400 400 Injection Pressure Daily Average psig 561 537 515 538 Injection Pressure Daily Maximum psig 599 598 598 599 Injection Pressure Permit Limit (LSIP) psig 609 609 Injection Pressure Automatic Kill psig 600 600 Injection Volume gal 43,790 20,765 17,883 82,438 Injection Volume bbl 1,043 494 426 1,963 Annulus Pressure Minimum psig 243 230 225 225 Annulus Pressure Average psig 262 247 236 248 Annulus Pressure Maximum psig 279 264 249 279 Annulus Pressure Permit Limit psig 200-800 200-800 Annulus Pressure Automatic Kill psig N/A N/A

Page 5: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Lost Creek ISR Project UIC Class I Quarterly Report

2nd Quarter 2018

3

TABLE 1B: Operational Data Summary for DDW3

PARAMETER UNITS

LC DW No. 3

April 2018 May 2018 June 2018 Quarterly Total/Min/ Max/Avg

Operation Time min 31,283 32,604 33,637 97,524 % Run Time % 72% 73% 78% 74% Injection Rate Minimum Instantaneous gpm 0 0 0 0 Injection Rate Average (TWA) gpm 6 7 7 7 Injection Rate Maximum Instantaneous gpm 8 8 48 48 Injection Rate Maximum Permit Limit gpm 50 50 Injection Pressure Daily Minimum psig 773 731 709 709 Injection Pressure Daily Average psig 816 805 825 815 Injection Pressure Daily Maximum psig 864 853 867 867 Injection Pressure Permit Limit (LSIP) psig 915 915 Injection Pressure Automatic Kill psig 890 890 Injection Volume gal 181,833 220,859 234,145 636,836 Injection Volume bbl 4,329 5,259 5,575 15,163 Annulus Pressure Minimum psig 220 220 218 218 Annulus Pressure Average psig 243 231 246 240 Annulus Pressure Maximum psig 263 243 277 277 Annulus Pressure Permit Limit psig 200-800 200-800 Annulus Pressure Automatic Kill psig N/A N/A

Page 6: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Lost Creek ISR Project UIC Class I Quarterly Report

2nd Quarter 2018

4

TABLE 1C: Operational Data Summary for DDW4

PARAMETER UNITS

LC DW No. 4

April 2018 May 2018 June 2018 Quarterly Total/Min/ Max/Avg

Operation Time min 36,920 37,121 27,526 101,567 % Run Time % 85% 83% 64% 78% Injection Rate Minimum Instantaneous gpm 0 0 0 0 Injection Rate Average (TWA) gpm 7 8 8 8 Injection Rate Maximum Instantaneous gpm 8 24 38 38 Injection Rate Maximum Permit Limit gpm 50 50 Injection Pressure Daily Minimum psig 612 603 586 586 Injection Pressure Daily Average psig 683 696 710 696 Injection Pressure Daily Maximum psig 732 745 754 754 Injection Pressure Permit Limit (LSIP) psig 838 838 Injection Pressure Automatic Kill psig 825 825 Injection Volume gal 274,475 294,801 228,487 797,762 Injection Volume bbl 6,535 7,019 5,440 18,994 Annulus Pressure Minimum psig 232 224 220 220 Annulus Pressure Average psig 246 246 241 245 Annulus Pressure Maximum psig 282 287 274 287 Annulus Pressure Permit Limit psig 200-800 200-800 Annulus Pressure Automatic Kill psig N/A N/A

TABLE 2: Cumulative Injection Volumes to Date

TIME PERIOD UNITS LC DW No. 1 LC DW No. 3 LC DW No. 4

2013 bbl 14,625 N/A 6,471

2014 bbl 31,278 8,239 164,694

2015 bbl 14,966 130,113 105,999

2016 bbl 9,300 95,653 107,254

2017 bbl 10,414 10,414 10,414

2018Q1 bbl 1,246 16,863 16,863

2018Q2 bbl 1,963 15,163 18,994

CUMULATIVE TOTAL TO DATE bbl 83,792 276,444 430,689

Page 7: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Lost Creek ISR Project UIC Class I Quarterly Report

2nd Quarter 2018

5

3.0 Analytical Results

A quarterly grab sample in duplicate of the injectate was collected from the Plant waste water line upstream of the branch points to each individual well. Sample parameters pH, conductivity, and temperature were measured with a field meter at the sampling site or in the onsite lab and other applicable parameters were analyzed by Energy Laboratories in Casper, WY. Results of the sample analyses are summarized in Table 3 below and the associated lab report is included as Appendix 2.

TABLE 3: Analytical Results Summary

Sample ID: DDW-Injectate

Sample Date: 6/14/2018

Lab Analyte or Parameter Method Results Units pH SM4500-H+B 7.60 s.u.

Specific Cond. at 25°C 120.1 5,890 uS/cm

Temperature, field SM2550B 18.0 °C

Specific Gravity n/a 1.00 ---

Total Dissolved Solids SM2540C 3,470 mg/L

Bicarbonate SM2320B ND(5) mg/L

Carbonate SM2320B ND(5) mg/L

Chloride, total 300.0 1,230 mg/L

Sulfate, total 300.0 726 mg/L

Sulfide (as hydrogen sulfide) A4500-S F ND(0.01) mg/L

Arsenic, dissolved 200.8 ND(0.005) mg/L

Selenium, dissolved 200.8 0.068 mg/L

Vanadium, dissolved 200.8 ND(0.02) mg/L

Uranium, total 200.7 1.31 mg/L

Radium-226, total E903.0 1,020 pCi/L The only constituent with a defined Permit limit is pH which must have a value between 2.0 and 12.5. The measured value for pH of 7.60 was within the limit.

4.0 Permit Exceedances

No operational exceedances occurred during the quarter.

TABLE 4: Summary of Exceedances

Event Well Date Limit Exceeded Value Permit

Limit Comment

No events

Page 8: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Lost Creek ISR Project UIC Class I Quarterly Report

2nd Quarter 2018

6

5.0 Alarms, Shut-Downs, and Corrective Actions

Nominal shutdowns both automatic and manual occurred due to pressure limit shutoff or due to maintenance activity such as changing inline filters or repairs. Intermittent operation of the injection systems is typical.

All three injection wells were off line in June for several days due to site wide operational shut down for repair of a Plant automation system component.

6.0 Summary of Maintenance, Well Tests, or Workovers

Maintenance completed during the quarter included:

• Routine filter changes • Replacement of annulus nitrogen tank for each well as needed • DDW-1: 5/31/2018 Pump motor packing replacement • DDW-3: 6/7/2018 Replacement of a valve and broken fitting. Resulted in leak and short-term

increase in flow rate.

Testing of the pressure switches to verify operation of automatic shutdown occurred in June. Digital shutoff is tested by reducing the shutoff pressure setting to prevent test pressure from exceeding permit limit and verifying the system shuts off at that pressure. Results of the testing are summarized on Table 5:

TABLE 5: Summary of Automatic Pressure Shutoff Testing

Well

Permit Pressure

Limit (psi)

Test Date

Digital Shutoff Tested at (psi)

Digital Shutoff Reset

to (psi)

Digital Shutoff

Function

Analog Pressure Switch Shutoff At (psi)

Analog Pressure Switch

Function

DDW-1 609 6/16/2018 475 600 Pass 602 Pass

DDW-3 915 6/16/2018 800 890 Pass 910 Pass

DDW-4 838 6/16/2018 600 825 Pass 830 Pass

Page 9: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Lost Creek ISR Project UIC Class I Quarterly Report

2nd Quarter 2018

I

APPENDIX 1

Page 10: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-1 2nd Quarter 2018

Lost Creek ISR Project 13-409

Date

Daily Minimum Injection Pressure

(psi)

Daily Average Injection Pressure

(psi)

Daily Maximum Injection Pressure

(psi)

Automatic Shutdown Pressure

(psi)

Maximum Injection Pressure Limit (psi)

Comments

4/1/2018 573 581 584 600 6094/2/2018 570 578 583 600 6094/3/2018 563 568 573 600 6094/4/2018 556 583 602 600 6094/5/2018 539 576 593 600 6094/6/2018 567 593 599 600 6094/7/2018 545 578 590 600 6094/8/2018 567 587 592 600 6094/9/2018 564 577 589 600 6094/10/2018 561 564 568 600 6094/11/2018 546 569 585 600 6094/12/2018 514 549 573 600 6094/13/2018 541 559 573 600 6094/14/2018 535 541 553 600 6094/15/2018 549 563 574 600 6094/16/2018 571 585 593 600 6094/17/2018 571 583 593 600 6094/18/2018 569 574 581 600 6094/19/2018 570 585 593 600 6094/20/2018 526 567 595 600 6094/21/2018 522 551 557 600 6094/22/2018 549 555 568 600 6094/23/2018 539 572 588 600 6094/24/2018 496 514 539 600 6094/25/2018 474 484 496 600 6094/26/2018 469 512 541 600 6094/27/2018 483 513 542 600 6094/28/2018 538 550 562 600 6094/29/2018 524 554 584 600 6094/30/2018 558 568 575 600 6095/1/2018 563 574 587 600 6095/2/2018 584 593 598 600 6095/3/2018 576 582 591 600 6095/4/2018 577 585 594 600 6095/5/2018 522 561 598 600 6095/6/2018 490 504 522 600 6095/7/2018 477 516 557 600 6095/8/2018 553 569 585 600 6095/9/2018 493 514 553 600 6095/10/2018 482 531 565 600 6095/11/2018 491 522 566 600 6095/12/2018 487 522 545 600 609

1 of 12

Page 11: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-1 2nd Quarter 2018

Lost Creek ISR Project 13-409

Date

Daily Minimum Injection Pressure

(psi)

Daily Average Injection Pressure

(psi)

Daily Maximum Injection Pressure

(psi)

Automatic Shutdown Pressure

(psi)

Maximum Injection Pressure Limit (psi)

Comments

5/13/2018 521 541 559 600 6095/14/2018 555 563 570 600 6095/15/2018 532 540 546 600 6095/16/2018 513 539 554 600 6095/17/2018 479 493 513 600 6095/18/2018 478 517 525 600 6095/19/2018 523 524 525 600 6095/20/2018 523 529 536 600 6095/21/2018 529 533 536 600 6095/22/2018 510 521 530 600 6095/23/2018 483 500 510 600 6095/24/2018 496 505 515 600 6095/25/2018 511 527 538 600 6095/26/2018 537 541 544 600 6095/27/2018 530 543 544 600 6095/28/2018 544 553 561 600 6095/29/2018 557 565 570 600 6095/30/2018 534 556 570 600 6095/31/2018 456 492 536 600 6096/1/2018 440 465 488 600 6096/2/2018 485 508 528 600 6096/3/2018 526 539 550 600 6096/4/2018 542 551 556 600 6096/5/2018 526 533 544 600 6096/6/2018 471 503 538 600 6096/7/2018 444 456 471 600 6096/8/2018 430 445 498 600 6096/9/2018 497 540 559 600 6096/10/2018 551 557 568 600 6096/11/2018 533 570 586 600 6096/12/2018 577 588 594 600 6096/13/2018 530 576 599 600 6096/14/2018 560 575 584 600 6096/15/2018 547 553 563 600 6096/16/2018 552 566 589 600 6096/17/2018 526 572 596 600 6096/18/2018 521 557 576 600 6096/19/2018 556 556 556 600 609 Shut down - no flow6/20/2018 --- --- --- 600 609 Shut down - no flow6/21/2018 --- --- --- 600 609 Shut down - no flow6/22/2018 --- --- --- 600 609 Shut down - no flow6/23/2018 411 411 411 600 609 Shut down - no flow

2 of 12

Page 12: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-1 2nd Quarter 2018

Lost Creek ISR Project 13-409

Date

Daily Minimum Injection Pressure

(psi)

Daily Average Injection Pressure

(psi)

Daily Maximum Injection Pressure

(psi)

Automatic Shutdown Pressure

(psi)

Maximum Injection Pressure Limit (psi)

Comments

6/24/2018 402 402 402 600 609 Shut down - no flow6/25/2018 394 394 394 600 609 Shut down - no flow6/26/2018 403 404 405 600 609 Shut down - no flow6/27/2018 400 426 468 600 6096/28/2018 405 412 424 600 6096/29/2018 402 436 477 600 6096/30/2018 424 454 488 600 609

psi: pounds per square inch

3 of 12

Page 13: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-1 2nd Quarter 2018

Lost Creek ISR Project 13-409

Press. Exc. 1Press. Exc. 1

0

100

200

300

400

500

600

700

3/24/2018

3/31/2018

4/7/2018

4/14/2018

4/21/2018

4/28/2018

5/5/2018

5/12/2018

5/19/2018

5/26/2018

6/2/2018

6/9/2018

6/16/2018

6/23/2018

6/30/2018

7/7/2018

DDW‐1

Max Inj Pressure Limit Daily Maximum Injection Pressure (psi) Daily Average Injection Pressure (psi) Daily Minimum Injection Pressure (psi)

4 of 12

Page 14: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-3 2nd Quarter 2018

Lost Creek ISR Project 13-409

Date

Daily Minimum Injection Pressure

(psi)

Daily Average Injection Pressure

(psi)

Daily Maximum Injection Pressure

(psi)

Automatic Shutdown Pressure

(psi)

Maximum Injection Pressure Limit (psi)

Comments

4/1/2018 797 807 842 890 9154/2/2018 841 848 859 890 9154/3/2018 807 826 850 890 9154/4/2018 787 797 808 890 9154/5/2018 772 787 794 890 9154/6/2018 779 800 815 890 9154/7/2018 774 782 808 890 9154/8/2018 768 794 801 890 9154/9/2018 798 825 843 890 915

4/10/2018 787 820 846 890 9154/11/2018 772 780 796 890 9154/12/2018 766 798 830 890 9154/13/2018 815 822 841 890 9154/14/2018 840 846 852 890 9154/15/2018 811 826 859 890 9154/16/2018 811 828 844 890 9154/17/2018 836 844 856 890 9154/18/2018 810 834 865 890 9154/19/2018 803 815 830 890 9154/20/2018 810 832 850 890 9154/21/2018 802 832 841 890 9154/22/2018 835 840 845 890 9154/23/2018 836 847 867 890 9154/24/2018 808 820 837 890 9154/25/2018 796 810 831 890 9154/26/2018 790 800 820 890 9154/27/2018 783 800 812 890 9154/28/2018 764 789 805 890 9154/29/2018 769 796 818 890 9154/30/2018 815 825 834 890 9155/1/2018 808 811 818 890 9155/2/2018 803 822 841 890 9155/3/2018 792 809 824 890 9155/4/2018 775 786 800 890 9155/5/2018 764 780 804 890 9155/6/2018 802 814 825 890 9155/7/2018 823 830 837 890 9155/8/2018 772 791 831 890 9155/9/2018 735 749 773 890 915

5/10/2018 731 770 800 890 9155/11/2018 760 779 803 890 9155/12/2018 757 778 801 890 915

5 of 12

Page 15: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-3 2nd Quarter 2018

Lost Creek ISR Project 13-409

Date

Daily Minimum Injection Pressure

(psi)

Daily Average Injection Pressure

(psi)

Daily Maximum Injection Pressure

(psi)

Automatic Shutdown Pressure

(psi)

Maximum Injection Pressure Limit (psi)

Comments

5/13/2018 800 821 832 890 9155/14/2018 795 814 826 890 9155/15/2018 751 776 806 890 9155/16/2018 780 804 827 890 9155/17/2018 778 796 811 890 9155/18/2018 794 807 822 890 9155/19/2018 790 804 819 890 9155/20/2018 758 779 797 890 9155/21/2018 762 798 823 890 9155/22/2018 785 816 841 890 9155/23/2018 834 838 842 890 9155/24/2018 776 805 846 890 9155/25/2018 797 822 839 890 9155/26/2018 838 845 850 890 9155/27/2018 823 846 854 890 9155/28/2018 760 794 847 890 9155/29/2018 769 805 836 890 9155/30/2018 802 824 838 890 9155/31/2018 801 829 844 890 9156/1/2018 843 848 854 890 9156/2/2018 798 818 854 890 9156/3/2018 801 816 854 890 9156/4/2018 853 862 868 890 9156/5/2018 828 850 868 890 9156/6/2018 785 820 832 890 9156/7/2018 709 798 823 890 9156/8/2018 773 791 824 890 9156/9/2018 805 825 849 890 915

6/10/2018 785 801 815 890 9156/11/2018 814 830 841 890 9156/12/2018 784 808 842 890 9156/13/2018 784 790 813 890 9156/14/2018 803 816 858 890 9156/15/2018 835 840 858 890 9156/16/2018 839 853 861 890 9156/17/2018 827 847 863 890 9156/18/2018 841 848 852 890 9156/19/2018 849 849 849 890 915 Shut down - no flow6/20/2018 749 749 749 890 915 Shut down - no flow6/21/2018 791 808 817 890 9156/22/2018 785 811 831 890 9156/23/2018 751 779 837 890 915

6 of 12

Page 16: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-3 2nd Quarter 2018

Lost Creek ISR Project 13-409

Date

Daily Minimum Injection Pressure

(psi)

Daily Average Injection Pressure

(psi)

Daily Maximum Injection Pressure

(psi)

Automatic Shutdown Pressure

(psi)

Maximum Injection Pressure Limit (psi)

Comments

6/24/2018 756 807 833 890 9156/25/2018 827 830 838 890 9156/26/2018 837 855 880 890 9156/27/2018 849 855 862 890 9156/28/2018 849 853 860 890 9156/29/2018 785 835 863 890 9156/30/2018 782 790 817 890 915

psi: pounds per square inch

7 of 12

Page 17: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-3 2nd Quarter 2018

Lost Creek ISR Project 13-409

Press. Exc. 1Press. Exc. 1

0

100

200

300

400

500

600

700

800

900

1000

3/24/2018

3/31/2018

4/7/2018

4/14/2018

4/21/2018

4/28/2018

5/5/2018

5/12/2018

5/19/2018

5/26/2018

6/2/2018

6/9/2018

6/16/2018

6/23/2018

6/30/2018

7/7/2018

DDW‐3

Max Inj Pressure Limit Daily Maximum Injection Pressure (psi) Daily Average Injection Pressure (psi) Daily Minimum Injection Pressure (psi)

8 of 12

Page 18: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-4 2nd Quarter 2018

Lost Creek ISR Project 13-409

Date

Daily Minimum Injection Pressure

(psi)

Daily Average Injection Pressure

(psi)

Daily Maximum Injection Pressure

(psi)

Shutdown Pressure

(psi)

Maximum Injection Pressure Limit (psi)

Comments

4/1/2018 644 663 687 825 8384/2/2018 679 686 696 825 8384/3/2018 669 679 687 825 8384/4/2018 664 668 676 825 8384/5/2018 639 668 676 825 8384/6/2018 638 666 677 825 8384/7/2018 614 640 659 825 8384/8/2018 610 659 678 825 8384/9/2018 674 694 702 825 8384/10/2018 612 657 699 825 8384/11/2018 612 643 663 825 8384/12/2018 661 679 687 825 8384/13/2018 653 694 711 825 8384/14/2018 683 708 718 825 8384/15/2018 628 676 686 825 8384/16/2018 665 693 713 825 8384/17/2018 636 656 691 825 8384/18/2018 621 655 693 825 8384/19/2018 615 671 696 825 8384/20/2018 692 704 711 825 8384/21/2018 696 705 713 825 8384/22/2018 701 706 713 825 8384/23/2018 711 726 731 825 8384/24/2018 726 729 733 825 8384/25/2018 699 727 746 825 8384/26/2018 697 720 726 825 8384/27/2018 681 706 719 825 8384/28/2018 628 649 688 825 8384/29/2018 685 690 695 825 8384/30/2018 658 683 696 825 8385/1/2018 638 683 699 825 8385/2/2018 657 688 705 825 8385/3/2018 647 675 702 825 8385/4/2018 652 687 702 825 8385/5/2018 651 684 720 825 8385/6/2018 697 706 713 825 8385/7/2018 664 705 716 825 8385/8/2018 627 667 700 825 8385/9/2018 640 675 699 825 8385/10/2018 621 663 679 825 8385/11/2018 622 637 679 825 8385/12/2018 626 656 689 825 838

9 of 12

Page 19: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-4 2nd Quarter 2018

Lost Creek ISR Project 13-409

Date

Daily Minimum Injection Pressure

(psi)

Daily Average Injection Pressure

(psi)

Daily Maximum Injection Pressure

(psi)

Shutdown Pressure

(psi)

Maximum Injection Pressure Limit (psi)

Comments

5/13/2018 681 691 700 825 8385/14/2018 661 680 688 825 8385/15/2018 678 689 705 825 8385/16/2018 701 716 722 825 8385/17/2018 715 720 726 825 8385/18/2018 695 704 727 825 8385/19/2018 683 695 716 825 8385/20/2018 651 663 694 825 8385/21/2018 689 707 730 825 8385/22/2018 683 718 733 825 8385/23/2018 693 719 741 825 8385/24/2018 692 724 729 825 8385/25/2018 713 732 741 825 8385/26/2018 735 742 758 825 8385/27/2018 697 723 749 825 8385/28/2018 600 635 668 825 8385/29/2018 665 712 731 825 8385/30/2018 686 719 756 825 8385/31/2018 726 737 744 825 8386/1/2018 712 739 750 825 8386/2/2018 681 699 716 825 8386/3/2018 694 723 751 825 8386/4/2018 743 750 755 825 8386/5/2018 675 723 750 825 8386/6/2018 654 711 719 825 8386/7/2018 669 709 736 825 8386/8/2018 731 738 748 825 8386/9/2018 698 739 757 825 8386/10/2018 664 692 723 825 8386/11/2018 682 707 731 825 8386/12/2018 672 681 695 825 8386/13/2018 658 686 707 825 8386/14/2018 691 717 747 825 8386/15/2018 680 728 750 825 8386/16/2018 722 744 750 825 8386/17/2018 730 751 756 825 8386/18/2018 692 728 756 825 8386/19/2018 692 692 692 825 838 Shut down - no flow6/20/2018 631 631 631 825 838 Shut down - no flow6/21/2018 686 686 686 825 8386/22/2018 686 686 686 825 8386/23/2018 637 637 637 825 838

10 of 12

Page 20: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-4 2nd Quarter 2018

Lost Creek ISR Project 13-409

Date

Daily Minimum Injection Pressure

(psi)

Daily Average Injection Pressure

(psi)

Daily Maximum Injection Pressure

(psi)

Shutdown Pressure

(psi)

Maximum Injection Pressure Limit (psi)

Comments

6/24/2018 655 655 655 825 8386/25/2018 635 635 635 825 8386/26/2018 609 638 685 825 8386/27/2018 681 698 709 825 8386/28/2018 668 707 725 825 8386/29/2018 643 666 685 825 8386/30/2018 586 618 669 825 838

psi: pounds per square inch

11 of 12

Page 21: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

APPENDIX 1: Daily Injection PressuresDDW-4 2nd Quarter 2018

Lost Creek ISR Project 13-409

Press. Exc. 1Press. Exc. 1

0

100

200

300

400

500

600

700

800

900

3/24/2018

3/31/2018

4/7/2018

4/14/2018

4/21/2018

4/28/2018

5/5/2018

5/12/2018

5/19/2018

5/26/2018

6/2/2018

6/9/2018

6/16/2018

6/23/2018

6/30/2018

7/7/2018

DDW‐4

Daily Minimum Injection Pressure (psi) Daily Average Injection Pressure (psi)

Daily Maximum Injection Pressure (psi) Maximum Injection Pressure Limit (psi)

12 of 12

Page 22: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Lost Creek ISR Project UIC Class I Quarterly Report

2nd Quarter 2018

II

APPENDIX 2

Page 23: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report
Page 24: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

7/24/2018Date:

1673 Terra Avenue, Sheridan, Wyoming 82801 ph: (307) 672-8945Inter-Mountain Labs

Your Environmental Monitoring Partner

Project: Lost Creek Class ICLIENT: UR-Energy

Lab Order: S1806306

CASE NARRATIVE

Report ID: S1806306001

Sample DDW Injectate was received on June 18, 2018.

All samples were received and analyzed within the EPA recommended holding times, except those noted below in this case narrative. Samples were analyzed using the methods outlined in the following references:

"Standard Methods For The Examination of Water and Wastewater", approved method versionsTest Methods for Evaluating Solid Waste, Physical/Chemical Methods, SW-846, 3rd Edition40 CFR Parts 136 and 14140 CFR Part 50, Appendices B, J, L, and OMethods indicated in the Methods Update Rule published in the Federal Register Friday, May 18, 2012ASTM approved and recognized standards

All Quality Control parameters met the acceptance criteria defined by EPA and Inter-Mountain Laboratories except as indicated in this case narrative.

Page 1 of 1Wade Nieuwsma, Assistant Laboratory Manager

Reviewed by:

Page 25: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Comments

Analyses Result QualUnits Date Analyzed/InitRL Method

Sample Analysis Report

1673 Terra Avenue, Sheridan, Wyoming 82801 ph: (307) 672-8945Inter-Mountain Labs

Your Environmental Monitoring Partner

Company: UR-Energy

ProjectName: Lost Creek Class ILab ID: S1806306-001ClientSample ID: DDW InjectateCOC: 176241

WorkOrder: S1806306CollectionDate: 6/14/2018 2:00:00 PMDateReceived: 6/18/2018 10:57:00 AMFieldSampler: JRMatrix: Water

Report ID S1806306001Date Reported 7/24/2018

5880 Enterprise Dr. Suite 200Casper, WY 82609

PWS ID:

Anions/Cations06/18/2018 2301Alkalinity, Total (As CaCO3) ND mg/L SM 2320B IBS5

06/18/2018 2301Alkalinity, Bicarbonate as HCO3 ND mg/L SM 2320B IBS5

06/18/2018 2301Alkalinity, Carbonate as CO3 ND mg/L SM 2320B IBS5

06/20/2018 2213Chloride 1230 mg/L EPA 300.0 AB1

06/19/2018 1821Sulfate 726 mg/L EPA 300.0 AB1

General Parameters06/18/2018 2301Electrical Conductivity 5890 µmhos/cm SM 2510B IBS5

06/18/2018 2301pH 7.6 s.u. SM 4500 H B IBS0.1

06/19/2018 716Specific Gravity 1.00 20°C/4°C ASTM D1429-08 KB0.01

06/19/2018 750Sulfide as H2S ND mg/L HACH 8131 KB0.01

06/18/2018 1719Total Dissolved Solids (180) 3470 mg/L SM 2540 NLG10

Metals - Total06/22/2018 340Arsenic ND mg/L EPA 200.8 MS0.005

06/22/2018 340Selenium 0.068 mg/L EPA 200.8 MS0.001

06/22/2018 340Uranium 1.31 mg/L EPA 200.8 MS0.0003

06/22/2018 340Vanadium ND mg/L EPA 200.8 MS0.02

Radionuclides - Dissolved07/17/2018 1218Radium 226 1020 pCi/L SM 7500 Ra-B MB0.2

07/17/2018 1218Radium 226 Precision (±) 3.4 pCi/L SM 7500 Ra-B MB

Qualifiers:

Page 1 of 1Wade Nieuwsma, Assistant Laboratory Manager

Reviewed by:

These results apply only to the samples tested. RL - Reporting Limit

B Analyte detected in the associated Method Blank C Calculated ValueE Value above quantitation range G Analyzed at IML Gillette laboratoryH Holding times for preparation or analysis exceeded J Analyte detected below quantitation limitsL Analyzed by another laboratory M Value exceeds Monthly Ave or MCL or is less than LCL

ND Not Detected at the Reporting Limit O Outside the Range of DilutionsS Spike Recovery outside accepted recovery limits U Analysis reported under the reporting limitX Matrix Effect

Page 26: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Project: Lost Creek Class I

CLIENT: UR-Energy

Work Order: S1806306

ANALYTICAL QC SUMMARY REPORT

Report ID: S1806306001

7/24/2018Date:

1673 Terra Avenue, Sheridan, Wyoming 82801 ph: (307) 672-8945Inter-Mountain Labs

Your Environmental Monitoring Partner

Alkalinity Sample Type MBLK Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158214BLANK (06/18/18 17:16)

Alkalinity, Total (As CaCO3) 5ND

Alkalinity Sample Type LCS Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158214ATQC (06/18/18 17:03)

595 90 - 110Alkalinity, Total (As CaCO3) 98.75588

Alkalinity Sample Type DUP Units: mg/L

Analyte Ref Samp %RPD %REC % RPD Limits QualRLResult

RunNo: 158214S1806287-002AD (06/18/18 18:20)

341 200.993Alkalinity, Bicarbonate as HCO3 5338

12 2013.4Alkalinity, Carbonate as CO3 513

299 200.00458Alkalinity, Total (As CaCO3) 5299

Conductivity by SM2510B Sample Type MBLK Units: µmhos/cm

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158214BLANK (06/18/18 17:16)

Electrical Conductivity 5ND

Conductivity by SM2510B Sample Type LCS Units: µmhos/cm

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158214ATQC (06/18/18 17:03)

1060 90 - 110Electrical Conductivity 98.751050

Conductivity by SM2510B Sample Type DUP Units: µmhos/cm

Analyte Ref Samp %RPD %REC % RPD Limits QualRLResult

RunNo: 158214S1806301-001AD (06/18/18 20:15)

20 203.37Electrical Conductivity 519

Page 1 of 4

Qualifiers: B Analyte detected in the associated Method Blank E Value above quantitation range

G Analyzed at IML Gillette laboratory H Holding times for preparation or analysis exceeded

J Analyte detected below quantitation limits L Analyzed by another laboratory

ND Not Detected at the Reporting Limit O Outside the Range of Dilutions

R RPD outside accepted recovery limits S Spike Recovery outside accepted recovery limits

X Matrix Effect

Page 27: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Project: Lost Creek Class I

CLIENT: UR-Energy

Work Order: S1806306

ANALYTICAL QC SUMMARY REPORT

Report ID: S1806306001

7/24/2018Date:

1673 Terra Avenue, Sheridan, Wyoming 82801 ph: (307) 672-8945Inter-Mountain Labs

Your Environmental Monitoring Partner

Anions by ION Chromatography Sample Type MBLK Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158267BLK (06/19/18 08:31)

Chloride 1ND

Sulfate 1ND

Anions by ION Chromatography Sample Type LCS Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158267DIONEX 1 (06/19/18 08:44)

30 90 - 110Chloride 103131

150 90 - 110Sulfate 98.81148

Anions by ION Chromatography Sample Type MS Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158267S1806304-003ASPK (06/19/18 15:30)

145 225 80 - 120Chloride 1041375

1090 314 80 - 120Sulfate 10811490

Anions by ION Chromatography Sample Type MSD Units: mg/L

Analyte Conc %RPD %REC % RPD Limits QualRLResult

RunNo: 158267S1806304-003ASPKD (06/19/18 15:43)

145375 200.551Chloride 1021373

10901490 201.51Sulfate 10611470

Radium 226 in Water - Dissolved Sample Type MBLK Units: pCi/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 159376 PrepDate: 06/27/18 0:00 BatchID 14799MB-1876 (07/16/18 23:14)

Radium 226 (Dissolved) 0.2ND

Radium 226 in Water - Dissolved Sample Type LCS Units: pCi/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 159376 PrepDate: 06/27/18 0:00 BatchID 14799LCS-1876 (07/16/18 16:22)

6.95 67.1 - 122Radium 226 (Dissolved) 94.70.26.6

Radium 226 in Water - Dissolved Sample Type MS Units: pCi/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 159376 PrepDate: 06/27/18 0:00 BatchID 14799MS-1876 (07/16/18 16:22)

6.95 0.2 65 - 131Radium 226 (Dissolved) 96.10.26.9

Radium 226 in Water - Dissolved Sample Type MSD Units: pCi/L

Analyte Conc %RPD %REC % RPD Limits QualRLResult

RunNo: 159376 PrepDate: 06/27/18 0:00 BatchID 14799MSD-1877 (07/17/18 12:18)

6.956.9 208.45Radium 226 (Dissolved) 1050.27.5

Page 2 of 4

Qualifiers: B Analyte detected in the associated Method Blank E Value above quantitation range

G Analyzed at IML Gillette laboratory H Holding times for preparation or analysis exceeded

J Analyte detected below quantitation limits L Analyzed by another laboratory

ND Not Detected at the Reporting Limit O Outside the Range of Dilutions

R RPD outside accepted recovery limits S Spike Recovery outside accepted recovery limits

X Matrix Effect

Page 28: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Project: Lost Creek Class I

CLIENT: UR-Energy

Work Order: S1806306

ANALYTICAL QC SUMMARY REPORT

Report ID: S1806306001

7/24/2018Date:

1673 Terra Avenue, Sheridan, Wyoming 82801 ph: (307) 672-8945Inter-Mountain Labs

Your Environmental Monitoring Partner

Solids By SM 2540 Sample Type MBLK Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158648DI (06/18/18 16:44)

Total Dissolved Solids (180) 10ND

Solids By SM 2540 Sample Type LCS Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158648CONTROL (06/18/18 16:45)

226 80 - 110Total Dissolved Solids (180) 95.610220

Solids By SM 2540 Sample Type DUP Units: mg/L

Analyte Ref Samp %RPD %REC % RPD Limits QualRLResult

RunNo: 158648S1806297-010A (06/18/18 16:56)

258000 200.889Total Dissolved Solids (180) 10260000

Sulfide by HACH 8131 Sample Type MBLK Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158255BLANK (06/19/18 07:50)

Sulfide as H2S 0.01ND

Sulfide by HACH 8131 Sample Type LCS Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158255QC (06/19/18 07:50)

0.452 80 - 120Sulfide as H2S 1150.010.52

Sulfide by HACH 8131 Sample Type MS Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158255S1806306-001C (06/19/18 07:51)

0.452 ND 70 - 130Sulfide as H2S 95.20.010.43

Sulfide by HACH 8131 Sample Type MSD Units: mg/L

Analyte Conc %RPD %REC % RPD Limits QualRLResult

RunNo: 158255S1806306-001C (06/19/18 07:51)

0.4520.43 200.491Sulfide as H2S 95.70.010.43

Page 3 of 4

Qualifiers: B Analyte detected in the associated Method Blank E Value above quantitation range

G Analyzed at IML Gillette laboratory H Holding times for preparation or analysis exceeded

J Analyte detected below quantitation limits L Analyzed by another laboratory

ND Not Detected at the Reporting Limit O Outside the Range of Dilutions

R RPD outside accepted recovery limits S Spike Recovery outside accepted recovery limits

X Matrix Effect

Page 29: UIC Class I Quarterly Report for the Lost Creek ISR Project ...Lost Creek ISR Project 1 UIC Class I Quarterly Report 2nd Quarter 2018 1.0 Introduction The period covered by this report

Project: Lost Creek Class I

CLIENT: UR-Energy

Work Order: S1806306

ANALYTICAL QC SUMMARY REPORT

Report ID: S1806306001

7/24/2018Date:

1673 Terra Avenue, Sheridan, Wyoming 82801 ph: (307) 672-8945Inter-Mountain Labs

Your Environmental Monitoring Partner

Total (200.2) Metals by EPA 200.8 - Water Sample Type MBLK Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158400 PrepDate: 06/20/18 7:00 BatchID 14677MB-14677 (06/22/18 03:28)

Arsenic 0.005ND

Selenium 0.005ND

Uranium 0.0003ND

Vanadium 0.02ND

Total (200.2) Metals by EPA 200.8 - Water Sample Type LCS Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158400 PrepDate: 06/20/18 7:00 BatchID 14677LCS-14677 (06/22/18 03:34)

0.2 85 - 115Arsenic 1040.0050.208

0.4 85 - 115Selenium 98.60.0050.395

0.2 85 - 115Uranium 98.20.00030.196

0.2 85 - 115Vanadium 98.80.020.20

Total (200.2) Metals by EPA 200.8 - Water Sample Type MS Units: mg/L

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158400 PrepDate: 06/20/18 7:00 BatchID 14677S1806306-001BS (06/22/18 03:51)

0.2 ND 70 - 130Arsenic 1100.0050.221

0.4 0.068 70 - 130Selenium 1010.0010.472

0.2 1.31 70 - 130Uranium 1170.00031.55

0.2 ND 70 - 130Vanadium 1040.020.21

Total (200.2) Metals by EPA 200.8 - Water Sample Type MSD Units: mg/L

Analyte Conc %RPD %REC % RPD Limits QualRLResult

RunNo: 158400 PrepDate: 06/20/18 7:00 BatchID 14677S1806306-001BMSD (06/22/18 03:57)

0.20.221 201.09Arsenic 1110.0050.223

0.40.472 200.910Selenium 1020.0010.476

0.21.55 200.161Uranium 1180.00031.55

0.20.21 200.525Vanadium 1040.020.21

pH Water by SM 4500 H B Sample Type LCS Units: s.u.

Analyte Spike Ref Samp %REC % Rec Limits QualRLResult

RunNo: 158214ATQC (06/18/18 17:03)

8.6 90 - 110pH 1020.18.8

pH Water by SM 4500 H B Sample Type DUP Units: s.u.

Analyte Ref Samp %RPD %REC % RPD Limits QualRLResult

RunNo: 158214S1806287-002AD (06/18/18 18:20)

8.4 200.571pH 0.18.5

Page 4 of 4

Qualifiers: B Analyte detected in the associated Method Blank E Value above quantitation range

G Analyzed at IML Gillette laboratory H Holding times for preparation or analysis exceeded

J Analyte detected below quantitation limits L Analyzed by another laboratory

ND Not Detected at the Reporting Limit O Outside the Range of Dilutions

R RPD outside accepted recovery limits S Spike Recovery outside accepted recovery limits

X Matrix Effect